PA 213431 25TrinitySt
Change of use from A1 to C3 to create 4 new 1 bedroom apartments. External repair and decoration. Internal Alternations. Additional Windows and relocation of door to rear elevation. ASHP units to roof top.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Steven Moseley // 1 thread
Change of use from A1 to C3 to create 4 new 1 bedroom apartments. External repair and decoration. Internal Alternations. Additional Windows and relocation of door to rear elevation. ASHP units to roof top.
Created by Steven Moseley // 1 thread
New Mixed Use Development comprising a convenience store (use Class A1), three flexible use units (Class A1-A5 or Class D1), associated yard and servicing area, parking spaces and landscaping.
Created by catch // 1 thread
New development of 100 homes off the A134 in Horkesley.
https://www.colchester.gov.uk/planning-app-details/?id=442d3ed1-7f61-ec11-8f8f-0022489d9171#ValidationSummaryEntityFormView
Created by Stuart Johnson // 1 thread
Demolition of six retail units part of the Priory Walk Shopping precinct and replacing them with a mixed development of 21 apartments and one retail unit situated on the north side of the junction of Long Wyre Street and Priory Walk.
https://www.colchester.gov.uk/planning-app-details/?id=e10f62af-2c5f-ec11-8f8f-0022489cf2d7
Demolition of a 1960's, 2 storey commercial building on the corner of 14-16 Long Wyre Street and 1-8 Priory Walk and, replacement with 4 storey new building, providing 18 new homes and one commercial unit at ground floor.
https://www.colchester.gov.uk/planning-app-details/?id=1a6462d2-bb5d-ec11-8f8f-0022489cfbff
Conversion and remodelling, including partial demolition, of an existing, Class E, building to form a mixed use development of 37 new,Class C3, self-contained homes and a new Gym Space at Ground Floor.
Created by Michael Robinson // 1 thread
Creating discussion on proposals for Cycleway 9 extension between Brentford and Hounslow town centres.
Hounslow to Brentford walking and cycling changes
We’re proposing to make a series of changes to help people to walk and cycle on Brentford High Street and London Road between Hounslow and Brentford town centres.
We’d like to know your thoughts on our proposals and we are holding a six-week consultation. You can reply by completing our survey, which should take no more than 5-10 minutes to complete.
If you prefer, you can email your comments to haveyoursay@tfl.gov.uk or write to us at FREEPOST TFL HAVE YOUR SAY (Walking and cycling changes between Hounslow and Brentford), no stamp needed.
The closing date for comments is 16 February 2022.
Summary of changes
We’ve described the changes in more detail but in summary we are proposing to make the following changes:
Created by Steven Moseley // 1 thread
Change of use from Sui-Generis (current police station) to residentialcare home (use class C2) Also addition of single front entrance porch/extension
Supplement to housing development application entitled 'Provision of a shared cycleway/footway west onto Ness Road, landscape, drainage, and associated infrastructure of previously approved 15/01175/OUM'
East Cambridgeshire Planning application reference : 21/01771/FUL
Burwell is not in Ely Cycling Campaign's remit but will be important to some Camcycle members.
The proposed infrastructure looks very good in these plans. The Council wouldn't dare require barriers on it because it is intended as a route for emergency vehicles. The rising bollards don't look to be too much of a problem, as long as they can be seen in poor visibility conditions -the plans includes lighting for the route but it might be good for the bollards to include reflective and fluorescent markings.
There already is a dropped kerb at the northwest end of the route (junction with Ness Road).
The plans include the 'Cyclists Dismount' sign for those emerging onto Ness Road.
Created by Steven Moseley // 1 thread
Replacement of bridge and associated highways works involving realignment, junction improvements and width increase of the carriageway.
(CBC version)
Created by Billboyheritagesurvey // 1 thread
The new active travel route is due to open very soon. What needs fixing?
sound+fury // 1 thread
It's a hefty application that will need careful study.
Created by Steven Moseley // 1 thread
Construction of a 3 Bed, Two-Storey, Detached dwelling with garage andassociated parking. Movement of the existing pathway
Created by John Chamberlain // 1 thread
In September 2020, Camden Council put in a segregated southbound cycle track on St Pancras Way under Covid-19 Safe Travel regulations. It was done under an Experimental Traffic Order and they are now consulting on making it permanent or removing it. Details in the attached thread.
Created by Steven Moseley // 1 thread
Convert the existing eight bedsits within an HMO into three separate two-bedroom flats.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Cross-party group
Active since 18 May 2021
Westminster is consulting on changes to Maida Hill Market (Harrow Road, Walterton Road). The proposed changes to cycling are limited but it looks from the design that cyclist would lose permeability to Fernhead road.
https://harrowroad.org/assets/Uploads/engagement/211127-Stage-3-Public-Engagement-Boards_MHM.pdf
Created by Steven Moseley // 1 thread
Outline application for 1no. new dwelling.
Created by Steven Moseley // 1 thread
Outline planning application for the development of up to 150 dwellings (including 30% affordable housing) with public open space, landscaping, sustainable drainage system (SuDS) and vehicular access points from Halstead Road and Fiddlers Hill. All ma
Created by Steven Moseley // 1 thread
Demolition of Mercury House and Food @ the Mercury Restaurant; fellingof selected trees; construction of 2-3 storey production block; construction of two-storey extension on northeast corner; infill of porte-cochere to provide internal ground floor acc
Created by catch // 1 thread
Objection to development of land west of Lakelands, off Church Lane / Western Bypass
Response here: https://www.ensembling.com/270062
Created by catch // 1 thread
Planning application objection for the Park Lane Business Centre
Created by Roxanne (Cycling Campaign Officer) // 1 thread
A pilot of delivery robots may be coming to Cambridgeshire.
What are our views/policies about delivery robots?
What do we know about other places they have been trialled?
Created by Rosamund Humphrey (Admin Officer) // 1 thread
(Demolition of existing garages, relocation of existing sub-station within the site, and redevelopment to provide 8no. residential dwellings (Use Class C3) with associated infrastructure and landscaping)
Land Rear Of 5-17 New Square Cambridge Cambridgeshire CB1 1EY
Cambridge
Created by Joseph Tucker // 1 thread
A friend recently smashed her shoulder by cycling into the car trap which awaits anyone who misses the "Except guided buses" sign and then misses the "Car trap" sign, while heading from North Station towards Milton Rd.
In the dark, this is actually an easy mistake for an inexperienced rider, since
a) you believe that you're on a road when actually you're on a piece of Guided Busway
b) these signs can appear to belong to the cycle path, where they are mounted.
Created by Steven Moseley // 1 thread
Construction of 1no. 4 bedroom house with single garage.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by David Earl // 1 thread
"14/0447/FUL | Change of use from motor bike show room to supermarket with cafe [without cooking facilities] and installation of air compressor unit. | 192 Green End Road Cambridge Cambridgeshire CB4 1RN"
The Dalmeny Park house builders have installed new chicanes on NCN route 1. Unfortunately none of these meet the guidlines for chicanes on cycling facilities.
Created by Martin A // 1 thread
This attractive former railway line would provide a useful off-road link between Ripley Greenway and Derby for commuters and leisure users.
Created by Heather Coleman // 1 thread
As described in the winter 2019 Camcycle magazine there is a group working on getting some improvements to the Trumpington busway. The magazine concentrates on the northern end of the busway but we are also seeking upgrades to the Addenbrookes spur junction and the crossing at Hobson Avenue/Lime Avenue as well as adding pedestrian footpath from the Hills Road Bridge all the way to Drury Avenue.
The group would like to start getting this out to users of the path for input, discussion and help with campaigning. Many Biomedical Campus commuters presumably use this path frequently, even daily. It would be great to get some input.
Created by Andrew Clegg // 2 threads
The garage at the end of radcliffe road uses the end of this road as a car storage area, which often results in the access onto the cyclepath being obstructed.
Created by Rogerdodge // 1 thread
Kingston Council have opened the consultation on this route, open until 17th November
Created by David Wilcox // 1 thread
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton Street
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.
An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
Created by Kevin Ablitt // 1 thread
Having grown up in this area I know it well. Bolton Lane and Christchurch Street could benefit from 20 mph, Cobbold Street and Withipoll Street would be more pedestrian and cyclist friendly if they had filtered permeability. Cobbold Street is extremely busy at school times as parents drop off or collect, make it closed half way to motors and this would cut out through traffic . Likely to be very contentious.
Created by Ian Seeley // 0 threads
There is a tree stump about 3 feet high on the cycle track. It's particularly difficult to see at night when travelling east bound and should be completely removed and the cycle track resurfaced.
Created by Tim P // 1 thread
Portsdown Hill Road & James Callaghan drive are a set of roads along the top of Portsdown Hill that is currently used by a lot of cyclists for commuting, touring and leisure facilties due to the forts, views and open areas around it.
As such, it's a well known tourist spot to stop for a burger or take a picnic and fly a kite.
However, being on top of an exposed hill results in significant side winds which results in cyclists being blown about by gusts, and therefore all cyclists need to take primary position on this road to give them space. As a 40mph road, many drivers have significant issues with cyclists taking primary, and therefore perform many punishment/close passes.
The affect of this on cycling in the area is many
1) More people would cycle from the surrounding areas ( Waterlooville, Havant, Fareham/Lee on Solent ) to work at QA Hospital or the businesses on the hill if there were better cycle infrastructure.
2) More people would cycle from the surrounding area & to enjoy the space & views if it felt safer to get there.
Created by Stephan Matthiesen // 0 threads
Contraflow bike lane in Salisbury Rd for easier access from Southside to Commonwealth Pool, Pollock Halls and Holyrood Park.
I cycle past this junction a lot, and sometimes the lights are red so I wait and look at the lanes and wonder why they're like this.
Created by FrenchyF // 0 threads
There should be a dropped kerb at the foot of Braidwood Gate, leading to Dumbiedykes
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Created by Adam Edwards // 2 threads
Shared use cycle path under construction but delayed completion now set for the end of February 2016. The path with extend the route from Hatfield station up to the town centre and then via the not so good on road lanes to the University and Business Park.
Created by Andrew Woodward // 0 threads
This is the approach to Kew Gardens station and is an area with many shops and cafe’s. Enabling this street to become 2-way for cycling will make access to the station and shops more convenient for cyclists and should therefore bring economic benefits to the area. Streetview: http://goo.gl/maps/P4spf
Created by Simon Still // 2 threads
Our proposals at a glance
Transport for London (TfL), together with Lambeth Council would like to know your views on proposals for improvements which will include:
To complement this scheme we have been working with Lambeth Council to develop a Low Traffic Neighbourhood in the nearby residential areas to the east of the A23. This will complement the A23 scheme by protecting local streets from through traffic and will help deliver wider objectives such as creating Healthy Routes on local roads. Visit the consultation page of Lambeth’s website from the 22 February 2020 to find out more.
Created by Dominic Fee // 1 thread
This issue covers Westminster City Council's proposals for a Quietway route from Green Park to Marylebone
Created by Richard Jennings // 1 thread
The Avenues Shambles
Few people who live in the area will be happy with the situation on The Avenues. A couple of years ago the city won a grant to improve cycle routes around the city, called a “Cycle City Ambition Grant”. The first route to be improved was the one that came along the Avenues, known as the “Pink” route. After two years of planning, public meetings and proposals we are left with the dangerous inadequate mess we see today.
Why is The Avenues Special?
Far more bikes use The Avenues than any other road in the city, "nearly 700,000 in 2016 according to the Air Quality Status Report for 2018. Most are students at UEA or workers at the Hospital and Research Parks. It’s also the route hundreds of children should be using to cycle to the City Academy School, so the potential number of cyclists could be even higher if the road were not so dangerous. Logically it should have been the highest priority for providing proper cycle tracks, but it didn’t turn out like that.
Why is it bad?
The road markings only allow enough space for one direction of flow on a two way street, so if it needs to pass traffic has to drive in the cycle lanes and when it gets busy the cycle lane simply disappear. There is basically far too much traffic for this type of design.
Why did we end up with this mess?
That’s a good question but there are clues, take a look on Tombland and the expensive paving around the cathedral gate. All this meant there just wasn’t enough money left to build the proposed cycle tracks and the present botch is the result. The council decided that the cost of doing The Avenues didn’t represent good value for money, yet doing Tombland did. This is a very suspect situation which has left us with an unacceptable, dangerous mess that simply can’t be left as it is.
What can be done?
Created by Dawes Jaguar // 0 threads
There is scope here for creating a short cycle path to complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Dawes Jaguar // 0 threads
College Walk is in a terrible state and the ancient and totally obsolete street lamps no longer turn on at night and off during the day.
Created by Gregory Williams // 2 threads
This provides a flatter, shorter, and traffic-free alternative to the National Cycle Route 18 alignment via Sole Street.
Martin Lucas-Smith // 1 thread
This junction is currently very poor. Cyclists end up doing awkward manoeuvres and visibility is not good.
It is possible this could be improved as part of the Chisholm Trail.
How could this junction be redesigned to make it best practice?
Created by Steven Moseley // 6 threads
Of and relating to Colchester Borough Council.