Issues
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
-
-
post removed ( Nightingale Avenue )
Post removed , increased usage by cars .
-
Camber on bike entrance going east on Glisson Road not trike-friendly
Turning from Hills Road onto Glisson Road going east, there’s a “cycles only” lane on the left-hand side, with a concrete separate from traffic in the other direction. The camber is extremely steep in the cycle gap, and risks our cargo trike overturning. The barrier is well meant, but ultimately the steep camber means we have to enter on the wrong side of the barrier, which is less rather than more safe than not having a battier at all.
-
-
Damaged bridleway sign
The Heathfield Bridleway is generally a good piece of off-road provision that links Thriplow to Heathfield/Duxford whilst avoiding the A505. The sign is damaged; Cambs CC say it’s not their duty to repair/replace.
-
Westbrook centre redevelopment
There are plans to redevelop the Westbrook Centre to a life sciences campus.
There is a "listening event" today Wednesday 17th May 3pm at St Luke's Church, Victoria Road.
-
23/01815/FUL Residential (Cherry Hinton)
Eight flats, six car parking spaces, eight bike parking spaces. Access from Cherry Hinton Road, within the queue region for the 'Robin Hood' junction, across the existing shared-use path.
-
23/01701/FUL Change of use of from office to student accommodation - 8 rooms
Change of use of first, second and third floors from office (Class E) to student accommodation (Class C2) comprising 8 student rooms and ancillary facilities. External works comprising the installation of an external staircase and entrance, PV panels to the roof and an Air Source Heat Pump at ground floor level. Installation of two openings into the listed wall for means of access and daylight to the rear.
First Floor And Second Floor And Third Floor 98 Regent Street Cambridge Cambridgeshire CB2 1DP
Cambridge
Application reference : 23/01701/FUL
-
Planned layout of new cycle/pedestrian crossing on Milton Road near Ascham Road
I noticed that on the plans for the ongoing Milton Road development, the plan for a new double split cycle/pedestrian crossing across Milton Road near Chesterton Hall Crescent/Ascham Road has the cycle crossing on the East side and the pedestrian crossing on the West side. The problem with this is it is the opposite way round from the way cyclists/pedestrians approach the crossing from Chesterton Hall Crescent (cyclists on the West, pedestrians on the East). In the mornings, this crossing is extremely busy with pedestrians and cyclists travelling from South to North (to reach Milton Road primary school and Chesterton Community College), and at the north side of the crossing, cyclists need to be on the West side to travel up Ascham Road and the pedestrians tend to walk on the east pavement. The new crossing plan would mean cyclists having to cross the flow of pedestrians on both sides of Milton Road. This would lead to queues of bikes on the crossing (in the road) and seems quite dangerous. I think it would create a natural flow if the crossings were switched to have the cycle crossing on the west (and this is how cyclists and pedestrians naturally organise themselves on the current toucan crossing)? I've included a photo where I've drawn arrows showing the cyclist/pedestrian flow lines in the current plan and if the crossings were switched. It hasn't been built yet so I wondered if there is a way to suggest this to GCP and do you think a change would be considered at this stage?
-
Mile Road /Roman Road /A 1307
Hi ! , I am writing to you to voice my concerns that the Bridleway ( Mile Road ) between the Roman Road and the A 1307 is
under threat .
As a regular user of this route ( cycle ) I first noticed that the finger post on the A 1307 had been removed some weeks ago
and on passing that way today found mounds of earth had been pushed up to the large gate making it almost impossible to
pass through . This route is heavily used by people wanting to go from Fulbourn to Babraham or just for walking . It is a well
defined route on all the maps / cycling Apps . I am incredulous that this threat to this route can so easily be blocked . -
Election campaign 2024
It is important that we engage with the candidates at each election, scrutinise their views, and press for commitments to active travel and sustainable transport.
-
New scoping application for 'Land South of Coldham's Lane'
Hybrid Planning Application at Land South of Coldhams Lane comprising: Full Application for 'Parcel A' Building 1 (Use Classes E(g)(i) (Offices), E(g)(ii) (Research and Development)) and the Hub Building (sui generis) with associated car and cycle parking, Outline Application for the remainder of 'Parcel A' for E(g) uses including office, research and development, car and cycle parking, landscaping, infrastructure and associated works, with all other matters reserved except for access, Full Application for ecological enhancements to 'Parcel B', Full Application for landscape improvements and access to 'Parcel C'.
Land South Of Coldhams Lane Cambridge Cambridgeshire
Cambridge
Application reference : 23/01683/SCOP
-
temporary fencing on Haling way
Temporary fencing, for no apparent purpose, that then becomes a hazard as it falls over or degrades.
-
A users first approach to cycle infrastructure design.
How can we tell whether a bicycling environment is good or bad? How many times have you been cycling along a piece of existing infrastructure only to find the word 'end' written on the pavement and yourself forced back onto the road into traffic?
With this in mind, I am undertaking a piece of research as part of my masters dissertation at Queens College, University of Cambridge. I am gathering primary data of existing users of the current cycling network across Cambridge. From this data I will be able to assess the coherence and directness of the existing cycle network and identify potential 'bottlenecks' and issues from the point of view of the users.
-
Greenway: Lode to Swaffham Bulbeck
Because of a combination of subsidence and grass tussocks growing through the path, my wife's e-trike tipped over on the Greenway path between Lode and Longmeadow this afternoon. Fortunately she is only bruised and shaken but it could clearly have been a lot worse. I have reported it to Cambs Highways as an emergency.
Unless and until it is repaired, I would advise extreme caution on this section of the Greenway or use the Bottisham Greenway, Tunbridge Lane, Park End and Swaffham Bulbeck High Street instead. The on-road sections of the latter are usually pretty quiet.
-
23/1287/FUL Extension of and alterations to Quy Mill Hotel
The area covered includes the cycle route to Church Road. It may also be useful to look at the cycle parking.
-
Extension of 19-35 Regent Street
Downing College are proposing to extend and rework the old 'Pizza hut building' on the corner of Parker's Piece.
I can't see any obvious issues other than making sure that sufficient cycle parking is created. I think they are intending to put this within the main college grounds themselves, over the road, which probably makes most sense.
-
Government Transport Policy
This (apparently) revised draft leaves little/nothing for any other forms of transport and continues a policy of road expansion.
-
Planning application: 23/00795/FUL Wendy's restaurant, Emmanuel St
Change of us from Class E to a composite restaurant (Class E) and takeaway use together with external changes
56 St Andrews Street Cambridge Cambridgeshire CB2 3DA
Application reference : 23/00795/FUL.
The plans indicate that the existing heavily-used cycle parking will, at least in part, be removed.
-
Hills Road North Sixth Form College
Not much information yet, but Hills Road Sixth Form College are hoping to create a second base to the north/east.
-
Planning application : 23/00872/REM Plaza adjacent to proposed primary school
Plaza adjacent to proposed primary school on key phase 1
Waterbeach Barracks Key Phase 1 Primary School Plaza Denny End Road Waterbeach Cambridgeshire CB25 9PA
South Cambridgeshire
Application reference : 23/00872/REM
I haven't spotted whatever it is that is supposed to provide "access for picking up and dropping off pupils". There seems to be a 5-Sheffield toastrack ("exact product TBC") on what looks like the 'drive' (next to 'He' which means heritage surface coarse asphalt). I do not see anything that would encourage use of Bakfiets etc.
Image is a crop from LANDSCAPE GENERAL ARRANGEMENT PLAN
-
Social Media Hostility
I have noticed that especially since the congestion charge there has been a lot of aggression towards Camcycle in social media comments. Notably on Facebook, Nextdoor, etc. I am aware that angry aggressive people have always been on the internet but I do feel the level has increased since congestion charge notoriety, with many people's opinions degenerating into conspiracy theories about Camcycle and the council.
I do worry about the effect this can have on increasing "us vs them" mentality and increasing aggressive behaviour towards cyclists on the road.
-
22/05018/REM - land to the west of Cherry Hinton Road/ Airport Way
We might need to look at the road layout proposed here.
-
Blockage on Horningsea Greenway in Fen Ditton
Works on the Greenway on east side of the Horningsea Road. No provision for cyclists to pass safely. Only option is to cross at previous pedestrian crossings, though there is no signage to indicate this.
-
Lincoln's lane car park crossing
Improvements required for safe crossing of walkers, cyclists and horseriders using the main path through the forest.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
-
No cycling space on Marine Parade
Residents of Kemptown are unable to join the Madeira Drive cyclepath approaching it from the north unless they cycle along Marine Parade to the Pier or to the Duke's Mound sliproad. This means they have two options:
1) cycle on Marine Parade which is a busy A road.
2) cycle on the promenade which is unofficially shared with pedestrians.
Neither of these options are safe.
-
Joining Bath Spa Uni with Bristol-Bath Railway Path
For additional commuter access to the Newton Park campus of Bath Spa uni, does anyone have any ideas about upgrading the footpath over the field from route 4, under the railway to the new path on the A4, linking up with the university.
I realise that for westbound commuters, this duplicates the route which took some effort to get made on the A4, and that it needs a new right of way to be made/purchased/recovered from the historic record, but it looks like a good link.
-
St. Michael's Retail Park proposed on Smiths Industries site (ex-Tesco)
Area Estates are proposing to build a retail park on the former Smiths Industries site between Winchester Road and Harrow Way, in Basingstoke. This was formerly owned by Tesco, who failed to build a supermarket there.
No cycling access has been proposed, and the provision for cycle parking is inadequate - insufficient for customers, and none for staff.Please submit feedback to the developer.
No planning application yet, but previous applications for the site are here: https://planning.basingstoke.gov.uk/online-applications/propertyDetails.do?activeTab=relatedCases&keyVal=H44MKACRLI568
-
Sheen Rd / Upper Richmond Rd West - segregation needed
Despite the cycle lanes being mandatory along this stretch the road layout is such that vehicles frequently intrude into the cyclelane - as this bus did.
White paint does not work on this stretch and some other segregation method is needed -eg a kerb; vertical posts or similar.
-
Poor road quality on Newmarket Road
It has an uneven degraded surface in the cycle lanes from the Elizabeth Way roundabout until the bridge.
-
Barrier on entrance to Nightingale Valley from Wick Rd
Friend of mine uses a wheelchair & hand cycle and is blocked this gate on his way home. Would be great if we could get it opened for him. [Jack Small]
-
U&C Outline planning Application
Objections to U&Cs outline planning application need to be submitted by 10 April. There seem to be some interesting ideas for improving cycling infrastructure but a lot that could be improved upon.
-
Hipper Valley Trail: Walton Dam and Somersall Park Poor Surface
This well-used trail is in desperate need of resurfacing. During spells of wet weather, it has large puddles at regular intervals and there is a particularly huge "mud bath" at the western end of Walton Dam just by the entrance to the woods. Currently (July 2014) the mud bath is reasonably, but not completely, dry but as recently as June it has been very muddy and was terrible over winter.
This is one of Chesterfield's major cycling routes and these conditions make it unreasonable to use it for transport journeys (ie. commuting and shopping) in normal clothes because the bike gets caked in mud and it splashes over your shoes and trousers, even with mudguards.
Alongside Walton Dam, I believe this path is supposed to be nominally 3 metres wide but vegetation has grown into the gravel surface making it significantly narrower (single file) in places.
The sloped tarmac section at the Walton Road end is suffering encroachment from overgrown vegetation and there is an unnecessary pinch-point part way down (a row of wooden posts) which could be opened up with perhaps only a single post if really necessary, or ideally none at all.
In Somersall Park, immediately to the south of the river bridge, there is a particularly rough patch of surface which, ironically, is the most recently resurfaced section of path. It's so incredibly rough that you have to be extra careful and slow if carrying delicate items like a laptop or fragile shopping (eg. soft fruit or eggs).
-
Busway cycleway flooded
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
-
NE Ipswich missing link at Woodbridge Road railway bridge
The cycle link from Bramley Hill to Haslemere Drive has opened up a route via Lacey Street, Haslemere Drive and Bramley Hill as a much quieter parallel route to Woodbridge Road for cycles.
However, to proceed to North East Ipswich from here means cycling (or indeed walking or driving) via Woodbridge Road at the point where it crosses the railway line. There are no other crossings for a considerable distance to the North or South.
The land fronting Woodbridge Road to the North is currently for sale for residential development.
If this land is developed I believe that this should include an additional cycle and pedestrian bridge over the railway to Belvedere Road to open up access to the residential areas NE of this (as well as Sidegate Lane Primary School) without having to use Woodbridge Road.
-
S/3018/15/COND5 Northstowe Phase 1 cycle routes details
Surfacing includes gravel and grit.
Cycle chicanes shown on diagrams.
-
signage on cycle-pedestrian path next to Trumpington allotments, Cambridge
Hello, I'm wondering how many other Cambridge cyclists have shared the experience I've had (about once per month now) regarding a particular elderly lady who insists that bikes are not allowed on the "footpath" adjacent to the Trumpington allotments, between Shelford Rd & the new busway in CB2. This path seems clearly demarcated as a shared pedestrian-cycle path on the cycle maps provided at the council link (below). However, it is not clearly labeled as such on the path itself, leading her to become quite angry with any cyclist who gets near her & her dog while they're out walking (and obstructing the path to underscore her point). "It's a footpath" she yells, and storms away.
So my questions are 1) am I correct in interpreting the council map (below) as permitting bikes on this path and 2) how might one go about requesting proper signage, clearly saying bikes & pedestrians are both welcome?
Thanks for any feedback, Robert
https://www.cambridge.gov.uk/sites/www.cambridge.gov.uk/files/documents/cambridge-cycling-map.pdf -
Possible effect on cycle route in Chesterton
Need to check this planning application for access issues. It proposes to make a new car entrance through a high wall across a pavement at the end of Chesterton Road.
The cycleway cut-through here is very poor currently.
-
Lack of offer at Hazel Court HWRC
The main HWRC depot which is out of bounds unless you turn up in a car offers a wide range of recycling opportunities. The pedestrian/cycle area directly of Hazel Court offers none of this other than the main recycling types that are available through household waste collections, and tin foil.
Its hardly acceptable to think that just because you're arriving by bike/foot you won't be able bring other items. All that happens is things either get wrongly sorted or left on the floor causing the area to become a state. -
Tennyson Road Crossing NCN 1&11 King's Lynn
This is one of the most difficult and dangerous sections of the local cycle network. A point where cycle traffic to 2 local schools, a college and a local park all meet.
Fast heavy traffic
Very poor sight-lines
Cars parking over dropped kerbs
Any suggestions as to how it can be improved?
-
Chartham to Godmersham cycle route
This provides a flatter, shorter, and traffic-free alternative to the National Cycle Route 18 alignment via Sole Street.
-
College Walk
College Walk is in a terrible state and the ancient and totally obsolete street lamps no longer turn on at night and off during the day.
-
The Avenues cycle route
The Avenues Shambles
Few people who live in the area will be happy with the situation on The Avenues. A couple of years ago the city won a grant to improve cycle routes around the city, called a “Cycle City Ambition Grant”. The first route to be improved was the one that came along the Avenues, known as the “Pink” route. After two years of planning, public meetings and proposals we are left with the dangerous inadequate mess we see today.
Why is The Avenues Special?
Far more bikes use The Avenues than any other road in the city, "nearly 700,000 in 2016 according to the Air Quality Status Report for 2018. Most are students at UEA or workers at the Hospital and Research Parks. It’s also the route hundreds of children should be using to cycle to the City Academy School, so the potential number of cyclists could be even higher if the road were not so dangerous. Logically it should have been the highest priority for providing proper cycle tracks, but it didn’t turn out like that.
Why is it bad?
The road markings only allow enough space for one direction of flow on a two way street, so if it needs to pass traffic has to drive in the cycle lanes and when it gets busy the cycle lane simply disappear. There is basically far too much traffic for this type of design.
Why did we end up with this mess?
That’s a good question but there are clues, take a look on Tombland and the expensive paving around the cathedral gate. All this meant there just wasn’t enough money left to build the proposed cycle tracks and the present botch is the result. The council decided that the cost of doing The Avenues didn’t represent good value for money, yet doing Tombland did. This is a very suspect situation which has left us with an unacceptable, dangerous mess that simply can’t be left as it is.
What can be done?
-
Quietway route from Green Park to Marylebone
This issue covers Westminster City Council's proposals for a Quietway route from Green Park to Marylebone
-
Queensway Hatfield
Shared use cycle path under construction but delayed completion now set for the end of February 2016. The path with extend the route from Hatfield station up to the town centre and then via the not so good on road lanes to the University and Business Park.
-
Off road route to redbourn
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
-
Braidwood Gate missing dropped kerb
There should be a dropped kerb at the foot of Braidwood Gate, leading to Dumbiedykes
-
Fixing none optimal lanes
I cycle past this junction a lot, and sometimes the lights are red so I wait and look at the lanes and wonder why they're like this.