PA 213431 25TrinitySt
Change of use from A1 to C3 to create 4 new 1 bedroom apartments. External repair and decoration. Internal Alternations. Additional Windows and relocation of door to rear elevation. ASHP units to roof top.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Steven Moseley // 1 thread
Change of use from A1 to C3 to create 4 new 1 bedroom apartments. External repair and decoration. Internal Alternations. Additional Windows and relocation of door to rear elevation. ASHP units to roof top.
Created by Steven Moseley // 1 thread
New Mixed Use Development comprising a convenience store (use Class A1), three flexible use units (Class A1-A5 or Class D1), associated yard and servicing area, parking spaces and landscaping.
Created by catch // 1 thread
New development of 100 homes off the A134 in Horkesley.
https://www.colchester.gov.uk/planning-app-details/?id=442d3ed1-7f61-ec11-8f8f-0022489d9171#ValidationSummaryEntityFormView
Created by Stuart Johnson // 1 thread
Demolition of six retail units part of the Priory Walk Shopping precinct and replacing them with a mixed development of 21 apartments and one retail unit situated on the north side of the junction of Long Wyre Street and Priory Walk.
https://www.colchester.gov.uk/planning-app-details/?id=e10f62af-2c5f-ec11-8f8f-0022489cf2d7
Demolition of a 1960's, 2 storey commercial building on the corner of 14-16 Long Wyre Street and 1-8 Priory Walk and, replacement with 4 storey new building, providing 18 new homes and one commercial unit at ground floor.
https://www.colchester.gov.uk/planning-app-details/?id=1a6462d2-bb5d-ec11-8f8f-0022489cfbff
Conversion and remodelling, including partial demolition, of an existing, Class E, building to form a mixed use development of 37 new,Class C3, self-contained homes and a new Gym Space at Ground Floor.
Created by Michael Robinson // 1 thread
Creating discussion on proposals for Cycleway 9 extension between Brentford and Hounslow town centres.
Hounslow to Brentford walking and cycling changes
We’re proposing to make a series of changes to help people to walk and cycle on Brentford High Street and London Road between Hounslow and Brentford town centres.
We’d like to know your thoughts on our proposals and we are holding a six-week consultation. You can reply by completing our survey, which should take no more than 5-10 minutes to complete.
If you prefer, you can email your comments to haveyoursay@tfl.gov.uk or write to us at FREEPOST TFL HAVE YOUR SAY (Walking and cycling changes between Hounslow and Brentford), no stamp needed.
The closing date for comments is 16 February 2022.
Summary of changes
We’ve described the changes in more detail but in summary we are proposing to make the following changes:
Created by Steven Moseley // 1 thread
Change of use from Sui-Generis (current police station) to residentialcare home (use class C2) Also addition of single front entrance porch/extension
Supplement to housing development application entitled 'Provision of a shared cycleway/footway west onto Ness Road, landscape, drainage, and associated infrastructure of previously approved 15/01175/OUM'
East Cambridgeshire Planning application reference : 21/01771/FUL
Burwell is not in Ely Cycling Campaign's remit but will be important to some Camcycle members.
The proposed infrastructure looks very good in these plans. The Council wouldn't dare require barriers on it because it is intended as a route for emergency vehicles. The rising bollards don't look to be too much of a problem, as long as they can be seen in poor visibility conditions -the plans includes lighting for the route but it might be good for the bollards to include reflective and fluorescent markings.
There already is a dropped kerb at the northwest end of the route (junction with Ness Road).
The plans include the 'Cyclists Dismount' sign for those emerging onto Ness Road.
Created by Steven Moseley // 1 thread
Replacement of bridge and associated highways works involving realignment, junction improvements and width increase of the carriageway.
(CBC version)
Created by Billboyheritagesurvey // 1 thread
The new active travel route is due to open very soon. What needs fixing?
sound+fury // 1 thread
It's a hefty application that will need careful study.
Created by Steven Moseley // 1 thread
Construction of a 3 Bed, Two-Storey, Detached dwelling with garage andassociated parking. Movement of the existing pathway
Created by John Chamberlain // 1 thread
In September 2020, Camden Council put in a segregated southbound cycle track on St Pancras Way under Covid-19 Safe Travel regulations. It was done under an Experimental Traffic Order and they are now consulting on making it permanent or removing it. Details in the attached thread.
Created by Steven Moseley // 1 thread
Convert the existing eight bedsits within an HMO into three separate two-bedroom flats.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Cross-party group
Active since 18 May 2021
Westminster is consulting on changes to Maida Hill Market (Harrow Road, Walterton Road). The proposed changes to cycling are limited but it looks from the design that cyclist would lose permeability to Fernhead road.
https://harrowroad.org/assets/Uploads/engagement/211127-Stage-3-Public-Engagement-Boards_MHM.pdf
Created by Steven Moseley // 1 thread
Outline application for 1no. new dwelling.
Created by Steven Moseley // 1 thread
Outline planning application for the development of up to 150 dwellings (including 30% affordable housing) with public open space, landscaping, sustainable drainage system (SuDS) and vehicular access points from Halstead Road and Fiddlers Hill. All ma
Created by Steven Moseley // 1 thread
Demolition of Mercury House and Food @ the Mercury Restaurant; fellingof selected trees; construction of 2-3 storey production block; construction of two-storey extension on northeast corner; infill of porte-cochere to provide internal ground floor acc
Created by catch // 1 thread
Objection to development of land west of Lakelands, off Church Lane / Western Bypass
Response here: https://www.ensembling.com/270062
Created by catch // 1 thread
Planning application objection for the Park Lane Business Centre
Created by Roxanne (CEO) // 1 thread
A pilot of delivery robots may be coming to Cambridgeshire.
What are our views/policies about delivery robots?
What do we know about other places they have been trialled?
Created by Rosamund Humphrey (Admin Officer) // 1 thread
(Demolition of existing garages, relocation of existing sub-station within the site, and redevelopment to provide 8no. residential dwellings (Use Class C3) with associated infrastructure and landscaping)
Land Rear Of 5-17 New Square Cambridge Cambridgeshire CB1 1EY
Cambridge
Created by Joseph Tucker // 1 thread
A friend recently smashed her shoulder by cycling into the car trap which awaits anyone who misses the "Except guided buses" sign and then misses the "Car trap" sign, while heading from North Station towards Milton Rd.
In the dark, this is actually an easy mistake for an inexperienced rider, since
a) you believe that you're on a road when actually you're on a piece of Guided Busway
b) these signs can appear to belong to the cycle path, where they are mounted.
Created by Steven Moseley // 1 thread
Construction of 1no. 4 bedroom house with single garage.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by jpennycook // 1 thread
Request for a screening opinion for the erection of a motorway service area
Land At O/S Grid Ref 460946 147950 M3 Basingstoke Hampshire
Basingstoke
Application reference : 16/02767/ENSC
http://pad.basingstoke.gov.uk/DocumentViewer/?DocumentClassCode=DC&Folder1Reference=16/02767/ENSC
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099199.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099197.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/10/05/01100568.PDF
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
Created by Sefton // 1 thread
The Lovers Loan shared path through the Grange has at least 5 very tight barriers along its length, and missing dropped kerbs - especially at the crossing of Dick Place. Removing barriers or widening them would make it much more easy to use for bikes, buggies and wheelchairs. Even some double pushchairs don't fit!
Created by Chris Peck // 1 thread
A long, tortuous issue, where no progress has been made, despite large amounts of effort. Godalming High Street was recommended for adopting as a trial two-way working for cyclists in 2001, thanks to Alec McCalden's excellent presentation to the Planning Inspector at the time.
However, the trial was never carried out. Cyclists continue to use the street in both directions, as there are plenty of ways to get out of the way of oncoming cars.
The City of London has introduced dozens of contra-flow cycling schemes on narrow streets and lanes across the City. A third of all the cyclists are now using the contraflow. There has been 1 cycle crash three years post-introduction (there were 2 in the three years before). See here for more details: https://www.ucl.ac.uk/transport-institute/pdfs/Cheung_slides.pdf
Created by Charlie Halliday // 5 threads
Proposal to address Farnborough Town Action Plan reference CW39. Issue: Alexandra Road, safety, pedestrian and cycle links.
Consultation documents may be downloaded from:
http://www3.hants.gov.uk/transport-schemes-index/farnborough-alexandra-road.htm
They are also on view in the reception area at Rushmoor Borough Council Offices, Farnborough Road during the consultation period
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
St Neots is receiving some funding as part of the Future High Streets Fund - this could include investment in cycling and walking infrastructure.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
Camcycle's time and energy is consistently taken up removing exclusionary barriers (e.g. Biomedical Campus, A14 active travel bridges, Warren Road). We need to consider long-term ways to prevent new barriers going in and remove existing ones which prevent people of all ages and abilities cycling.
Created by Fraser // 0 threads
Travelling along Fore Street from the East where it splits with Key Street there are several traffic calming patches and speed bumps that are difficult and dangerous to negotiate on a bike.
In particular the three sections of cobbles; as the street becomes one way just before Fore Street Pools, just before you cross Star Lane, and just after crossing Star Lane.
They are so ragged that as a cyclist you have to almost come to a stop, where as other road users can travel over them at ~20mph.
This makes them extremely dangerous as just after accelerating away from the traffic lights you then need to slow almost to a stop and weave your way through the cobbles while the traffic behind you is expecting to carry on and the street is too narrow for them to safely overtake.
The section of Fore Street between Star Lane and Eagle Street has better speed humps (still not great, but a dream compared with the above mentioned cobble sections!) with flat section at the sides so that bikes may pass them safely. However the flat sections are occasionally blocked by parked vehicles forcing cyclists over the speed humps.
The less said about the time it takes to negotiate these three sets of traffic lights the better!
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by CycleSi // 2 threads
TfL are undertaking major junction improvements at several gyratory systems. All of them include protected cycle lanes/tracks, except Wandsworth!
The local London Cycle Campaign group is not campaigning and virtually defunct. We desperately need to organise local cyclists and campaigners all over London and beyond to challenge this bizarre scheme.
Oval, Vauxhall, Elephant & Castle, Stockwell, Archway, Aldgate, etc, etc are all getting extensive safe space for cycling.
TfL for some reason (I suspect the blame lies with the borough) have instead decided to claim that the awful shared footpaths and streets with no cycling infrastructure at all that have been designated as 'cycle routes' form part of a 'cycle network'. They are even planning to have Cycle Superhighway 8 run along Wandsworth High Street with not even a painted cycle lane - cyclists will be mixed in with extremely heavy bus traffic.
It seems like no-one is talking about this other than me!! Seriously-argh!!!!
Suggestions, ideas, offers to help campaign all welcome.
Created by Simon Nuttall // 1 thread
Is it legal or not to ride on either Christ's Lane or Milton's Walk ?
Always been a bit of a problem - worse for pedestrians than cyclists.
Detailed (re-)design is apparently underway.
Created by Colin Wing // 3 threads
This is the proposed route of Quietway 88 in Westminster. An alternative option uses the west side of Trafalgar Square instead of Cockspur Street.
Created by Simon Redding // 0 threads
The Jepson Road estate has great cycling infrastructure, but when you get to the west end of it, the path peters out and ends in a fence. Lots of cyclists then carry their bike over a fence and round the end of a culvert to Hartfield Close, but it would be better to just have a cycle gate in the fence straight on to Midland Terrace, which is likely to form part of NCN67 soon.
Created by Iain Lane // 2 threads
Press article in the post today: http://www.nottinghampost.com/Major-route-city-centre-overhauled-priority-buses/story-26177322-detail/story.html
Can't find plans just yet.
Since the changes to Mare St at Westgate St some vehicles travel past the children's centre in Triangle Road, at excessive speeds, to avoid the traffic light at Mare St . Can Hackney Council add a restriction in Triangle Road.
Created by Stephan Matthiesen // 1 thread
Cycle lanes in both directions needs urgent improvment. It's painted on but
- it is far too narrow, encouraging dangerous overtaking
- road surface in the gutter (=cycle lane) extremely bad, with deep&wide cracks, most covers have sunken etc.
- paint has faded
- parking (near the schools)
Many sections of Gilmerton Rd have hatching in the centre, wasting space; these sections would be wide enough for a segregated path (or wide lane protected by bollards/armadillos).
In the narrower sections, the existing bike lane should be removed completely because at the moment it increases the dangers (encouraging cyclists to be in the gutter between kerb and speeding cars).
Created by jennifer Kirner // 1 thread
I am bringing up the problem that cyclists and pedestrians have crossing East Road to get to ARU and the neighbouring residential area. It would be helpful have a discussion about how to create safe routes in this area and how to get them implemented.
When I am cycling, I find it dangerous and difficult to cross East Road from Petersfield or Bradmore Street and I resort to using the pedestrian crossings with my bike because it is.
This area that really needs addressing for improvements to safe cycling and I don’t understand why given the expansion of ARU this has not been addressed.
The junction of Mill Road/East Road is also pretty scary for cyclists and pedestrians. The crossing at the slip road at the corner of Petersfield is difficult for pedestrians because it has no traffic controls and cars come quickly round this corner making it dangerous for anyone who is not alert , who is not tall enough to see, or who can't move quickly. This includes the young, the old, someone in a wheelchair. I wouldn't fancy pushing a child in a buggy across either.
Basically, it seems to me that the Junction and East road are designed for motor vehicles and traffic flow not for pedestrians and cyclists. Can we try and address this?
Created by jpennycook // 1 thread
Erection of 40 dwellings to include 24 private homes and 16 affordable homes, associated parking, landscaping, amenity space and highway alterations
Land At Farleigh Road Farleigh Road Cliddesden Hampshire
Basingstoke
Application reference : 16/04690/FUL
Created by George Britton // 1 thread
Aldershot Urban Extension - Green Light from RBC
Created by Gregory Williams // 1 thread
Planning application Y12/0897/SH proposes the redevelopment of a significant portion Folkestone Harbour and surrounding land. The proposals include up to 1000 dwellings and up to 10000sqm of commercial landuse. NCR2 runs through the development area.
Created by jpennycook // 1 thread
15/04503/OUT | Outline application to include access to be considered, for up to 750 residential units with a mix of units, and a neighbourhood centre including principal community centre, private children's nursery, local retail facilities, indoor sports hall and three form entry primary school and ancillary development | Hounsome Fields Trenchard Lane Dummer Hampshire
Created by GG // 1 thread
For a long time I have wondered about a crowd-sourced cycleability map.
In this, people cycle along a link (accepting the first question of how to define the beginning and end of this) then give it a thumbs up or down. After enough people do this, then others can see how popular it is.
Some people wonder about subjectivity but I think this should be less of a problem with more voters.
The reason I am asking is because this method could apply to a potential commercial project for a Council which wants to drive around 100km of rural roads and use a panel of 4 experts to grade meaningful segments on a 1 to 7 scale according to their suitability for HGV movements.
Any views on whether this is already done within an app I am not aware of, or could be it done by anyone as an add-on to something else, or is it something CamCycle could offer as a commercial package (there may well be more than one local authority looking for this sort of thing)
POSSIBLE Cycle Route Between Lowedges Rd/Chesterfield Rd + Bradway Fire Station Sheffield S8........using existing 8ft wide pavements by upgrading to "shared use".........This could connect to the new cycling "on + off " road routes being developed in the Meadowhead School area
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?