cars parked in cycle lane
Out side the royal orthopaedic hospital up top 30 cars are parked in the cycle lane every day. Cyclists are forced out into the traffic lane of the A38 over a distance of about 1/4 mile.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by TonyBeaumont // 1 thread
Out side the royal orthopaedic hospital up top 30 cars are parked in the cycle lane every day. Cyclists are forced out into the traffic lane of the A38 over a distance of about 1/4 mile.
Created by Stephan Matthiesen // 0 threads
This route should be signed. It's a very nice quiet bicycle-walking connection between Liberton and Gilmerton, but very difficult to find, especially the footpaths between all the curved bits of Malbet Park/Wynd.
Created by Stephan Matthiesen // 1 thread
Cycle lanes in both directions needs urgent improvment. It's painted on but
- it is far too narrow, encouraging dangerous overtaking
- road surface in the gutter (=cycle lane) extremely bad, with deep&wide cracks, most covers have sunken etc.
- paint has faded
- parking (near the schools)
Many sections of Gilmerton Rd have hatching in the centre, wasting space; these sections would be wide enough for a segregated path (or wide lane protected by bollards/armadillos).
In the narrower sections, the existing bike lane should be removed completely because at the moment it increases the dangers (encouraging cyclists to be in the gutter between kerb and speeding cars).
Created by Stephan Matthiesen // 0 threads
Drum Street is very narrow in Gilmerton, many shops and pedestrians. Should really be included in 20mph.
Created by chdot // 1 thread
Longstanding issue about 'optimum' design, particularly to reduce conflict caused by vehicles turning from Teviot Pl due to signal phases.
Created by Rosie Downes // 5 threads
Transport for London's public consultation on Cycle Superhighway 1 is open from 16 February to 29 March. The LCC office has set up this thread to facilitate discussion of the proposals.
Created by Stephan Matthiesen // 1 thread
Cars and buses southbound often cut the corner at the traffic lights (road bends to left), driving over the cycle lane.
The cycle lane leads up to the lights but ends there and restarts some distance along the road.
It is dangerous because drivers think that cyclists are out of the way in their own lane, even larger vehicles overtake here without realising that they easily move into the bike lane. Attached a photo where that happened to me, on 21 October 2014, the bus overtook and cut me off, I had to slam the brakes in order not to be squashed.
The bike lane should be clearly separated here, bypassing the traffic lights completely.
Created by Stephan Matthiesen // 0 threads
Drivers often cut the corner at the Bank of Scotland, driving over the cycle lane. The current layout encourages drivers to overtake without giving people on bicycles the necessary distance. Parking is also a dangerous problem here.
It would be easy to install plastic highway bollards here along the cycle lane which would encourage drivers not to encroach on the cycle lane.
Created by Stephan Matthiesen // 1 thread
Very difficult to cross here, coming from Brunstane Burn Walkway to turn right towards Musselburgh.
The timing of the traffic lights seems to be such that there is almost always traffic from one direction, so one often has to wait for very long here.
Created by Stephan Matthiesen // 0 threads
Lady Rd needs a segregated cycle path uphills. It's very steep uphills with dense&fast traffic, and it is particularly difficult to turn right.
Created by Stephan Matthiesen // 0 threads
Apparently it is not possible to close the road to through-traffic, but it could be significantly discouraged by making it a less convenient ratrun.
I suggest at the entrance to the carpark of Inch House the road could be changed to create a very tight corner. This would not affect people going to Inch House from either direction, but it would make it less convenient to drive through, and slow down the cars (there is a blind corner behind the house).
Created by Stephan Matthiesen // 1 thread
The road through Inch Park has a lot of very high/short speed bumps which are total bone-shakers for people on bicycles - dunno how many eggs I have broken cycling home from the shopping centre.
I realise aggressive speed bumps are there to remind drivers of the 10mph speed limit.
Perhaps they could be changed to have a gap or a shallower ramp in the centre so that they are easier on bicycles. Some actually have pothole repairs which essentially created such a ramp and they are much nicer.
Presumably this would also be better for users of mobility scooters.
Created by edge // 1 thread
When approaching this junction from the East on Widney Lane (and possibly other directions as well), the traffic lights do not detect the presence of waiting cycles.
Since the default priority at this junction is for traffic on the Blossomfield Rd / Marshall Lake Road axis, this means that cycles heading from Widney Lane to Longmore Road have to wait indefinitely to cross the junction.
In busy times this is not a problem, because a waiting car will trigger the traffic lights to change.
However, at quiet times this effectively means cycles cannot cross this junction legally at all. I have experimentally waited more than 5 minutes for the lights to change. Unless a car comes to trigger the change, cyclists are stuck.
This "bike-blindness" built into the road signalling infrastructure is unfortunately not uncommon. As well as being inconvenient for and disrespectful of cyclists, it reinforces the notion that bicycles are second-class road-users - indeed that they do not really belong on the road at all.
Created by Stephan Matthiesen // 0 threads
It would be great to have a pedestrian/bicycle entrance in the South East corner of Kings Buildings. This would be of much benefit to everybody coming from the south, as you can avoid the steep, busy Mayfield Road.
Created by Stephan Matthiesen // 0 threads
The shared footpath under the bypass ends at the bottom of Loanhead Rd and then there is no suitable connection into the Straiton Retail Park area.
Loanhead Rd is very steep with fast cars. Straiton Rd is fast dual road with unconnected bits of narrow painted cycle lanes. Both are total barriers for other than high-risk extreme sports enthusiasts. No way families could cycle to the shopping centre here.
The connections into Edinburgh (Burdiehouse Burn, or the new Loanhead-Lasswade path) are actually really good, so it's particularly sad that you're dumped in a car hell on the last few hundred metres.
Created by Stephan Matthiesen // 0 threads
Need considerably more bicycle parking at the shopping centre. The few racks here are often overfull.
Created by Stephan Matthiesen // 0 threads
Need proper bike parking in front of Summerhall. Bikes chained to the guardrails are a hazard for pedestrians.
Some should be right at the entrance, some more could be at the front of Summerhall Square (please not tugged away somewhere at the back of Summerhall Square where it would be perfect for thieves).
Created by Stephan Matthiesen // 0 threads
Contraflow bike lane in Salisbury Rd for easier access from Southside to Commonwealth Pool, Pollock Halls and Holyrood Park.
Created by Stephan Matthiesen // 0 threads
Contraflow here would make it much easier to get from Pleasance and Geography Dept in Drummond Street to South Bridge and avoid the uphills detour to Hill Place.
Created by Stephan Matthiesen // 0 threads
Contraflow bike lane to make it easier to get from University to East Crosscauseway (St Leonhards, Innocent etc.) and St Patrick Square.
Created by Stephan Matthiesen // 0 threads
Make more pedestrian friendly and discourage car use. There has been a fatal collision in 2012 but near hits are common.
Remove the fence around the garden, or add additional entrances on all four corners, to open it up and enable pedestrians to use the garden to cross the square in East-West direction and diagonally. At the moment it doesn't have an exit in the west, making it a dead end and barrier for people moving between Nicolson St and Potterrow.
The pavement on the south (from Mosque kitchen to the libanese restaurant) are far too narrow. Double yellow lines regularly ignored, creating blind corners, making it difficult for pedestrians to cross.
Marshall Street should be narrowed considerably to one lane, as it's really only used for a few bus lines, no need to have two fairly wide lanes here. The southern pavement far too narrow, but it is very busy with pedestrians.
It is used a lot as ratrun between Nicolson Street and Potterrow.
Created by Stephan Matthiesen // 0 threads
These racks are too close to the wall so you can't actually lean a bicycle against them in a stable way.
Also why only so few in such a central and busy location?
Created by Stephan Matthiesen // 0 threads
Need much more bicycle parking here, also to access Nicolson Street.
Created by Stephan Matthiesen // 0 threads
The whole area is a barrier, there are no connections between North Bridge, St Andrews Sq/George St and top of Leith Walk without lot of bus/taxi/confused private car drivers and cyclist-blender junctions.
Created by Stephan Matthiesen // 0 threads
Cobbles, tarmac patches etc almost impossible to cycle on.
These streets are key connections between centre and the Innocent Path.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by jpennycook // 1 thread
Request for a screening opinion for the erection of a motorway service area
Land At O/S Grid Ref 460946 147950 M3 Basingstoke Hampshire
Basingstoke
Application reference : 16/02767/ENSC
http://pad.basingstoke.gov.uk/DocumentViewer/?DocumentClassCode=DC&Folder1Reference=16/02767/ENSC
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099199.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099197.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/10/05/01100568.PDF
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
Created by Sefton // 1 thread
The Lovers Loan shared path through the Grange has at least 5 very tight barriers along its length, and missing dropped kerbs - especially at the crossing of Dick Place. Removing barriers or widening them would make it much more easy to use for bikes, buggies and wheelchairs. Even some double pushchairs don't fit!
Created by Chris Peck // 1 thread
A long, tortuous issue, where no progress has been made, despite large amounts of effort. Godalming High Street was recommended for adopting as a trial two-way working for cyclists in 2001, thanks to Alec McCalden's excellent presentation to the Planning Inspector at the time.
However, the trial was never carried out. Cyclists continue to use the street in both directions, as there are plenty of ways to get out of the way of oncoming cars.
The City of London has introduced dozens of contra-flow cycling schemes on narrow streets and lanes across the City. A third of all the cyclists are now using the contraflow. There has been 1 cycle crash three years post-introduction (there were 2 in the three years before). See here for more details: https://www.ucl.ac.uk/transport-institute/pdfs/Cheung_slides.pdf
Created by Charlie Halliday // 5 threads
Proposal to address Farnborough Town Action Plan reference CW39. Issue: Alexandra Road, safety, pedestrian and cycle links.
Consultation documents may be downloaded from:
http://www3.hants.gov.uk/transport-schemes-index/farnborough-alexandra-road.htm
They are also on view in the reception area at Rushmoor Borough Council Offices, Farnborough Road during the consultation period
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
St Neots is receiving some funding as part of the Future High Streets Fund - this could include investment in cycling and walking infrastructure.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
Camcycle's time and energy is consistently taken up removing exclusionary barriers (e.g. Biomedical Campus, A14 active travel bridges, Warren Road). We need to consider long-term ways to prevent new barriers going in and remove existing ones which prevent people of all ages and abilities cycling.
Created by Fraser // 0 threads
Travelling along Fore Street from the East where it splits with Key Street there are several traffic calming patches and speed bumps that are difficult and dangerous to negotiate on a bike.
In particular the three sections of cobbles; as the street becomes one way just before Fore Street Pools, just before you cross Star Lane, and just after crossing Star Lane.
They are so ragged that as a cyclist you have to almost come to a stop, where as other road users can travel over them at ~20mph.
This makes them extremely dangerous as just after accelerating away from the traffic lights you then need to slow almost to a stop and weave your way through the cobbles while the traffic behind you is expecting to carry on and the street is too narrow for them to safely overtake.
The section of Fore Street between Star Lane and Eagle Street has better speed humps (still not great, but a dream compared with the above mentioned cobble sections!) with flat section at the sides so that bikes may pass them safely. However the flat sections are occasionally blocked by parked vehicles forcing cyclists over the speed humps.
The less said about the time it takes to negotiate these three sets of traffic lights the better!
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by CycleSi // 2 threads
TfL are undertaking major junction improvements at several gyratory systems. All of them include protected cycle lanes/tracks, except Wandsworth!
The local London Cycle Campaign group is not campaigning and virtually defunct. We desperately need to organise local cyclists and campaigners all over London and beyond to challenge this bizarre scheme.
Oval, Vauxhall, Elephant & Castle, Stockwell, Archway, Aldgate, etc, etc are all getting extensive safe space for cycling.
TfL for some reason (I suspect the blame lies with the borough) have instead decided to claim that the awful shared footpaths and streets with no cycling infrastructure at all that have been designated as 'cycle routes' form part of a 'cycle network'. They are even planning to have Cycle Superhighway 8 run along Wandsworth High Street with not even a painted cycle lane - cyclists will be mixed in with extremely heavy bus traffic.
It seems like no-one is talking about this other than me!! Seriously-argh!!!!
Suggestions, ideas, offers to help campaign all welcome.
Created by Simon Nuttall // 1 thread
Is it legal or not to ride on either Christ's Lane or Milton's Walk ?
Always been a bit of a problem - worse for pedestrians than cyclists.
Detailed (re-)design is apparently underway.
Created by Colin Wing // 3 threads
This is the proposed route of Quietway 88 in Westminster. An alternative option uses the west side of Trafalgar Square instead of Cockspur Street.
Created by Simon Redding // 0 threads
The Jepson Road estate has great cycling infrastructure, but when you get to the west end of it, the path peters out and ends in a fence. Lots of cyclists then carry their bike over a fence and round the end of a culvert to Hartfield Close, but it would be better to just have a cycle gate in the fence straight on to Midland Terrace, which is likely to form part of NCN67 soon.
Created by Iain Lane // 2 threads
Press article in the post today: http://www.nottinghampost.com/Major-route-city-centre-overhauled-priority-buses/story-26177322-detail/story.html
Can't find plans just yet.
Since the changes to Mare St at Westgate St some vehicles travel past the children's centre in Triangle Road, at excessive speeds, to avoid the traffic light at Mare St . Can Hackney Council add a restriction in Triangle Road.
Created by Stephan Matthiesen // 1 thread
Cycle lanes in both directions needs urgent improvment. It's painted on but
- it is far too narrow, encouraging dangerous overtaking
- road surface in the gutter (=cycle lane) extremely bad, with deep&wide cracks, most covers have sunken etc.
- paint has faded
- parking (near the schools)
Many sections of Gilmerton Rd have hatching in the centre, wasting space; these sections would be wide enough for a segregated path (or wide lane protected by bollards/armadillos).
In the narrower sections, the existing bike lane should be removed completely because at the moment it increases the dangers (encouraging cyclists to be in the gutter between kerb and speeding cars).
Created by jennifer Kirner // 1 thread
I am bringing up the problem that cyclists and pedestrians have crossing East Road to get to ARU and the neighbouring residential area. It would be helpful have a discussion about how to create safe routes in this area and how to get them implemented.
When I am cycling, I find it dangerous and difficult to cross East Road from Petersfield or Bradmore Street and I resort to using the pedestrian crossings with my bike because it is.
This area that really needs addressing for improvements to safe cycling and I don’t understand why given the expansion of ARU this has not been addressed.
The junction of Mill Road/East Road is also pretty scary for cyclists and pedestrians. The crossing at the slip road at the corner of Petersfield is difficult for pedestrians because it has no traffic controls and cars come quickly round this corner making it dangerous for anyone who is not alert , who is not tall enough to see, or who can't move quickly. This includes the young, the old, someone in a wheelchair. I wouldn't fancy pushing a child in a buggy across either.
Basically, it seems to me that the Junction and East road are designed for motor vehicles and traffic flow not for pedestrians and cyclists. Can we try and address this?
Created by jpennycook // 1 thread
Erection of 40 dwellings to include 24 private homes and 16 affordable homes, associated parking, landscaping, amenity space and highway alterations
Land At Farleigh Road Farleigh Road Cliddesden Hampshire
Basingstoke
Application reference : 16/04690/FUL
Created by George Britton // 1 thread
Aldershot Urban Extension - Green Light from RBC
Created by Gregory Williams // 1 thread
Planning application Y12/0897/SH proposes the redevelopment of a significant portion Folkestone Harbour and surrounding land. The proposals include up to 1000 dwellings and up to 10000sqm of commercial landuse. NCR2 runs through the development area.
Created by jpennycook // 1 thread
15/04503/OUT | Outline application to include access to be considered, for up to 750 residential units with a mix of units, and a neighbourhood centre including principal community centre, private children's nursery, local retail facilities, indoor sports hall and three form entry primary school and ancillary development | Hounsome Fields Trenchard Lane Dummer Hampshire
Created by GG // 1 thread
For a long time I have wondered about a crowd-sourced cycleability map.
In this, people cycle along a link (accepting the first question of how to define the beginning and end of this) then give it a thumbs up or down. After enough people do this, then others can see how popular it is.
Some people wonder about subjectivity but I think this should be less of a problem with more voters.
The reason I am asking is because this method could apply to a potential commercial project for a Council which wants to drive around 100km of rural roads and use a panel of 4 experts to grade meaningful segments on a 1 to 7 scale according to their suitability for HGV movements.
Any views on whether this is already done within an app I am not aware of, or could be it done by anyone as an add-on to something else, or is it something CamCycle could offer as a commercial package (there may well be more than one local authority looking for this sort of thing)
POSSIBLE Cycle Route Between Lowedges Rd/Chesterfield Rd + Bradway Fire Station Sheffield S8........using existing 8ft wide pavements by upgrading to "shared use".........This could connect to the new cycling "on + off " road routes being developed in the Meadowhead School area
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?