Cycle safety promotion - Cambridge
This is a general, over-arching issue for discussion of helmet-related and cycle safety promotion strategic matters in Cambridge that periodically (and continually) arise.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
This is a general, over-arching issue for discussion of helmet-related and cycle safety promotion strategic matters in Cambridge that periodically (and continually) arise.
Bermondsey St is being used as a rat run not just along its length but also across at Tanner St. Through traffic should use the A100, Tooley St or Borough High St.
Could be a good mode filter project
Created by velocipedus@gmail.com // 0 threads
CN Letters 30 July 2012:
"If the Lady whose bottom was smacked by a passenger in a green Ford KA as she cycled along Cambridge Rd, Shelford, towards Trumpington at 11 am on July 25, would like to do anything about it, please get in touch with me via this newspaper. I was following and have the details of the car" (Name withheld in CN)
CCC to local police
"CCC would like to encourage the local police force to get in touch with the informant and take the necessary steps. Such behaviour is degrading, it is extremely dangerous, potentially life threatening, and must not be allowed to become a local custom. We look forward to read in the newspaper that the necessary steps have been taken and that such behaviour will be punished, including revoking of driver's license."
Suggestions?
Created by Chris Peck // 1 thread
Upgrading the narrow footpath into a wider route usable by cyclists has been a long term priority for the Godalming Cycle Campaign. This route is a key link for pedestrians and cyclists between Farncombe/Binscombe and Godalming.
This year the Waverley Local Committee has dedicated funds to construct the path, which will run over land currently owned by Jewsons.
Created by Chris Peck // 0 threads
Major development for around 140 dwellings. Godalming Cycle Campaign has written to the developer requesting matters to be taken into consideration to ensure that the development improves access around the site for cyclists.
Some changes to the junctions nearby have been proposed.
http://www.waverley.gov.uk/info/200074/planning/1282/godalming_key_site
Created by Heather Coleman // 6 threads
The Addenbrooke's site is a poor cycling environment in so many ways. A full set of proposals for change are needed.
Created by David Earl // 2 threads
Expansion of the site by 510 vehicles
Martin Lucas-Smith // 2 threads
Large gyratory, which needs removal and replacement with cycle-friendly measures.
Created by Gregory Williams // 1 thread
Cycle parking is required at Bekesbourne railway station. The issue photo is evidence of this.
From the EIP programme for the South Area Committee, a proposal to put in a signalised crossing. (The report mentions Fulbrooke Road (which is in Newnham and not part of this patch) but I think it means here instead.) It's likely to get South Area Transport Corridor funding. No more details given.
Created by Rohan Wilson // 2 threads
Parcels either side of Spine Road's junction with Long Road, and one along eastern edge of housing, west side of proposed secondary school site. http://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=M5YZKKDX07900 Official deadline 19 July
12/0794/REM | Reserved matters for 231 dwellings (outline approval 07/0620/OUT) Parcels 1B, 2 And 5 Clay Farm, near Long Road
Created by Rohan Wilson // 0 threads
Cycle parking in lean-to's in rear gardens, access via narrow rear alleys, while cars are in front, across driveway. Site far behind Esso, Aldi and modern factory building. Deadline 25 July
Created by Rohan Wilson // 0 threads
"... office development adjoining Unex House (Savills), providing 5 storeys of B1(a) office space (4688m2) and two storeys of associated parking spaces (3102m2). Providing a total of 7790m2 gross internal floorspace of development. | Car Park Unex House 132 - 134 Hills Road..."
Created by cobweb // 1 thread
The proposal is to retain the CB1 café and reconfigure the two upper floors to include 10 studio flats.
Created by Rohan Wilson // 1 thread
New development:
Phase 1 reserved matters for the layout, scale and appearance of 201 dwellings, hard and soft landscaping and associated infrastructure and works including a means of access from Church Road
Martin Lucas-Smith // 10 threads
The route from the Royal Cambridge Hotel junction to Newmarket Road is a catalogue of hostile junctions, squeezed road situations, narrow cycle lanes, high collisions, and slow progress through this crucial part of the ring road. What is needed is a total overhaul of this route to add either a Danish or Dutch -style cycle route (2m+ could be achieved in most sections, with only one or two sections a squeezed 1.5m) that would encourage a massive shift of people from cars to bikes. To be clear: this is a proposal that a proper, strategic cycleway, that forms a coherent, uninterrupted route is needed, not bits of random infrastructure. See: http://www.camcycle.org.uk/newsletters/103/article4.html
Created by cobweb // 1 thread
I noticed today that there were notices on the racks outside Trinity College asking users to remove their bikes by 27th June but not giving a reason.
Martin Lucas-Smith // 1 thread
12/0783/FUL Barclays Bank, Bene't Street
Change to approved scheme 11/1421/FUL
to omit 21 bike store and replace with fitness room and laundry
Needs checking out.
Created by Gerhard Weiss // 0 threads
Superhighway 3 on cable street is also a rat run. Cell 1 marks the area bounded by 'logical' cell boundary streets. There should be no through motor traffic within this area
Created by Gregory Williams // 1 thread
Overgrown vegetation encroaching on the cycle path.
Created by Gregory Williams // 1 thread
A dropped kerb is needed for the cycle path where it links to Star Lane at the back of the retail park, near Gordon Road.
Created by Jean Dollimore // 1 thread
Camden Council is planning to remove the Brunswick Square roundabout and replace it with a cross roads. They have support from Marchmont Street residents association. The space reclaimed from the roundabout will be added to Brunswick Square
This roundabout is on a north-south cycle route along Judd Street, Hunter Street, Lambs Conduit Street and Red Lion Street which is currently being improved by LB Camden and will soon be signed.
Some manoeuvres on the roundabout can be hazardous for cyclists and we have already told LB Camden that we support this scheme.
They have suggested various enhancements:
- raised table at the junction
- zebra crossings over all four arms
- raise the road north of the junction to footway level (a 'shared space')
- close Lansdowne Road to motors and make Grenville Street two way
We have been asked to tell them what would be the best scheme for cyclists, to suggest what to put in the space reclaimed (e.g trees, bike stands) and to provide a drawing.
See Camden's web page:
https://www.wearecamden.org/brunswicksquare/assets/documents/brunswick-square-roundabout-im-2
Created by Jean Dollimore // 1 thread
email received (30/6/12): I thought I'd get in contact about the new Parkway junction with Camden High Street. I'm sure you have to use this route while riding through Camden at times and are therefore probably aware of the changes that have been made recently. Both motorists (in particular) and cyclists have suffered huge inconvenience over the last few months as the number of lanes have been halved at the bottom of Parkway where it meets Camden High Street. However, now it appears to be completed and I just cannot believe how poor the finished result is. Not only do the changes appear to have turned Parkway into a giant car park making it difficult and dangerous to navigate on a bike but the junction at the bottom has absolutely no room for cyclists to move at the side of the traffic and is an accident waiting to happen.
I cannot believe that such an important route has completely ignored the plight of cyclists at this time when cycling in the Capital is at an all time high. If you could shed any light on what is going on here and perhaps advise who I could write to at TFL or Camden Council about this, I would be most grateful.
(Photo to be added as soon as possible)
email receivedr: I thought I'd get in contact about the new Parkway junction with Camden High Street. I'm sure you have to use this route while riding through Camden at times and are therefore probably aware of the changes that have been made recently. Both motorists (in particular) and cyclists have suffered huge inconvenience over the last few months as the number of lanes have been halved at the bottom of Parkway where it meets Camden High Street. However, now it appears to be completed and I just cannot believe how poor the finished result is. Not only do the changes appear to have turned Parkway into a giant car park making it difficult and dangerous to navigate on a bike but the junction at the bottom has absolutely no room for cyclists to move at the side of the traffic and is an accident waiting to happen.
I cannot believe that such an important route has completely ignored the plight of cyclists at this time when cycling in the Capital is at an all time high. If you could shed any light on what is going on here and perhaps advise who I could write to at TFL or Camden Council about this, I would be most grateful.
(Photo to be added as soon as possible)
email from Nick Miller: I thought I'd get in contact about the new Parkway junction with Camden High Street. I'm sure you have to use this route while riding through Camden at times and are therefore probably aware of the changes that have been made recently. Both motorists (in particular) and cyclists have suffered huge inconvenience over the last few months as the number of lanes have been halved at the bottom of Parkway where it meets Camden High Street. However, now it appears to be completed and I just cannot believe how poor the finished result is. Not only do the changes appear to have turned Parkway into a giant car park making it difficult and dangerous to navigate on a bike but the junction at the bottom has absolutely no room for cyclists to move at the side of the traffic and is an accident waiting to happen.
I cannot believe that such an important route has completely ignored the plight of cyclists at this time when cycling in the Capital is at an all time high. If you could shed any light on what is going on here and perhaps advise who I could write to at TFL or Camden Council about this, I would be most grateful.
(Photo to be added as soon as possible)
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by jpennycook // 1 thread
Request for a screening opinion for the erection of a motorway service area
Land At O/S Grid Ref 460946 147950 M3 Basingstoke Hampshire
Basingstoke
Application reference : 16/02767/ENSC
http://pad.basingstoke.gov.uk/DocumentViewer/?DocumentClassCode=DC&Folder1Reference=16/02767/ENSC
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099199.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099197.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/10/05/01100568.PDF
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
Created by Sefton // 1 thread
The Lovers Loan shared path through the Grange has at least 5 very tight barriers along its length, and missing dropped kerbs - especially at the crossing of Dick Place. Removing barriers or widening them would make it much more easy to use for bikes, buggies and wheelchairs. Even some double pushchairs don't fit!
Created by Chris Peck // 1 thread
A long, tortuous issue, where no progress has been made, despite large amounts of effort. Godalming High Street was recommended for adopting as a trial two-way working for cyclists in 2001, thanks to Alec McCalden's excellent presentation to the Planning Inspector at the time.
However, the trial was never carried out. Cyclists continue to use the street in both directions, as there are plenty of ways to get out of the way of oncoming cars.
The City of London has introduced dozens of contra-flow cycling schemes on narrow streets and lanes across the City. A third of all the cyclists are now using the contraflow. There has been 1 cycle crash three years post-introduction (there were 2 in the three years before). See here for more details: https://www.ucl.ac.uk/transport-institute/pdfs/Cheung_slides.pdf
Created by Charlie Halliday // 5 threads
Proposal to address Farnborough Town Action Plan reference CW39. Issue: Alexandra Road, safety, pedestrian and cycle links.
Consultation documents may be downloaded from:
http://www3.hants.gov.uk/transport-schemes-index/farnborough-alexandra-road.htm
They are also on view in the reception area at Rushmoor Borough Council Offices, Farnborough Road during the consultation period
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
St Neots is receiving some funding as part of the Future High Streets Fund - this could include investment in cycling and walking infrastructure.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
Camcycle's time and energy is consistently taken up removing exclusionary barriers (e.g. Biomedical Campus, A14 active travel bridges, Warren Road). We need to consider long-term ways to prevent new barriers going in and remove existing ones which prevent people of all ages and abilities cycling.
Created by Fraser // 0 threads
Travelling along Fore Street from the East where it splits with Key Street there are several traffic calming patches and speed bumps that are difficult and dangerous to negotiate on a bike.
In particular the three sections of cobbles; as the street becomes one way just before Fore Street Pools, just before you cross Star Lane, and just after crossing Star Lane.
They are so ragged that as a cyclist you have to almost come to a stop, where as other road users can travel over them at ~20mph.
This makes them extremely dangerous as just after accelerating away from the traffic lights you then need to slow almost to a stop and weave your way through the cobbles while the traffic behind you is expecting to carry on and the street is too narrow for them to safely overtake.
The section of Fore Street between Star Lane and Eagle Street has better speed humps (still not great, but a dream compared with the above mentioned cobble sections!) with flat section at the sides so that bikes may pass them safely. However the flat sections are occasionally blocked by parked vehicles forcing cyclists over the speed humps.
The less said about the time it takes to negotiate these three sets of traffic lights the better!
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by CycleSi // 2 threads
TfL are undertaking major junction improvements at several gyratory systems. All of them include protected cycle lanes/tracks, except Wandsworth!
The local London Cycle Campaign group is not campaigning and virtually defunct. We desperately need to organise local cyclists and campaigners all over London and beyond to challenge this bizarre scheme.
Oval, Vauxhall, Elephant & Castle, Stockwell, Archway, Aldgate, etc, etc are all getting extensive safe space for cycling.
TfL for some reason (I suspect the blame lies with the borough) have instead decided to claim that the awful shared footpaths and streets with no cycling infrastructure at all that have been designated as 'cycle routes' form part of a 'cycle network'. They are even planning to have Cycle Superhighway 8 run along Wandsworth High Street with not even a painted cycle lane - cyclists will be mixed in with extremely heavy bus traffic.
It seems like no-one is talking about this other than me!! Seriously-argh!!!!
Suggestions, ideas, offers to help campaign all welcome.
Created by Simon Nuttall // 1 thread
Is it legal or not to ride on either Christ's Lane or Milton's Walk ?
Always been a bit of a problem - worse for pedestrians than cyclists.
Detailed (re-)design is apparently underway.
Created by Colin Wing // 3 threads
This is the proposed route of Quietway 88 in Westminster. An alternative option uses the west side of Trafalgar Square instead of Cockspur Street.
Created by Simon Redding // 0 threads
The Jepson Road estate has great cycling infrastructure, but when you get to the west end of it, the path peters out and ends in a fence. Lots of cyclists then carry their bike over a fence and round the end of a culvert to Hartfield Close, but it would be better to just have a cycle gate in the fence straight on to Midland Terrace, which is likely to form part of NCN67 soon.
Created by Iain Lane // 2 threads
Press article in the post today: http://www.nottinghampost.com/Major-route-city-centre-overhauled-priority-buses/story-26177322-detail/story.html
Can't find plans just yet.
Since the changes to Mare St at Westgate St some vehicles travel past the children's centre in Triangle Road, at excessive speeds, to avoid the traffic light at Mare St . Can Hackney Council add a restriction in Triangle Road.
Created by Stephan Matthiesen // 1 thread
Cycle lanes in both directions needs urgent improvment. It's painted on but
- it is far too narrow, encouraging dangerous overtaking
- road surface in the gutter (=cycle lane) extremely bad, with deep&wide cracks, most covers have sunken etc.
- paint has faded
- parking (near the schools)
Many sections of Gilmerton Rd have hatching in the centre, wasting space; these sections would be wide enough for a segregated path (or wide lane protected by bollards/armadillos).
In the narrower sections, the existing bike lane should be removed completely because at the moment it increases the dangers (encouraging cyclists to be in the gutter between kerb and speeding cars).
Created by jennifer Kirner // 1 thread
I am bringing up the problem that cyclists and pedestrians have crossing East Road to get to ARU and the neighbouring residential area. It would be helpful have a discussion about how to create safe routes in this area and how to get them implemented.
When I am cycling, I find it dangerous and difficult to cross East Road from Petersfield or Bradmore Street and I resort to using the pedestrian crossings with my bike because it is.
This area that really needs addressing for improvements to safe cycling and I don’t understand why given the expansion of ARU this has not been addressed.
The junction of Mill Road/East Road is also pretty scary for cyclists and pedestrians. The crossing at the slip road at the corner of Petersfield is difficult for pedestrians because it has no traffic controls and cars come quickly round this corner making it dangerous for anyone who is not alert , who is not tall enough to see, or who can't move quickly. This includes the young, the old, someone in a wheelchair. I wouldn't fancy pushing a child in a buggy across either.
Basically, it seems to me that the Junction and East road are designed for motor vehicles and traffic flow not for pedestrians and cyclists. Can we try and address this?
Created by jpennycook // 1 thread
Erection of 40 dwellings to include 24 private homes and 16 affordable homes, associated parking, landscaping, amenity space and highway alterations
Land At Farleigh Road Farleigh Road Cliddesden Hampshire
Basingstoke
Application reference : 16/04690/FUL
Created by George Britton // 1 thread
Aldershot Urban Extension - Green Light from RBC
Created by Gregory Williams // 1 thread
Planning application Y12/0897/SH proposes the redevelopment of a significant portion Folkestone Harbour and surrounding land. The proposals include up to 1000 dwellings and up to 10000sqm of commercial landuse. NCR2 runs through the development area.
Created by jpennycook // 1 thread
15/04503/OUT | Outline application to include access to be considered, for up to 750 residential units with a mix of units, and a neighbourhood centre including principal community centre, private children's nursery, local retail facilities, indoor sports hall and three form entry primary school and ancillary development | Hounsome Fields Trenchard Lane Dummer Hampshire
Created by GG // 1 thread
For a long time I have wondered about a crowd-sourced cycleability map.
In this, people cycle along a link (accepting the first question of how to define the beginning and end of this) then give it a thumbs up or down. After enough people do this, then others can see how popular it is.
Some people wonder about subjectivity but I think this should be less of a problem with more voters.
The reason I am asking is because this method could apply to a potential commercial project for a Council which wants to drive around 100km of rural roads and use a panel of 4 experts to grade meaningful segments on a 1 to 7 scale according to their suitability for HGV movements.
Any views on whether this is already done within an app I am not aware of, or could be it done by anyone as an add-on to something else, or is it something CamCycle could offer as a commercial package (there may well be more than one local authority looking for this sort of thing)
POSSIBLE Cycle Route Between Lowedges Rd/Chesterfield Rd + Bradway Fire Station Sheffield S8........using existing 8ft wide pavements by upgrading to "shared use".........This could connect to the new cycling "on + off " road routes being developed in the Meadowhead School area
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?