Spring Lane tram stop/junction with City Road
Because of the way that the Spring Lane tram platform juts out into the road and also the curve of the tram lines as they join City Road there have been a number of accidents here.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Dexter Johnstone // 1 thread
Because of the way that the Spring Lane tram platform juts out into the road and also the curve of the tram lines as they join City Road there have been a number of accidents here.
Created by Dexter Johnstone // 1 thread
Because of the way the tram lines cross the roads around here there have been quite a few accidents as the tracks cannot be crossed at right angles.
Created by Dexter Johnstone // 1 thread
There have been a number of accidents here because of the angle that Shrewsbury Road joins Granville Street, and also the way the tram stop platform juts out into the road forcing cyclists to cross the tracks.
Created by Dexter Johnstone // 1 thread
There are a lot of accidents around this tram stop:
https://www.google.com/maps/d/edit?mid=zUOBSdPNPOfg.k1ohLkAyXvek&usp=sharing
Because the pavements are narrower here I don't think there is room to provide an off road route around the stop. Therefore an alternative, signed cycle route should be provided to avoid this tram stop.
Created by Dexter Johnstone // 1 thread
Because of the way the tram lines criss-cross the road at Hillsborough corner it is very difficult to cycle through this area safely. There are a lot of accidents here, see map: https://www.google.com/maps/d/edit?mid=zUOBSdPNPOfg.k1ohLkAyXvek
Created by Dexter Johnstone // 1 thread
the off road cycle path along Infirmary Road which currently ends at the Junction with Whitehouse Lane could be extended along Langsett Road on the left hand side of the road as you go away from town towards Hillsborough. At the moment there is just a grass verge from Primrose Hill to Bamford Street.
Created by Dexter Johnstone // 1 thread
There are a lot of accidents around this tram stop - see here for evidence: https://www.google.com/maps/d/edit?mid=zUOBSdPNPOfg.k1ohLkAyXvek&usp=sharing
This is because the platform juts into the road - causing cyclists to have to cross the tracks.
However, there is ample room behind the tram stop platforms on either side of the road for an off road cycle path. Currently there is just a grass verge behind the platforms.
Created by Dexter Johnstone // 1 thread
When cycling towards town along Langsett Road it is difficult/hazardous to get to the off road cycle path on the other side of the road which starts on the corner of Infirmary Road/Whitehouse Lane because you need to cross the tram tracks.
The junction at the top of West Street is dangerous because it is difficult for anyone travelling from Glossop Road onto West Street to cross the lines at a right angle. There is no signage warning of this, although I have seen such signs in other UK cities with trams.
One cyclist I know suffered a badly damaged shoulder which needed a metal plate to repair it, and resulted in long term discomfort, loss of mobility and strength.
I revisited the spot yesterday and found that of the 4 lines I could get some kind of angle on 3, but that left me 'between the lines' going down West St with no way to escape. Much to the chagrin of the Ford Transit driver following me!
Created by Roxanne (CEO) // 1 thread
Erection of 23 residential units (use class C3) to be arranged in two blocks comprising a mix of studio and 1 & 2 bed flats including 40% affordable housing, two car parking spaces, cycle parking and associated hard and soft landscaping.
149B Histon Road Cambridge Cambridgeshire CB4 3JD
Application reference : 15/1369/FUL
DETAILS:
23 residential apartment units comprising 22 x 1-bed and studio units and 1 x 2 bed unit
Transport statement:
There will be no onsite car parking
There will be 26 cycle parking spaces (the minimum requirement is 24)
States (in paragraph 6.3) that the cycle parking will meet the requirements from the local plan 2006:
>Cycle racks or stands should conform to the design and dimension requirements.
>For residential, cycle parking should be within a covered lockable enclosure. The cycle parking should be accessible and convenient to use.
>All cycle parking should be designed to minimise conflict between cycles and motor vehicles.
There are no details or drawings of the proposed cycle parking provision in the transport statement.
Floor Plans:
The floor plans for A and B indicate there will be two enclosed cycle store areas, one on the ground floor of each block. There are no details of what type of racks will be used. Although the drawing indicates sheffield stands (8 for block A = 16 cycles) (5 for block B = 10 cycles).
Created by Richard Jennings // 1 thread
Norfolk County Council with Norwich City Council are proposing changes to Westlegate, St Stephens Street, Golden Ball Street, Farmers Avenue, Ber Street and Cattle Market Street that include closing some streets to motor traffic and making Golden Ball Street two way.
Generally access for people cycling will be improved in this area and motor traffic reduced. We are considering how well the proposed designs meet the needs of those cycling through the area.
Consultation closed on 27 July 2015.
Created by JonathanF // 1 thread
Proposal from Sainsbury's to build a new petrol filling station at their Fallowfield store, which is accessed from Wilmslow Road at a junction shared with Fallowfield Loop cycle traffic.
MCC planning app: 109301/FO/2015/S1 or PP-04261580
http://pa.manchester.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=NQHVVCBC6K000
Travel - Transport Survey: http://www.publicaccess.manchester.gov.uk/associateddocs/Default1.aspx?109301-tts-0001.pdf
Martin Lucas-Smith // 1 thread
The following planning application has been submitted. This may be an opportunity to raise through the planning system the inappropriateness that vehicles can be driven into the site but not people cannot cycle (I believe). As the planning application includes public access to the new facilities, the ability for people to cycle direct to the buildings is relevant to the public.
---
Demolition of old chorister block and netball court and erection of new sports hall, gym/studio and changing rooms including new pedestrian access and landscaping.
Kings College School West Road Cambridge Cambridgeshire CB3 9DN
Application reference : 15/1309/FUL
Created by Shaun McDonald // 1 thread
Ipswich Borough Council are currently consulting on the Cycling Supplementary Planning Document (SPD), and are in the early Call for Ideas stage.
"
Cycling Strategy Supplementary Planning Document – Call for Ideas
The Council is preparing a Cycling Strategy Supplementary Planning Document (SPD), as set out in its Local Development Scheme (8th Edition, September 2014). The SPD will provide additional guidance to policies contained in the Ipswich Local Plan (currently the
Core Strategy and Policies development plan document 2011 and remaining saved policies of the Ipswich Local Plan 1997). Further information on the Local Plan can be found at www.ipswich.gov.uk/localplan. The SPD will not set new policies but will be a material consideration in taking decisions on planning applications. The Council has already adopted a number of SPDs which can be found at www.ipswich.gov.uk/content/current-and- proposed-supplementary-planning-documents.
The scope of the Cycling Strategy SPD relates to providing guidance on the provision of cycling infrastructure as part of new development and will also provide an opportunity to identify potential wider improvements to cycling infrastructure across the Borough. Cycling infrastructure in this respect not only relates to places where people cycle but also to provision for parking and storing cycles.
At this stage we are asking for ideas on what the SPD should contain. This consultation is being carried out under Regulation 12 of the Town and Country Planning (Local Planning) (England) Regulations 2012. Following this initial Call for Ideas consultation, there will be a public consultation on the draft SPD which is anticipated to take place during Autumn 2015.
We would appreciate any ideas you may have on the content of the SPD – the questions below may act as useful prompts.
What measures should be taken to encourage cycling in and around new developments?
What measures should be taken to encourage cycling throughout the Borough?
Are you aware of any particular issues which would currently act to discourage
cycling in the Borough?
Please send us any comments by 11:45pm on Monday 17th August 2015. A comments form is available on our website at www.ipswich.gov.uk/consultations. If you would like further information, please contact Felicia Blake on 01473 432019.
As part of the production of the SPD the Council is also looking for school / college pupils’ and their parents’ views on cycling to school – a short online survey is available at www.ipswich.gov.uk/consultations.
"
From https://www.ipswich.gov.uk/sites/default/files/cycling_strategy_spd_call_for_ideas_-_june_2015.pdf
Created by Rosie Downes // 0 threads
Created by Roxanne (CEO) // 1 thread
We have been invited by the City Council to join a meeting to discuss lighting for green spaces. Is this something we would like to partake in and if so who is the best representative for the Campaign.
The draft agenda is:
· Introductions
· Where we are now
· What we want to achieve
· Discussion on Lighting for Green Spaces
· AOB
The meeting will be held at the Guildhall in Cambridge, final details to be confirmed once the date and agenda are agreed.
Created by Sam Webster // 1 thread
Surprised to see that somebody has put up barriers restricting the width of the bus/cycle path so that there's not enough room for a bus to pass a bike. Dangerous enough to call Police?
Created by Rohan Wilson // 1 thread
15/1227/FUL | Erection of a new 18,000sqm research laboratory building (Use Class B1 (b)) and associated works. | Puddicombe Way Cambridge
Site Plan shows "Cycle Storage" adjacent to the hotel? site to the east.
Red line extending to Robinson Way (north of Francis Crick roundabout), Puddicombe Way and including half the Forum area suggests intention to secure good transport links.
Essential to remedy poor walking/cycling layout at foot of busway/cycleway bridge, and secure easy access to (across?) the bus/cycleway's extension to The Forum, where the intention may be to continue cycleway on southern side only of busway.
Standard Consultation Expiry Date Thu 06 Aug 2015
Created by Chris Peck // 2 threads
Proposals from the developers, the Rutland Group, for 1,800 homes and more businesses on Dunsfold aerodrome.
The proposal says the developers wish "To encourage walking, cycling and use of bus services, and make internal car use unnecessary"
http://www.dunsfoldpark.com/files/dunsfold-park-1-july-exhibition-boards.pdf
Created by Lizzie // 1 thread
Protected space for cycling Eastbound along Clyde Gateway, it's marked along the footway, too narrow but not bad. Then reach the junction with Dunn St and the cycle path joins the carriageway and immediately in conflict with a huge sweeping left turn filter lane. This is terrible, dangerous design.
Created by Lizzie // 1 thread
Glasgow City Council have confirmed that Polmadie Bridge is to be demolished as it cannot be repaired. This imperfect but important link from southside has been severed; makes a mockery of Commonwealth games legacy routes.
Created by Lizzie // 0 threads
More cycle parking needed: the racks at the entrance - as limited as it is - overflowing with bikes.
Richard G // 1 thread
the junction of Consort Avenue and the old service road alongside Hauxton Road seems to have been designed specially to hold up cyclists
It has two button controlled crossings, over a lightly used road, and I would expect it to be ignored by every single cyclist.
A simple, "Give Way" should be perfectly sufficient I would have thought
Was any comment made when this was designed/proposed?
Martin Lucas-Smith // 1 thread
The County Council is proposing to power off street lights overnight for most residential streets in Cambridge.
http://democracy.cambridge.gov.uk/ieIssueDetails.aspx?IId=15022&PlanId=0&Opt=3#AI14389
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by David Wilcox // 0 threads
This junction is a problem. It has four exits and no one indicates their intent. We got the billboards removed a couple of years ago, but there are still accidents here.
It's a 20mph zone and most drivers ignore it.
The Magdalene place junction needs to be blocked off.
Created by Peter Loader // 1 thread
Petition to Three Rivers District Council:
“Please would you deliver a programme of safe cycle routes to our schools, using a substantial increase in the cycling budget of the Community Infrastructure Levy.
(This Levy will become payable by developers).”
Created by Cycling Dumfries // 1 thread
The Maxwelltown Cycle Path runs along the back of the Cuckoobridge retail park, but there's no easy access from the path into it. At the moment cyclists and pedestrians have to come off the path, cross the Glasgow Road at the lights (which are very slow) and then go into the retail park via the exit from the KFC drive-thru window, which is potentially quite dangerous. It would be quicker and more convenient to have a path from the cyclepath into the car park directly. We note that the new Aldi seems to have a direct entrance being built, which we welcome
Created by M Stanley // 1 thread
Large piece of concrete partially blocking access. If this was put here to stop motorbikes, then it is obviously ineffective due to eroded bank on right hand side.
Reported to Leeds City Council via online reporting system 26/02/2016
Created by David Lally // 0 threads
The path between Grace Avenue and Mona Street (Part of NCR 6) has had a ramp added for much better cycle access on the Mona Street end and a useful mirror at the other end to be able to see round the corner to and from Grace Avenue. All very good until... this was followed by the fitting of Dismount signs.
Sustrans Rangers are aware of this.
Created by Sam Saunders // 1 thread
The existing continuous route from Bristol's Cumberland Basin Swing Bridge along The Portway towards Sea Mills and Avonmouth runs under a footbridge beside the sea lock that provides a direct traffic-free link to quiet streets on the other side of a very busy road system. The footbridge is wide and occasionally used by cyclists who carry or bump their bikes up and then down a long series of steps on each side to get to Granby Hill and Cumberland Place. The advantage of using the bridge is that it avoids crossing or joining the multi-lane traffic of Hotwell Road and offers a quiet route to Clifton, and to Hotwells Primary School. It would be useful for cyclists travelling from the west or the east along the existing cycle route. A continuous channel in which to wheel a bicycle at one side of the steps would be helpful for some and make use of the bridge a more viable option than it is now.
Created by Dawes Jaguar // 1 thread
The distance between the cycleway and Vincent Drive is a couple of metres. It is illegal for people to cycle this distance because the connection is via a zebra crossing. This is backed up with a CYCLISTS DISMOUNT sign. This is absurd and needs to be corrected.
There is also an obstructive pavement-mounted tree at this location. There is plenty of space for trees just a couple of metres to the right, so the tree should be removed and a new one planted in the grassy area.
Martin Lucas-Smith // 0 threads
Fitzroy Lane is a major walking route to the Grafton Centre, but bizarrely has no pavement.
One of the two parking queuing lanes should be removed, and pavements added on at least the east side of the street, if not both sides.
20 mph speed limit on Long Bridge section between The Square and Severn Brethren desired
Created by JohnSch // 1 thread
At certain high usage times for the games area, such as on a Sunday morning, despite there two large car parks adjacent to the High school and a very large amount of on-road parking, the cycle itself becomes a car park. Also cars park across the dropped kerbs and along side the path, meaning that access is almost impossible for bicycles, prams and motobility scooters to squeeze through. Parking on the cycle path also blocks the path for users and also damages the surface.
Also surrounding pavements are blocked making it very difficult for the local community to use them and this causes road safety issues.
Created by Jean Dollimore // 1 thread
Camden is consulting on: The direction of motor traffic flow i.e. – should it remain as it is now (eastbound between Gower Street and Judd Street and westbound between Gower Street and Tottenham Court Road) – or change to westbound through the entire stretch between Judd Street and Tottenham Court Road They also ask support for further improvements (including stepped tracks and widened footways) subject to funding being available.
[Deadline extended by Camden Council to 6 January 2019.]
Created by Simon Munk // 1 thread
Kensington & Chelsea council said:
"The scheme aims to reduce the dominance of traffic and create an attractive high-quality environment.
In partnering with Cadogan as the majority landowner, and Transport for London, (TfL), we have the unique opportunity to improve the public realm not only on borough-controlled roads and pavements but also in areas of the street that are in private ownership."
Created by kirbyjames // 1 thread
Comments are invited on Exeter's new east-west shared use route.
In particular suggestions are invited on how it might be improved.
Created by Simon Redding // 0 threads
The barrier in the photo blocks the route where NCN67 joins Storforth Road at the end of the Rother Washlands in Chesterfield.
Perhaps the council was trying to be safe here, but since it's not a well lit area, a cyclist travelling this way at night might well have a nasty accident flying over this barrier.
Created by acsimpson // 1 thread
The traffic island on Maybury Road at the Maybury Junction is too small to accommodate cyclists (especially those pulling child trailers, etc) other than at it's extreme southern end. As this is a two stage crossing it can lead to either the need to cross when red or wait partly blocking the carriageway.
The light timings need changed to allow a full crossing at once or the island needs to be extended.
Created by Shaun McDonald // 1 thread
Comment at Cycle Ipswich meeting:
"Cycle link to new development with dropped curb."
Need to find out exactly which location(s) this is required. Ideal use of filtered permeability to allow people to cycle easier than driving.
Created by Katja Leyendecker // 0 threads
It's a route to school and a natural route for Gosforth residents to walk and cycle into the city centre. Yet it's incredibly over-run by inconsiderate drivers, speeding and blighted by pavement parking. It's 20mph but due to its rat-run nature feels like a motorway thorough-fare. There are blind spots at the metro bridge crossings either end which are dangerous to navigate too. Drivers turning into Ilford / Rectory are also cutting corner, so you'd find a situation of an oncoming cars in your traffic lane.
Newcastle City Council have said there's nothing they can do. I don't believe that to be true. I think they are putting drivers needs before the needs of people walking and cycling.
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
Bermondsey St is being used as a rat run not just along its length but also across at Tanner St. Through traffic should use the A100, Tooley St or Borough High St.
Could be a good mode filter project
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Created by David Earl // 1 thread
County Council press release: http://www.cambridgeshire.gov.uk/CMSWebsite/Apps/News/Details.aspx?ref=1154
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
Created by Simon Redding // 1 thread
There's no clear desire line or route west of Linacre/Holymoorside to join up to Chatsworth/Baslow/Rowsley/Beeley. This is a clear link to join Chesterfield mainline rail station to the Peak District.
Campaign for a 300m section of the unguided busway between Milton Road and the pedestrian and cyclists access at the end of Nuffield Close to be built as a road, providing a more direct access for lorries and cars to the trading estate.
Nuffield Road’s residential section should then be cut-off for motorised through traffic just past Discovery Way, turning the first part of Nuffield Road into a residential close.
Petition: http://iitm.be/ChestertonTrafficReduction
Picture Gallery: http://iitm.be/NuffieldRoad
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821