21/04396: 3bed dwelling, 24 Elfleda Road
21/04396/FUL | Erection of one three-bedroom dwelling with associated access, parking and landscaping. | 24 Elfleda Road Cambridge Cambridgeshire CB5 8LZ
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/04396/FUL | Erection of one three-bedroom dwelling with associated access, parking and landscaping. | 24 Elfleda Road Cambridge Cambridgeshire CB5 8LZ
Created by Steven Moseley // 1 thread
Land Adjacent Hospytts, The Causeway, Great Horkesley CO6 4AD
Created by Steven Moseley // 1 thread
Proposal for 9 dwellings consisting of 4 x 3 bed houses and 4 x 2 bed apartments and 1 x 1 bed apartment.
Created by Steven Moseley // 1 thread
Demolition of existing Rugby clubhouse and erection of a new two storey community centre with associated parking and landscaping.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
A new thread for discussions related to the Cambridgeshire and Peterborough Combined Authority, the strategic transport authority for our region.
Change of use from agricultural land for the construction of an A10 bridge structure with associated earthworks embankment bridge landing, construction of a shared use route for non-motorised users between the Waterbeach Barracks site and Green End including a 3m shared footway cycleway and 2m grassed verge for equestrians and 1m grassed verge, hard and soft landscaping, lighting, construction compound and temporary haul roads
Land Between Green End And The Waterbeach Barracks Site Waterbeach Cambridge Cambridgeshire CB25 9PA
South Cambridgeshire
Application reference : 21/04625/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Transport in the March area (March North and Waldersley, March South and Rural, Whittlesey South) has been under review.
sound+fury // 1 thread
Part demolition of the existing Romsey Labour Club building with retention of the BLI historic frontage and erection of 44no. serviced apartments (sui generis use class) along with a cafe, gymnasium, community space, and associated infrastructure and landscaping.
Romsey Labour Club Mill Road Cambridge CB1 3NL
Cambridge
Application reference : 21/04559/FUL
Created by Steven Moseley // 1 thread
Outline planning application for 30 dwellings and 1ha of public open space and access from Newbarn Road. Some matters reserved.
Created by Steven Moseley // 1 thread
Demolition of existing dwelling and its replacement with a new dwelling
The existing mini-roundabouts are relatively easy to navigate for confident cyclists only. Any future segregated route along Berechurch Hall Road will require improvements.
Created by Steven Moseley // 1 thread
This junction is fast, dangerous, and over-complicated. It should be improved to better handle the current and future traffic, and cycle and pedestrian movements.
CBC cycling SPD route no. 9 (bidirectional segregated) along Berechurch Hall Road between Layer Rd. and Garrison path at junction with Berechurch Rd. should be provided.
Created by Steven Moseley // 1 thread
Created by Steven Moseley // 1 thread
The barrier should be removed (8.3)
The white line (6.5.2-3) segregated ~1.5m wide bidirectional cycleway (Table 5-2 & 5-3) along Baronswood Way (CW) doesn't comply with LTN 1/20.
The width should be increased to the recommended unconstrained minimum of 3m, and demarcation should be improved from the obsolete white line.
The white line (6.5.2-3) segregated ~1.5m wide bidirectional cycleway (Table 5-2 & 5-3) along Camulodunum Way (CW) is obstructed by lamp columns. As such it doesn't comply with LTN 1/20.
The width should be increased to the recommended unconstrained minimum of 3m, proper allowance should be made for the lamp columns (or they should be moved), and demarcation should be improved from the obsolete white line.
Created by Steven Moseley // 1 thread
Berechurch Hall Road is a busy road that is becoming increasingly residential West of the junction with Berechurch Road (J1). The speed limit has been reduced from 40mph to 30mph, except for a section of 40mph East of J1.
To improve safety for pedestrians, cyclists, and motorists, the current speed limits should be reduced by 10mph (Fig 4.1) and traffic lanes correspondingly narrowed (7.2.5-7).
Created by Steven Moseley // 1 thread
The sub-LTN 1/20 white line (6.5.2-3) segregated bidirectional cycleway (Table 5-2 & 5-3) along Camulodunum Way (CW) and Baronswood Way (BW) are not connected, leaving unconfident cyclists travelling North/South along CW via the toucan crossing from the new development 202025 unable to continue North to the Town Centre, as advertised in planning documents.
The gap could be easily filled to the existing standard on CW/BW via footway conversion.
Created by Jean Dollimore // 1 thread
Camden is consulting on making permanent the trial scheme put in during summer 2020:
They also propose the following new measures
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Change of use from a small HMO (use class C4) to a 9 bed large house in multiple occupation (use class sui generis).
49 College Fields Cambridge Cambridgeshire CB4 1YZ
Cambridge
Application reference : 21/04425/FUL
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
A new thread to highlight issues in and around Huntingdon which we may wish to engage with / support our partners with.
Created by Steven Moseley // 1 thread
Outline application for erection of 3 bedroom two storey house on garden of 22 Valentines Drive.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by jpennycook // 1 thread
Request for a screening opinion for the erection of a motorway service area
Land At O/S Grid Ref 460946 147950 M3 Basingstoke Hampshire
Basingstoke
Application reference : 16/02767/ENSC
http://pad.basingstoke.gov.uk/DocumentViewer/?DocumentClassCode=DC&Folder1Reference=16/02767/ENSC
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099199.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099197.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/10/05/01100568.PDF
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
Created by Sefton // 1 thread
The Lovers Loan shared path through the Grange has at least 5 very tight barriers along its length, and missing dropped kerbs - especially at the crossing of Dick Place. Removing barriers or widening them would make it much more easy to use for bikes, buggies and wheelchairs. Even some double pushchairs don't fit!
Created by Chris Peck // 1 thread
A long, tortuous issue, where no progress has been made, despite large amounts of effort. Godalming High Street was recommended for adopting as a trial two-way working for cyclists in 2001, thanks to Alec McCalden's excellent presentation to the Planning Inspector at the time.
However, the trial was never carried out. Cyclists continue to use the street in both directions, as there are plenty of ways to get out of the way of oncoming cars.
The City of London has introduced dozens of contra-flow cycling schemes on narrow streets and lanes across the City. A third of all the cyclists are now using the contraflow. There has been 1 cycle crash three years post-introduction (there were 2 in the three years before). See here for more details: https://www.ucl.ac.uk/transport-institute/pdfs/Cheung_slides.pdf
Created by Charlie Halliday // 5 threads
Proposal to address Farnborough Town Action Plan reference CW39. Issue: Alexandra Road, safety, pedestrian and cycle links.
Consultation documents may be downloaded from:
http://www3.hants.gov.uk/transport-schemes-index/farnborough-alexandra-road.htm
They are also on view in the reception area at Rushmoor Borough Council Offices, Farnborough Road during the consultation period
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
St Neots is receiving some funding as part of the Future High Streets Fund - this could include investment in cycling and walking infrastructure.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
Camcycle's time and energy is consistently taken up removing exclusionary barriers (e.g. Biomedical Campus, A14 active travel bridges, Warren Road). We need to consider long-term ways to prevent new barriers going in and remove existing ones which prevent people of all ages and abilities cycling.
Created by Fraser // 0 threads
Travelling along Fore Street from the East where it splits with Key Street there are several traffic calming patches and speed bumps that are difficult and dangerous to negotiate on a bike.
In particular the three sections of cobbles; as the street becomes one way just before Fore Street Pools, just before you cross Star Lane, and just after crossing Star Lane.
They are so ragged that as a cyclist you have to almost come to a stop, where as other road users can travel over them at ~20mph.
This makes them extremely dangerous as just after accelerating away from the traffic lights you then need to slow almost to a stop and weave your way through the cobbles while the traffic behind you is expecting to carry on and the street is too narrow for them to safely overtake.
The section of Fore Street between Star Lane and Eagle Street has better speed humps (still not great, but a dream compared with the above mentioned cobble sections!) with flat section at the sides so that bikes may pass them safely. However the flat sections are occasionally blocked by parked vehicles forcing cyclists over the speed humps.
The less said about the time it takes to negotiate these three sets of traffic lights the better!
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by CycleSi // 2 threads
TfL are undertaking major junction improvements at several gyratory systems. All of them include protected cycle lanes/tracks, except Wandsworth!
The local London Cycle Campaign group is not campaigning and virtually defunct. We desperately need to organise local cyclists and campaigners all over London and beyond to challenge this bizarre scheme.
Oval, Vauxhall, Elephant & Castle, Stockwell, Archway, Aldgate, etc, etc are all getting extensive safe space for cycling.
TfL for some reason (I suspect the blame lies with the borough) have instead decided to claim that the awful shared footpaths and streets with no cycling infrastructure at all that have been designated as 'cycle routes' form part of a 'cycle network'. They are even planning to have Cycle Superhighway 8 run along Wandsworth High Street with not even a painted cycle lane - cyclists will be mixed in with extremely heavy bus traffic.
It seems like no-one is talking about this other than me!! Seriously-argh!!!!
Suggestions, ideas, offers to help campaign all welcome.
Created by Simon Nuttall // 1 thread
Is it legal or not to ride on either Christ's Lane or Milton's Walk ?
Always been a bit of a problem - worse for pedestrians than cyclists.
Detailed (re-)design is apparently underway.
Created by Colin Wing // 3 threads
This is the proposed route of Quietway 88 in Westminster. An alternative option uses the west side of Trafalgar Square instead of Cockspur Street.
Created by Simon Redding // 0 threads
The Jepson Road estate has great cycling infrastructure, but when you get to the west end of it, the path peters out and ends in a fence. Lots of cyclists then carry their bike over a fence and round the end of a culvert to Hartfield Close, but it would be better to just have a cycle gate in the fence straight on to Midland Terrace, which is likely to form part of NCN67 soon.
Created by Iain Lane // 2 threads
Press article in the post today: http://www.nottinghampost.com/Major-route-city-centre-overhauled-priority-buses/story-26177322-detail/story.html
Can't find plans just yet.
Since the changes to Mare St at Westgate St some vehicles travel past the children's centre in Triangle Road, at excessive speeds, to avoid the traffic light at Mare St . Can Hackney Council add a restriction in Triangle Road.
Created by Stephan Matthiesen // 1 thread
Cycle lanes in both directions needs urgent improvment. It's painted on but
- it is far too narrow, encouraging dangerous overtaking
- road surface in the gutter (=cycle lane) extremely bad, with deep&wide cracks, most covers have sunken etc.
- paint has faded
- parking (near the schools)
Many sections of Gilmerton Rd have hatching in the centre, wasting space; these sections would be wide enough for a segregated path (or wide lane protected by bollards/armadillos).
In the narrower sections, the existing bike lane should be removed completely because at the moment it increases the dangers (encouraging cyclists to be in the gutter between kerb and speeding cars).
Created by jennifer Kirner // 1 thread
I am bringing up the problem that cyclists and pedestrians have crossing East Road to get to ARU and the neighbouring residential area. It would be helpful have a discussion about how to create safe routes in this area and how to get them implemented.
When I am cycling, I find it dangerous and difficult to cross East Road from Petersfield or Bradmore Street and I resort to using the pedestrian crossings with my bike because it is.
This area that really needs addressing for improvements to safe cycling and I don’t understand why given the expansion of ARU this has not been addressed.
The junction of Mill Road/East Road is also pretty scary for cyclists and pedestrians. The crossing at the slip road at the corner of Petersfield is difficult for pedestrians because it has no traffic controls and cars come quickly round this corner making it dangerous for anyone who is not alert , who is not tall enough to see, or who can't move quickly. This includes the young, the old, someone in a wheelchair. I wouldn't fancy pushing a child in a buggy across either.
Basically, it seems to me that the Junction and East road are designed for motor vehicles and traffic flow not for pedestrians and cyclists. Can we try and address this?
Created by jpennycook // 1 thread
Erection of 40 dwellings to include 24 private homes and 16 affordable homes, associated parking, landscaping, amenity space and highway alterations
Land At Farleigh Road Farleigh Road Cliddesden Hampshire
Basingstoke
Application reference : 16/04690/FUL
Created by George Britton // 1 thread
Aldershot Urban Extension - Green Light from RBC
Created by Gregory Williams // 1 thread
Planning application Y12/0897/SH proposes the redevelopment of a significant portion Folkestone Harbour and surrounding land. The proposals include up to 1000 dwellings and up to 10000sqm of commercial landuse. NCR2 runs through the development area.
Created by jpennycook // 1 thread
15/04503/OUT | Outline application to include access to be considered, for up to 750 residential units with a mix of units, and a neighbourhood centre including principal community centre, private children's nursery, local retail facilities, indoor sports hall and three form entry primary school and ancillary development | Hounsome Fields Trenchard Lane Dummer Hampshire
Created by GG // 1 thread
For a long time I have wondered about a crowd-sourced cycleability map.
In this, people cycle along a link (accepting the first question of how to define the beginning and end of this) then give it a thumbs up or down. After enough people do this, then others can see how popular it is.
Some people wonder about subjectivity but I think this should be less of a problem with more voters.
The reason I am asking is because this method could apply to a potential commercial project for a Council which wants to drive around 100km of rural roads and use a panel of 4 experts to grade meaningful segments on a 1 to 7 scale according to their suitability for HGV movements.
Any views on whether this is already done within an app I am not aware of, or could be it done by anyone as an add-on to something else, or is it something CamCycle could offer as a commercial package (there may well be more than one local authority looking for this sort of thing)
POSSIBLE Cycle Route Between Lowedges Rd/Chesterfield Rd + Bradway Fire Station Sheffield S8........using existing 8ft wide pavements by upgrading to "shared use".........This could connect to the new cycling "on + off " road routes being developed in the Meadowhead School area
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?