Cambridge Retail Park redevelopment
Railpen are consulting on changes to the Retail Park on Newmarket Road
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Martin Lucas-Smith // 1 thread
Railpen are consulting on changes to the Retail Park on Newmarket Road
Created by sarah // 1 thread
Anything to do with the DNA path - lighting, vegetation, obstructions
Created by Owaldron // 0 threads
Fallen Tree at head height - reported to Kent County Council - Fault Number 240650775
Created by Owaldron // 0 threads
Recent FOI confirmed that foliage cutback should occur in ‘Bi-annually’ on the Fordwich Way route in May and September every year. No foliage cutback has taken place on the Fordwich Way in May. The whole path is slowly becoming overgrown and will need cutting back as per Kent County Councils own internal documents. The whole route needs foliage clearance - Fault No. 811012
sound+fury // 1 thread
Creation of additional storey above existing single storey (middle) part of the site and redevelopment of rear part of the site comprising: demolition of existing building and structures and creation of five storey office building.
16 - 17 Sidney Street Cambridge Cambridgeshire CB2 3HG
Cambridge
Application reference : 24/01905/FUL
Created by cpax // 1 thread
On a recent ride up The Mere Way I noticed that the wooden pillar had been removed and that cars were being driven on the route .
Created by Gregory Williams // 1 thread
The cycle parking at Canterbury's Asda is conveniently located for the shop entrance, but doesn't properly secure or support bicycles. Hence parts of bicycles go missing and cyclists choose to secure to other street furniture.
Created by Gregory Williams // 0 threads
Cycle parking provision at Longmarket needs to be improved. The are insufficient stands at Rose Lane, leading to cyclists using other street furniture, such as pictured.
Created by KW // 1 thread
Partial demolition, alterations and extensions to Clarendon House, new ramped vehicular access, delivery bay, cycle access and parking, etc etc
Quite a lot of cycle parking, and some reduced car parking, in the basement. Cycle and car movements cross with potential visibility issues.
sound+fury // 1 thread
Erection of seven residential dwellings along with access, car and cycle parking, landscaping and associated infrastructure works following demolition of existing buildings.
195 Perne Road Cambridge Cambridgeshire CB1 3NT
Cambridge
Application reference : 24/00922/FUL
Created by Martin Wheatley // 2 threads
Planning application not addressing cycling issues credibly.
Created by T9292 // 1 thread
Poor surfacing of the road with potholes, cracks and very limited space for pedestrians
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Cambridgeshire County Council is publishing this proposal on 18th March 2024.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
New thread to discuss proposals.
Created by C // 1 thread
The cycle lanes on this road have trees growing over them with many branches at eye height (as demonstrated by my glamorous assistant).
Created by Josh Grantham // 1 thread
Demolition of existing buildings and structures, and erection of building (Class E(g)i/ii) with associated access, site infrastructure, landscaping and car and cycle parking provision.
Brookmount Court Kirkwood Road Cambridge Cambridgeshire CB4 2QH
Cambridge
Application reference : 23/04289/FUL
Created by Josh Grantham // 1 thread
Outline planning application for demolition of existing buildings and construction of a new business/science park (Use Class E(g)) and ancillary "hub" building (Use Class E(b)(d)(f)) and associated car parking and landscaping.
Sawston Park London Road Pampisford Cambridgeshire CB22 3EE
South Cambridgeshire
Application reference : 24/00166/OUT
Created by cpax // 1 thread
Very uneven surface on cycle path between Fen Ditton village and Horningsea .
sound+fury // 1 thread
Change of layout to existing customer car park.
Land At Cambridge Retail Park Newmarket Road Cambridge Cambridgeshire CB5 8WR
Cambridge
Application reference : 24/00384/FUL
Created by KW // 1 thread
Submission of details required by condition 10 ( hard and soft landscape works) and 11 (Cycle parking) of planning permission 22/04976/FUL
26 Barton Road Cambridge Cambridgeshire CB3 9JZ
Cambridge
Application reference : 22/04976/CONDB
Created by KW // 1 thread
Don't know why we didn't see 23/03273/FUL (decided, with conditions) but there is now 23/03273/COND7 re staff cycle parking to consider.
Full:
Cond7:
Created by Gregory Williams // 2 threads
There isn't a dropped kerb at the northern end of the Legacy Park cycle path where it meets Chaucer Road. Therefore cyclists can't easily transition between the cycle path and the road here.
Created by Gregory Williams // 1 thread
The signs at the junction between Mill Lane and St. Radigund's Street in Canterbury have gone missing.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Rosalind Lund // 1 thread
further to the piece in newsletter 128, I wonder if any thought has been given to the difficulty of turning right into Emmanuel Street if you are coming towards the town centre from St Andrew's Street? We go fairly often to the Arts Cinema and this is the obvious way for us to go home, but it is impossible to turn right on the correct side of the bollard at present as it is designed only for left turning cycles coming out of town. There is, however, nothing to suggest that such a right turn is illegal.
Created by Shaun McDonald // 0 threads
The entrance to Dock Street should be turned into a continuous footway with pedestrian and cyclist priority over turning vehicles akin to this Danish junction: http://www.youtube.com/watch?v=QcnmLU1ClTo
This would improve sight lines for pedestrians too as the dropped kerbs are away from the junction, and it would also go with the pedestrian desire line as many tend to cross closer to the junction than the dropped kerbs. It would also slow down the vehicles entering the narrow street.
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Martin Lucas-Smith // 3 threads
Elizabeth Way is wide. Currently cycling is permitted on the pavements.
This should be changed to have dutch-style cycle tracks, achieved by narrowing the road slightly and narrowing the pavements (which are very wide and not heavily trafficked, so this would not disadvantage pedestrians).
This would give a safer cycling environment, and improve the pedestrian experience.
Martin Lucas-Smith // 10 threads
Milton Road, like other main roads in the city, is a mix of typically bad bits of cycle infrastructure. There is considerable scope, possibly within the City Deal funding, to rework the whole streetscape to Dutch standards.
Meeting with Leeds City Council to discuss possible remedial works due to high casualty rates.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Created by Matthew // 2 threads
On 1 January 2026, historic routes in England that aren’t properly recorded will be lost to the public forever. We are looking for people to volunteer their time to help us identify and register these routes before it is too late.
Created by Shaun McDonald // 1 thread
It would be much safer to have cyclist priority on the slip roads here as is done in The Netherlands http://www.flickr.com/photos/smsm1/10046288016/ , or even the following example from Britain: http://www.cycling-embassy.org.uk/photos/good-cycling-facility-of-the-week/good-cycling-facility-of-the-week-14th-november-2013-0
The slip roads also need to be narrowed to slow motor vehicle speeds as does the turning radii of the roundabout.
Created by chdot // 1 thread
Longstanding issue about 'optimum' design, particularly to reduce conflict caused by vehicles turning from Teviot Pl due to signal phases.
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
Created by HankChief // 0 threads
There needs to be a ramped access to the school grounds at this point to replace or bypass the 6 steps currently there.
This would not only improve access to the school but also improve connection between the East Craigs Path Network and North Gyle and the only toucan crossing on the A8 in Edinburgh on Dechmont Road.
Created by Roy Russell // 0 threads
This is a good location for "No Entry except Cycles".
The existing Traffic Order allows cycling past the No Entry sign.
The existing "cycle bypass" over the footway, which was rarely used, has been obstructed and largely destroyed by the adjacent building site.
The simplest solution is to add a supplementary plate "Except Cycles" under the No Entry sign.
Where the quite good segregated cycle lane joins The Ride, DfT advice was certainly NOT followed. As per DfT advice, when cycle lanes are merged with the carriageway, it should be done via a length of dropped kerb that is flush with the carriageway and the cycle lane shouldn't be joined at a 90 degree angle to the road.
Here, the cycle lane runs parallel to the road for a short distance before it loops around a large boulder specifically placed to force cyclists around and then finally joins the road at a 90 degree angle.
The kerb, though dropped, is far from flush and creates a risk for cyclists joining the track from the road.
This junction between the road and the track should be scrapped and redone according to DfT guidelines.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by Simon Redding // 2 threads
The railway path from Sheffield down through Staveley & Poolsbrook stops at Arkwright Town. Since an opencast / landfill was south of this point, there is no trace of the former railway line to join to the trails at Sutton Spring Wood. This is an important local link.
Created by Matthew Phillips // 1 thread
The route on the east side of the A167 past Crossgate Moor and Framwellgate Moor crosses a number of roundabouts. The cycle-path leads you across the roads very close to the roundabout, via the central refuge in the middle of the road. Some of these roads have two lane entry to the roundabout. Crossing both lanes at once is tricky as you have to have an eye on whether the traffic is about to move out onto the roundabout. If you have a longer vehicle, such as a bus, waiting, then the route to the refuge is blocked. There are no road markings to warn motorists that cyclists might be expected.
The route is probably going to be improved as part of the Great North Cycleway. If these roundabouts are to be made safe enough for children to use, major alterations will be required. (The route goes past Durham Johnston School so should be available to children.) The route should cross further from the mouth of the roundabout, preferably on a different-coloured surface, maybe raised.
Created by SamGW // 1 thread
The Road between Great Wilbraham and Fulbourn is very well used by Cyclists, runners and walkers throughout the year. It is a single track road with a 60 MPH speed limit. A bicycle path here would encourage more people to cycle to Fulbourn and Cambridge. The path would significantly improve safety for cars, pedestrians and cyclists.
Created by Steve Crapper // 1 thread
This planning application is a revised version of a previous application that would have infilled the disused railway beneath Buttermilk lane bridge, preventing the disused railway becoming a vital new greenway between Bolsover and Poolsbrook country Park (extending the existing Stockley Trail)
The revised application has changed from infill to ramps, but this forces an unnecessary road crossing, when an underpass is perfectly feasible
please object on this basis if you are able . our campaign has created a Facebook page called "build the Stockley Extension"
Bolsover
Application reference : 18/00178/FUL
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by Andrew Woodward // 0 threads
Pinch point outside Courtlands on Sheen Road. Despite resurfacing, pinch point has not been addressed. Because of the poor road layout vehicles frequently encroach into the cycle lane. At off peak times the wide road encourages speeding - vehicles often approach this pinch point at 40mph.
Created by Stephan Matthiesen // 1 thread
The chicane at the west end of the Magdalene Glen path interrupts the flow when going uphills, particularly unpleasant for people with weak knees. It also forces cyclists uphills often to stop and start when there are other people going through, as it's not wide enough to pass.
It doesn't serve any useful purpose at it is on the top of the slope where cyclists are very slow anyway. As it's uphills, there is little danger that e.g. kids run out onto the wide pavement of Duddingston Pk South. Cyclists from the West are slow at this point anyway as they turn into the path.
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.