Issues
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
-
-
"Kissing Gate" replacement or improvement for prams, buggies and cycles
Barriers restrict access for people of all abilities, e.g. hand cycles, buggies for carers with disabled children, and for this that wish to cycle.
-
20/05360/FUL: Erection of cycle shelter, 93 Regent Street
Plans for erection of cycle shelter
93 Regent Street Cambridge CB2 1AW
-
21/00188/FUL: 2 storey dwelling, Land r/o 207 Cherry Hinton Road
21/00188/FUL:
Erection of a two storey dwelling, with associated amenity space, parking, bin and cycle store following demolition of garage.
Land R/o 207 Cherry Hinton Road, Cambridge, CB1 7DA
-
Development Proposal for 35 homes on Sandy Lane
There is a proposal to build 35 new homes on Sandy Lane (described by the developers as 26 'family houses' and 9 'affordable homes').
The project has a website: https://yoursay.online/sandy-lane#about-the-project
At 6pm today (23rd February 2021) there will be webinar about the development (hosted by the developers).
-
21/00264/FUL: multi use buildings, Blocks B2&F2, Devonshire Quarter, D'shire Rd
21/00264/FUL: Erection of two new buildings comprising Class E(g)i/E(g)ii floorspace including ancillary accommodation/ facilities with associated plant and cycle parking for Block F2 and an Aparthotel (Class C1) with multi-storey car park for Network Rail, including car and cycle parking, for Block B2 with associated plant, hard and soft landscaping and permanent access from Devonshire Road to the Cambridge Station Car Park, utilising the existing pedestrian and cycle access, restricted to emergency access to the railway only.
Blocks B2 & F2, Devonshire Quarter, Devonshire Road, Cambridge
-
21/00038/FUL: 2 bed dwelling, 199-201 Cherry Hinton / Coniston Road
21/00038/FUL
Erection of new 2 bedroom 1.5 storey dwelling, associated works along with new parking/cycle parking following demolition of existing outbuildings
199-201 Cherry Hinton Road, Cambridge, CB1 7BX
-
Oxford Street plans: Chance to fix Marble Arch bike lanes
The bike lanes across Marble Arch have long been chaotic and poorly marked. Confusion has been increased by the hurried COVID additions. I have found taking my 14 year old to practice learning to ride on North Carriage Drive scary.
I have heard our Chair despair on the subject before.
Specifically there are no clearly marked lanes on the Marble Arch island, through an area mobbed in Summer with visitors, and with a table tennis table on the intuitive route. But a chance has emerged - see below. Link via Westminster web-site to oxfordst@westminster.gov.uk.
Views are sought to "stakeholderteam@murphycareyjv.co.uk by Friday 19 February
-
21/00185/FUL New 2 bedroom house
New 2 bedroom house being built close to an existing property.
-
21/00027/FUL: change use to 8 bed HMO and a 2bed flat, 1 Hurrell Road, CB4 3RQ
21/00027/FUL | Change of use from Class C3(a) to C4 turning a 7bed dwelling to a large no 8bed HMO and 1no 2bed self-contained flat.
1 Hurrell Road Cambridge CB4 3RQ
-
Proposed Trial Changes to Haverstock Hill and Rosslyn Hill
Camden proposes the following measures:
- New cycle lanes, protected by flexible wands, will be installed on both sides of Haverstock Hill and Rosslyn Hill (between Prince of Wales Road and Belsize Lane).
- On the northbound side, cyclists will have to use the existing bus lane from Belsize Avenue on – the bus lane times will be made 24/7.
- All parking and loading spaces are to be removed from this section of Haverstock and Rosslyn Hill to make space for the cycle lanes. Some will be replaced in side roads.
- All pedestrian refuges at informal crossings are being removed to make room for the cycle lanes. Five of the existing ‘uncontrolled’ crossing points on Haverstock Hill will be replaced with four new zebra crossings and one new signalised crossing .
- Shared use bus boarders will be deployed at the eight bus stops – bus stops will be moved into the carriageway to allow for the cycle lane to continue next to the kerb.
- At the junctions with England’s Lane and Pond Street ‘pedestrian countdown’ facilities, ‘early release’ for bikes and extended ‘Advanced Stop Lines’ will be provided subject to approval from TfL
- Timed loading bays (Mon-Sat 10 am - 2pm) along (on southbound side opposite Steeles Road Haverstock Hill and full time loading bay opposite Belsize Lane.
- If the consultation is agreed, cycle parking will be added at the shopping parades.
- New cycle lanes, protected by flexible wands, will be installed on both sides of Haverstock Hill and Rosslyn Hill (between Prince of Wales Road and Belsize Lane).
-
20/05396/FUL: 4 commercial buildings, Trinity Hall Fam Ind. Estate, Nuffield Rd
20/05396/FUL
Erection of four commercial mid-tech buildings comprising Use Class E (commercial, business and service) to provide flexible office, research and development and light industrial uses, and Use Class B8 (storage and distribution) limited to a maximum of 20% GEFA; together with car parking, cycle parking, landscaping, substation and associated infrastructure (following demolition of the existing buildings).
Trinity Hall Farm Industrial Estate, Nuffield Road, Cambridge, CB4 1TG
-
Camden Square Area Safe and Healthy Streets
The Camden Square area is bounded by Camden Road, Camden Park Road-York Way, Agar Grove and St Pancras Way. Most of this area already benefits from some road closures made in the 1970s at junctions with Agar Grove (St Augustines Road, St Paul’s Crescent and Stratford Villas) and at junctions with Camden Road (Rochester Square and Cantelowes Road). But Murray Street is still used as a rat-run between Camden Road and Agar Grove.
This consultation focuses on
- The removal of the rat-run on Murray Street and of another potential rat-run via North Villas
- Improvements to the cycle route that runs from Cliff Road, through Camden Square and on to Royal College Street.
The rat-run reduction scheme proposes two filters:
- A diagonal filter on Murray Street at the junction with Stratford Villas enforced by ANPR camera. (right turns into Camden Road from Murray Street will be permitted)
- A filter with a removable bollard at the top of Camden Square west side which will become two-way for all vehicles.
- Mandatory left turn signs where Camden Mews meets Camden Park Road.
The proposals for improving the cycle route are:
- Randolph Street with flow and contraflow cycle lanes protected by wands
- Marked cycle crossings over Royal College Street at the junction with Randolph Street (with relocation of the bus stop to the south of this junction).
- A radical improvement of the junction of Agar Grove, St Pancras Way and Randolph Street;
- on each of the four arms of the junction, cycles will get a green at a stage in the signals where they can cross safely without conflict with motor vehicles.
- pedestrians can obtain an all green stage on demand
- the approach from Agar Grove will be in a lane protected by wands
- A Tiger Crossing over Agar Grove at the southern end of Stratford Villas
- Cliff Road: the contraflow lane will be moved behind the parked cars while the with flow lane runs with general traffic but all parking will be removed on this (the south) side.
-
Crossways / The Downsway proposed 20mph informal consultation
The plans involve East/West road with multiple signage for entry/exit of 20/30mph zones plus the Byway cul-de-sac.
Plan (pdf) is embedded on consultation page.
To the North of route shown in blue is existing 20mph
This forms part of the NCN77 route.
-
Draft Sutton Sustainable Transport Strategy 2020-2025 Consultation
The draft document is linked right at the bottom of the consulation page, again here
https://drive.google.com/file/d/15a9o8nCb5R9rs5iPINp8M2zrr3Qm-Axr/view
from 1.3
Everyone benefits from sustainable transport because it means that we are:
• Keeping the air cleaner through alternative travel choices, such as walking, cycling to work, using public transport or using electric vehicles, while improving public health;
• Improving safety for travellers, especially for people with disabilities, children, older residents and other vulnerable road users such as pedestrians and cyclists;1.13 In July 2019, the London Borough of Sutton declared a climate emergency, and pledged to make the borough carbon neutral. Air quality improvements and carbon reduction are byproducts of, and some of many reasons for, sustainable transport.
from section 4
Cycle mode share is low, 1.1% of all journeys and among the lowest share in London.
5.7 Essentially, more people in Sutton are choosing to use their car for journeys of less than 2km than anywhere else in London.
See Section 6 re. cycling.
6.12 The existing number of cycling trips made each year in Sutton is 7,700, out of a total in outer London of 208,200 trips.
However, there is a potential for 234,900 daily cyclable trips, which would mean that 3% of all borough journeys would be by cycle. This
figure is higher than boroughs of similar size and population such as Harrow, Merton and Richmond upon Thames.
6.13 As with walkable trips, Sutton also has the highest number of potentially cyclable trips per resident that are currently made by a motorised mode of travel22.Targets include
Appendix F : no mention of cycleways
also saw under Developer checklists:
Cycling
G6g) The Council, landowners, developers, infrastructure providers and funding agencies will work together to implement the place-based projects in the Sutton Public Realm Design Guide Supplementary Planning Document (adopted January 2020).
G6h) The Council, landowners, developers, infrastructure providers and funding agencies will work together to implement the Liveable Neighbourhoods schemes and to bid for and implement future schemes where possible. -
Trail Link needed
An obvious link between the very well publicised and used Brierley trail and Skegby Trail is required in this plot of land to enable circular routes to be created
-
Northern Gateway Plots 9,10,11
Northern Gateway Plots 9,10,11
-
Six new School Streets - Feb 2021
All of the schemes operate timed road closures on Mondays to Fridays e.g. from 8.15am-9.15am and 3pm-4pm in term time.
In all but one of the schemes, it is stated that the restrictions will be enforced using Automatic Number Plate Recognition (ANPR) cameras.
Each scheme would be introduced as a trial for a maximum of 18 months with a further consultation After 12 months.
Exemptions: properties and businesses in the closed section of the affected road, emergency services, bin lorries, blue badge and pupils of the school that have a disability that prevents them from using active travel.
A few nice surprises here, marked with asterisks ***
Brookfield School
A Healthy School Street on Croftdown Road, between the junction with Chester Road and the east side of the junction with St. Albans Road.
And close with planters and bollards the west side of the junction Croftdown Road/ St Albans Road
Consultation on Camden’s website:
https://consultations.wearecamden.org/supporting-communities/healthy-school-streets-brookfield/
Kentish Town Church of England Primary School
A Healthy School Street on Islip Street, from Frideswide Place to the junction with Hammond Street.
*** Create a permanent restriction on Hammond Street by placing planters halfway between Islip Street and Caversham Road.
Temporary widening of footway outside school. Why temporary?
Removal of some guard rails
Consultation on Camden’s website:
https://consultations.wearecamden.org/supporting-communities/healthy-school-streets-kentish-town/
Christopher Hatton Primary School
1. A Healthy School Street On Mount Pleasant, between the junction with Grays Inn Road and the junction with Elm Street.
No mention of the use of ANPR cameras.
*** 2. Make permanent the trial scheme in Laystall Street north of Rosebery Avenue which implemented a mid-point closure and allowed two-way cycling.
Consultation on Camden’s website
Argyle Primary School
A Healthy School Street road on Bidborough Street, Hastings Street and Tonbridge Street.
*** The one-way systems on all three streets would remain in place, with the addition of a contraflow for cycles.
Consultation on Camden’s website
https://consultations.wearecamden.org/supporting-communities/healthy-school-streets-argyle/
St Mary and St Pancras School
A Healthy School Street on Polygon Road between Chalton Street and Werrington Street.
Consultation on Camden’s website:
Ecole Jeanine Manuel
A Healthy School Street on the south side of Bedford Square which is one-way westbound.
from the junction with Bloomsbury Street to Adeline Place
*** Add a contraflow cycle lane to the southern side of Bedford Square
Consultation on Camden’s website:
-
Mansfield Road and Estelle Road Safe and Healthy Streets consultation
The proposal is to made a Tiger crossing over Mansfield Road between Estelle Roads and the cut-through to Elaine Grove. This will replace the existing zebra crossing. The following supporting measures are also proposed:
- No Entry to Estelle Road from Mansfield Road
- Introducing small sections of shared space (pedestrians and cycles) areas around the proposed crossing
- removal of 9m parking bays on Estelle Road close to this junction
The improvement of this crossing is in preparation for the extension of C6 from Kentish Town via Castle Road, Castelehaven Road and Grafton Road to reach Hampstead Heath at Savernake bridge.
Implement on 18 month ETO,
-
20/04825/FUL: 8 bed HMO, Arbury Road, Cambridge
Change of use to large HMO (8 bed) including conversion of existing garage to make the 8th bedroom with ensuite.
189 Arbury Road, Cambridge, CB4 2JJ
-
21/00182/PRIO30: PRIOR APPROVAL for 3x dwellings, 175-179 Newmarket Rd
21/00182/PRI03O | Prior approval for change of use of offices (Class B1(a) to 3 No. dwellinghouses (Class C3)
175-179 Newmarket Road, Cambridge, CB5 8HA
-
20/04992/FUL: conversion of bungalow to comprise 4 flats, Newmarket Rd
20/04992/FUL: Conversion of bungalow to a two storey dwelling comprising of 4 flats
538 Newmarket Road, Cambridge, CB5 8LL
-
King Henry's Road area Safe and Healthy Streets
This scheme is intended to reduce through traffic on King Henry’s Road and Elsworthy Road, both of which have ~ 2000 motor vehicle movements per day in each direction, 74% of which is through traffic. In addition, average speeds are well in excess of 20 mph.
To stop the rat-running and to reduce the traffic volumes and speeds on King Henry’s Road and Elsworthy Road, Camden proposes the following point closures:
- Elsworthy Road at the junction with Avenue Road
- Elsworthy Road to the east of the junction with Elsworthy Rise
- King Henry’s Road to the east of the junction with Elsworthy Rise
In addition, Camden proposes:
- A Healthy School Street for St Paul’s School (in the eastern end of Elsworthy Road) operating 8am to 9am and 3pm to 4pm with exemptions for people who live in that section of road
- Footway widening on Primrose Hill Road near to St Paul’s School
- and a new Zebra crossing near Oppidans Road
-
Map of planned projects
It's hard to know where (and when) all the future cycling-related developments are, so a map showing them could be very useful. This issue is to discuss this idea, if it is useful, or already exists somewhere, and how it might be done.
-
20/05040/FUL Peterhouse Tech Park - West Expansion
20/05040/FUL | The erection of a new building comprising E(g) floorspace with car and cycle parking, landscaping and associated infrastructure | Land To The West Of Peterhouse Technology Park Fulbourn Road Cambridge CB1 9NJ
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
-
Pinch point created by pedestrian crossing
The current layout of the pedestrian crossing at the junction of Winchester road and Vermont close forces cyclists out of the cycle lane and into the flow of traffic. This is a risky maneuver and relies on the patience of the car driver behind the cyclist. A possible solution would be to be extend the cycle lane through the chicane, with give way markings so that pedestrians have right of way.
-
Dangerous section of cycle path outside Dominos Pizza on the Avenue
Southampton Cycling Campaign has received many reports of local cyclists having accidents on the cycle path outside the Dominos Pizza outlet at the southern end of The Avenue.
A recent incident was reported in the Southampton Echo, http://www.dailyecho.co.uk/news/10475081.Cyclist_hurt_in_road_crash/
-
Grey Street
Redesign of Grey Street to remove the danger of cars reversing (blind) out parking bays into middle of the road.
-
Tandem carriage on Scotrail trains
We have a tandem which fits in all the spaces on trains in Scotland (as far as I know), but we are prohibited from taking it on any except the East Coast line trains. I've been writing to various officials - elected and otherwise - and contributed to the recent review of the Scotrail franchise, but am not getting much joy. No one seems to think it is a big deal. But, for my family, with 2 kids aged 5 and 1, and no car, if we don't go by tandem and train, we can't go anywhere much. The tandem is not a luxury but a practical transport solution. Does anyone else want to join in and make this more than a one-woman issue?
(another related issue: even once the kids can ride their own bikes, we won't be able to use trains much since most only allow 2 reservations).
-
St Peters Dock lethal rail tracks
Disused railway tracks on St Peters Dock provide short section of road surface that is dangerous to traverse from East to West by bike.
If you are avoiding crossing the tracks then you are forced into oncoming traffic.
If you cross the tracks, you are then potentially trapped between parked cars and the railway tracks, which can be dangerous.
The tracks are very slippery when wet or icy, and sections are often hidden underwater because there is poor drainage after heavy rain.
Ideally the tracks are totally removed, or the surface covered with concrete or tarmac.
-
Dogs Head Street cycle contraflow lane parking/loading bay
There is a loading bay in the cycle contraflow cycle lane, which means that the cycle lane is blocked for cyclists as soon as a vehicle is parked there. This means that cyclists have to pull out into the path of oncoming buses, thus making the NCN route unsuitable to young children or inexperienced cyclists.
-
Clerkenwell Boulevard
Here is an ambitious plan for a Bicycle Boulevard from Shoreditch to Fitzrovia, along Old Street, Clerkenwell Road and Theobalds Road, open only to bicycles, buses and motor traffic for local access only.
a. It is now the most cycled route in London, showing that it is the desired EW route.
b. It is of variable width, therefore trying to accommodate bikes, buses, and through traffic in a consistent and safe way is impossible. In other words, a compromise will be a botch job.
c. There will not be mixing of buses and bicycles: bicycles will have a dedicated two way cycle lane on the South side of the street.
d. The Boulevard stops being a mega- EW-rat-run. Motor traffic will have to use Pentonville/City Road.More details here: https://docs.google.com/presentation/d/1yw9mkHhGZaVBKYJs6FxyhC1Z4nNYVl-IFH-aR1ScK9U/pub?start=false#slide=id.p
-
Cycling on A2
The A2 is a hostile environment for cycling. Cyclists should be directed away from using the A2 towards existing safe alternatives (e.g. RCR16) and the current A2 cycle signs should be removed.
-
North Meadow Walk - NMW
Surface, drainage and width issues.
Planned for upgrade as part of CEC 'family network'
No details/dates.
Was an issue 5 years ago (and before)
-
Chisholm Trail
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
-
NCN route 11 and the Waterbeach Gap
I've visited Riverside to Waterbeach with William Rayner of county cycling team. He's revising signage here and providing it along the St Ives corridor, with the old NCN 51 being renamed Regional Route 24 (blue patch). We've decided finally to continue to sign NCN 11 from Riverside Bridge to Waterbeach Station, and he's looking at suitable (hopefully temporary) wording to advise to follow NCN 51 to Bottisham for destinations beyond Waterbeach, which will hopefully eliminate misrouting those from outside the area.
Our inspection of existing signs showed that only one new signboard was provided on completion 5 years ago of Riverside Bridge. Signboards still send people via Green Dragon. Sustrans considers signage is an important part of any route project.
The intention is to sign Milton Country Park as a destination, not as part of the route, removing route signs within the park, and probably retaining Coles Road as the signed route through the village, though it would be much preferable to have improvements past the shops and the village green, pubs etc.
Retaining the route to Waterbeach as NCN will help keep the gap in people's awareness.
I am planning to contact again the landowner of the missing link between Bottisham Lock and Fen Road, Lode with a suggestion for a low-level route, southeast side of the Bottisham Lode floodbank which is the route of the public footpath, where signs forbid cycling. It might be considered more visually acceptable. All parish councils are for the route, including the one of which he is a member.
-
Wandle path bypass for Earlsfield
Garratt Lane at Earlsfield station sucks massively for cyclists, and is a jarring interruption to the Wandle Trail (Sustrans route 20). It would be great to extend the riverside path underneath the railway to avoid this dangerous stretch of road.
-
Lack of safe room for cycles, terrible road surface
While some painted "cycle lane" does exist northbound, there is woefully little provision for cyclists considering the huge number that use this section of road each day, a large number of whom are those who work at the General Hospital and other nearby health centres. Southbound cyclists have no real provision of space at all, save a graduated stopline, where cars turning right often try to pass right-turning cycles on the inside. Dale road itself is extremely narrow by winchester road, with almost no pavement space for pedestrians.
Cyclists heading northbound on Winchester road must beat traffic off the line at Dale road to get to the painted centre of Winchester road. North of the traffic light at The Range, the cycle lane is almost non-existent, placing cyclists between 2 lanes of heavy traffic, and cyclists have to stop and wait in this dangerous area in order to turn right onto Wilton road. Furthermore, the road surface, especially at this part of Winchester road, is currently deplorable. -
Tower Bridge road surface problem
Six inch high ridge near left side of north bound lane on the south side of the bridge forces cyclists too close to the kerb or into the path of motor vehicles. Issue reported via CTC pothole reporting site. Resurfacing required.
-
Kings Avenue/Milner Street rat run.
Motorised vehicles currently use the rat run through Milner Street to avoid the fraffic lights at Grove Lane/ St Helens St.
This is part of NCN 41 , any extra traffic passing through here detracts from the cycling experience and is negative for residents.
Cyclist comments are needed now ! -
Ommision of lights creates danger on cyclepath
The cycle path crosses the soutbound exit from the M53 at Cheshire Oaks. The exit is light controlled for traffic as they enter the roundabout. This provides a safe time for cyclists to ride across the sliproad. However the lights are not visible to cyclist on the path and there is no light provided to advise cyclists when they can cross.
This makes it very difficult and dangerous for cyclists to know when they can safely cross. This would require no physical change to the road layout simply a new light to show cyclists when to cross.
-
A14 very hostile for cycling
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
-
Replace Hooper Street gates with bollard
The permeability gate between Hooper Street and Kingston Street is obstructive as it only allows passage in one direction at a time.
Given the ever-increasing amount of cycling in areas like this, it's time to get this replaced with a simple bollard arrangement that would allow two-way passage whilst still enable the emergency services to unlock for access in an emergency.
-
Lack of cycle routes to Cambridge Business Park, Waterbeach
My employer is planning to relocate from central cambridge to the Cambridge Business Park (near Waterbeach). There is currently no decent cycle (or footpath!) access to this business park which avoids riding along the A10. I am a confident cyclist but I am not looking forward to riding to work along sections of the A10.
Are there any plans for cycle route construction which the campaign can, perhaps, help accelerate?
-
Reach Fair Ride
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.htmlI've created this issue to help plan this event.
-
Prince St Bridge - Quick Fix
Prince St bridge is an anarchic pigs ear. I like pigs and fond of a bit of anarchy but it's getting beyond a joke. Of course it will all be sorted out properly in due course but we could live with this for years. Here's a quick fix:
SOUTH
1. Move south vehicle stop line back 10m behind tramlines
2. Remove all bollards unless one or two kept in line with centre of bridge with arrows right for cars
3. Widen cycle lane from bridge to Festival way turn so suitable for 2-way cycling.
4. Put in Give Way painted line at an angle running from enlarged cycle lane to centre line so southbound cyclists alerted to need to filter across traffic.NORTH
1. Remove all bollards
2. Widen cycle lane for 2 way cycling all the way up to the traffic lights with The Grove.
3. Remove 5 bollards on each side of north bound traffic light along with the two set back
4. Paint cycle lane passing behind light and then back onto carriageway making it nice and clear that it's an option for cyclists when lights red or they can carry on (as most will, no worse than now but at least it will be clear that they can treat these as 'give way')
5. There will need to be 'give way' paint to make clear that pedestrians have right of way on the by-pass.Yes it's muddled but less so than now and makes the desire lines easier. It's also a cheap paint based fix pending the proper job.
-
Brook Hill Roundabout
Brook Hill roundabout is a major barrier for cyclists in West Sheffield. The traffic is fast and as it is a three-lane spiral roundabout with the exit roads (except Bolsover St) having two lanes there is a lot of lane-switching by motorists. This makes the risk of a collision very high, and for less experienced cyclists it is simply a no-go area.
Many of the buildings adjacent to the roundabout belong to the University, and have been built up to the curtilage, so there is no space to expand the pavements and make them shared use.
One alternative for cyclists coming from the Walkley/Crookes area via Bolsover St is to use Tower Court, but this area can be very congested when the University is in session, with several thousand students using the Arts Tower and Library.
The council has signed an alternative route via Weston St and the Netherthorpe Rd tram subway, but this involves a drop in height of about 100 metres and subsequent climb up again, plus the negotiation of access barriers in the subway, so is not really sensible.
Meanwhile on Upper Hanover Way, a cycle crossing was severed when the tramway was installed, although cyclists still use the crossing. A proposed alternative crossing is stalled as it is too expensive.
What can be done about this knotty problem?
-
Cycle Superhighway 1 consultation (CS1)
Transport for London's public consultation on Cycle Superhighway 1 is open from 16 February to 29 March. The LCC office has set up this thread to facilitate discussion of the proposals.
-
A41 Divides Guilden Sutton from Chester - better crossing needed
The A41 ring road cuts across a useful quiet route north-west out of Chester, which is an alternative to the traffic-free Greenway (which is unlit, and slippery in icy conditions). Crossing the A41 during busy periods - e.g. when commuting at rush-hour - can be a slow and potentially very dangerous process, especially after dark. A better crossing for cyclists and pedestrians, or a lower speed limit on the A41 (or both), would be very helpful here.
[Original version of map was wrong; I've now updated it.] -
Marlborough Street to Park Row, Bristol Dutch Style Cycle Infrastructure.
Proposal
To investigate options to provide a safe, continuous route from St James Barton Roundabout to the top of Park Street.Rationale
Marlborough Street/Upper Maudlin Street/Perry Road/Park Row (known as the Scope Route) is the most desirable route for cyclists from the east of the city to the University, the Triangle, Clifton etc but is heavily trafficked with little cycle provision.Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF proposals.