Trail Link needed
An obvious link between the very well publicised and used Brierley trail and Skegby Trail is required in this plot of land to enable circular routes to be created
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Steve Crapper // 1 thread
An obvious link between the very well publicised and used Brierley trail and Skegby Trail is required in this plot of land to enable circular routes to be created
Created by Steven Moseley // 1 thread
Created by Jean Dollimore // 1 thread
All of the schemes operate timed road closures on Mondays to Fridays e.g. from 8.15am-9.15am and 3pm-4pm in term time.
In all but one of the schemes, it is stated that the restrictions will be enforced using Automatic Number Plate Recognition (ANPR) cameras.
Each scheme would be introduced as a trial for a maximum of 18 months with a further consultation After 12 months.
Exemptions: properties and businesses in the closed section of the affected road, emergency services, bin lorries, blue badge and pupils of the school that have a disability that prevents them from using active travel.
A few nice surprises here, marked with asterisks ***
Brookfield School
A Healthy School Street on Croftdown Road, between the junction with Chester Road and the east side of the junction with St. Albans Road.
And close with planters and bollards the west side of the junction Croftdown Road/ St Albans Road
Consultation on Camden’s website:
https://consultations.wearecamden.org/supporting-communities/healthy-school-streets-brookfield/
Kentish Town Church of England Primary School
A Healthy School Street on Islip Street, from Frideswide Place to the junction with Hammond Street.
*** Create a permanent restriction on Hammond Street by placing planters halfway between Islip Street and Caversham Road.
Temporary widening of footway outside school. Why temporary?
Removal of some guard rails
Consultation on Camden’s website:
https://consultations.wearecamden.org/supporting-communities/healthy-school-streets-kentish-town/
Christopher Hatton Primary School
1. A Healthy School Street On Mount Pleasant, between the junction with Grays Inn Road and the junction with Elm Street.
No mention of the use of ANPR cameras.
*** 2. Make permanent the trial scheme in Laystall Street north of Rosebery Avenue which implemented a mid-point closure and allowed two-way cycling.
Consultation on Camden’s website
Argyle Primary School
A Healthy School Street road on Bidborough Street, Hastings Street and Tonbridge Street.
*** The one-way systems on all three streets would remain in place, with the addition of a contraflow for cycles.
Consultation on Camden’s website
https://consultations.wearecamden.org/supporting-communities/healthy-school-streets-argyle/
St Mary and St Pancras School
A Healthy School Street on Polygon Road between Chalton Street and Werrington Street.
Consultation on Camden’s website:
Ecole Jeanine Manuel
A Healthy School Street on the south side of Bedford Square which is one-way westbound.
from the junction with Bloomsbury Street to Adeline Place
*** Add a contraflow cycle lane to the southern side of Bedford Square
Consultation on Camden’s website:
Created by Jean Dollimore // 1 thread
The proposal is to made a Tiger crossing over Mansfield Road between Estelle Roads and the cut-through to Elaine Grove. This will replace the existing zebra crossing. The following supporting measures are also proposed:
The improvement of this crossing is in preparation for the extension of C6 from Kentish Town via Castle Road, Castelehaven Road and Grafton Road to reach Hampstead Heath at Savernake bridge.
Implement on 18 month ETO,
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Change of use to large HMO (8 bed) including conversion of existing garage to make the 8th bedroom with ensuite.
189 Arbury Road, Cambridge, CB4 2JJ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00182/PRI03O | Prior approval for change of use of offices (Class B1(a) to 3 No. dwellinghouses (Class C3)
175-179 Newmarket Road, Cambridge, CB5 8HA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/04992/FUL: Conversion of bungalow to a two storey dwelling comprising of 4 flats
538 Newmarket Road, Cambridge, CB5 8LL
Created by Jean Dollimore // 1 thread
This scheme is intended to reduce through traffic on King Henry’s Road and Elsworthy Road, both of which have ~ 2000 motor vehicle movements per day in each direction, 74% of which is through traffic. In addition, average speeds are well in excess of 20 mph.
To stop the rat-running and to reduce the traffic volumes and speeds on King Henry’s Road and Elsworthy Road, Camden proposes the following point closures:
In addition, Camden proposes:
It's hard to know where (and when) all the future cycling-related developments are, so a map showing them could be very useful. This issue is to discuss this idea, if it is useful, or already exists somewhere, and how it might be done.
20/05040/FUL | The erection of a new building comprising E(g) floorspace with car and cycle parking, landscaping and associated infrastructure | Land To The West Of Peterhouse Technology Park Fulbourn Road Cambridge CB1 9NJ
Created by Steven Moseley // 1 thread
Development of 102 dwellings with associated parking, landscaping, open space, drainage and infrastructure and the formation of a vehicular access onto London Road
Created by Roxanne (CEO) // 1 thread
Issue to collect various government strategies related to transport that might impact cycling but are not specifically related to cycling.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/04969/FUL: Three storey front and rear extensions, alterations to the office building, replacement cycle store, new plant compound and installation of EV charging points.
Babbage House, Castle Park, Cambridge, CB3 0AT
Created by George Coulouris // 1 thread
The proposals will trial a motor traffic-free environment that reduces traffic volumes and speeds, supports the existing market and local businesses, and allows more space for social distancing, walking, and cycling. The proposals also include measures at the junction of Queen’s Crescent and Grafton Road to prevent rat running traffic from using Grafton Road and Vicar’s Road and create a safer and quieter environment for residents in that area.
Camden have announced a consultation trial closures of Queen's Crescent (the market area) and Grafton Road. The resulting reduction in motor traffic will improve cycling conditions massively on Grafton Road in particular and in adjacent streets to a lesser extent. This, in conjunction with this scheme including the closure of Anglers Lane (decision to go ahead) should result in a sizeable LTN in all but name.
The contra-flow (westbound) cycle lane on Plender Street has been closed by the building works to the former Methodist Chapel. There is signage up saying "cycle lane closed".
Created by George Coulouris // 1 thread
Change of use from industrial (Class B2) to flexible industrial (Class B2)/ storage or distribution (Class B8)/ light industrial (Class E),
If this is approved it will result in a continual flow of vans all day on Holmes Road and Grafton Road, both of which are already overloaded with traffic and have primary schools on them. Grafton Road is part of a Cycling Quiet Way between Camden Town and Highgate also connecting to Hampstead Heath (Constantine Road) and it is planned to upgrade this route to be part of cycleway C6
We intend to submit an objection to the application and to coordinate our response with Inkerman Area Residents Association.
Below is a first draft for our response. Please comment and suggest further points for inclusion.
Created by JohnP // 1 thread
The Office of Road and Rail has put out a Consultation on ‘Principles for managing level crossing safety’. See https://www.orr.gov.uk/sites/default/files/2021-01/consultation-on-principles-for-managing-level-crossing-safety-guidance.pdf
I became aware of this when checking out the reason why a stupid 'Cyclists Dismount' sign has appears at one of the Queen Adelaide level crossings. Dismounting on this narrow road that has lots of agricultural vehicle and heavy goods vehicles on it is unwise. On the other hand, the angle at which the rail track crosses the road eats up cycle front wheels regularly. But changing the nature of the hazard is not a sensible way forward.
Created by Roxanne (CEO) // 1 thread
There is a new Living Streets group in Cambridge.
To find out more visit: https://www.livingstreets.org.uk/get-involved/local-groups/cambridge
What can we do to help promote the group and support campaigns for more, better and safer walking?
Created by Jean Dollimore // 1 thread
Camden Council is consulting on changes to Baynes Street which will prevent motor traffic (except buses, emergency and refuse vehicles) from using Baynes Street as a cut-through between St Pancras Way and Royal College Street. They will be able to use Georgiana Street instead.
Baynes Street will be made two-way for all vehicles (including cycles) but no motor vehicles will be able to enter Baynes Street from Royal College Street. Motor vehicles can enter from St Pancras Way to access properties and some parking will be removed to facilitate turning round.
On St Pancras Way - a proposal to widen the northbound cycle lane and to remove the turning pocket.
Created by Jean Dollimore // 1 thread
Camden Council, Brent Council and Westminster Council are consulting on the following joint proposals for the section of Kilburn High Road from West End Lane to Greville Place:
If the scheme goes ahead, it will be implemented under an ETO with a further consultation after 12 months from the start of the ETO period.
Created by Hounslow Cycling Campaign // 1 thread
Redevelopment of the Tesco and Homebase sites near Gillette Corner is an opportunity to improve cycling provision in the area.
Created by Shaun McDonald // 1 thread
Suffolk Design: Streets Guide
Our consultation is for a new Streets Guide, which will assist designing streets for new residential developments especially by promoting walking and cycling.
You are invited to comment on the Suffolk Design: Streets Guide by completing the survey.
The consultation will run from 16 December 2020 until 5pm 10 February 2021.
What we are consulting on
This emerging guidance will assist with the design of new residential developments showing how best to create sustainable transport layouts that promote walking and cycling
The District, Borough and County Councils of Suffolk have been working to improve the design new development through the Suffolk Design initiative. As part of this programme, the County Council commissioned Stantec to produce a new Street Guide to update guidance for residential streets.
Attached is a draft of the emerging Street Design Guide and you are invited to shape the final version of the document.
Download the consultation document:
Suffolk Design: Streets Guide (PDF, 5MB).
Next Steps
Following an eight week public consultation on Suffolk Design: Streets Guide, a report of the consultation will be published when the Streets Guide is presented to Suffolk County Council’s Cabinet.
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
The Fulbourn Parish Council and a group of volunteers from the village has been working to prepare a Neighbourhood Plan to influence the development of the village and the wider Parish.
Created by Jean Dollimore // 1 thread
Camden Council is consulting on its proposals to make it easier to cross over the three roads at this roundabout.
One residents’ and three paid for parking spaces will be removed
The drawing is here
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Peterborough Local Plan identifies the required delivery of 19,440 new homes and 17,600 new jobs by 2036.
The 80-hectare Norwood site will provide 2,000 dwellings, a local centre and primary school. Delivery of the development has been sl=plit into two phases. The first phase includes up to 870 dwellings and auxiliary uses, including a primary school and local centre, and will initially be accessed via Newborough Road. The second phase will complete the build.
Development of 945 dewellings, a local centre, a primary school and a secondary school has already begun at the Paston Reserve (adjacent to the Norwood site).
The project requires improvements along the A16 corridor including a new access roundabout with the A16 and a new junction with Newborough Road. The plan is to connect the two points of access with an internal road.
Highways England have agreed in principle to the proposed interventions.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Henry Lancashire // 1 thread
Info from survey:
"The London Borough of Brent and Sustrans are working together to explore ways in which the Kilburn High Road and surrounding area shown could be improved. Together we want to better meet the needs of the community to make it a more desireable place to walk, cycle and enjoy being in.
...
London Borough of Brent and London Borough of Camden will submit a joint application to Transport for London's Liveable Neighbourhood programme in November 2018, which will incorporate suggestions made by the community."
Brent Cyclists are forming our own response, to be sent by end of October 2018.
Created by jpennycook // 0 threads
The diversion route for Cufaude Lane, installed by Croudace, has a big fence and concrete blocks at the northern end, preventing access to Cufaude Lane.
Created by Andrew Woodward // 1 thread
Create a shared use path (or even better a dedicated cycle track) from the junction of Woodlands Road / Vine Road to Barnes Railway station - this would join LCN37 and providing a quiet route to Barnes Railway station for many residents of Sheen / Mortlake, avoiding the busy A205. This route is currently a footpath.
Pedestrians and cyclists at the toucan crossing where the busway meets Station Road, Histon have to wait a long time for the lights to change even if there is zero bus or road traffic.
This seems inconsistent with Highway Code rule H1 about the hierarchy of road users. Pedestrians should have priority over non-existent buses!
Created by Robin Heydon // 3 threads
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.
Created by Sam Saunders // 1 thread
Cyclists travelling south west along Woodland Road and intending to turn left into Park Row are offered a continuous (advisory) cycle lane that is less then 1.2 metres wide and paved with cobbles for half of its width. It should be removed or else widened and considerable resurfaced.
Created by Phil Lee // 0 threads
What to do about disgraceful decisions like this:
http://www.cambridge-news.co.uk/Driver-ran-Cambridge-cyclist-mistakenly-thinking/story-24555273-detail/story.html ?
Clearly, the magistrate erred seriously in matters of both fact and law - all the prosecution had to prove was that the way he drives falls below what would be expected of a competent and careful driver.
Equally clearly, it did - nobody who could possibly be described as "competent and careful" would run over something the size of a cyclist without even being aware of it. He even admitted that he was talking on the phone at the time.
It staggers the mind to think what on earth the magistrates were thinking - or what with. Maybe they slept through the case, so didn't hear the prosecution, but were woken up for the defence (how there can be any defence for that is beyond me). Maybe they are dangerous drivers themselves, so sympathise with others of the same ilk instead of adequately discharging the responsibilities they are charged with? Mark Tyler also deserves complete contempt for not pleading guilty, and so preventing this gross miscarriage of justice. He should have been thanking his lucky stars that the police and CPS are so incompetent as not to pursue Dangerous driving, which it equally clearly was.
How can we get rid of incompetent idiots like Phil King (the lead magistrate in this case) who asserted that "there were “significant gaps” in the evidence". It is obvious to me that this dangerous idiot is perverting the course of justice by remaining in his position.
Presumably his colleagues on the bench conspired with him in this perversion - they could (and should) have over-ruled him unless they were parties to the conspiracy, surely?
The evidence was all there - there was a cyclist in front of him - whether the cyclist was upright or on the ground is irrelevant. Mark Tyler drove over him. Neither of those facts were in dispute. That is not the action of a competent and careful driver, and it should be beyond question that a person being in front of the vehicle is something which the driver should be expected to be aware of, which means the test in s3ZA of the Road Traffic Act is satisfied, and the accused is guilty.
The evidence also meets the test in s2A (Meaning of dangerous driving) so there is no excuse whatsoever for clearing him of even the lesser offence of careless driving. With driving like that, it is clear, beyond reasonable doubt, that he should not be in possession of a driving license, and the magistrates failed in their duty to relieve him of it.
As long as dangerous criminals like Phil King are allowed on the bench, the roads will never be safe for anyone.
As a footnote, from the report is appears that this dangerous character commutes from Whitchurch, Hampshire to Clifton Way, Cambridge. What length does that make his effective working day?
It's about 120 miles each way, so at least 4 hours driving (considerably more if in the "rush hour") on top of a full workday. It's utterly moronic to make a commute like that - when I worked anywhere near that far away, I commuted weekly. But this happened on a Wednesday.
Created by Roxanne (CEO) // 1 thread
Huawei plans to develop R & D superhub at the 550-acre Spicer's Site in Sawston.
Martin Lucas-Smith // 1 thread
Queen's Road is currently one-way for cycling - it would be good to remove this barrier.
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling and road safety organisations - to review and improve cycling provision at major junctions across London. Please see www.tfl.gov.uk/betterjunctions for more information.
Why We Are Consulting
As part of this work we have developed proposals to improve safety at the Waterloo (IMAX) roundabout at the junctions of Waterloo Road, Stamford Street, York Road and Concert Hall Approach.
What we’re proposing and why
Waterloo roundabout is a key junction for cyclists travelling between central and south London. Counts show that more than 5,500 cyclists use Waterloo roundabout each weekday, representing nearly a quarter of all traffic here.
Our review of the current road layout identified that early improvements can be made to allow cyclists better access to Advanced Stop Lines (ASLs) on the roundabout, reducing the need for them to position themselves amongst fast-moving traffic. We’re proposing the following improvements:
New cycle feeder lanes leading into new longer ASLs will reduce the risk of collisions by helping cyclists to get ahead of other traffic. The new feeder lanes will mean that some sections of the roundabout will have three lanes for all traffic instead of four
Extending footways and traffic islands to reduce traffic speeds and provide more space for pedestrians.
Traffic modelling suggests that these changes would cause some increase in queuing on the roundabout and approaches at busy times, particularly on the approach from Stamford Street.
Proposed 20mph speed limit to follow in 2013
We are also proposing a 20mph speed limit at the roundabout. This would be introduced early in 2013. We will provide more information once these proposals have been developed further.
Please click here to see the map for further information on the proposals.
We are continuing to explore further improvements for cyclists and pedestrians as part of planned longer-term regeneration of the Waterloo area.
We intend to begin work at the roundabout on 21 November 2012. We will write to residents and businesses nearer the time to advise on the timing and impact of construction work.
Have your say
Please give us your views by completing the online consultation form by 14 November 2012.
https://consultations.tfl.gov.uk/betterjunctions/waterloo-roundabout
Created by Charlie Halliday // 1 thread
Proposal by Hampshire County Council to increase the capacity of the roundabout.
Concerns that the carriageway would be even less appealing for cyclists and the shared used paths not an adequate alternative.
Decision to be made on 5 November 2013
Created by carlystevens1989 // 1 thread
There are a number of varying sized pot holes along the Cumberland Road leading up the traffic lights near the Mud Dock Deli, the side of the road with no cycle markings. They are mainly on the edge of the road, the largest being around 12 inches in diameter and are also in succession of each other. I would estimate around 10-15 pot holes in total.
Cars are often less than forthcoming when you have to move into the middle of the road to avoid them and therefore cyclists often cycle on the path in order to avoid them - although this path is wide enough to accommodate a cyclist it is not a shared path.
It would also be useful if this side of the road had cycle markings like the other side.
Created by Jon Warbrick // 1 thread
The County Council have a consultation running on "improvements along Cherry Hinton Road, Cambridge, to make it safer and more attractive for walking and cycling" between Hills road and Perne Road.
The consultation runs until Tuesday 18 June. There are two consultation events at Rock Road Library, 69 Rock Road, Cambridge on Tuesday 21 May and Tuesday 21 May.
Created by Andy Allan // 1 thread
There used to be around 6 covered sheffield stands outside Tulse Hill station, tucked away around the corner from the Station Rise. But they've disappeared recently.
Are they coming back? Are there going to be replacements?
Created by Shaun McDonald // 1 thread
Comment from Cycle Ipswich meeting 10-2014:
"Need dedicated cycle tracks for cycle traffic from new NW Ipswich development".
Anon // 1 thread
Our Healthy Streets: Dulwich
Recent projects and engagement with residents in the Dulwich area have shown a common theme that there is too much traffic in the area, and this is having an adverse effect on local life.
We want to work with residents to address these concerns about traffic volume and its impact on the community.
Phase 1 of 429 April to 7 June
In this first phase we want to hear from you about the issues in this area. We are completely open to your ideas, later phases will look in more detail at possible solutions.
Get involved
Created by Thomas Lancaster // 0 threads
Coming off the Scholars Greenway out of Farnham Park, cyclists currently have to detour along Park Row and the heavily trafficked Castle Street and The Borough to get to The Woolmead, East Street development and South Street to the Station. Bear Lane is wide enough to accept a contraflow to The Woolmead. The Woolmead is currently one way but designated for 2-way traffic as part of the East Street (Brightwells) development.
Created by Dawes Jaguar // 0 threads
There is scope here for creating a short cycle path to complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Andrew Woodward // 0 threads
This is the approach to Kew Gardens station and is an area with many shops and cafe’s. Enabling this street to become 2-way for cycling will make access to the station and shops more convenient for cyclists and should therefore bring economic benefits to the area. Streetview: http://goo.gl/maps/P4spf
Created by Kevin Ablitt // 1 thread
Having grown up in this area I know it well. Bolton Lane and Christchurch Street could benefit from 20 mph, Cobbold Street and Withipoll Street would be more pedestrian and cyclist friendly if they had filtered permeability. Cobbold Street is extremely busy at school times as parents drop off or collect, make it closed half way to motors and this would cut out through traffic . Likely to be very contentious.
Created by Heather Coleman // 1 thread
As described in the winter 2019 Camcycle magazine there is a group working on getting some improvements to the Trumpington busway. The magazine concentrates on the northern end of the busway but we are also seeking upgrades to the Addenbrookes spur junction and the crossing at Hobson Avenue/Lime Avenue as well as adding pedestrian footpath from the Hills Road Bridge all the way to Drury Avenue.
The group would like to start getting this out to users of the path for input, discussion and help with campaigning. Many Biomedical Campus commuters presumably use this path frequently, even daily. It would be great to get some input.
Created by Dawes Jaguar // 1 thread
This path is supposed to be a shared use path, part of the Merritts Brook Greenway. Unfortunately it is the same width as a bicycle and completely unlit. It emerges at an informal crossing upon which cyclists are instructed to dismount. Cyclists are then expected to pedal along the pavement. It's completely useless and unnecessary, as there is a better route via Charfield Close.
Created by Simon Still // 1 thread
In response to resident requests to reduce vehicle speeds and to provide a continuous low-traffic cycling “Quietway” route between Shepherd’s Bush and Kensington High Street, the Council is proposing some changes on Russell Road and other local streets.
Possible changes and implications
On Russell Road, where our surveys confirm that traffic speeds are high, we propose removing the existing chicanes, as these do not work well. This will mean we can create a small amount of additional resident parking. Instead, to reduce traffic speeds, we propose seven sinusoidal humps along the length of Russell Road. They would be spaced in line with national guidance on the optimum spacing to encourage drivers to keep to a consistent speed, thereby minimising accelerating, braking and associated noise and emissions. Sinusoidal humps are designed so that, when driven over at lower speeds, they are noticeably more comfortable to drive over than traditional humps. We have recently introduced sinusoidal humps in St James’s Gardens and we also use them when we resurface roads that have traditional humps - for example, in Abbotsbury Road near Holland Park.
We also propose to remove the centre line to encourage drivers to slow down and take more care whilst driving. In addition, in response to reports of vehicles cutting the corner at the sharp turn onto Russell Gardens, we propose hatching markings, to encourage drivers to position themselves correctly when making the turn.
Other proposed measures
At Russell Road’s junction with Kensington High Street, a new pavement build-out on the west side and introduction of a raised table across Russell Road to slow turning traffic and provide a shorter crossing distance for pedestrians.
Removal of the island at the north end of Elsham Road to provide more space to exit from the cycling contra-flow lane.
Removal of the cycling feeder lane and introduction of an advanced stop line at the junction of Lower Addison Gardens with Holland Road to improve cycle safety.
Removal of approximately three metres of parking to improve entry into the existing segregated cycling facility on Addison Gardens bridge and to provide a safe waiting space for cyclists wishing to turn into Hansard Mews.
Permit contra-flow cycling through Hansard Mews, providing access to Shepherd’s Bush and Holland Park Avenue.
Alterations to the surface of the inclined section of Hansard Mews (approximately 30 metres) to reduce the slip hazard, especially in wet conditions, while minimising the change in appearance.
Introduction of wayfinding signs and road markings along Russell Road, Russell Gardens, Elsham Road, Lower Addison Gardens and Hansard Mews at points where a change of direction is required. We estimate there would need to be around 15-20 signs and symbols across the area.
Created by Chris Neston // 2 threads
This section of the A540 is Dual carriageway North of the Welsh Road (A550) towards Hoylake ( 60 mph) and single carriageway south of it towards Chester ( 50mph). It is used by hundreds of cyclists every week, yet is extremely dangerous to them and there have been numerous collisions and several cyclists have died along here. It provides a vital link between the lanes of Wirral and those of Chester and North Wales. It also houses the world famous Eureka cyclists cafe.
Ideally the whole of the A540 from Chester to Hoylake needs a cycle path, but to provide one over the relatively short section between Mudhouse Lane and Woodbank Lane would make an incredible difference for a small outlay. North of the A550 there is plenty of room alongside the existing road. South is more difficult but not insurmountable.