Hills Road North Sixth Form College
Not much information yet, but Hills Road Sixth Form College are hoping to create a second base to the north/east.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
sound+fury // 1 thread
Not much information yet, but Hills Road Sixth Form College are hoping to create a second base to the north/east.
Plaza adjacent to proposed primary school on key phase 1
Waterbeach Barracks Key Phase 1 Primary School Plaza Denny End Road Waterbeach Cambridgeshire CB25 9PA
South Cambridgeshire
Application reference : 23/00872/REM
I haven't spotted whatever it is that is supposed to provide "access for picking up and dropping off pupils". There seems to be a 5-Sheffield toastrack ("exact product TBC") on what looks like the 'drive' (next to 'He' which means heritage surface coarse asphalt). I do not see anything that would encourage use of Bakfiets etc.
Image is a crop from LANDSCAPE GENERAL ARRANGEMENT PLAN
I have noticed that especially since the congestion charge there has been a lot of aggression towards Camcycle in social media comments. Notably on Facebook, Nextdoor, etc. I am aware that angry aggressive people have always been on the internet but I do feel the level has increased since congestion charge notoriety, with many people's opinions degenerating into conspiracy theories about Camcycle and the council.
I do worry about the effect this can have on increasing "us vs them" mentality and increasing aggressive behaviour towards cyclists on the road.
sound+fury // 1 thread
We might need to look at the road layout proposed here.
Created by Richard Holton // 0 threads
Works on the Greenway on east side of the Horningsea Road. No provision for cyclists to pass safely. Only option is to cross at previous pedestrian crossings, though there is no signage to indicate this.
Created by George Lund // 1 thread
Improvements required for safe crossing of walkers, cyclists and horseriders using the main path through the forest.
Created by Gabriel // 1 thread
The County Council is proposing some of those cheap and nasty speed cushions at Birdwood Rd. Link: https://www.cambridgeshire.gov.uk/residents/travel-roads-and-parking/roads-and-pathways/traffic-regulation-orders/permanent-traffic-regulation-orders#proposed-tro--reference-number-pr--------proposed-speed-cushions-in-birdwood-road--cambridge--9-0
Closing date for comment is 17 March 2023. Email to: policyandregulation@cambridgeshire.gov.uk
Created by Rosamund Humphrey (Admin Officer) // 1 thread
This is a container issue for event threads.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Cambridge City Council have launched this new consultation as part of the Our Cambridge programme which aims to shape the council of the future. This may be relevant to our work because it includes thinking about how the council works with its stakeholders.
sound+fury // 1 thread
A previous application was refused in part because of the cycle parking provision. What's the new one like?
Created by David Green // 1 thread
Are you confident at what to do if something goes wrong with your bike when you're miles from home? Could you repair a puncture by the side of the road? Yes? Great! No need to read on.
No? You may be interested in the following Saturday workshop I am running again. This will be a repeat of the popular workshop held last year where attendees gave feedback such as:
"Excellent - would recommend it to all inexperienced riders."
"Following the course I really feel I understand the workings of my cycle."
"It was very clearly explained and covered very useful topics."
"Thoroughly informative workshop. To be highly recommended."
David Green
===
Survival Skills for Cyclists
Venue: Coleridge Community College, Radegund Road, Cambridge CB1 3RJ
Date: Sat 25 March 2023, 10am to 4 pm
Description: A one day bike maintenance course for local cyclists. Bring your bike and get confident you can cope with common roadside cycling breakdowns. Women members especially encouraged to sign up! Places are limited to ensure you learn in a small friendly group and get all the assistance you need. Topics will include: checks before you set off, tools to take along, fixing punctures, handling chain problems, gear and brake adjustments.
Equipment: Your own bike to work on, pump, puncture repair kit, and any tools you normally ride with.
Refreshments: hot and cold drinks provided, but please bring your own lunch!
Fee: £20 (CTC and CamCycle members) £50 (non-members). Subsidy available for those on a low income - please don't be put off by the price. Primarily funded and supported by CTC Cambridge.
Enrolment: To book a place, email da...@guertler-green.co.uk with subject 'Survival Skills for Cyclists 25 March 2023'.
sound+fury // 1 thread
There's a proposal to use speed cushions to slow traffic down on Shelly Row and Albion Row.
Created by Marcus Howarth // 1 thread
Consultation:
London Borough of Sutton is considering installing a motorcycle barrier on the Spencer Road Entrance at Watercress Park to help prevent unlawful use by motorbikes and we are interested in hearing your views. The barriers are designed to allow pedestrians and those using mobility scooters and wheelchairs to enter but to stop motorcycles from gaining access.
We are aware that motorbikes regularly access the site via the Spencer Road entrance which can cause anti-social behaviour and safety issues. As part of the Council's commitment to improving the situation for local residents we propose to install an inhibitor gate.
Created by Marcus Howarth // 2 threads
(Last item on sheet)
Convert zebra crossing to a parallel crossing (one that allows cyclists to use it) near Mellows Park which would provide a continuous safe facility for cyclists. This would provide links to an existing contra flow cycle lane in Redford Avenue and a large residential area in Mellows Park, and a borough cycle route into Wallington district centre
Stafford Road Parallel crossing
These currently being negotiated by LBS with TfL - hopefully funding confirmed mid March 2023.
Created by Marcus Howarth // 2 threads
Created by Roxanne (Cycling Campaign Officer) // 1 thread
The new owners of Capital Park, Fulbourn, CB21 would like to meet and discuss any cycling issues relevant to the site.
Created by Martin Wheatley // 1 thread
On-road section of Greenway which is unpleasant and dangerous, and certainly not suitable for riders of all ages and levels of confidence, as it should be.
Created by linus // 1 thread
This is a joint Camden and Westminster consultation of the design of a short route of part of the longer Fitzrovia to Pimlico cycle route. https://westminstercycleways.co.uk/cleveland-street-cycleway.html
Westminster Council is leading on this project. Consultation closes 3 March. There will also be a drop-in community event about the plans from 3pm to 7.30pm on Tuesday 7 February 2023 at Fitzrovia Community Centre, 2 Foley Street, London W1W 6DL.
Created by Marcus Howarth // 1 thread
The current layout and building stock at Greenshaw are inefficient and energy intensive.
sound+fury // 1 thread
22/05108/SCRE | EIA screening opinion under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the proposed development to provide up to 12,442 sqm of employment floorspace in a building up to 34 metres in height with associated car parking, cycle parking and landscaping. | Vitrum Building St Johns Innovation Park Cowley Road Cambridge Cambridgeshire CB4 0WS
Created by Marcus Howarth // 1 thread
The Council is proposing to introduce a traffic management scheme in Plough Lane junction with Collyer Avenue and Queenswood Avenue. We are proposing these measures in response to concerns raised by local residents in the area, ward councillors about traffic speed, noise, pollution, cut through traffic and road safety at the above mentioned junctions.
What is proposed?
The following measures are proposed:
What is the aim of the measures?
These measures aim to
From the 2023/24 and indicative 2024/25 programmes: (A) / Environment and Sustainable Transport Committee
Appendix 7 b) - this is getting (£ ,000's )
Perceived safety issues raised that vehicles are not stopping at the
existing zebra because vehicles are rat running to avoid Croydon
Road/A232 (red route). The zebra is located on a link between the two
roads being used for rat running so drivers are looking for the next road
entrance rather than at the zebra. The proposal is considering measures
to address through traffic issues - initial locations being investigated are
the junctions of Queenswood Avenue/Plough Lane and Collyer
Ave/Plough Lane (subject to consultation).
The proposal also includes consideration of a parallel low traffic cycle
route along Queenswood & Collyers Road as an alternative to the A232
Croydon Road which currently has no cycle facilities along the parallel
stretch. Cyclists using this quiet alternative link will be able to re-join the
A232 Croydon Road via Aldwick Rd which connects to the existing
Croydon Rd cycle facility. This element of the scheme could be moved to
the Cycle Network Development/Borough Cycling Fund.
Created by Robert Watson // 1 thread
Grange Road has extremely narrow cycle lanes for most of its length, which include traffic calming bollards forcing traffic down to a single lane. While this design does slow traffic, the narrow space for the cycle lane means that trikes have to slow almost to a stop to pass safely -- or in some cases may not fit at all. This forces trikes out into the single centre lane, where cars may not properly give way, and also are the sites of speed bumps and significant potholes. If the lanes were about 20-30cm wider, then trikes could pass without a problem. This issue affects all of the bollards on both sides of Grange Road for its full length, but I’ve highlighted a particularly problematic one since I had to pick a spot.
(In general, the cycle lanes on Grange Road are too narrow for cargo trikes forcing them out into traffic lanes anyway, but it’s the brick bases to the bollards that cause a particular problem.)
Created by Robert Watson // 1 thread
On the northeast side of the Trumpington Road and Brooklands Ave junction, there’s a combined cycle and foot path around the corner that suffers two problems that make trike use problematic in peak times:
Created by Robert Watson // 1 thread
Bollards close Storeys Way to through traffic while allowing cycles through. However, the bollard spacing makes it difficult to get cargo trikes through -- e.g., Nohila and Winther products.
Where the new wands on East road begin if heading from the Newmarket road underpass into East road is a layby outside Mackays. The placement of the wands initially mean there is insufficient room to cycle on the road, but the layby is potholed, making it difficult to ride through. After the layby the spacing is wider and they are much better.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by Jon_B // 1 thread
The cycle link from Bramley Hill to Haslemere Drive has opened up a route via Lacey Street, Haslemere Drive and Bramley Hill as a much quieter parallel route to Woodbridge Road for cycles.
However, to proceed to North East Ipswich from here means cycling (or indeed walking or driving) via Woodbridge Road at the point where it crosses the railway line. There are no other crossings for a considerable distance to the North or South.
The land fronting Woodbridge Road to the North is currently for sale for residential development.
If this land is developed I believe that this should include an additional cycle and pedestrian bridge over the railway to Belvedere Road to open up access to the residential areas NE of this (as well as Sidegate Lane Primary School) without having to use Woodbridge Road.
Surfacing includes gravel and grit.
Cycle chicanes shown on diagrams.
Created by Robert Asher // 1 thread
Hello, I'm wondering how many other Cambridge cyclists have shared the experience I've had (about once per month now) regarding a particular elderly lady who insists that bikes are not allowed on the "footpath" adjacent to the Trumpington allotments, between Shelford Rd & the new busway in CB2. This path seems clearly demarcated as a shared pedestrian-cycle path on the cycle maps provided at the council link (below). However, it is not clearly labeled as such on the path itself, leading her to become quite angry with any cyclist who gets near her & her dog while they're out walking (and obstructing the path to underscore her point). "It's a footpath" she yells, and storms away.
So my questions are 1) am I correct in interpreting the council map (below) as permitting bikes on this path and 2) how might one go about requesting proper signage, clearly saying bikes & pedestrians are both welcome?
Thanks for any feedback, Robert
https://www.cambridge.gov.uk/sites/www.cambridge.gov.uk/files/documents/cambridge-cycling-map.pdf
Need to check this planning application for access issues. It proposes to make a new car entrance through a high wall across a pavement at the end of Chesterton Road.
The cycleway cut-through here is very poor currently.
Anon // 1 thread
The main HWRC depot which is out of bounds unless you turn up in a car offers a wide range of recycling opportunities. The pedestrian/cycle area directly of Hazel Court offers none of this other than the main recycling types that are available through household waste collections, and tin foil.
Its hardly acceptable to think that just because you're arriving by bike/foot you won't be able bring other items. All that happens is things either get wrongly sorted or left on the floor causing the area to become a state.
Created by Rob Archer // 1 thread
This is one of the most difficult and dangerous sections of the local cycle network. A point where cycle traffic to 2 local schools, a college and a local park all meet.
Fast heavy traffic
Very poor sight-lines
Cars parking over dropped kerbs
Any suggestions as to how it can be improved?
Created by Gregory Williams // 2 threads
This provides a flatter, shorter, and traffic-free alternative to the National Cycle Route 18 alignment via Sole Street.
Created by Dawes Jaguar // 0 threads
College Walk is in a terrible state and the ancient and totally obsolete street lamps no longer turn on at night and off during the day.
Created by Richard Jennings // 1 thread
The Avenues Shambles
Few people who live in the area will be happy with the situation on The Avenues. A couple of years ago the city won a grant to improve cycle routes around the city, called a “Cycle City Ambition Grant”. The first route to be improved was the one that came along the Avenues, known as the “Pink” route. After two years of planning, public meetings and proposals we are left with the dangerous inadequate mess we see today.
Why is The Avenues Special?
Far more bikes use The Avenues than any other road in the city, "nearly 700,000 in 2016 according to the Air Quality Status Report for 2018. Most are students at UEA or workers at the Hospital and Research Parks. It’s also the route hundreds of children should be using to cycle to the City Academy School, so the potential number of cyclists could be even higher if the road were not so dangerous. Logically it should have been the highest priority for providing proper cycle tracks, but it didn’t turn out like that.
Why is it bad?
The road markings only allow enough space for one direction of flow on a two way street, so if it needs to pass traffic has to drive in the cycle lanes and when it gets busy the cycle lane simply disappear. There is basically far too much traffic for this type of design.
Why did we end up with this mess?
That’s a good question but there are clues, take a look on Tombland and the expensive paving around the cathedral gate. All this meant there just wasn’t enough money left to build the proposed cycle tracks and the present botch is the result. The council decided that the cost of doing The Avenues didn’t represent good value for money, yet doing Tombland did. This is a very suspect situation which has left us with an unacceptable, dangerous mess that simply can’t be left as it is.
What can be done?
Created by Dominic Fee // 1 thread
This issue covers Westminster City Council's proposals for a Quietway route from Green Park to Marylebone
Created by Adam Edwards // 2 threads
Shared use cycle path under construction but delayed completion now set for the end of February 2016. The path with extend the route from Hatfield station up to the town centre and then via the not so good on road lanes to the University and Business Park.
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Created by FrenchyF // 0 threads
There should be a dropped kerb at the foot of Braidwood Gate, leading to Dumbiedykes
I cycle past this junction a lot, and sometimes the lights are red so I wait and look at the lanes and wonder why they're like this.
Created by Ian Seeley // 0 threads
There is a tree stump about 3 feet high on the cycle track. It's particularly difficult to see at night when travelling east bound and should be completely removed and the cycle track resurfaced.