211236_RiversideCentre
Application to determine if prior approval is required for a proposed change of use from offices (B1) to dwellinghouses (C3)
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Steven Moseley // 1 thread
Application to determine if prior approval is required for a proposed change of use from offices (B1) to dwellinghouses (C3)
Tom McKeown // 1 thread
Access to Impington Village College has not been looked at in any detail since the college opened in 1939. What issues are there for cycling to the college? What opportunities are there to make improvements?
Created by Jean Dollimore // 1 thread
The main proposal is for a new Zebra crossing outside the Harmood Children’s Centre
The new zebra will be 6.5m wide and replaces a 12+ m wide crossing with a pedestrian island. The consultation says: “Reducing the carriageway width can also have a traffic calming effect.
Space will also be provided for rain gardens (SUDs) and cycle parking for 6 to 8 bikes
The other proposal is to provide a temporary bus stand for the 27 bus during the Morrisons development and to relocate the affected parking bays. The new bus stand will be beside the Denton residential block at the northern end of Ferdinand Street.
Created by Roxanne (CEO) // 1 thread
https://www.cambridgesciencepark.co.uk/cambridge-science-park-north/
Trinity College has begun to consult on a proposal to transform a parcel of adjacent agricultural land to the east of Histon and Impington into Cambridge Science Park North. The proposal is at early stages with a submission having been made into the Call for Sites process which forms part of the Greater Cambridge local plan
Science Park North will be created on land which is currently used for farming, but is located close to the Park and Ride and the waste transfer site which are both accessed from the A10.
It is located close to the Area Action Plan land to the east and the Project Team is working closely with AAP Members on a number of areas which are of mutual interest. It is anticipated that the timescale for the AAP process will match the development timescale for the Greater Cambridge Local Plan and the CSP North timetable is planned to complement this.
CSP North is also located close to Cambridge Regional College, which sits between the existing science park and the proposed expansion land. Discussions are underway with CRC with the ambition of providing facilities for greater collaboration in the future which could be in the form of expansion but also education and work apprenticeship schemes for future students of the CRC.
The transport strategy for Cambridge Science Park North is targeted at complementing the improvement plans for the existing science park. The initial aim is to ensure that there is no increase in car use across the two sites, with a medium and long-term target of reducing car usage across the two sites completely.
The early ideas are to provide a consolidated space for parking which will serve both Science Park sites, which will be linked to a mobility hub providing pedestrian, cycling, autonomous vehicle and sustainable mass transit facilities for onward travel. These will utilise existing infrastructure such as Mereway Cycle Route and the Guided Busway as well as proposed infrastructure such as The CAM.
These proposals will improve access to the whole of Cambridge, reducing current traffic on the Milton Road by providing a hub serving the wider AAP area including access to Cambridge North Station.
Created by Anna Williams – Head of Campaigns & Engagement // 3 threads
Cambridgeshire communities must work together for a green recovery from Covid-19 and to play our part in reducing carbon emissions. Zero Carbon Streets is the campaign that brings local groups together to do this.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01609/FUL | Demolition of existing HMO and construction of 7 no. replacement 1 bedroom apartments and 1 no. restaurant | 60 Mill Road Cambridge CB1 2AS
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01764/FUL | Conversion of 3bed dwelling to 2no. 1bed flats and 1no. 2bed flat, following a part two storey side and rear and part single storey rear extensions. | 45 Kings Hedges Road Cambridge CB4 2QE
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01697/FUL | Retrospective change of use (Use Class C3 or C4) to a large house of multiple occupation (Use Class Sui Generis). | 40 Hanson Court Cambridge CB4 2SE
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/02148/PRI03O | Prior approval for a change of Use from Offices (Class B1(a)) to 1 No. Dwellinghouse (Class C3). | Anglia Accommodation Services 190 Green End Road Cambridge Cambridgeshire CB4 1RN
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01791/FUL | Construction of a 1 bed bungalow | Land Rear Of 190 Green End Road Cambridge Cambridgeshire
Created by Steven Moseley // 1 thread
Application for approval of reserved matters following outline approval 201309: Demolition of existing structures & redevelopment to construct 4 No. three bed residential dwellings (Class C3) with associated garages, car parking & access. All matters r
Created by Steven Moseley // 1 thread
Erection of new dwelling (previously approved under 172115)
Created by Steven Moseley // 1 thread
he Essex County Council (St Nicholas Street, Colchester) (One Way) Order 202*Statement of ReasonsSummary of the LocationSt Nicholas Street, Colchester, illustrated on drawingref. 169_HAT_GA_110 Rev. B.Reasons for the Proposed ChangesThis one-way restriction is part of a wider public realm improvement project proposed by Colchester Borough Council for the area around St Nicholas Square. For details of the proposed development, visit their webpage https://www.colchester.gov.uk/info/cbc-article/?id=KA-035711Benefits of the Proposed ChangesTo enhance the public realm in St Nicholas Square, and minimise carriageway to create enhanced footways and space availablefor outdoor seating. The key aims of the St Nicholas Square project are to:• Create a more pedestrian friendly environment, less dominated by car anddelivery traffic• Create more outdoor seating space for cafés and restaurants to spill out• Createspace for market stalls and events to happen• Ensure the space is accessible to all usersA number of local Councillors have been supportive of the scheme and the overall ambition to create a more pedestrian friendly and open square, which supports local businesses through the creation of more external seating areas, more space for markets and events, and increased footfall in the long term.CBC have secured central government funding enabling the project to move forward.
sound+fury // 1 thread
It's unclear if there is any cycle parking related to this attraction.
Created by Rosamund Humphrey (Admin Officer) // 2 threads
21/01625/FUL | Refurbishment, reconfiguration and extension of the existing chapel building to create an improved day nursery facility with external play area and 13 residential apartments (following part demolition), together with associated landscaping and infrastructure | Church Hall 6A Chapel Street Cambridge Cambridgeshire CB4 1DY
Created by Steven Moseley // 1 thread
Proposed Change of Use From Stables to Medical Clinic (class E) & Refurbishment of Structure. Clinic to be used as a private GP clinic and for other allied medical professionals like Physiotherapy. Existing vehicular access to be upgraded.
Created by Steven Moseley // 1 thread
Change of use of stable/outbuildings/annexe to form a single dwelling
Created by Steven Moseley // 1 thread
Erection of four bedroom detached house
Created by Steven Moseley // 1 thread
Erection of 2 No detached single storey dwellings with attached garages, existing dwelling and garage to be demolished and alterationsto existing vehicular access
Created by Steven Moseley // 1 thread
Redevelopment of site to residential comprising of 9 flats.
Created by Roxanne (CEO) // 1 thread
This site has been redeveloped from industrial to commercial use (office and leisure/food).
Reports on Twitter suggest insufficient cycle parking.
Planning application:
Site website:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01330/FUL | Conversion and extensions to provide 9 No. flats (Use Class C3) along with access, cycle parking and associated infrastructure | 4 Highworth Avenue Cambridge Cambridgeshire CB4 2BG
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01393/FUL | Construction of a drop-off/pick-up bay located along Gilbert Road to assist taxi movements associated with the aparthotel | Gilbert Road Adjacent To Aparthotel 33A Milton Road Cambridge Cambridgeshire CB4 1UZ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01402/FUL | Conversion of the existing warden's office to a bedroom with en-suite, adaption of the existing car park to increase capacity with 4 additional spaces, and installation of a new Bike Shelter. | Ely Place Monkswell Cambridge CB2 9SS
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01279/FUL | Demolition of existing garage and creation of a one bedroom dwelling including outdoor amenity space and primary pedestrian access from Cromwell Road | Land At 64 Cromwell Road Cambridge CB1 3EG
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Martin Lucas-Smith // 3 threads
Elizabeth Way is wide. Currently cycling is permitted on the pavements.
This should be changed to have dutch-style cycle tracks, achieved by narrowing the road slightly and narrowing the pavements (which are very wide and not heavily trafficked, so this would not disadvantage pedestrians).
This would give a safer cycling environment, and improve the pedestrian experience.
Created by Richenda // 1 thread
Apparently TfL commissioned "...to explore the opportunity of a pedestrian river crossing ....". They may not think bikes should also be included, but they should!
http://www.telegraph.co.uk/luxury/travel/4162/a-garden-bridge-across-the-thames.html
http://www.gardenbridgetrust.org/index.html
Created by Andrew Woodward // 0 threads
Railway footbridge should have a ramp/trough added to make it easier for cyclists to cross the railway. This would then create a quiet north/south route to Marshgate school as an alternative to Manor Road.
Created by TonyBeaumont // 1 thread
Out side the royal orthopaedic hospital up top 30 cars are parked in the cycle lane every day. Cyclists are forced out into the traffic lane of the A38 over a distance of about 1/4 mile.
Created by HVS // 3 threads
The A5117 at this point has some sections of non-protected cycle lane, but they are not continuous, and they disappear at a number of pinch points. The road carries a lot of very fast moving heavy traffic, and is dangerous and unpleasant to cycle on. It would be a useful route for people travelling by bike to or from Stanlow Refinery, Cheshire Oaks, the University of Chester at Thornton Science Park, and Ince & Elton villages, but is currently only used by a tiny number of very brave and confident cyclists. This situation could be improved by making the cycle lane continuous along the whole route.
Created by Andrew Woodward // 0 threads
Pinch-point at zebra crossing where cyclists are forced to share space with traffic that is often speeding. Cars try to squeeze past cyclists or brake suddenly.
Created by HankChief // 0 threads
There needs to be a ramped access to the school grounds at this point to replace or bypass the 6 steps currently there.
This would not only improve access to the school but also improve connection between the East Craigs Path Network and North Gyle and the only toucan crossing on the A8 in Edinburgh on Dechmont Road.
Created by Fraser Stephens // 1 thread
RAISED AT PUBLIC MEETING 10-04-2014
The infamous missing link in the Llanfoist-Brynmawr cycle path (route 46) is a huge barrier to its safe use by children as well as those who find the steep section of the diversion route impossible to climb.
The service entrance to the motorway services now has priority over the shared use path which runs parallel to the main road.
I have contacted both Hampshire County Council and Test Valley Borough Council about this change in priorities, but neither has responded beyond a cursory "we have received your email".
This is yet another example of through traffic being de-prioritised simply because it is on a cycle (or shared) path, rather than on a road.
Created by Andrew Woodward // 0 threads
Pinch point outside Courtlands on Sheen Road. Despite resurfacing, pinch point has not been addressed. Because of the poor road layout vehicles frequently encroach into the cycle lane. At off peak times the wide road encourages speeding - vehicles often approach this pinch point at 40mph.
Created by Frenchie // 0 threads
This is one of the prime candidate for a cycle contraflow in Newcastle City Centre. Currently one way for all traffic from Percy Street to Strawberry place. Allowing cyclists down from Strawberry Place to Percy Street would improve permeability and connectivity for cyclists. Note: not a lot of traffic, space not an issue, short uphill section so speeding not an issue.
Created by Shaun McDonald // 0 threads
The entrance to Dock Street should be turned into a continuous footway with pedestrian and cyclist priority over turning vehicles akin to this Danish junction: http://www.youtube.com/watch?v=QcnmLU1ClTo
This would improve sight lines for pedestrians too as the dropped kerbs are away from the junction, and it would also go with the pedestrian desire line as many tend to cross closer to the junction than the dropped kerbs. It would also slow down the vehicles entering the narrow street.
Created by Ned Harrison // 1 thread
Holywells Park has a section of cycle route 51 running through it, linking South East Ipswich to the centre with a pleasant and safe route down to the waterfront.
During Winter, the park is closed at dusk, sometimes as early as 4, meaning that just when the roads are most dangerous (dark and wet) cyclists are forced onto steep and busy routes either along Cliff Lane or up Bishops Hill.
The closures are largely at the request of the Park Friends group. I've spoken to them, and their concerns seem to be largely about what might go on after dark. It's not clear that there is any evidence for this, nor that the current situation of locking the main gates but leaving others would do anything to deter misbehaviour.
Keeping it open as a cycle route would ensure a legitimate presence in the park, and help provide less confident cyclists in the area with a safe route to and from town.
I'd propose either locking later, or for a trial period leaving the park unlocked.
Created by Rosalind Lund // 1 thread
further to the piece in newsletter 128, I wonder if any thought has been given to the difficulty of turning right into Emmanuel Street if you are coming towards the town centre from St Andrew's Street? We go fairly often to the Arts Cinema and this is the obvious way for us to go home, but it is impossible to turn right on the correct side of the bollard at present as it is designed only for left turning cycles coming out of town. There is, however, nothing to suggest that such a right turn is illegal.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by chdot // 1 thread
Longstanding issue about 'optimum' design, particularly to reduce conflict caused by vehicles turning from Teviot Pl due to signal phases.
Over the past couple of years of regularly cycling between Waterbeach and Cambridge on NCN11 I have noticed that the path between Waterbeach and Baits Bite Lock is in really bad repair and is getting gradually worse. I have been in touch with the council to ask them to repair it, and they told me that as far as they are concerned the path is only a footpath, and they have no obligation to maintain it to a standard suitable for bikes. Sustrans tells me they have no responsibility for maintaining that section of the route, and that the council should be responsible for it.
It seems absurd to allow the path to fall into total disrepair, but at the moment it doesn't seem like anyone recognises any obligation for its upkeep.
I am happy to go out occasionally with some secateurs and chop off the more annoying bits of greenery, but the path needs resurfacing and that feels a bit beyond me!
Does anyone have any experience with this sort of problem? Have they come across it on other sections of the NCN?
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Created by Shaun McDonald // 1 thread
It would be much safer to have cyclist priority on the slip roads here as is done in The Netherlands http://www.flickr.com/photos/smsm1/10046288016/ , or even the following example from Britain: http://www.cycling-embassy.org.uk/photos/good-cycling-facility-of-the-week/good-cycling-facility-of-the-week-14th-november-2013-0
The slip roads also need to be narrowed to slow motor vehicle speeds as does the turning radii of the roundabout.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Created by Andrew Woodward // 1 thread
Providing a cycle-friendly surface on the path from Meadlands Drive to the road serving the German School and the Polo Club would improve cycling access to Strathmore and Russell Schools and help provide a better quiet route from Meadlands Drive area towards Richmond - providing more/better options for avoiding the busy Petersham Road.
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
Meeting with Leeds City Council to discuss possible remedial works due to high casualty rates.
Created by Shaun McDonald // 1 thread
Many cyclists won't cycle to Harwich International from the Ipswich direction due to the roads. There really should be a high quality cycle route for this to continue the cycle journey from The Netherlands, where you can ride of the ferry and on to quality cycle infrastructure. The fact people choose the train is not a good sign.
This issue is the overall goal, and needs to be broken down into smaller sub issues of smaller more specific projects or improvements that can work towards this goal.