Space for Cycling request Crookes
Address the dangerous pinch point created by road narrowing on the bend of Crookes Road outside the old Grindstone pub.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Dexter Johnstone // 1 thread
Address the dangerous pinch point created by road narrowing on the bend of Crookes Road outside the old Grindstone pub.
Created by Dexter Johnstone // 1 thread
Transform Meadow Street and Upperthorpe Road from a rat-run to a pleasant walking and cycling route by closing them to through-traffic. This would allow safe and pleasant access to Ponderosa Park, local shops and communities. It would also form part of a direct route from the city centre to Walkley.
Created by Matt Turner // 4 threads
Plans are to widen Chesterfield Road as part of the Key Bus Routes project.
The scheme plans to introduce a peak time inbound bus lane, changes to pedestrian/cycling crossings, new shared use pavements, one way streets, cycle contraflow and parking changes.
Created by Dexter Johnstone // 1 thread
This is the worst stretch of road for reported tram accidents. 67 accidents have been reported to CycleSheffield:
https://www.google.com/maps/d/edit?mid=zUOBSdPNPOfg.k1ohLkAyXvek&usp=sharing
The majority occur around tram stops.
Created by Dexter Johnstone // 1 thread
accidents reported at this junction as the tram lines cannot be crossed at 90 degrees.
Created by Dexter Johnstone // 1 thread
37 accidents have been reported to CycleSheffield along Glossop Road / West street.
The accidents mainly occur when people are turning from / to side roads and the tram lines cannot be crossed at 90 degrees and by West Street tram stop where the platform juts out into the road.
Created by Dexter Johnstone // 1 thread
accidents reported here where tram lines cross York Street / High Street
Created by Dexter Johnstone // 1 thread
accidents reported here where tram lines cross top of Angel Street / High Street
Created by Dexter Johnstone // 1 thread
accidents reported here as tram lines cannot be crossed at 90 degrees where tram lines join White Lane at Fox Lane junction
Created by Dexter Johnstone // 1 thread
a number of accidents have been reported here. it is not possible to cross the tram lines at 90 degrees.
Created by Dexter Johnstone // 1 thread
the cycle path crosses the tram lines at a less than 90 degree angle. Accidents have been reported here.
Created by Dexter Johnstone // 1 thread
proposed changes to Park Grange Croft
Created by Cllr Ian Manning // 1 thread
Altering the guidance given to planning with respect to walking/cycling
Created by Dexter Johnstone // 1 thread
There are a lot of accidents here as the tram platform juts into the road, causing cyclists to cross the rails at a less than 90 degree angle.
I don't know what the best option here, the pavements are quite narrow on either side so I don't think there is the option for an off road cycle path to avoid the hazard.
Created by Dexter Johnstone // 1 thread
There are a lot of accidents by the Leppings Lane as the platform juts out into the road, forcing cyclists to cross the tracks at less than 90 degrees.
The pavement on the inbound platform is very wide and there is room for an off road cycle path to go round the platform and rejoin the road afterwards.
Created by Chris Peck // 1 thread
Two new pedestrian refuges are proposed on the A3100 at Broadwater Park. The two existing refuges are difficult for cyclists, two more will make it even worse.
Created by Dexter Johnstone // 1 thread
There have been a number of accidents here as the tram lines curve across the road, it is not possible to cross them at right angles.
Created by Dexter Johnstone // 1 thread
There have been a number of accidents where the tram lines curve across the road on Donetsk Way as it is not possible to cross them at right angles.
There is just grass and hedges on either side of the road and so it would be quite easy to install off road cycle paths along Donetsk Way.
Created by Dexter Johnstone // 1 thread
There have been a number of accidents here where the tram lines curve across Sheffield Road to the Birley Moor tram stop. The rails cannot be crossed at right angles.
There is loads of open space around here where off road cycle paths could be installed.
Created by Dexter Johnstone // 1 thread
There have been a lot of accidents around the tram stop at White Lane because of the way the platform juts into the road.
There are only hedges behind each of the platforms and so a cycle path on either side of the road could run behind the platform, avoiding the hazard.
Created by Dexter Johnstone // 1 thread
Because of the way that the Spring Lane tram platform juts out into the road and also the curve of the tram lines as they join City Road there have been a number of accidents here.
Created by Dexter Johnstone // 1 thread
Because of the way the tram lines cross the roads around here there have been quite a few accidents as the tracks cannot be crossed at right angles.
Created by Dexter Johnstone // 1 thread
There have been a number of accidents here because of the angle that Shrewsbury Road joins Granville Street, and also the way the tram stop platform juts out into the road forcing cyclists to cross the tracks.
Created by Dexter Johnstone // 1 thread
There are a lot of accidents around this tram stop:
https://www.google.com/maps/d/edit?mid=zUOBSdPNPOfg.k1ohLkAyXvek&usp=sharing
Because the pavements are narrower here I don't think there is room to provide an off road route around the stop. Therefore an alternative, signed cycle route should be provided to avoid this tram stop.
Created by Dexter Johnstone // 1 thread
Because of the way the tram lines criss-cross the road at Hillsborough corner it is very difficult to cycle through this area safely. There are a lot of accidents here, see map: https://www.google.com/maps/d/edit?mid=zUOBSdPNPOfg.k1ohLkAyXvek
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by David Earl // 1 thread
"14/0447/FUL | Change of use from motor bike show room to supermarket with cafe [without cooking facilities] and installation of air compressor unit. | 192 Green End Road Cambridge Cambridgeshire CB4 1RN"
The Dalmeny Park house builders have installed new chicanes on NCN route 1. Unfortunately none of these meet the guidlines for chicanes on cycling facilities.
Created by Martin A // 1 thread
This attractive former railway line would provide a useful off-road link between Ripley Greenway and Derby for commuters and leisure users.
Created by Heather Coleman // 1 thread
As described in the winter 2019 Camcycle magazine there is a group working on getting some improvements to the Trumpington busway. The magazine concentrates on the northern end of the busway but we are also seeking upgrades to the Addenbrookes spur junction and the crossing at Hobson Avenue/Lime Avenue as well as adding pedestrian footpath from the Hills Road Bridge all the way to Drury Avenue.
The group would like to start getting this out to users of the path for input, discussion and help with campaigning. Many Biomedical Campus commuters presumably use this path frequently, even daily. It would be great to get some input.
Created by Andrew Clegg // 2 threads
The garage at the end of radcliffe road uses the end of this road as a car storage area, which often results in the access onto the cyclepath being obstructed.
Created by Rogerdodge // 1 thread
Kingston Council have opened the consultation on this route, open until 17th November
Created by David Wilcox // 1 thread
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton Street
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.
An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
Created by Kevin Ablitt // 1 thread
Having grown up in this area I know it well. Bolton Lane and Christchurch Street could benefit from 20 mph, Cobbold Street and Withipoll Street would be more pedestrian and cyclist friendly if they had filtered permeability. Cobbold Street is extremely busy at school times as parents drop off or collect, make it closed half way to motors and this would cut out through traffic . Likely to be very contentious.
Created by Ian Seeley // 0 threads
There is a tree stump about 3 feet high on the cycle track. It's particularly difficult to see at night when travelling east bound and should be completely removed and the cycle track resurfaced.
Created by Tim P // 1 thread
Portsdown Hill Road & James Callaghan drive are a set of roads along the top of Portsdown Hill that is currently used by a lot of cyclists for commuting, touring and leisure facilties due to the forts, views and open areas around it.
As such, it's a well known tourist spot to stop for a burger or take a picnic and fly a kite.
However, being on top of an exposed hill results in significant side winds which results in cyclists being blown about by gusts, and therefore all cyclists need to take primary position on this road to give them space. As a 40mph road, many drivers have significant issues with cyclists taking primary, and therefore perform many punishment/close passes.
The affect of this on cycling in the area is many
1) More people would cycle from the surrounding areas ( Waterlooville, Havant, Fareham/Lee on Solent ) to work at QA Hospital or the businesses on the hill if there were better cycle infrastructure.
2) More people would cycle from the surrounding area & to enjoy the space & views if it felt safer to get there.
Created by Stephan Matthiesen // 0 threads
Contraflow bike lane in Salisbury Rd for easier access from Southside to Commonwealth Pool, Pollock Halls and Holyrood Park.
I cycle past this junction a lot, and sometimes the lights are red so I wait and look at the lanes and wonder why they're like this.
Created by FrenchyF // 0 threads
There should be a dropped kerb at the foot of Braidwood Gate, leading to Dumbiedykes
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Created by Adam Edwards // 2 threads
Shared use cycle path under construction but delayed completion now set for the end of February 2016. The path with extend the route from Hatfield station up to the town centre and then via the not so good on road lanes to the University and Business Park.
Created by Andrew Woodward // 0 threads
This is the approach to Kew Gardens station and is an area with many shops and cafe’s. Enabling this street to become 2-way for cycling will make access to the station and shops more convenient for cyclists and should therefore bring economic benefits to the area. Streetview: http://goo.gl/maps/P4spf
Created by Simon Still // 2 threads
Our proposals at a glance
Transport for London (TfL), together with Lambeth Council would like to know your views on proposals for improvements which will include:
To complement this scheme we have been working with Lambeth Council to develop a Low Traffic Neighbourhood in the nearby residential areas to the east of the A23. This will complement the A23 scheme by protecting local streets from through traffic and will help deliver wider objectives such as creating Healthy Routes on local roads. Visit the consultation page of Lambeth’s website from the 22 February 2020 to find out more.
Created by Dominic Fee // 1 thread
This issue covers Westminster City Council's proposals for a Quietway route from Green Park to Marylebone
Created by Richard Jennings // 1 thread
The Avenues Shambles
Few people who live in the area will be happy with the situation on The Avenues. A couple of years ago the city won a grant to improve cycle routes around the city, called a “Cycle City Ambition Grant”. The first route to be improved was the one that came along the Avenues, known as the “Pink” route. After two years of planning, public meetings and proposals we are left with the dangerous inadequate mess we see today.
Why is The Avenues Special?
Far more bikes use The Avenues than any other road in the city, "nearly 700,000 in 2016 according to the Air Quality Status Report for 2018. Most are students at UEA or workers at the Hospital and Research Parks. It’s also the route hundreds of children should be using to cycle to the City Academy School, so the potential number of cyclists could be even higher if the road were not so dangerous. Logically it should have been the highest priority for providing proper cycle tracks, but it didn’t turn out like that.
Why is it bad?
The road markings only allow enough space for one direction of flow on a two way street, so if it needs to pass traffic has to drive in the cycle lanes and when it gets busy the cycle lane simply disappear. There is basically far too much traffic for this type of design.
Why did we end up with this mess?
That’s a good question but there are clues, take a look on Tombland and the expensive paving around the cathedral gate. All this meant there just wasn’t enough money left to build the proposed cycle tracks and the present botch is the result. The council decided that the cost of doing The Avenues didn’t represent good value for money, yet doing Tombland did. This is a very suspect situation which has left us with an unacceptable, dangerous mess that simply can’t be left as it is.
What can be done?
Created by Dawes Jaguar // 0 threads
There is scope here for creating a short cycle path to complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Dawes Jaguar // 0 threads
College Walk is in a terrible state and the ancient and totally obsolete street lamps no longer turn on at night and off during the day.
Created by Gregory Williams // 2 threads
This provides a flatter, shorter, and traffic-free alternative to the National Cycle Route 18 alignment via Sole Street.
Martin Lucas-Smith // 1 thread
This junction is currently very poor. Cyclists end up doing awkward manoeuvres and visibility is not good.
It is possible this could be improved as part of the Chisholm Trail.
How could this junction be redesigned to make it best practice?
Created by Steven Moseley // 6 threads
Of and relating to Colchester Borough Council.