Unlit post hazard
Where the path splits there is a marker post that is completely invisible at night. It should be fitted with reflective material or removed.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Tim Steele // 0 threads
Where the path splits there is a marker post that is completely invisible at night. It should be fitted with reflective material or removed.
As the bridleway crosses Milton Road, it swaps sides of the busway, so most pedestrians and cyclists want to cross diagonally. However the toucan crossing only protects people crossing Milton Road. It doesn't stop busway traffic.
This is confusing and dangerous. When the road traffic stops at red lights, and the Toucan crossing turns green, it feels very safe to cross the busway. Yet buses can come from three directions (busway west, busway east, Milton Road south) at speeds of 30 mph.
Cyclists in particular are tempted to cross diagonally from north west to south east. Last week I saw a near accident.
Pedestrians and cyclists at the toucan crossing where the busway meets Station Road, Histon have to wait a long time for the lights to change even if there is zero bus or road traffic.
This seems inconsistent with Highway Code rule H1 about the hierarchy of road users. Pedestrians should have priority over non-existent buses!
Created by donald mccuaig // 1 thread
There are no give way markers where Max.Railway Path joins the Garroch Loaning cycle path
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
Campaigns to improve active travel provision in East Cambridgeshire.
Created by Josh Grantham // 1 thread
22/02776/FUL | Erection of 3no 2bed units providing accommodation for use by Pembroke College, as well as alterations/refurbishment of existing Coach House to rear of 32 Panton Street and associated landscape works/vehicle and cycle parking, and bins storage, including the front gardens of nos 32-40 Panton Street. | The Coach House Rear Of 32 Panton Street Cambridge Cambridgeshire CB2 1HP
Created by Josh Grantham // 1 thread
unacceptable cycle parking arrangement at dwelling house to sui generis large HMO (9no. bedrooms / 9no. occupants). | 11 Darwin Drive Cambridge Cambridgeshire CB4 3HQ.
Created by Nick Flynn // 1 thread
Hello
This is my application for a cycle shed on my driveway.
Unfortunately I have received an objection from a neighbour.
Created by Josh Grantham // 1 thread
Outline application for the development of up to 125 dwellings, with all matters reserved except for access. | Land East Of Long Lane Fowlmere SG8 7TG
Created by Josh Grantham // 1 thread
Demolition of existing house and erection of eight flats and one maisonette (net eight new homes) together with ancillary works | 611 Newmarket Road Cambridge Cambridgeshire CB5 8PA
Created by Flic // 1 thread
New local supermarket, day nursery, community centre and retail units being planned in the new estate in Ely. Lack of segregated/marked cycle access to the only community facilities in the North of the city, and by the looks of it not much cycle parking either. There is already a primary school and care home in the area and any cycle access provided is on shared paths.
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
The updated Manual for Streets is to be published on 1 July 2022.
Created by Roxanne (CEO) // 1 thread
Proposals for a new development on Fanshaw Road have been approved. A planning application is pending.
Created by Gabriel Bienzobas // 1 thread
Proposed temporary installation of art structures than in some cases will create conflict and cause narrowing at certain points in the Cam tow path towards Waterbeach.
Created by Tim Ward // 1 thread
Google Maps suggests that Fen Rivers Way from Bottisham Lock to the A1123 is cyclable. It isn't.
Anon // 2 threads
Cambridgeshire County Council, June 2022 (their web page): "A programme of Active Travel (Tranche 2) projects, to encourage walking and cycling across Cambridgeshire, is set to be delivered in the next few months. The Tranche 2 schemes will be installed on a temporary basis for up to 18 months."
The first part of the Tranche 2 delivery programme, to be delivered between June and August, includes the following active travel schemes (heavily summarised):
(And also some cycle parking around the county, in Buckden, Cottenham, Ely, Haddenham, Huntingdon, Little Thetford, Littleport, Melbourn, Mepal, Ramsey, St Ives, St Neots, Stretham, Whittlesey, Wisbech, and Witcham.)
Nigel // 1 thread
In June 2022 the owners of the Beehive Centre are holding a consultation on the "redevelopment of the Beehive Centre and the land surrounding the site"
Created by Josh Grantham // 1 thread
Demolition of nursery building, part of outbuildings; partial demolition, refurbishment and extension of other existing college buildings and the erection of four accommodation blocks containing 60 rooms for postgraduate students; associated landscaping, car and cycle parking, refuse and other storage and new electricity substation within outbuildings. | Owlstone Croft Owlstone Road Cambridge Cambridgeshire CB3 9JJ
Created by Josh Grantham // 1 thread
Infill of existing carport area and garage conversion to create home office/guest accomodation. | 51A Highworth Avenue Cambridge Cambridgeshire CB4 2BQ
Created by Josh Grantham // 2 threads
Residential development containing seven dwellings along with access, car parking, landscaping and associated infrastructure
Created by Josh Grantham // 1 thread
Erection of 3 dwellings following the partial demolition of the existing outbuildings. | 70 Water Street Cambridge Cambridgeshire CB4 1PA
Created by Alice Woods // 0 threads
Following forest trails north from Glentrool leads to a gate with a wayfinder with an arrow pointing directly ahead. The gate ahead is locked shut with a bike lock. Two more gates were locked in this way in the next 400m along the trail, blocking access to the no.7 cycle route from this end of the forest.
Created by Josh Grantham // 1 thread
Erection of 6no (1 and 2bed) dwellings with associated infrastructure following demolition of existing dwelling. | 72 High Street Cherry Hinton Cambridge Cambridgeshire CB1 9HZ
Created by Josh Grantham // 1 thread
Change of use from Guest House to large 12bed House in Multiple Occupation (Sui Generis Use Class)
Created by Josh Grantham // 1 thread
Erection of office building and associated infrastructure and works following demolition of existing buildings and structures
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Martin Lucas-Smith // 3 threads
Elizabeth Way is wide. Currently cycling is permitted on the pavements.
This should be changed to have dutch-style cycle tracks, achieved by narrowing the road slightly and narrowing the pavements (which are very wide and not heavily trafficked, so this would not disadvantage pedestrians).
This would give a safer cycling environment, and improve the pedestrian experience.
Created by Richenda // 1 thread
Apparently TfL commissioned "...to explore the opportunity of a pedestrian river crossing ....". They may not think bikes should also be included, but they should!
http://www.telegraph.co.uk/luxury/travel/4162/a-garden-bridge-across-the-thames.html
http://www.gardenbridgetrust.org/index.html
Created by Andrew Woodward // 0 threads
Railway footbridge should have a ramp/trough added to make it easier for cyclists to cross the railway. This would then create a quiet north/south route to Marshgate school as an alternative to Manor Road.
Created by TonyBeaumont // 1 thread
Out side the royal orthopaedic hospital up top 30 cars are parked in the cycle lane every day. Cyclists are forced out into the traffic lane of the A38 over a distance of about 1/4 mile.
Created by HVS // 3 threads
The A5117 at this point has some sections of non-protected cycle lane, but they are not continuous, and they disappear at a number of pinch points. The road carries a lot of very fast moving heavy traffic, and is dangerous and unpleasant to cycle on. It would be a useful route for people travelling by bike to or from Stanlow Refinery, Cheshire Oaks, the University of Chester at Thornton Science Park, and Ince & Elton villages, but is currently only used by a tiny number of very brave and confident cyclists. This situation could be improved by making the cycle lane continuous along the whole route.
Created by Andrew Woodward // 0 threads
Pinch-point at zebra crossing where cyclists are forced to share space with traffic that is often speeding. Cars try to squeeze past cyclists or brake suddenly.
Created by HankChief // 0 threads
There needs to be a ramped access to the school grounds at this point to replace or bypass the 6 steps currently there.
This would not only improve access to the school but also improve connection between the East Craigs Path Network and North Gyle and the only toucan crossing on the A8 in Edinburgh on Dechmont Road.
Created by Fraser Stephens // 1 thread
RAISED AT PUBLIC MEETING 10-04-2014
The infamous missing link in the Llanfoist-Brynmawr cycle path (route 46) is a huge barrier to its safe use by children as well as those who find the steep section of the diversion route impossible to climb.
The service entrance to the motorway services now has priority over the shared use path which runs parallel to the main road.
I have contacted both Hampshire County Council and Test Valley Borough Council about this change in priorities, but neither has responded beyond a cursory "we have received your email".
This is yet another example of through traffic being de-prioritised simply because it is on a cycle (or shared) path, rather than on a road.
Created by Andrew Woodward // 0 threads
Pinch point outside Courtlands on Sheen Road. Despite resurfacing, pinch point has not been addressed. Because of the poor road layout vehicles frequently encroach into the cycle lane. At off peak times the wide road encourages speeding - vehicles often approach this pinch point at 40mph.
Created by Frenchie // 0 threads
This is one of the prime candidate for a cycle contraflow in Newcastle City Centre. Currently one way for all traffic from Percy Street to Strawberry place. Allowing cyclists down from Strawberry Place to Percy Street would improve permeability and connectivity for cyclists. Note: not a lot of traffic, space not an issue, short uphill section so speeding not an issue.
Created by Shaun McDonald // 0 threads
The entrance to Dock Street should be turned into a continuous footway with pedestrian and cyclist priority over turning vehicles akin to this Danish junction: http://www.youtube.com/watch?v=QcnmLU1ClTo
This would improve sight lines for pedestrians too as the dropped kerbs are away from the junction, and it would also go with the pedestrian desire line as many tend to cross closer to the junction than the dropped kerbs. It would also slow down the vehicles entering the narrow street.
Created by Ned Harrison // 1 thread
Holywells Park has a section of cycle route 51 running through it, linking South East Ipswich to the centre with a pleasant and safe route down to the waterfront.
During Winter, the park is closed at dusk, sometimes as early as 4, meaning that just when the roads are most dangerous (dark and wet) cyclists are forced onto steep and busy routes either along Cliff Lane or up Bishops Hill.
The closures are largely at the request of the Park Friends group. I've spoken to them, and their concerns seem to be largely about what might go on after dark. It's not clear that there is any evidence for this, nor that the current situation of locking the main gates but leaving others would do anything to deter misbehaviour.
Keeping it open as a cycle route would ensure a legitimate presence in the park, and help provide less confident cyclists in the area with a safe route to and from town.
I'd propose either locking later, or for a trial period leaving the park unlocked.
Created by Rosalind Lund // 1 thread
further to the piece in newsletter 128, I wonder if any thought has been given to the difficulty of turning right into Emmanuel Street if you are coming towards the town centre from St Andrew's Street? We go fairly often to the Arts Cinema and this is the obvious way for us to go home, but it is impossible to turn right on the correct side of the bollard at present as it is designed only for left turning cycles coming out of town. There is, however, nothing to suggest that such a right turn is illegal.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by chdot // 1 thread
Longstanding issue about 'optimum' design, particularly to reduce conflict caused by vehicles turning from Teviot Pl due to signal phases.
Over the past couple of years of regularly cycling between Waterbeach and Cambridge on NCN11 I have noticed that the path between Waterbeach and Baits Bite Lock is in really bad repair and is getting gradually worse. I have been in touch with the council to ask them to repair it, and they told me that as far as they are concerned the path is only a footpath, and they have no obligation to maintain it to a standard suitable for bikes. Sustrans tells me they have no responsibility for maintaining that section of the route, and that the council should be responsible for it.
It seems absurd to allow the path to fall into total disrepair, but at the moment it doesn't seem like anyone recognises any obligation for its upkeep.
I am happy to go out occasionally with some secateurs and chop off the more annoying bits of greenery, but the path needs resurfacing and that feels a bit beyond me!
Does anyone have any experience with this sort of problem? Have they come across it on other sections of the NCN?
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Created by Shaun McDonald // 1 thread
It would be much safer to have cyclist priority on the slip roads here as is done in The Netherlands http://www.flickr.com/photos/smsm1/10046288016/ , or even the following example from Britain: http://www.cycling-embassy.org.uk/photos/good-cycling-facility-of-the-week/good-cycling-facility-of-the-week-14th-november-2013-0
The slip roads also need to be narrowed to slow motor vehicle speeds as does the turning radii of the roundabout.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Created by Andrew Woodward // 1 thread
Providing a cycle-friendly surface on the path from Meadlands Drive to the road serving the German School and the Polo Club would improve cycling access to Strathmore and Russell Schools and help provide a better quiet route from Meadlands Drive area towards Richmond - providing more/better options for avoiding the busy Petersham Road.
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
Meeting with Leeds City Council to discuss possible remedial works due to high casualty rates.
Created by Shaun McDonald // 1 thread
Many cyclists won't cycle to Harwich International from the Ipswich direction due to the roads. There really should be a high quality cycle route for this to continue the cycle journey from The Netherlands, where you can ride of the ferry and on to quality cycle infrastructure. The fact people choose the train is not a good sign.
This issue is the overall goal, and needs to be broken down into smaller sub issues of smaller more specific projects or improvements that can work towards this goal.