tram track accidents
There have been a number of accidents here because of the angle that Shrewsbury Road joins Granville Street, and also the way the tram stop platform juts out into the road forcing cyclists to cross the tracks.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Dexter Johnstone // 1 thread
There have been a number of accidents here because of the angle that Shrewsbury Road joins Granville Street, and also the way the tram stop platform juts out into the road forcing cyclists to cross the tracks.
Created by Dexter Johnstone // 1 thread
There are a lot of accidents around this tram stop:
https://www.google.com/maps/d/edit?mid=zUOBSdPNPOfg.k1ohLkAyXvek&usp=sharing
Because the pavements are narrower here I don't think there is room to provide an off road route around the stop. Therefore an alternative, signed cycle route should be provided to avoid this tram stop.
Created by Dexter Johnstone // 1 thread
Because of the way the tram lines criss-cross the road at Hillsborough corner it is very difficult to cycle through this area safely. There are a lot of accidents here, see map: https://www.google.com/maps/d/edit?mid=zUOBSdPNPOfg.k1ohLkAyXvek
Created by Dexter Johnstone // 1 thread
the off road cycle path along Infirmary Road which currently ends at the Junction with Whitehouse Lane could be extended along Langsett Road on the left hand side of the road as you go away from town towards Hillsborough. At the moment there is just a grass verge from Primrose Hill to Bamford Street.
Created by Dexter Johnstone // 1 thread
There are a lot of accidents around this tram stop - see here for evidence: https://www.google.com/maps/d/edit?mid=zUOBSdPNPOfg.k1ohLkAyXvek&usp=sharing
This is because the platform juts into the road - causing cyclists to have to cross the tracks.
However, there is ample room behind the tram stop platforms on either side of the road for an off road cycle path. Currently there is just a grass verge behind the platforms.
Created by Dexter Johnstone // 1 thread
When cycling towards town along Langsett Road it is difficult/hazardous to get to the off road cycle path on the other side of the road which starts on the corner of Infirmary Road/Whitehouse Lane because you need to cross the tram tracks.
The junction at the top of West Street is dangerous because it is difficult for anyone travelling from Glossop Road onto West Street to cross the lines at a right angle. There is no signage warning of this, although I have seen such signs in other UK cities with trams.
One cyclist I know suffered a badly damaged shoulder which needed a metal plate to repair it, and resulted in long term discomfort, loss of mobility and strength.
I revisited the spot yesterday and found that of the 4 lines I could get some kind of angle on 3, but that left me 'between the lines' going down West St with no way to escape. Much to the chagrin of the Ford Transit driver following me!
Created by Roxanne (CEO) // 1 thread
Erection of 23 residential units (use class C3) to be arranged in two blocks comprising a mix of studio and 1 & 2 bed flats including 40% affordable housing, two car parking spaces, cycle parking and associated hard and soft landscaping.
149B Histon Road Cambridge Cambridgeshire CB4 3JD
Application reference : 15/1369/FUL
DETAILS:
23 residential apartment units comprising 22 x 1-bed and studio units and 1 x 2 bed unit
Transport statement:
There will be no onsite car parking
There will be 26 cycle parking spaces (the minimum requirement is 24)
States (in paragraph 6.3) that the cycle parking will meet the requirements from the local plan 2006:
>Cycle racks or stands should conform to the design and dimension requirements.
>For residential, cycle parking should be within a covered lockable enclosure. The cycle parking should be accessible and convenient to use.
>All cycle parking should be designed to minimise conflict between cycles and motor vehicles.
There are no details or drawings of the proposed cycle parking provision in the transport statement.
Floor Plans:
The floor plans for A and B indicate there will be two enclosed cycle store areas, one on the ground floor of each block. There are no details of what type of racks will be used. Although the drawing indicates sheffield stands (8 for block A = 16 cycles) (5 for block B = 10 cycles).
Created by Richard Jennings // 1 thread
Norfolk County Council with Norwich City Council are proposing changes to Westlegate, St Stephens Street, Golden Ball Street, Farmers Avenue, Ber Street and Cattle Market Street that include closing some streets to motor traffic and making Golden Ball Street two way.
Generally access for people cycling will be improved in this area and motor traffic reduced. We are considering how well the proposed designs meet the needs of those cycling through the area.
Consultation closed on 27 July 2015.
Created by JonathanF // 1 thread
Proposal from Sainsbury's to build a new petrol filling station at their Fallowfield store, which is accessed from Wilmslow Road at a junction shared with Fallowfield Loop cycle traffic.
MCC planning app: 109301/FO/2015/S1 or PP-04261580
http://pa.manchester.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=NQHVVCBC6K000
Travel - Transport Survey: http://www.publicaccess.manchester.gov.uk/associateddocs/Default1.aspx?109301-tts-0001.pdf
Martin Lucas-Smith // 1 thread
The following planning application has been submitted. This may be an opportunity to raise through the planning system the inappropriateness that vehicles can be driven into the site but not people cannot cycle (I believe). As the planning application includes public access to the new facilities, the ability for people to cycle direct to the buildings is relevant to the public.
---
Demolition of old chorister block and netball court and erection of new sports hall, gym/studio and changing rooms including new pedestrian access and landscaping.
Kings College School West Road Cambridge Cambridgeshire CB3 9DN
Application reference : 15/1309/FUL
Created by Shaun McDonald // 1 thread
Ipswich Borough Council are currently consulting on the Cycling Supplementary Planning Document (SPD), and are in the early Call for Ideas stage.
"
Cycling Strategy Supplementary Planning Document – Call for Ideas
The Council is preparing a Cycling Strategy Supplementary Planning Document (SPD), as set out in its Local Development Scheme (8th Edition, September 2014). The SPD will provide additional guidance to policies contained in the Ipswich Local Plan (currently the
Core Strategy and Policies development plan document 2011 and remaining saved policies of the Ipswich Local Plan 1997). Further information on the Local Plan can be found at www.ipswich.gov.uk/localplan. The SPD will not set new policies but will be a material consideration in taking decisions on planning applications. The Council has already adopted a number of SPDs which can be found at www.ipswich.gov.uk/content/current-and- proposed-supplementary-planning-documents.
The scope of the Cycling Strategy SPD relates to providing guidance on the provision of cycling infrastructure as part of new development and will also provide an opportunity to identify potential wider improvements to cycling infrastructure across the Borough. Cycling infrastructure in this respect not only relates to places where people cycle but also to provision for parking and storing cycles.
At this stage we are asking for ideas on what the SPD should contain. This consultation is being carried out under Regulation 12 of the Town and Country Planning (Local Planning) (England) Regulations 2012. Following this initial Call for Ideas consultation, there will be a public consultation on the draft SPD which is anticipated to take place during Autumn 2015.
We would appreciate any ideas you may have on the content of the SPD – the questions below may act as useful prompts.
What measures should be taken to encourage cycling in and around new developments?
What measures should be taken to encourage cycling throughout the Borough?
Are you aware of any particular issues which would currently act to discourage
cycling in the Borough?
Please send us any comments by 11:45pm on Monday 17th August 2015. A comments form is available on our website at www.ipswich.gov.uk/consultations. If you would like further information, please contact Felicia Blake on 01473 432019.
As part of the production of the SPD the Council is also looking for school / college pupils’ and their parents’ views on cycling to school – a short online survey is available at www.ipswich.gov.uk/consultations.
"
From https://www.ipswich.gov.uk/sites/default/files/cycling_strategy_spd_call_for_ideas_-_june_2015.pdf
Created by Rosie Downes // 0 threads
Created by Roxanne (CEO) // 1 thread
We have been invited by the City Council to join a meeting to discuss lighting for green spaces. Is this something we would like to partake in and if so who is the best representative for the Campaign.
The draft agenda is:
· Introductions
· Where we are now
· What we want to achieve
· Discussion on Lighting for Green Spaces
· AOB
The meeting will be held at the Guildhall in Cambridge, final details to be confirmed once the date and agenda are agreed.
Created by Sam Webster // 1 thread
Surprised to see that somebody has put up barriers restricting the width of the bus/cycle path so that there's not enough room for a bus to pass a bike. Dangerous enough to call Police?
Created by Rohan Wilson // 1 thread
15/1227/FUL | Erection of a new 18,000sqm research laboratory building (Use Class B1 (b)) and associated works. | Puddicombe Way Cambridge
Site Plan shows "Cycle Storage" adjacent to the hotel? site to the east.
Red line extending to Robinson Way (north of Francis Crick roundabout), Puddicombe Way and including half the Forum area suggests intention to secure good transport links.
Essential to remedy poor walking/cycling layout at foot of busway/cycleway bridge, and secure easy access to (across?) the bus/cycleway's extension to The Forum, where the intention may be to continue cycleway on southern side only of busway.
Standard Consultation Expiry Date Thu 06 Aug 2015
Created by Chris Peck // 2 threads
Proposals from the developers, the Rutland Group, for 1,800 homes and more businesses on Dunsfold aerodrome.
The proposal says the developers wish "To encourage walking, cycling and use of bus services, and make internal car use unnecessary"
http://www.dunsfoldpark.com/files/dunsfold-park-1-july-exhibition-boards.pdf
Created by Lizzie // 1 thread
Protected space for cycling Eastbound along Clyde Gateway, it's marked along the footway, too narrow but not bad. Then reach the junction with Dunn St and the cycle path joins the carriageway and immediately in conflict with a huge sweeping left turn filter lane. This is terrible, dangerous design.
Created by Lizzie // 1 thread
Glasgow City Council have confirmed that Polmadie Bridge is to be demolished as it cannot be repaired. This imperfect but important link from southside has been severed; makes a mockery of Commonwealth games legacy routes.
Created by Lizzie // 0 threads
More cycle parking needed: the racks at the entrance - as limited as it is - overflowing with bikes.
Richard G // 1 thread
the junction of Consort Avenue and the old service road alongside Hauxton Road seems to have been designed specially to hold up cyclists
It has two button controlled crossings, over a lightly used road, and I would expect it to be ignored by every single cyclist.
A simple, "Give Way" should be perfectly sufficient I would have thought
Was any comment made when this was designed/proposed?
Martin Lucas-Smith // 1 thread
The County Council is proposing to power off street lights overnight for most residential streets in Cambridge.
http://democracy.cambridge.gov.uk/ieIssueDetails.aspx?IId=15022&PlanId=0&Opt=3#AI14389
Created by Adam Edwards // 1 thread
A possible route from Welham Green to the University of Hertfordshire and then to the Hatfield business park via the University park and ride and possible sports ground at Angerland Common, Hatfield.
The route would use Dellsome Lane, if vegetation cleared, a short new route accross Angerland Common, the traffic lights at the park and ride to cross South Way and then shared use of the Roehyde Way pavement to join up with the existing cycle path between Colney Heath and the University.
Created by Adam Edwards // 1 thread
In 1884 the 18 year old Beatrix Potter stayed at Bush Hall, fished in the Lea and painted a Hertfordshire Farm which looks remarkably like Mill Green, home of the WHBC museum.
WelHatCycling therefore proposes a leisure cycling route from Stanborough Park alongside the river Lea past Bush Hall to Mill Green.
Information on Beatrix Potter's visit to Hatfield can be found here:
http://www.ourhatfield.org.uk/page_id__209.aspx
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Dawes Jaguar // 1 thread
A cycle path built here would complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by North Devon Cycling Forum // 0 threads
Two-way traffic for cyclists on Barbican Terrace-Litchdon Street, allowing to cycle from the Strand to Summerland Street
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/04969/FUL: Three storey front and rear extensions, alterations to the office building, replacement cycle store, new plant compound and installation of EV charging points.
Babbage House, Castle Park, Cambridge, CB3 0AT
Created by Rogerdodge // 1 thread
Kingston Council have opened the Consultation on this route, it also includes Ewell Rd - see separate Map. Open until 17th November
Created by Adam Edwards // 1 thread
Hatfield has the makings of a good cycle path network. However, the cycle path from the station to the town centre ends at the west end of French Horn Lane and fails to then connect to the University to the south or the Business Park (EE HQ, etc) to the west.
WelHatCycling are lobbying (most recently our MP Grant Shapps) to get this missing link filled. The route is shown on the map and is entirely unobstructed. The key work is a toucan crossing of Queensway, needed not only for the cycle route, but also to open up the north east end of the town centre to passing trade from people cycling and walking via the town centre.
Created by David Butler // 1 thread
Consultation of cycle lanes and junction changes by Manchester City Council
Created by Charlie Halliday // 1 thread
Proposed off-road cycle path following the A323, Norris Hill Road, to link Fleet with the existing cycle-path from Norris Bridge towards the centre of Farnborough.
It would enable cyclists to avoid Norris Hill Road, an unlit road with speed limit of 60 mph. Once built it would be possible to cycle from Fleet to Farnborough without cycling on roads.
This is in the Fleet Town Access Plan ref. PC9
Created by Marcus Howarth // 1 thread
see https://consultations.tfl.gov.uk/trams/sutton-link/?cid=sutton-link
Here's the overview from TFL:
Overview
We are consulting on proposals for a new, direct and quicker transport link between Sutton and Merton. We have called this the Sutton Link.
The Sutton Link would create a high-capacity route for people travelling between Sutton town centre and Merton using zero-emission vehicles. It would connect with other major transport services into central London and across south London, including National Rail, London Underground, existing tram and bus services. It would make journeys by public transport quicker and more attractive, and reduce the need for trips by private car.
Many of the neighbourhoods along the proposed routes have limited public transport options. The Sutton Link would support new homes being built and would improve access to jobs, services, major transport hubs and leisure opportunities across both boroughs and beyond.
Our work is at a stage where we would like to know your views about three potential routes. We are considering a tram or ‘bus rapid transit’ (BRT) for the Sutton Link and would also like to know your views on this.
BRT is similar to a tram but runs on road segregated from traffic where possible, not on rails, and carries fewer people in each vehicle. A full explanation is included below in the section titled ‘About trams and bus rapid transit’.
From LCC -
general principles would be ensure this doesn’t negatively impact cycle routes, that there are good routes to the stations/stops, that any places where cyclists will be crossing tracks are designed carefully with latest materials to avoid tramlining incidents, that the space comes from private car lanes.
Created by Shaun McDonald // 1 thread
The roundabout at the south end of Claydon under the A14 is pretty horrible for pedestrians and cyclists. It would be extremely useful if this could be upgraded to a Dutch style roundabout with:
* tighter entrances and exits will slow down vehicles to a safer speed while cyclists and pedestrians are around. The current dimensions are only ok when there are no cyclists or pedestrians around and it's safe for motors to go fast.
* single lane entrances and exit will make is easier to cross each arm. There would be no zig zag in the island.
* cycle track with separate pavement for pedestrians outside the roundabout, thus preventing conflict between the 3 modes of transport.
* cycle track crossing at 90 degrees to the road to aid visibility between different modes of transport.
Created by Stephan Matthiesen // 0 threads
The whole area is a barrier, there are no connections between North Bridge, St Andrews Sq/George St and top of Leith Walk without lot of bus/taxi/confused private car drivers and cyclist-blender junctions.
Created by Stephan Matthiesen // 0 threads
Road was converted to one-way recently, forcing cyclists from Kings Buildings out onto busy West Mains Rd where previously they could cycle within the campus to the toucan at the NE corner.
Created by Dominic Fee // 1 thread
East-West Cycle Superhighway Phase 2 from Paddington to Acton
Created by Sam Saunders // 0 threads
A twenty metre stretch of advisory cycle lane at the end of Whiteladies Road, from a zebra crossing to its junction with Queens Road, encourages cyclists to take a position near to the curb as they enter the and leave the junction. This puts them exposed to frequent buses turning immediately left into Queens Avenue and in a vulnerable position from which to continue a journey south west towards Park Street or Park Row.
Created by Jim Chisholm // 3 threads
AstraZeneca have announced they will by 2016 move to the Biomedical Campus on the Addenbrooke's site. We need to engage with them.
Created by Simon Nuttall // 3 threads
Talk by local historian about cycling in Cambridge
Created by Steven Moseley // 6 threads
Of and relating to Colchester Borough Council.
Created by Stephan Matthiesen // 0 threads
Contraflow bike lane in Salisbury Rd for easier access from Southside to Commonwealth Pool, Pollock Halls and Holyrood Park.
Created by aSemy // 0 threads
A tree on the side of East side of Whiteladies road (next to HSBC) has a notice stating that the tree will be removed and replanted. The tree is on the very wide pavement right next to the road, and the road is not wide enough for vehicles and cyclists: a pinch point.
There is clearly enough space on Whiteladies road for a segregated cycle lane. It is a popular route used often by heavy traffic. With enough shifting of road lanes there's even enough room for an uphill cycle lane.
Replanting the tree away from the road would remove one small obstacle and show evidence that BCC is looking towards improving cycling in the long run.
Created by Simon Still // 1 thread
The Local Implementation Plan (LIP) sits underneath the Local Plan and sets out our commitments to make the changes outlined in the Local Plan a reality.
This LIP also identifies how the London Borough of Redbridge will work with Transport for London (TfL) towards achieving the Mayor's Transport Strategy goals of:
Created by Shaun McDonald // 1 thread
The "cyclist priority route" on NCN1, Felixstowe Road obviously isn't that subjectively safe as I've seen someone cycling on the pavement southbound rather than on the road.
http://www.youtube.com/watch?v=DItGP0Lt200 is a video of the road from another occasion.
Created by Dan // 1 thread
Traffic lights will not change for cyclists when on the sensor (at night).
Kate Ravilious // 1 thread
no cyclist ever uses this junction as the engineers intended. It doesn't function well and is dangerous. Needs reviewing.
Well lane has been blocked to through motor traffic creating a nice quietway for walking and cycling.
However where it meets Percival Road a dropped kerb has not been installed meaning that cycles, pushchairs and wheelchairs have to bump down to cross Percival.
A couple of dropped kerbs and perhaps a parking restriction would really open this up as a nice cycle quietway.
Bike users can turn right and cycle contra flow using a very narrow on road cycle path. Motorised traffic cannot do this, Park Road is one way to motorised traffic. Traveling down Queens Road there is no signage to suggest that bike users can turn right. Once into Park
Road there is awkward raised 'island' to manoeuvre around. Suggest signage saying right turn for bikes only and reconsider design of Island to make it less of an obstacle.
Created by Jean Dollimore // 1 thread
Fleet Road is a one-way street with heavy motor traffic and no protected cycle infrastructure. This means that people cycling through the area face unpleasant interactions with motor vehicles as well as needing to make diversions to reach destinations in the area,