A1124 / Eight Ash Green / Stanway links
Poor links from Eight Ash Green to Stanway, due to lack of cycling provision on the A1124, and lack of cycle crossing across London Rd.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Poor links from Eight Ash Green to Stanway, due to lack of cycling provision on the A1124, and lack of cycle crossing across London Rd.
Created by Steven Moseley // 1 thread
Conversion of existing 6 bed HMO (C4) into 9no. bedroom House in Multiple Occupation (HMO) for up to 9 people (Sui Generis) including the single story rear and side extensions approved under App Ref No's 211168 and 211243.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03437/FUL | Division of existing property into 4 no. 1 bedroom Flats including the construction of a single storey rear extension, two storey side extension and partial first floor extension. | 136 Mowbray Road Cambridge CB1 7TG
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03508/FUL | Erection of 2 No. dwellinghouses together with associated access and landscaping works | Land To The Rear Of 368-370 Milton Road Cambridge Cambridgeshire CB4 1SU
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03538/CL2PD | Certificate of lawfulness under Section 192 for a change of use of Unit 8 from Dwellinghouse (Class C3) to House in Multiple Occupation (HMO ( 6 bed )) (Class C4), retention of Unit 8A as a separated unit used as a Studio Flat and minor internal layout alterations. | 8 Oak Tree Avenue Cambridge CB4 1BA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03467/FUL | Construction of 4no, 1bed flats and associated external works to rear. |
17 - 19 Radegund Road Cambridge Cambridgeshire CB1 3RH
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03439/FUL | Erection of 3 No. 1 bedroom duplex dwellings with associated landscaping, parking, bin and cycle storage. |
Land Adjacent To 22 Mill End Close Cambridge Cambridgeshire CB1 9HS
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03498/FUL | Demolition of existing garages and area of hardstanding and erection of 3 No. dwellings together with car parking, landscaping, bin and bike stores and associated infrastructure.
Land At Borrowdale Cambridge Cambridgeshire CB4 3HU
Created by catch // 0 threads
Proposal for new traffic-free routes using mostly existing footpaths/tracks from Cymbeline way opposite Sheepen Rd. to West Bergholt.
Created by Jean Dollimore // 1 thread
Camden is consulting on some proposed improvements for walking and cycling through the junction of Abbey Road and Belsize Road
Created by Steven Moseley // 1 thread
Erection of 4 detached dwellings, access road, new woodland plantation and additional landscaping.
Created by Steven Moseley // 1 thread
Full planning permission for the development of the site to provide 144 new residential units (including affordable homes) with associatedon-site electricity and drainage infrastructure, open space, landscaping, access roads, parking and turning areas,
Created by cpax // 1 thread
. I regularly have to use this mini roundabout ( 3 times a week )and when approaching from Fulbourn I find that drivers are increasingly
ignoring the give-way to traffic coming from the right rule and as I brake they then drive up the cycle route .
Created by Jean Dollimore // 1 thread
Camden Council installed Pop-up cycle lanes on Chalk Farm Road and the lower end of Haverstock Hill last summer. They are now consulting on proposals to make these and associated changes permanent.
The proposals include:
Drop In Sessions
23 September 2021 (Thursday) from 16:00 to 19:00
30 September 2021 (Thursday) from 16:00 to 19:00
Location: Castlehaven Community Centre, 23 Castlehaven Rd, London NW1 8RU
21/03609/FUL | Retention of the former NIAB Headquarters building, the demolition of all other buildings and structures, and the erection of buildings with basements for 291 Build to Rent units (Use Class C3) including affordable housing and a 202 bed Apart-Hotel (Sui Generis) and associated facilities along with access, car and cycle parking, landscaping and infrastructure works. | National Institute Of Agricultural Botany Huntingdon Road Cambridge Cambridgeshire CB3 0LE
sound+fury // 1 thread
The cycle parking.
Reserved Matters approval for appearance, landscaping, layout and scale for 373 dwellings, access roads, cycle and pedestrian routes, cycle and car parking, landscaping, utilities and associated ancillary structures at Lots S1 and S2, North West Cambridge Development following outline planning permission S/1886/11 as varied by planning permission S/2036/13/VC
Lots S1 And S2, North West Cambridge Development Eddington Avenue Cambridge CB3 0LH
South Cambridgeshire
Application reference : 21/04036/REM
Erection of 280 dwellings, including 72 affordable dwellings, two new vehicular accesses from Babraham Road, pedestrian and cycle access, publicly accessible open space, a Local Area of Play (LAP) and a Local Equipped Area of Play (LEAP), landscaping and earthworks and surface water drainage, associated amenity space and attenuation features and internal infrastructure.
Land South Of Babraham Road Sawston Cambridge South Cambridgeshire
South Cambridgeshire
Application reference : 21/03955/FUL
Created by Steven Moseley // 1 thread
Proposed commercial office block (resubmission of application 211722
Created by Steven Moseley // 1 thread
Demolition of existing detached house and erection of 2 No. detached dwellings.
Created by Steven Moseley // 1 thread
Proposed two bedroom bungalow and vehicle access to rear of 168 St Andrews Avenue
Created by Steven Moseley // 1 thread
202349 Application to determine if prior approval is needed for proposed New dwelling dwellinghouses on detached block of flats.
202161 Prior approval application for erection of two additional floors of residential floorspace to create 8 no. 2 bedroom flats.
202321 Application to determine if prior approval is required for two new additional floors of residential floor space to create 8no. 2 bedroom flats.
202001 Prior approval application for erection of two additional floors of residential floorspace to create 8 no. 2 bedroom flats.
Created by Steven Moseley // 1 thread
Residential use of former car park to international house following change of use from B1a (offices) to C3 (dwellings) of international house (resubmission of planning permission 170259)
Created by Steven Moseley // 1 thread
Change of use of existing dwellinghouse to 6 flats and erection of replacement building at rear to provide 4 flats. Resubmission and variation of planning approved under reference 180116
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by jpennycook // 1 thread
Area Estates are proposing to build a retail park on the former Smiths Industries site between Winchester Road and Harrow Way, in Basingstoke. This was formerly owned by Tesco, who failed to build a supermarket there.
No cycling access has been proposed, and the provision for cycle parking is inadequate - insufficient for customers, and none for staff.
Please submit feedback to the developer.
No planning application yet, but previous applications for the site are here: https://planning.basingstoke.gov.uk/online-applications/propertyDetails.do?activeTab=relatedCases&keyVal=H44MKACRLI568
Created by Andrew Woodward // 0 threads
Despite the cycle lanes being mandatory along this stretch the road layout is such that vehicles frequently intrude into the cyclelane - as this bus did.
White paint does not work on this stretch and some other segregation method is needed -eg a kerb; vertical posts or similar.
Created by Andrew France // 1 thread
It has an uneven degraded surface in the cycle lanes from the Elizabeth Way roundabout until the bridge.
Created by Eric Booth // 1 thread
Friend of mine uses a wheelchair & hand cycle and is blocked this gate on his way home. Would be great if we could get it opened for him. [Jack Small]
Created by Paul Bearpark // 1 thread
Objections to U&Cs outline planning application need to be submitted by 10 April. There seem to be some interesting ideas for improving cycling infrastructure but a lot that could be improved upon.
Created by Nicola Peck // 1 thread
This well-used trail is in desperate need of resurfacing. During spells of wet weather, it has large puddles at regular intervals and there is a particularly huge "mud bath" at the western end of Walton Dam just by the entrance to the woods. Currently (July 2014) the mud bath is reasonably, but not completely, dry but as recently as June it has been very muddy and was terrible over winter.
This is one of Chesterfield's major cycling routes and these conditions make it unreasonable to use it for transport journeys (ie. commuting and shopping) in normal clothes because the bike gets caked in mud and it splashes over your shoes and trousers, even with mudguards.
Alongside Walton Dam, I believe this path is supposed to be nominally 3 metres wide but vegetation has grown into the gravel surface making it significantly narrower (single file) in places.
The sloped tarmac section at the Walton Road end is suffering encroachment from overgrown vegetation and there is an unnecessary pinch-point part way down (a row of wooden posts) which could be opened up with perhaps only a single post if really necessary, or ideally none at all.
In Somersall Park, immediately to the south of the river bridge, there is a particularly rough patch of surface which, ironically, is the most recently resurfaced section of path. It's so incredibly rough that you have to be extra careful and slow if carrying delicate items like a laptop or fragile shopping (eg. soft fruit or eggs).
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by Jon_B // 1 thread
The cycle link from Bramley Hill to Haslemere Drive has opened up a route via Lacey Street, Haslemere Drive and Bramley Hill as a much quieter parallel route to Woodbridge Road for cycles.
However, to proceed to North East Ipswich from here means cycling (or indeed walking or driving) via Woodbridge Road at the point where it crosses the railway line. There are no other crossings for a considerable distance to the North or South.
The land fronting Woodbridge Road to the North is currently for sale for residential development.
If this land is developed I believe that this should include an additional cycle and pedestrian bridge over the railway to Belvedere Road to open up access to the residential areas NE of this (as well as Sidegate Lane Primary School) without having to use Woodbridge Road.
Surfacing includes gravel and grit.
Cycle chicanes shown on diagrams.
Created by Robert Asher // 1 thread
Hello, I'm wondering how many other Cambridge cyclists have shared the experience I've had (about once per month now) regarding a particular elderly lady who insists that bikes are not allowed on the "footpath" adjacent to the Trumpington allotments, between Shelford Rd & the new busway in CB2. This path seems clearly demarcated as a shared pedestrian-cycle path on the cycle maps provided at the council link (below). However, it is not clearly labeled as such on the path itself, leading her to become quite angry with any cyclist who gets near her & her dog while they're out walking (and obstructing the path to underscore her point). "It's a footpath" she yells, and storms away.
So my questions are 1) am I correct in interpreting the council map (below) as permitting bikes on this path and 2) how might one go about requesting proper signage, clearly saying bikes & pedestrians are both welcome?
Thanks for any feedback, Robert
https://www.cambridge.gov.uk/sites/www.cambridge.gov.uk/files/documents/cambridge-cycling-map.pdf
Need to check this planning application for access issues. It proposes to make a new car entrance through a high wall across a pavement at the end of Chesterton Road.
The cycleway cut-through here is very poor currently.
Anon // 1 thread
The main HWRC depot which is out of bounds unless you turn up in a car offers a wide range of recycling opportunities. The pedestrian/cycle area directly of Hazel Court offers none of this other than the main recycling types that are available through household waste collections, and tin foil.
Its hardly acceptable to think that just because you're arriving by bike/foot you won't be able bring other items. All that happens is things either get wrongly sorted or left on the floor causing the area to become a state.
Created by Rob Archer // 1 thread
This is one of the most difficult and dangerous sections of the local cycle network. A point where cycle traffic to 2 local schools, a college and a local park all meet.
Fast heavy traffic
Very poor sight-lines
Cars parking over dropped kerbs
Any suggestions as to how it can be improved?
Created by Gregory Williams // 2 threads
This provides a flatter, shorter, and traffic-free alternative to the National Cycle Route 18 alignment via Sole Street.
Created by Dawes Jaguar // 0 threads
College Walk is in a terrible state and the ancient and totally obsolete street lamps no longer turn on at night and off during the day.
Created by Richard Jennings // 1 thread
The Avenues Shambles
Few people who live in the area will be happy with the situation on The Avenues. A couple of years ago the city won a grant to improve cycle routes around the city, called a “Cycle City Ambition Grant”. The first route to be improved was the one that came along the Avenues, known as the “Pink” route. After two years of planning, public meetings and proposals we are left with the dangerous inadequate mess we see today.
Why is The Avenues Special?
Far more bikes use The Avenues than any other road in the city, "nearly 700,000 in 2016 according to the Air Quality Status Report for 2018. Most are students at UEA or workers at the Hospital and Research Parks. It’s also the route hundreds of children should be using to cycle to the City Academy School, so the potential number of cyclists could be even higher if the road were not so dangerous. Logically it should have been the highest priority for providing proper cycle tracks, but it didn’t turn out like that.
Why is it bad?
The road markings only allow enough space for one direction of flow on a two way street, so if it needs to pass traffic has to drive in the cycle lanes and when it gets busy the cycle lane simply disappear. There is basically far too much traffic for this type of design.
Why did we end up with this mess?
That’s a good question but there are clues, take a look on Tombland and the expensive paving around the cathedral gate. All this meant there just wasn’t enough money left to build the proposed cycle tracks and the present botch is the result. The council decided that the cost of doing The Avenues didn’t represent good value for money, yet doing Tombland did. This is a very suspect situation which has left us with an unacceptable, dangerous mess that simply can’t be left as it is.
What can be done?
Created by Dominic Fee // 1 thread
This issue covers Westminster City Council's proposals for a Quietway route from Green Park to Marylebone
Created by Adam Edwards // 2 threads
Shared use cycle path under construction but delayed completion now set for the end of February 2016. The path with extend the route from Hatfield station up to the town centre and then via the not so good on road lanes to the University and Business Park.
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Created by FrenchyF // 0 threads
There should be a dropped kerb at the foot of Braidwood Gate, leading to Dumbiedykes
I cycle past this junction a lot, and sometimes the lights are red so I wait and look at the lanes and wonder why they're like this.
Created by Ian Seeley // 0 threads
There is a tree stump about 3 feet high on the cycle track. It's particularly difficult to see at night when travelling east bound and should be completely removed and the cycle track resurfaced.