Abdon Avenue - Bristol Road Link
A cycle path built here would complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Dawes Jaguar // 1 thread
A cycle path built here would complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Dawes Jaguar // 0 threads
This road has been left with a hopelessly outmoded junction geometry, with huge radii and a simply breathtaking width. It's so bad that it's not unknown for oncoming vehicles to pass "continental style", because a perfectly reasonable path turning right into the close will take you way over to the right of anyone making a right turn out of the close (note there are no white lines to provide road positioning guidance). This would in fact make a great cycling link from Cob Lane into the park. There is ample room to create a cycle path and a crossing with a central refuge, and make the junction safer and less bizarre for motorists. Instead the city council has elected to take cyclists on an unlit shared path the same width as a bike, across an informal crossing upon which cyclists are instructed to dismount, and along a footpath.
Created by Dawes Jaguar // 1 thread
This path is supposed to be a shared use path, part of the Merritts Brook Greenway. Unfortunately it is the same width as a bicycle and completely unlit. It emerges at an informal crossing upon which cyclists are instructed to dismount. Cyclists are then expected to pedal along the pavement. It's completely useless and unnecessary, as there is a better route via Charfield Close.
This path has been built recently as part of the Merritts Brook Greenway walking and cycling route. It would be quite useful were it not narrow, twisty, and covered in loose chippings. As it is, it is all but useless for cycling, so it needs to be rebuilt properly.
Created by Dawes Jaguar // 0 threads
There is scope here for creating a short cycle path to complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Jean Dollimore // 2 threads
N-S Cycle Superhighway consultation
------------------------------------------------------
TfL proposed that the N-S Cycle Superhighway should stop at Greville Street but LCC's response to the consultation stated that the route should continue on Farringdon Road to at least the junction with Calthorpe and Margery Street (under discussion here).
After the consultation TfL replied that they would explore options north of Stonecutter Street(which is actually south of Greville Street!). The N-S Cycle Superhighway may be completed by Spring 2016 but we have no date for it being extended any further north.
Link to our discussion on CycleScape
http://camdencyclists.cyclescape.org/issues/1407-the-tfl-north-south-cycle-superhighway-consultation
=========
Junction Kings Cross Road/Farringdon Road/Calthorpe Street/Margery Street
---------
See consultation on TfL's website at:
https://consultations.tfl.gov.uk/cycling/kings-cross-road
which has a link to their junction plan
Plan to build September 2015
-----------
TfL's proposals include the following:
On Farringdon Road - Grays Inn Road
- right turn pocket for northbound cyclists turning into Margery Street
-1.5 m advisory cycle lane on Kings Cross Road for cyclists travelling southbound with one instead of two motor lanes and on northbound carriageway north of the junction
- footway build outs
Calthorpe Street
- longer ASL and low-level early release signals
- footway build out
Margery Street
- widen contraflow
- longer ASL box and low-level early release signals
Immediate issues:
- no space for cycling on Farringdon Road south of the junction
- northbound approach on Farringdon Road left hook issue
- no attempt to provide protection for cyclists crossing the junction; Farringdon Road is wide enough to put in the infrastructure needed for a separate signal stage for northbound cyclists or for "hold the left turn".
- the early release signals are only as effective as a longer ASl box, not protecting cycles that arrive during the green stage.
Dates: consultation 20 February 2015; reply due 6 April 2015.
Created by Dawes Jaguar // 0 threads
The layout here makes crossing from Victoria Common to St Joseph's Avenue awkward on this proposed cycle route: http://www.pushbikes.org.uk/location/northfield-3. It would benefit from some minor attention.
Created by Dawes Jaguar // 0 threads
This footpath needs to be improved and made shared use for this proposed cycle route segment: http://www.pushbikes.org.uk/location/northfield-3
Created by Dawes Jaguar // 0 threads
This short section of scruffy footpath completes this proposed cycle route segment http://www.pushbikes.org.uk/location/bournville-1 and links it with the Merritts Brook Greenway. Since the path is in such a poor state I would suggest updating it to create a cycle path and footpath, the two being made flush with the existing carriageway.
Created by Dawes Jaguar // 0 threads
This puffin crossing is a barrier to creating a cycle route: http://www.pushbikes.org.uk/location/bournville-1. I've attached a photo, because despite it being a random Google Street View shot it shows there is a demand for cycling.
Created by Dawes Jaguar // 0 threads
The footpaths on the Davids Estate provide permeability for pedestrians, but not cyclists, yet one of them would allow the creation of a quiet route for cyclists: http://www.pushbikes.org.uk/location/bournville-1 (the other just links that route with The Davids). Making the paths shared use to lift a barrier to cycling.
Created by Donald Noble // 0 threads
It would be good to have a dropped kerb near here to allow southeast-bound cyclists who have used the road/bus lane to rejoin the cycle path without having to go onto the A90 slip road to rejoin at Crammond Brig
Created by Dawes Jaguar // 0 threads
Cycling is banned on Victoria Common, but it represents the sort of environment in which people love to cycle. In the short term the paths should be made shared use, but longer term it would be sensible to create cycle paths through the park.
Created by Dawes Jaguar // 0 threads
If this path was made shared use, cyclists could use it to connect the official cycle route on Heath Road South with Northfield town centre via Chatham Road and Rochester Road (there is a toucan crossing that takes cyclists across Church Road).
Created by Dawes Jaguar // 0 threads
Maas Road used to be two way, and was a quiet road upon which cyclists could bypass the motorised traffic that has been allowed to totally dominate Northfield High Street. Then it was turned into a two-lane, one-way rat run, and became a barrier to cycling. It should be restored to two-way for cycling.
Created by Stephan Matthiesen // 1 thread
The entrance is very decorative but has a really narrow corner, so it is difficult to negotiate by bicycle when you've been shopping, and impossible for trailers. There is a desire line (mudpath) next to it, this could be converted to a proper path.
Created by Stephan Matthiesen // 0 threads
The footpath has a very bad surface, and should also be a little bit wider.
Created by Stephan Matthiesen // 1 thread
A walking/cycling connection between Summertrees court and Gilmerton Rd would make the route to the bus stops, to St John Vianney and generally between the two halves of the Inch much shorter, encouraging walking.
Created by Stephan Matthiesen // 0 threads
This path is often quite muddy. It is gravel and resurfaced every year or so.
But it's a very busy walking and cycling connection between Inch and Craigmillar, and the gravel just doesn't last very long.
Not sure what to do. It would be a shame to convert it to tarmac, but perhaps there is some surfacing option that lasts a bit longer.
Created by Stephan Matthiesen // 0 threads
Make dropped kerb where the footpath from Ravenswood Avenue meets the Old Dalkeith Rd. This would make it possible for cyclists on Old Dalkeith Rd to dismount here and walk over to Ravenswood Av.
Created by Dawes Jaguar // 0 threads
A bi-directional cycle path here would link Langleys Road (a quiet road that leads down into Bournville Village and beyond) with Katie Road (another quiet road that links with the BCR route on the Worcester and Birmingham canal). Cyclists would cross Oak Tree Lane using what is currently a puffin crossing (suitably modified to promote sustainable transport). There is a huge amount of space here, currently largely used for pavement car parking.
Created by Stephan Matthiesen // 0 threads
Add a dropped kerb at the bottom of Kirk Brae so that people on bike can dismount easier and push if they don't feel like struggling up the hill.
Created by Stephan Matthiesen // 0 threads
Dropped kerb at the end of the cycle lane southbound, so that people on bikes can get off and push.
At rush hour it is usually impossible to merge into and keep up with the motor traffic uphills, many cyclists dismount here and walk to the pedestrian crossing.
Created by Stephan Matthiesen // 1 thread
Often a lot of parking on the grass, in laybys etc., especially during sports event, but also other days.
There is a small parking area in front of the Sports Centre, mainly disabled bays, and a large car park in front of Inch House.
The council has over time added more and more grasscrete areas on the eastern part of the road for about 12 cars, I've been told they were not in the original planning permission.
The provision of parking attracted more and more drivers into the park as there is now an expectation that one can park close to the sports centre, this has become the norm rather than the exception (for people with disabilities, deliveries etc).
Needed are
- bollards along the road to protect the grass
- clear signage
- reduce the parking spaces within the park to the minimum to discourage drivers.
Created by Stephan Matthiesen // 0 threads
Remove the steps and the guardrails to make a connection for bicycles (and buggys and wheelchairs).
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by jpennycook // 1 thread
Request for a screening opinion for the erection of a motorway service area
Land At O/S Grid Ref 460946 147950 M3 Basingstoke Hampshire
Basingstoke
Application reference : 16/02767/ENSC
http://pad.basingstoke.gov.uk/DocumentViewer/?DocumentClassCode=DC&Folder1Reference=16/02767/ENSC
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099199.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099197.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/10/05/01100568.PDF
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
Created by Sefton // 1 thread
The Lovers Loan shared path through the Grange has at least 5 very tight barriers along its length, and missing dropped kerbs - especially at the crossing of Dick Place. Removing barriers or widening them would make it much more easy to use for bikes, buggies and wheelchairs. Even some double pushchairs don't fit!
Created by Chris Peck // 1 thread
A long, tortuous issue, where no progress has been made, despite large amounts of effort. Godalming High Street was recommended for adopting as a trial two-way working for cyclists in 2001, thanks to Alec McCalden's excellent presentation to the Planning Inspector at the time.
However, the trial was never carried out. Cyclists continue to use the street in both directions, as there are plenty of ways to get out of the way of oncoming cars.
The City of London has introduced dozens of contra-flow cycling schemes on narrow streets and lanes across the City. A third of all the cyclists are now using the contraflow. There has been 1 cycle crash three years post-introduction (there were 2 in the three years before). See here for more details: https://www.ucl.ac.uk/transport-institute/pdfs/Cheung_slides.pdf
Created by Charlie Halliday // 5 threads
Proposal to address Farnborough Town Action Plan reference CW39. Issue: Alexandra Road, safety, pedestrian and cycle links.
Consultation documents may be downloaded from:
http://www3.hants.gov.uk/transport-schemes-index/farnborough-alexandra-road.htm
They are also on view in the reception area at Rushmoor Borough Council Offices, Farnborough Road during the consultation period
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
St Neots is receiving some funding as part of the Future High Streets Fund - this could include investment in cycling and walking infrastructure.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
Camcycle's time and energy is consistently taken up removing exclusionary barriers (e.g. Biomedical Campus, A14 active travel bridges, Warren Road). We need to consider long-term ways to prevent new barriers going in and remove existing ones which prevent people of all ages and abilities cycling.
Created by Fraser // 0 threads
Travelling along Fore Street from the East where it splits with Key Street there are several traffic calming patches and speed bumps that are difficult and dangerous to negotiate on a bike.
In particular the three sections of cobbles; as the street becomes one way just before Fore Street Pools, just before you cross Star Lane, and just after crossing Star Lane.
They are so ragged that as a cyclist you have to almost come to a stop, where as other road users can travel over them at ~20mph.
This makes them extremely dangerous as just after accelerating away from the traffic lights you then need to slow almost to a stop and weave your way through the cobbles while the traffic behind you is expecting to carry on and the street is too narrow for them to safely overtake.
The section of Fore Street between Star Lane and Eagle Street has better speed humps (still not great, but a dream compared with the above mentioned cobble sections!) with flat section at the sides so that bikes may pass them safely. However the flat sections are occasionally blocked by parked vehicles forcing cyclists over the speed humps.
The less said about the time it takes to negotiate these three sets of traffic lights the better!
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by CycleSi // 2 threads
TfL are undertaking major junction improvements at several gyratory systems. All of them include protected cycle lanes/tracks, except Wandsworth!
The local London Cycle Campaign group is not campaigning and virtually defunct. We desperately need to organise local cyclists and campaigners all over London and beyond to challenge this bizarre scheme.
Oval, Vauxhall, Elephant & Castle, Stockwell, Archway, Aldgate, etc, etc are all getting extensive safe space for cycling.
TfL for some reason (I suspect the blame lies with the borough) have instead decided to claim that the awful shared footpaths and streets with no cycling infrastructure at all that have been designated as 'cycle routes' form part of a 'cycle network'. They are even planning to have Cycle Superhighway 8 run along Wandsworth High Street with not even a painted cycle lane - cyclists will be mixed in with extremely heavy bus traffic.
It seems like no-one is talking about this other than me!! Seriously-argh!!!!
Suggestions, ideas, offers to help campaign all welcome.
Created by Simon Nuttall // 1 thread
Is it legal or not to ride on either Christ's Lane or Milton's Walk ?
Always been a bit of a problem - worse for pedestrians than cyclists.
Detailed (re-)design is apparently underway.
Created by Colin Wing // 3 threads
This is the proposed route of Quietway 88 in Westminster. An alternative option uses the west side of Trafalgar Square instead of Cockspur Street.
Created by Simon Redding // 0 threads
The Jepson Road estate has great cycling infrastructure, but when you get to the west end of it, the path peters out and ends in a fence. Lots of cyclists then carry their bike over a fence and round the end of a culvert to Hartfield Close, but it would be better to just have a cycle gate in the fence straight on to Midland Terrace, which is likely to form part of NCN67 soon.
Created by Iain Lane // 2 threads
Press article in the post today: http://www.nottinghampost.com/Major-route-city-centre-overhauled-priority-buses/story-26177322-detail/story.html
Can't find plans just yet.
Since the changes to Mare St at Westgate St some vehicles travel past the children's centre in Triangle Road, at excessive speeds, to avoid the traffic light at Mare St . Can Hackney Council add a restriction in Triangle Road.
Created by Stephan Matthiesen // 1 thread
Cycle lanes in both directions needs urgent improvment. It's painted on but
- it is far too narrow, encouraging dangerous overtaking
- road surface in the gutter (=cycle lane) extremely bad, with deep&wide cracks, most covers have sunken etc.
- paint has faded
- parking (near the schools)
Many sections of Gilmerton Rd have hatching in the centre, wasting space; these sections would be wide enough for a segregated path (or wide lane protected by bollards/armadillos).
In the narrower sections, the existing bike lane should be removed completely because at the moment it increases the dangers (encouraging cyclists to be in the gutter between kerb and speeding cars).
Created by jennifer Kirner // 1 thread
I am bringing up the problem that cyclists and pedestrians have crossing East Road to get to ARU and the neighbouring residential area. It would be helpful have a discussion about how to create safe routes in this area and how to get them implemented.
When I am cycling, I find it dangerous and difficult to cross East Road from Petersfield or Bradmore Street and I resort to using the pedestrian crossings with my bike because it is.
This area that really needs addressing for improvements to safe cycling and I don’t understand why given the expansion of ARU this has not been addressed.
The junction of Mill Road/East Road is also pretty scary for cyclists and pedestrians. The crossing at the slip road at the corner of Petersfield is difficult for pedestrians because it has no traffic controls and cars come quickly round this corner making it dangerous for anyone who is not alert , who is not tall enough to see, or who can't move quickly. This includes the young, the old, someone in a wheelchair. I wouldn't fancy pushing a child in a buggy across either.
Basically, it seems to me that the Junction and East road are designed for motor vehicles and traffic flow not for pedestrians and cyclists. Can we try and address this?
Created by jpennycook // 1 thread
Erection of 40 dwellings to include 24 private homes and 16 affordable homes, associated parking, landscaping, amenity space and highway alterations
Land At Farleigh Road Farleigh Road Cliddesden Hampshire
Basingstoke
Application reference : 16/04690/FUL
Created by George Britton // 1 thread
Aldershot Urban Extension - Green Light from RBC
Created by Gregory Williams // 1 thread
Planning application Y12/0897/SH proposes the redevelopment of a significant portion Folkestone Harbour and surrounding land. The proposals include up to 1000 dwellings and up to 10000sqm of commercial landuse. NCR2 runs through the development area.
Created by jpennycook // 1 thread
15/04503/OUT | Outline application to include access to be considered, for up to 750 residential units with a mix of units, and a neighbourhood centre including principal community centre, private children's nursery, local retail facilities, indoor sports hall and three form entry primary school and ancillary development | Hounsome Fields Trenchard Lane Dummer Hampshire
Created by GG // 1 thread
For a long time I have wondered about a crowd-sourced cycleability map.
In this, people cycle along a link (accepting the first question of how to define the beginning and end of this) then give it a thumbs up or down. After enough people do this, then others can see how popular it is.
Some people wonder about subjectivity but I think this should be less of a problem with more voters.
The reason I am asking is because this method could apply to a potential commercial project for a Council which wants to drive around 100km of rural roads and use a panel of 4 experts to grade meaningful segments on a 1 to 7 scale according to their suitability for HGV movements.
Any views on whether this is already done within an app I am not aware of, or could be it done by anyone as an add-on to something else, or is it something CamCycle could offer as a commercial package (there may well be more than one local authority looking for this sort of thing)
POSSIBLE Cycle Route Between Lowedges Rd/Chesterfield Rd + Bradway Fire Station Sheffield S8........using existing 8ft wide pavements by upgrading to "shared use".........This could connect to the new cycling "on + off " road routes being developed in the Meadowhead School area
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?