Norman Castle to Dane John - Connected Canterbury
Removal of wall, addition of cycle hub, and planters. Re-paving surfaces.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Gregory Williams // 1 thread
Removal of wall, addition of cycle hub, and planters. Re-paving surfaces.
Created by Gregory Williams // 1 thread
The plan appears to show that the proposed cycle hub will replace the existing cycle parking. I believe that the cycle hub is just for hire cycles, therefore it'd be a loss of capacity for non-hire cycles.
Created by Gregory Williams // 1 thread
Proposed changes to paving and addition of planters at St. George's Square. An opportunity to add cycle parking lost by the recent changes at St. George's Street the the north-west appears to have been missed.
Created by Gregory Williams // 1 thread
Proposals for changes to road and path surfaces, addition of cycle hub, planters, and trees. The pelican crossing is proposed to be retained. The cycle hub appears to be just for hire bicycles, without capacity for non-hire bicycles.
Created by Josh Grantham // 1 thread
23/03080/OUT | Outline application for demolition of existing structures and redevelopment for employment (office and laboratory) floorspace E(g)(i)(ii) alongside a new amenity building (including F2(b)(c)), country park and associated infrastructure with all other matters reserved for future determination apart from access, layout, scale. | Former Waste Water Treatment Facility Cambridge Road Hauxton Cambridgeshire CB22 5HT
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
A project from Greater Cambridge Shared Planning to inform urban design.
Created by Josh Grantham // 1 thread
23/02696/FUL | Demolition of 3 residential properties (known as Fossdene, Winside and The Gables) and the erection of five residential buildings for postgraduate students as well as two storey and single storey extensions to The Knott for postgraduate accommodation and the provision of cycle and bin stores, landscaping and car parking including new boundary treatments. |Fossdene Whinside The Gables Mount Pleasant Cambridge Cambridgeshire CB3 0BL
Created by Martin Wheatley // 1 thread
People cycling being abused by drivers for not using cyclepaths, even where they are sub-standard or useless.
sound+fury // 1 thread
Change of use from an office (Use Class E(g)(i)) to a state funded school (Use Class F1(a))
72 Hills Road Cambridge Cambridgeshire CB2 1LA
Cambridge
Application reference : 23/02904/PRIOR
Created by sarah // 0 threads
General overgrowth impinging on DNA path link to CBC; 2 bikes can no longer pass each other. Reported to CCC on 31st July.
Anon // 1 thread
Towards the west end of Love Lane, vegetation overhanging from the south does not allow an adult to pass (on foot or cycle) without bending. (Photo is looking west.)
Noticed on 13 July, confirmed still there 20 July.
Reported to Cambridgeshire County Council 19 July (ref 00438005). They closed the report 24 July, saying "The issue you raised with us is the responsibility of the landowner. Unfortunately we do not have records of who is responsible for this location and we are therefore unable to take any action."
(This area has been problematic previously -- see KW's reporting in March 2023 on the 'exclusionary barriers' thread. Not sure if exactly the same vegetation, but same general area.)
sound+fury // 1 thread
i) Demolition of 11-12 Burleigh Street and Abbeygate House, ii) Part demolition and alterations to the Grafton Centre, removal of existing facades, erection of new floorspace for life science use, new and replacement façades and shopfronts, provision of terraces at fourth floor level, installation of plant and enclosures, iii) Redevelopment of existing bus turning head and redundant service area to provide new hotel and leisure quarter, iv) New pedestrian access route from Christchurch Street to Burleigh Street, provision of cycle parking spaces, public realm and landscape improvements, v) Highway works to East Road providing new bus stops, pedestrian and cycle routes and other associated works.
Grafton Centre Fitzroy Street Cambridge Cambridgeshire
Cambridge
Application reference : 23/02685/FUL
Created by jack // 1 thread
The bushes/trees are pretty overgrown into the left side of the cycle path, meaning you have to move away from the edge at points, on an already narrow cycle track (fairly narrow for bidirectional travel, anyway).
Outline planning application for the erection of up to 38 Affordable Homes with associated access, parking and landscaping - all matters reserved except for Means of Access
Land South Of 44 Cambridge Road Stretham Cambridgeshire
East Cambridgeshire
Application reference : 23/00712/OUM
sound+fury // 1 thread
Concern about the bike/bin store for the CONDA application.
Created by Roxanne (CEO) // 1 thread
Cambridge City Council has launched its Environmental Improvement Programme (EIP) for 2024, which gives residents the opportunity to identify where they would like the council to fund small-scale improvements to the city’s streets and open spaces.
Cambridge residents are invited to put forward their ideas for the EIP through the council's online consultation platform. A total of £170,000 is available to be allocated to the proposed projects – up to £5,000 is available for local projects unless they are strongly supported in which case up to £10,000 could be made available. Up to £20,000 is available for projects that will enhance larger areas of the city.
sound+fury // 1 thread
They propose to add an eighth floor to Mayflower House, and to increase the cycle parking.
Created by wookey // 1 thread
New housing development of about 250 houses next to Barrington on the old cement works quarry land.
sound+fury // 1 thread
Change of use of the first floor only at 13-14 Burleigh Street, Cambridge from use falling within Class E (commercial, business and service) to two flats comprising one 1xbed unit and one Studio unit (Class C3 (dwellinghouse)).
13 - 14 Burleigh Street Cambridge Cambridgeshire CB1 1DG
Cambridge
Application reference : 23/01966/PRIOR
sound+fury // 1 thread
Created by cpax // 1 thread
Post removed , increased usage by cars .
Created by Robert Watson // 1 thread
Turning from Hills Road onto Glisson Road going east, there’s a “cycles only” lane on the left-hand side, with a concrete separate from traffic in the other direction. The camber is extremely steep in the cycle gap, and risks our cargo trike overturning. The barrier is well meant, but ultimately the steep camber means we have to enter on the wrong side of the barrier, which is less rather than more safe than not having a battier at all.
sound+fury // 1 thread
Created by sarah // 0 threads
The Heathfield Bridleway is generally a good piece of off-road provision that links Thriplow to Heathfield/Duxford whilst avoiding the A505. The sign is damaged; Cambs CC say it’s not their duty to repair/replace.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Gingineer // 1 thread
I work near the station and the area out the front of the new building has short term cycle spaces for the shops there. These spaces are specifically for the retail units (ratios of this is in the planning application I understand). so the racks have to be installed and wont be policed by the retail units (such as the ones by Microsoft which are for employees) yet they fill with commuters who should be using the cycle park.
I have been thinking that Cambridge CC needs to agree a system (bye law?) to create short term racks. The colour should be different and signage provided but for racks that need controlling like this it is essential to stop antisocial cyclists piling up bikes.
Of course its difficult to police, and a heavy handed approach should be avoided but I see a growing issue across the city where racks for specific short term purposes are created but then filled with long term cyclists who should accept if they are parked all day that the extra 2 minutes walk for them to a proper cycle park is reasonable to expect. Otherwise this puts people off cycling the short distances as they fear they wont get a rack or will spend a lot of time scrambling for a spot.
Cyclists could be stickered and if caught again then fined. Or clamped to the rack with a fee to unlock (yes I know that sounds like it defeats the object but it should work after a while).
Created by jpennycook // 1 thread
Request for a screening opinion for the erection of a motorway service area
Land At O/S Grid Ref 460946 147950 M3 Basingstoke Hampshire
Basingstoke
Application reference : 16/02767/ENSC
http://pad.basingstoke.gov.uk/DocumentViewer/?DocumentClassCode=DC&Folder1Reference=16/02767/ENSC
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099199.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099197.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/10/05/01100568.PDF
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
Created by Sefton // 1 thread
The Lovers Loan shared path through the Grange has at least 5 very tight barriers along its length, and missing dropped kerbs - especially at the crossing of Dick Place. Removing barriers or widening them would make it much more easy to use for bikes, buggies and wheelchairs. Even some double pushchairs don't fit!
Created by Chris Peck // 1 thread
A long, tortuous issue, where no progress has been made, despite large amounts of effort. Godalming High Street was recommended for adopting as a trial two-way working for cyclists in 2001, thanks to Alec McCalden's excellent presentation to the Planning Inspector at the time.
However, the trial was never carried out. Cyclists continue to use the street in both directions, as there are plenty of ways to get out of the way of oncoming cars.
The City of London has introduced dozens of contra-flow cycling schemes on narrow streets and lanes across the City. A third of all the cyclists are now using the contraflow. There has been 1 cycle crash three years post-introduction (there were 2 in the three years before). See here for more details: https://www.ucl.ac.uk/transport-institute/pdfs/Cheung_slides.pdf
Created by Charlie Halliday // 5 threads
Proposal to address Farnborough Town Action Plan reference CW39. Issue: Alexandra Road, safety, pedestrian and cycle links.
Consultation documents may be downloaded from:
http://www3.hants.gov.uk/transport-schemes-index/farnborough-alexandra-road.htm
They are also on view in the reception area at Rushmoor Borough Council Offices, Farnborough Road during the consultation period
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
St Neots is receiving some funding as part of the Future High Streets Fund - this could include investment in cycling and walking infrastructure.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
Camcycle's time and energy is consistently taken up removing exclusionary barriers (e.g. Biomedical Campus, A14 active travel bridges, Warren Road). We need to consider long-term ways to prevent new barriers going in and remove existing ones which prevent people of all ages and abilities cycling.
Created by Fraser // 0 threads
Travelling along Fore Street from the East where it splits with Key Street there are several traffic calming patches and speed bumps that are difficult and dangerous to negotiate on a bike.
In particular the three sections of cobbles; as the street becomes one way just before Fore Street Pools, just before you cross Star Lane, and just after crossing Star Lane.
They are so ragged that as a cyclist you have to almost come to a stop, where as other road users can travel over them at ~20mph.
This makes them extremely dangerous as just after accelerating away from the traffic lights you then need to slow almost to a stop and weave your way through the cobbles while the traffic behind you is expecting to carry on and the street is too narrow for them to safely overtake.
The section of Fore Street between Star Lane and Eagle Street has better speed humps (still not great, but a dream compared with the above mentioned cobble sections!) with flat section at the sides so that bikes may pass them safely. However the flat sections are occasionally blocked by parked vehicles forcing cyclists over the speed humps.
The less said about the time it takes to negotiate these three sets of traffic lights the better!
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by CycleSi // 2 threads
TfL are undertaking major junction improvements at several gyratory systems. All of them include protected cycle lanes/tracks, except Wandsworth!
The local London Cycle Campaign group is not campaigning and virtually defunct. We desperately need to organise local cyclists and campaigners all over London and beyond to challenge this bizarre scheme.
Oval, Vauxhall, Elephant & Castle, Stockwell, Archway, Aldgate, etc, etc are all getting extensive safe space for cycling.
TfL for some reason (I suspect the blame lies with the borough) have instead decided to claim that the awful shared footpaths and streets with no cycling infrastructure at all that have been designated as 'cycle routes' form part of a 'cycle network'. They are even planning to have Cycle Superhighway 8 run along Wandsworth High Street with not even a painted cycle lane - cyclists will be mixed in with extremely heavy bus traffic.
It seems like no-one is talking about this other than me!! Seriously-argh!!!!
Suggestions, ideas, offers to help campaign all welcome.
Created by Simon Nuttall // 1 thread
Is it legal or not to ride on either Christ's Lane or Milton's Walk ?
Always been a bit of a problem - worse for pedestrians than cyclists.
Detailed (re-)design is apparently underway.
Created by Colin Wing // 3 threads
This is the proposed route of Quietway 88 in Westminster. An alternative option uses the west side of Trafalgar Square instead of Cockspur Street.
Created by Simon Redding // 0 threads
The Jepson Road estate has great cycling infrastructure, but when you get to the west end of it, the path peters out and ends in a fence. Lots of cyclists then carry their bike over a fence and round the end of a culvert to Hartfield Close, but it would be better to just have a cycle gate in the fence straight on to Midland Terrace, which is likely to form part of NCN67 soon.
Created by Iain Lane // 2 threads
Press article in the post today: http://www.nottinghampost.com/Major-route-city-centre-overhauled-priority-buses/story-26177322-detail/story.html
Can't find plans just yet.
Since the changes to Mare St at Westgate St some vehicles travel past the children's centre in Triangle Road, at excessive speeds, to avoid the traffic light at Mare St . Can Hackney Council add a restriction in Triangle Road.
Created by Stephan Matthiesen // 1 thread
Cycle lanes in both directions needs urgent improvment. It's painted on but
- it is far too narrow, encouraging dangerous overtaking
- road surface in the gutter (=cycle lane) extremely bad, with deep&wide cracks, most covers have sunken etc.
- paint has faded
- parking (near the schools)
Many sections of Gilmerton Rd have hatching in the centre, wasting space; these sections would be wide enough for a segregated path (or wide lane protected by bollards/armadillos).
In the narrower sections, the existing bike lane should be removed completely because at the moment it increases the dangers (encouraging cyclists to be in the gutter between kerb and speeding cars).
Created by jennifer Kirner // 1 thread
I am bringing up the problem that cyclists and pedestrians have crossing East Road to get to ARU and the neighbouring residential area. It would be helpful have a discussion about how to create safe routes in this area and how to get them implemented.
When I am cycling, I find it dangerous and difficult to cross East Road from Petersfield or Bradmore Street and I resort to using the pedestrian crossings with my bike because it is.
This area that really needs addressing for improvements to safe cycling and I don’t understand why given the expansion of ARU this has not been addressed.
The junction of Mill Road/East Road is also pretty scary for cyclists and pedestrians. The crossing at the slip road at the corner of Petersfield is difficult for pedestrians because it has no traffic controls and cars come quickly round this corner making it dangerous for anyone who is not alert , who is not tall enough to see, or who can't move quickly. This includes the young, the old, someone in a wheelchair. I wouldn't fancy pushing a child in a buggy across either.
Basically, it seems to me that the Junction and East road are designed for motor vehicles and traffic flow not for pedestrians and cyclists. Can we try and address this?
Created by jpennycook // 1 thread
Erection of 40 dwellings to include 24 private homes and 16 affordable homes, associated parking, landscaping, amenity space and highway alterations
Land At Farleigh Road Farleigh Road Cliddesden Hampshire
Basingstoke
Application reference : 16/04690/FUL
Created by George Britton // 1 thread
Aldershot Urban Extension - Green Light from RBC
Created by Gregory Williams // 1 thread
Planning application Y12/0897/SH proposes the redevelopment of a significant portion Folkestone Harbour and surrounding land. The proposals include up to 1000 dwellings and up to 10000sqm of commercial landuse. NCR2 runs through the development area.
Created by jpennycook // 1 thread
15/04503/OUT | Outline application to include access to be considered, for up to 750 residential units with a mix of units, and a neighbourhood centre including principal community centre, private children's nursery, local retail facilities, indoor sports hall and three form entry primary school and ancillary development | Hounsome Fields Trenchard Lane Dummer Hampshire
Created by GG // 1 thread
For a long time I have wondered about a crowd-sourced cycleability map.
In this, people cycle along a link (accepting the first question of how to define the beginning and end of this) then give it a thumbs up or down. After enough people do this, then others can see how popular it is.
Some people wonder about subjectivity but I think this should be less of a problem with more voters.
The reason I am asking is because this method could apply to a potential commercial project for a Council which wants to drive around 100km of rural roads and use a panel of 4 experts to grade meaningful segments on a 1 to 7 scale according to their suitability for HGV movements.
Any views on whether this is already done within an app I am not aware of, or could be it done by anyone as an add-on to something else, or is it something CamCycle could offer as a commercial package (there may well be more than one local authority looking for this sort of thing)
POSSIBLE Cycle Route Between Lowedges Rd/Chesterfield Rd + Bradway Fire Station Sheffield S8........using existing 8ft wide pavements by upgrading to "shared use".........This could connect to the new cycling "on + off " road routes being developed in the Meadowhead School area