Lincoln's lane car park crossing
Improvements required for safe crossing of walkers, cyclists and horseriders using the main path through the forest.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by George Lund // 1 thread
Improvements required for safe crossing of walkers, cyclists and horseriders using the main path through the forest.
Created by Gabriel // 1 thread
The County Council is proposing some of those cheap and nasty speed cushions at Birdwood Rd. Link: https://www.cambridgeshire.gov.uk/residents/travel-roads-and-parking/roads-and-pathways/traffic-regulation-orders/permanent-traffic-regulation-orders#proposed-tro--reference-number-pr--------proposed-speed-cushions-in-birdwood-road--cambridge--9-0
Closing date for comment is 17 March 2023. Email to: policyandregulation@cambridgeshire.gov.uk
Created by Rosamund Humphrey (Admin Officer) // 1 thread
This is a container issue for event threads.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Cambridge City Council have launched this new consultation as part of the Our Cambridge programme which aims to shape the council of the future. This may be relevant to our work because it includes thinking about how the council works with its stakeholders.
sound+fury // 1 thread
A previous application was refused in part because of the cycle parking provision. What's the new one like?
Created by David Green // 1 thread
Are you confident at what to do if something goes wrong with your bike when you're miles from home? Could you repair a puncture by the side of the road? Yes? Great! No need to read on.
No? You may be interested in the following Saturday workshop I am running again. This will be a repeat of the popular workshop held last year where attendees gave feedback such as:
"Excellent - would recommend it to all inexperienced riders."
"Following the course I really feel I understand the workings of my cycle."
"It was very clearly explained and covered very useful topics."
"Thoroughly informative workshop. To be highly recommended."
David Green
===
Survival Skills for Cyclists
Venue: Coleridge Community College, Radegund Road, Cambridge CB1 3RJ
Date: Sat 25 March 2023, 10am to 4 pm
Description: A one day bike maintenance course for local cyclists. Bring your bike and get confident you can cope with common roadside cycling breakdowns. Women members especially encouraged to sign up! Places are limited to ensure you learn in a small friendly group and get all the assistance you need. Topics will include: checks before you set off, tools to take along, fixing punctures, handling chain problems, gear and brake adjustments.
Equipment: Your own bike to work on, pump, puncture repair kit, and any tools you normally ride with.
Refreshments: hot and cold drinks provided, but please bring your own lunch!
Fee: £20 (CTC and CamCycle members) £50 (non-members). Subsidy available for those on a low income - please don't be put off by the price. Primarily funded and supported by CTC Cambridge.
Enrolment: To book a place, email da...@guertler-green.co.uk with subject 'Survival Skills for Cyclists 25 March 2023'.
sound+fury // 1 thread
There's a proposal to use speed cushions to slow traffic down on Shelly Row and Albion Row.
Created by Marcus Howarth // 1 thread
Consultation:
London Borough of Sutton is considering installing a motorcycle barrier on the Spencer Road Entrance at Watercress Park to help prevent unlawful use by motorbikes and we are interested in hearing your views. The barriers are designed to allow pedestrians and those using mobility scooters and wheelchairs to enter but to stop motorcycles from gaining access.
We are aware that motorbikes regularly access the site via the Spencer Road entrance which can cause anti-social behaviour and safety issues. As part of the Council's commitment to improving the situation for local residents we propose to install an inhibitor gate.
Created by Marcus Howarth // 2 threads
(Last item on sheet)
Convert zebra crossing to a parallel crossing (one that allows cyclists to use it) near Mellows Park which would provide a continuous safe facility for cyclists. This would provide links to an existing contra flow cycle lane in Redford Avenue and a large residential area in Mellows Park, and a borough cycle route into Wallington district centre
Stafford Road Parallel crossing
These currently being negotiated by LBS with TfL - hopefully funding confirmed mid March 2023.
Created by Marcus Howarth // 2 threads
Created by Roxanne (CEO) // 1 thread
The new owners of Capital Park, Fulbourn, CB21 would like to meet and discuss any cycling issues relevant to the site.
Created by Martin Wheatley // 1 thread
On-road section of Greenway which is unpleasant and dangerous, and certainly not suitable for riders of all ages and levels of confidence, as it should be.
Created by linus // 1 thread
This is a joint Camden and Westminster consultation of the design of a short route of part of the longer Fitzrovia to Pimlico cycle route. https://westminstercycleways.co.uk/cleveland-street-cycleway.html
Westminster Council is leading on this project. Consultation closes 3 March. There will also be a drop-in community event about the plans from 3pm to 7.30pm on Tuesday 7 February 2023 at Fitzrovia Community Centre, 2 Foley Street, London W1W 6DL.
Created by Marcus Howarth // 1 thread
The current layout and building stock at Greenshaw are inefficient and energy intensive.
sound+fury // 1 thread
22/05108/SCRE | EIA screening opinion under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the proposed development to provide up to 12,442 sqm of employment floorspace in a building up to 34 metres in height with associated car parking, cycle parking and landscaping. | Vitrum Building St Johns Innovation Park Cowley Road Cambridge Cambridgeshire CB4 0WS
Created by Marcus Howarth // 1 thread
The Council is proposing to introduce a traffic management scheme in Plough Lane junction with Collyer Avenue and Queenswood Avenue. We are proposing these measures in response to concerns raised by local residents in the area, ward councillors about traffic speed, noise, pollution, cut through traffic and road safety at the above mentioned junctions.
What is proposed?
The following measures are proposed:
What is the aim of the measures?
These measures aim to
From the 2023/24 and indicative 2024/25 programmes: (A) / Environment and Sustainable Transport Committee
Appendix 7 b) - this is getting (£ ,000's )
Perceived safety issues raised that vehicles are not stopping at the
existing zebra because vehicles are rat running to avoid Croydon
Road/A232 (red route). The zebra is located on a link between the two
roads being used for rat running so drivers are looking for the next road
entrance rather than at the zebra. The proposal is considering measures
to address through traffic issues - initial locations being investigated are
the junctions of Queenswood Avenue/Plough Lane and Collyer
Ave/Plough Lane (subject to consultation).
The proposal also includes consideration of a parallel low traffic cycle
route along Queenswood & Collyers Road as an alternative to the A232
Croydon Road which currently has no cycle facilities along the parallel
stretch. Cyclists using this quiet alternative link will be able to re-join the
A232 Croydon Road via Aldwick Rd which connects to the existing
Croydon Rd cycle facility. This element of the scheme could be moved to
the Cycle Network Development/Borough Cycling Fund.
Created by Robert Watson // 1 thread
Grange Road has extremely narrow cycle lanes for most of its length, which include traffic calming bollards forcing traffic down to a single lane. While this design does slow traffic, the narrow space for the cycle lane means that trikes have to slow almost to a stop to pass safely -- or in some cases may not fit at all. This forces trikes out into the single centre lane, where cars may not properly give way, and also are the sites of speed bumps and significant potholes. If the lanes were about 20-30cm wider, then trikes could pass without a problem. This issue affects all of the bollards on both sides of Grange Road for its full length, but I’ve highlighted a particularly problematic one since I had to pick a spot.
(In general, the cycle lanes on Grange Road are too narrow for cargo trikes forcing them out into traffic lanes anyway, but it’s the brick bases to the bollards that cause a particular problem.)
Created by Robert Watson // 1 thread
On the northeast side of the Trumpington Road and Brooklands Ave junction, there’s a combined cycle and foot path around the corner that suffers two problems that make trike use problematic in peak times:
Created by Robert Watson // 1 thread
Bollards close Storeys Way to through traffic while allowing cycles through. However, the bollard spacing makes it difficult to get cargo trikes through -- e.g., Nohila and Winther products.
Where the new wands on East road begin if heading from the Newmarket road underpass into East road is a layby outside Mackays. The placement of the wands initially mean there is insufficient room to cycle on the road, but the layby is potholed, making it difficult to ride through. After the layby the spacing is wider and they are much better.
Created by PHG // 1 thread
The new wands on East road force cyclists on to the pavement, rather than the roundabout, where East road meets Newmarket roundabout. Why should cyclists be blocked from using Newmarket roundabout, which is the easiest way to access the bus lane on Elizabeth Way bridge.
Pulling out of the wands early is dangerous and annoying. more annoying is when you forget and have to stop, or go onto the pavement and round to use the ramp.
Created by Anna Williams – Head of Campaigns & Engagement // 8 threads
It is important that we engage with the candidates at each election, scrutinise their views, and press for their commitments to cycling.
Created by KW // 1 thread
Demolish and replace with terrace of three: conflicting bike store drawings, so which version already has permission?
sound+fury // 1 thread
Is this a cause for celebration?
Created by cpax // 3 threads
Like many other cyclists the majority being school pupils I have used the road between Perne Road and Tiverton Way as a way to avoid the traffic on Birdwood Road , however recently the work has begun to convert the bungalow and often with builders vehicles blocking the cycle path on Perne Road . Today I encountered a group of people gathered ( deep in discussion ) in the road adjacent to the empty site which lies closer to Tiverton Way and on hearing my cycle bell seemed reluctant to move . I am concerned that this could be a site for future conflict .
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by DavidT // 2 threads
The current layout of the pedestrian crossing at the junction of Winchester road and Vermont close forces cyclists out of the cycle lane and into the flow of traffic. This is a risky maneuver and relies on the patience of the car driver behind the cyclist. A possible solution would be to be extend the cycle lane through the chicane, with give way markings so that pedestrians have right of way.
Southampton Cycling Campaign has received many reports of local cyclists having accidents on the cycle path outside the Dominos Pizza outlet at the southern end of The Avenue.
A recent incident was reported in the Southampton Echo, http://www.dailyecho.co.uk/news/10475081.Cyclist_hurt_in_road_crash/
Created by Shaun McDonald // 1 thread
There is a loading bay in the cycle contraflow cycle lane, which means that the cycle lane is blocked for cyclists as soon as a vehicle is parked there. This means that cyclists have to pull out into the path of oncoming buses, thus making the NCN route unsuitable to young children or inexperienced cyclists.
We have a tandem which fits in all the spaces on trains in Scotland (as far as I know), but we are prohibited from taking it on any except the East Coast line trains. I've been writing to various officials - elected and otherwise - and contributed to the recent review of the Scotrail franchise, but am not getting much joy. No one seems to think it is a big deal. But, for my family, with 2 kids aged 5 and 1, and no car, if we don't go by tandem and train, we can't go anywhere much. The tandem is not a luxury but a practical transport solution. Does anyone else want to join in and make this more than a one-woman issue?
(another related issue: even once the kids can ride their own bikes, we won't be able to use trains much since most only allow 2 reservations).
Created by PeterMac // 1 thread
Redesign of Grey Street to remove the danger of cars reversing (blind) out parking bays into middle of the road.
Created by Alex Oldman // 1 thread
Disused railway tracks on St Peters Dock provide short section of road surface that is dangerous to traverse from East to West by bike.
If you are avoiding crossing the tracks then you are forced into oncoming traffic.
If you cross the tracks, you are then potentially trapped between parked cars and the railway tracks, which can be dangerous.
The tracks are very slippery when wet or icy, and sections are often hidden underwater because there is poor drainage after heavy rain.
Ideally the tracks are totally removed, or the surface covered with concrete or tarmac.
Created by Gregory Williams // 1 thread
The A2 is a hostile environment for cycling. Cyclists should be directed away from using the A2 towards existing safe alternatives (e.g. RCR16) and the current A2 cycle signs should be removed.
Created by Andrea Casalotti // 1 thread
Here is an ambitious plan for a Bicycle Boulevard from Shoreditch to Fitzrovia, along Old Street, Clerkenwell Road and Theobalds Road, open only to bicycles, buses and motor traffic for local access only.
a. It is now the most cycled route in London, showing that it is the desired EW route.
b. It is of variable width, therefore trying to accommodate bikes, buses, and through traffic in a consistent and safe way is impossible. In other words, a compromise will be a botch job.
c. There will not be mixing of buses and bicycles: bicycles will have a dedicated two way cycle lane on the South side of the street.
d. The Boulevard stops being a mega- EW-rat-run. Motor traffic will have to use Pentonville/City Road.
More details here: https://docs.google.com/presentation/d/1yw9mkHhGZaVBKYJs6FxyhC1Z4nNYVl-IFH-aR1ScK9U/pub?start=false#slide=id.p
Martin Lucas-Smith // 29 threads
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
Surface, drainage and width issues.
Planned for upgrade as part of CEC 'family network'
No details/dates.
Was an issue 5 years ago (and before)
Created by David MacKay FRS // 1 thread
Our campaign for safer walking and cycling to/from NWCambridge now has a petition and a first video (of five) summarising our position.
See our new video summarising our petition:
https://youtu.be/hIlQAzsU0js?t=1s
I’d be delighted if you could promote this to your networks. Time is of the essence because a Senate House discussion is coming up [3 Nov 2015], and I will report the number of signatures on our petition there. (But signatures after the date will still be useful.)
More information:
http://tinyurl.com/EddingtonSafety
The petition:
http://www.ipetitions.com/petition/EddingtonSafety
Anyone is welcome to sign the petition; we ask people to use the Comment field to let us know if they are University Member / University employee / City resident / SouthCambs resident / etc.
For twitter purposes the recommended hashtag is #EddingtonSafety and there is an @EddingtonSafety account too.
Thanks very much
David
David J C MacKay FRS
djcm1@cam.ac.uk
Regius Professor of Engineering,
Cambridge University Engineering Department
Author of “Sustainable Energy - without the hot air” www.withouthotair.com
and “Information Theory, Inference, and Learning Algorithms” www.inference.eng.cam.ac.uk/mackay/
Girton resident and parent.
Cambridge Cycling Campaign Member
Created by londoncycler // 1 thread
Six inch high ridge near left side of north bound lane on the south side of the bridge forces cyclists too close to the kerb or into the path of motor vehicles. Issue reported via CTC pothole reporting site. Resurfacing required.
Created by Rohan Wilson // 1 thread
I've visited Riverside to Waterbeach with William Rayner of county cycling team. He's revising signage here and providing it along the St Ives corridor, with the old NCN 51 being renamed Regional Route 24 (blue patch). We've decided finally to continue to sign NCN 11 from Riverside Bridge to Waterbeach Station, and he's looking at suitable (hopefully temporary) wording to advise to follow NCN 51 to Bottisham for destinations beyond Waterbeach, which will hopefully eliminate misrouting those from outside the area.
Our inspection of existing signs showed that only one new signboard was provided on completion 5 years ago of Riverside Bridge. Signboards still send people via Green Dragon. Sustrans considers signage is an important part of any route project.
The intention is to sign Milton Country Park as a destination, not as part of the route, removing route signs within the park, and probably retaining Coles Road as the signed route through the village, though it would be much preferable to have improvements past the shops and the village green, pubs etc.
Retaining the route to Waterbeach as NCN will help keep the gap in people's awareness.
I am planning to contact again the landowner of the missing link between Bottisham Lock and Fen Road, Lode with a suggestion for a low-level route, southeast side of the Bottisham Lode floodbank which is the route of the public footpath, where signs forbid cycling. It might be considered more visually acceptable. All parish councils are for the route, including the one of which he is a member.
Created by Andy Allan // 1 thread
Garratt Lane at Earlsfield station sucks massively for cyclists, and is a jarring interruption to the Wandle Trail (Sustrans route 20). It would be great to extend the riverside path underneath the railway to avoid this dangerous stretch of road.
Created by DavidTheScientist // 1 thread
While some painted "cycle lane" does exist northbound, there is woefully little provision for cyclists considering the huge number that use this section of road each day, a large number of whom are those who work at the General Hospital and other nearby health centres. Southbound cyclists have no real provision of space at all, save a graduated stopline, where cars turning right often try to pass right-turning cycles on the inside. Dale road itself is extremely narrow by winchester road, with almost no pavement space for pedestrians.
Cyclists heading northbound on Winchester road must beat traffic off the line at Dale road to get to the painted centre of Winchester road. North of the traffic light at The Range, the cycle lane is almost non-existent, placing cyclists between 2 lanes of heavy traffic, and cyclists have to stop and wait in this dangerous area in order to turn right onto Wilton road. Furthermore, the road surface, especially at this part of Winchester road, is currently deplorable.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by David Green // 1 thread
My employer is planning to relocate from central cambridge to the Cambridge Business Park (near Waterbeach). There is currently no decent cycle (or footpath!) access to this business park which avoids riding along the A10. I am a confident cyclist but I am not looking forward to riding to work along sections of the A10.
Are there any plans for cycle route construction which the campaign can, perhaps, help accelerate?
Martin Lucas-Smith // 1 thread
The permeability gate between Hooper Street and Kingston Street is obstructive as it only allows passage in one direction at a time.
Given the ever-increasing amount of cycling in areas like this, it's time to get this replaced with a simple bollard arrangement that would allow two-way passage whilst still enable the emergency services to unlock for access in an emergency.
Created by HVS // 2 threads
The A41 ring road cuts across a useful quiet route north-west out of Chester, which is an alternative to the traffic-free Greenway (which is unlit, and slippery in icy conditions). Crossing the A41 during busy periods - e.g. when commuting at rush-hour - can be a slow and potentially very dangerous process, especially after dark. A better crossing for cyclists and pedestrians, or a lower speed limit on the A41 (or both), would be very helpful here.
[Original version of map was wrong; I've now updated it.]
Created by Chris Neston // 2 threads
The cycle path crosses the soutbound exit from the M53 at Cheshire Oaks. The exit is light controlled for traffic as they enter the roundabout. This provides a safe time for cyclists to ride across the sliproad. However the lights are not visible to cyclist on the path and there is no light provided to advise cyclists when they can cross.
This makes it very difficult and dangerous for cyclists to know when they can safely cross. This would require no physical change to the road layout simply a new light to show cyclists when to cross.
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Created by Rosie Downes // 5 threads
Transport for London's public consultation on Cycle Superhighway 1 is open from 16 February to 29 March. The LCC office has set up this thread to facilitate discussion of the proposals.
Created by WildNorthlands // 1 thread
Brook Hill roundabout is a major barrier for cyclists in West Sheffield. The traffic is fast and as it is a three-lane spiral roundabout with the exit roads (except Bolsover St) having two lanes there is a lot of lane-switching by motorists. This makes the risk of a collision very high, and for less experienced cyclists it is simply a no-go area.
Many of the buildings adjacent to the roundabout belong to the University, and have been built up to the curtilage, so there is no space to expand the pavements and make them shared use.
One alternative for cyclists coming from the Walkley/Crookes area via Bolsover St is to use Tower Court, but this area can be very congested when the University is in session, with several thousand students using the Arts Tower and Library.
The council has signed an alternative route via Weston St and the Netherthorpe Rd tram subway, but this involves a drop in height of about 100 metres and subsequent climb up again, plus the negotiation of access barriers in the subway, so is not really sensible.
Meanwhile on Upper Hanover Way, a cycle crossing was severed when the tramway was installed, although cyclists still use the crossing. A proposed alternative crossing is stalled as it is too expensive.
What can be done about this knotty problem?
As the bridleway crosses Milton Road, it swaps sides of the busway, so most pedestrians and cyclists want to cross diagonally. However the toucan crossing only protects people crossing Milton Road. It doesn't stop busway traffic.
This is confusing and dangerous. When the road traffic stops at red lights, and the Toucan crossing turns green, it feels very safe to cross the busway. Yet buses can come from three directions (busway west, busway east, Milton Road south) at speeds of 30 mph.
Cyclists in particular are tempted to cross diagonally from north west to south east. Last week I saw a near accident.
Created by Eric Booth // 2 threads
Prince St bridge is an anarchic pigs ear. I like pigs and fond of a bit of anarchy but it's getting beyond a joke. Of course it will all be sorted out properly in due course but we could live with this for years. Here's a quick fix:
SOUTH
1. Move south vehicle stop line back 10m behind tramlines
2. Remove all bollards unless one or two kept in line with centre of bridge with arrows right for cars
3. Widen cycle lane from bridge to Festival way turn so suitable for 2-way cycling.
4. Put in Give Way painted line at an angle running from enlarged cycle lane to centre line so southbound cyclists alerted to need to filter across traffic.
NORTH
1. Remove all bollards
2. Widen cycle lane for 2 way cycling all the way up to the traffic lights with The Grove.
3. Remove 5 bollards on each side of north bound traffic light along with the two set back
4. Paint cycle lane passing behind light and then back onto carriageway making it nice and clear that it's an option for cyclists when lights red or they can carry on (as most will, no worse than now but at least it will be clear that they can treat these as 'give way')
5. There will need to be 'give way' paint to make clear that pedestrians have right of way on the by-pass.
Yes it's muddled but less so than now and makes the desire lines easier. It's also a cheap paint based fix pending the proper job.