Election campaign 2022
It is important that we engage with the candidates at each election, scrutinise their views, and press for their commitments to cycling.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Rosamund Humphrey (Admin Officer) // 5 threads
It is important that we engage with the candidates at each election, scrutinise their views, and press for their commitments to cycling.
Created by David Earl // 1 thread
Rods at this cattle grid have either sheared off or been vandalised (not that recently). It already appears on the county fault report site ref 372428, from June 2021, but nothing appears to have been done about it.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Outline planning permission for the demolition of existing buildings and
provision of up to 16 dwellings up to 120sq.m of office accommodation
access public open space and landscaping (including details of access and
with all other matters reserved)
Reference: S/4057/19/OL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Demolition of existing building and erection of building with two Class E units at ground floor level and 9 flats above.
56 - 60 Hills Road Cambridge Cambridgeshire CB2 1LA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of a 1bed dwelling.
42 Birdwood Road Cambridge CB1 3SU
Cambridge
Application reference : 22/00231/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Change of use from vacant retail to 7 No. apartments (Use Class C3)
212 - 214 Newmarket Road Cambridge Cambridgeshire CB5 8JL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
First floor and single storey rear extensions of existing bungalow to create 3no. flats.
538 Newmarket Road Cambridge CB5 8LL
Cambridge
Application reference : 22/00219/FUL
Created by Will Bramhill // 1 thread
This is our response to a planning application for a new secondary school. It may help others up against a similar scheme. https://docs.google.com/document/d/1xSVC4pzeBz1uW3ujT9VtKSKjFyp1rk668E4dd4prPtk/edit?usp=sharing
Proposed installation of parking places for electric vehicles in the De Freville Avenue and Riverside areas, Cambridge. Closing date for comment is 31 January 2022.
One diagram at least shows incursion into the pavement.
Created by Jean Dollimore // 1 thread
Camden proposes to make permanent the trial changes at Oakley Square (north) at the junction with Crowndale Road put in under an ETO in December 2020. (No Entry for motor vehicles from Crowndale Road into Oakley Square – north).
Camden also proposes for the Crowndale Road junction:
- The planters and droppable bollard to be replaced with a new ‘continuous footway’ with a widening of the pavement along Crowndale Road
- The cycle entry gap is to be re-aligned to accommodate the pavement
- A new tree and bench are to be installed alongside the continuous footway
A new bike hangar is to replace a residents’ parking bay outside 50 Oakley Square (north).
Camden also proposes for the junction with Eversholt Street.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/05431/FUL | First floor side and single storey rear extensions to create two self-contained flats. |
17 Greenlands Cambridge CB2 0QY
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/05578/FUL | Change of use to large 7bed HMO (7 persons) sui generis. Rebuild and extend existing garage to bedroom 7 including changing to pitch roof. First floor rear extension (bedroom 6, previously approved under 20/01261/FUL). |
45 Leete Road Cambridge CB1 9HB
Created by Steven Moseley // 1 thread
Outline application for the erection of five dwellings
Created by Steven Moseley // 1 thread
Outline planning application for: up to 50 dwellings; a new vehicle drop-off/pick up point; and access from Peldon Road. All Matters Reserved, except access
Created by Will Bramhill // 0 threads
See planning application comment at link below. NB this is a good blueprint for any cycle groups looking to comment on new schools. https://www.ensembling.com/273042
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/05549/FUL | Retention of building frontage facade and introduction of a mixed use development comprising basement and ground floor public house and an office/business Use (Class E(g)) to the rear and on the upper floors along with access, cycle parking and associated infrastructure following demolition of existing buildings.
The Emperor 21 Hills Road Cambridge CB2 1NW
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/05362/FUL | Single storey front and side extension and first floor extension to create a 1no 1bed flat above existing detached building at the rear of 6 Kings Hedges Road.
6E Kings Hedges Road Cambridge CB4 2PA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Request for a formal scoping opinion for Hybrid Planning Application comprising Full Planning Permission for c47,280sqm (GEA) of Class E floorspace comprising an office building (One Milton Avenue) and two lab buildings together with ground floor amenity uses, a Mobility Hub comprising of c1031 car parking spaces including c3,742sqm of Class E floorspace at ground floor level, a temporary car park of c379 spaces, a wildlife habitat area, Network Rail compound area, enabling works and associated infrastructure; and Outline Planning Permission for c41,940 sqm (GEA) of Class E floorspace comprising one lab building and one office building, together with ground floor amenity uses, enabling works and associated infrastructure.
Cambridge North Commercial Quarter
Cambridge
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/05042/FUL | Elevational changes to accommodate 7 No. dwellings. | 212-214 Newmarket Road Cambridge CB5 8JL
Created by Rosamund Humphrey (Admin Officer) // 2 threads
Reserved Matters application for third housing phase (known as BDW3) including 210 dwellings with associated internal roads, car parking, landscaping, amenity and public open space. The Reserved Matters include access, appearance, landscaping, layout and scale and related partial discharge of conditions 8, 10, 14, 17, 18, 22, 25, 26, 28, 35, 40, 49, 58, 62, 66, and 69 pursuant to outline approval 07/0003/OUT | Darwin Green One BDW3 Development Site Huntingdon Road Cambridge Cambridgeshire
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Darwin Green One BDW4
Development Site
Huntingdon Road
Cambridge
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/05423/FUL
Erection of a new dwelling
Land At Rear Of 1 Priory Street, Cambridge, Cambridgeshire, CB4 3QH
Created by Finlay KM // 1 thread
The brook conduit has partially collapsed under the road and the shared-use path. It is currently being repaired (after nearly a year) but the contractors have made use of a very interesting "Cyclists dismount and get an escort" sign. A yellow ramp also makes passing on any non-standard cycle a real challenge. Both of these items are really bad practice and actively discriminate against anyone on a non-standard cycle.
Created by Steven Moseley // 1 thread
Application to determine if prior approval is required for a proposed change of use of agricultural building to dwellinghouse.
Created by Steven Moseley // 1 thread
Change of Use from Offices to HMO Residential Use
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by jpennycook // 1 thread
Request for a screening opinion for the erection of a motorway service area
Land At O/S Grid Ref 460946 147950 M3 Basingstoke Hampshire
Basingstoke
Application reference : 16/02767/ENSC
http://pad.basingstoke.gov.uk/DocumentViewer/?DocumentClassCode=DC&Folder1Reference=16/02767/ENSC
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099199.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099197.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/10/05/01100568.PDF
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
Created by Sefton // 1 thread
The Lovers Loan shared path through the Grange has at least 5 very tight barriers along its length, and missing dropped kerbs - especially at the crossing of Dick Place. Removing barriers or widening them would make it much more easy to use for bikes, buggies and wheelchairs. Even some double pushchairs don't fit!
Created by Chris Peck // 1 thread
A long, tortuous issue, where no progress has been made, despite large amounts of effort. Godalming High Street was recommended for adopting as a trial two-way working for cyclists in 2001, thanks to Alec McCalden's excellent presentation to the Planning Inspector at the time.
However, the trial was never carried out. Cyclists continue to use the street in both directions, as there are plenty of ways to get out of the way of oncoming cars.
The City of London has introduced dozens of contra-flow cycling schemes on narrow streets and lanes across the City. A third of all the cyclists are now using the contraflow. There has been 1 cycle crash three years post-introduction (there were 2 in the three years before). See here for more details: https://www.ucl.ac.uk/transport-institute/pdfs/Cheung_slides.pdf
Created by Charlie Halliday // 5 threads
Proposal to address Farnborough Town Action Plan reference CW39. Issue: Alexandra Road, safety, pedestrian and cycle links.
Consultation documents may be downloaded from:
http://www3.hants.gov.uk/transport-schemes-index/farnborough-alexandra-road.htm
They are also on view in the reception area at Rushmoor Borough Council Offices, Farnborough Road during the consultation period
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
St Neots is receiving some funding as part of the Future High Streets Fund - this could include investment in cycling and walking infrastructure.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
Camcycle's time and energy is consistently taken up removing exclusionary barriers (e.g. Biomedical Campus, A14 active travel bridges, Warren Road). We need to consider long-term ways to prevent new barriers going in and remove existing ones which prevent people of all ages and abilities cycling.
Created by Fraser // 0 threads
Travelling along Fore Street from the East where it splits with Key Street there are several traffic calming patches and speed bumps that are difficult and dangerous to negotiate on a bike.
In particular the three sections of cobbles; as the street becomes one way just before Fore Street Pools, just before you cross Star Lane, and just after crossing Star Lane.
They are so ragged that as a cyclist you have to almost come to a stop, where as other road users can travel over them at ~20mph.
This makes them extremely dangerous as just after accelerating away from the traffic lights you then need to slow almost to a stop and weave your way through the cobbles while the traffic behind you is expecting to carry on and the street is too narrow for them to safely overtake.
The section of Fore Street between Star Lane and Eagle Street has better speed humps (still not great, but a dream compared with the above mentioned cobble sections!) with flat section at the sides so that bikes may pass them safely. However the flat sections are occasionally blocked by parked vehicles forcing cyclists over the speed humps.
The less said about the time it takes to negotiate these three sets of traffic lights the better!
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by CycleSi // 2 threads
TfL are undertaking major junction improvements at several gyratory systems. All of them include protected cycle lanes/tracks, except Wandsworth!
The local London Cycle Campaign group is not campaigning and virtually defunct. We desperately need to organise local cyclists and campaigners all over London and beyond to challenge this bizarre scheme.
Oval, Vauxhall, Elephant & Castle, Stockwell, Archway, Aldgate, etc, etc are all getting extensive safe space for cycling.
TfL for some reason (I suspect the blame lies with the borough) have instead decided to claim that the awful shared footpaths and streets with no cycling infrastructure at all that have been designated as 'cycle routes' form part of a 'cycle network'. They are even planning to have Cycle Superhighway 8 run along Wandsworth High Street with not even a painted cycle lane - cyclists will be mixed in with extremely heavy bus traffic.
It seems like no-one is talking about this other than me!! Seriously-argh!!!!
Suggestions, ideas, offers to help campaign all welcome.
Created by Simon Nuttall // 1 thread
Is it legal or not to ride on either Christ's Lane or Milton's Walk ?
Always been a bit of a problem - worse for pedestrians than cyclists.
Detailed (re-)design is apparently underway.
Created by Colin Wing // 3 threads
This is the proposed route of Quietway 88 in Westminster. An alternative option uses the west side of Trafalgar Square instead of Cockspur Street.
Created by Simon Redding // 0 threads
The Jepson Road estate has great cycling infrastructure, but when you get to the west end of it, the path peters out and ends in a fence. Lots of cyclists then carry their bike over a fence and round the end of a culvert to Hartfield Close, but it would be better to just have a cycle gate in the fence straight on to Midland Terrace, which is likely to form part of NCN67 soon.
Created by Iain Lane // 2 threads
Press article in the post today: http://www.nottinghampost.com/Major-route-city-centre-overhauled-priority-buses/story-26177322-detail/story.html
Can't find plans just yet.
Since the changes to Mare St at Westgate St some vehicles travel past the children's centre in Triangle Road, at excessive speeds, to avoid the traffic light at Mare St . Can Hackney Council add a restriction in Triangle Road.
Created by Stephan Matthiesen // 1 thread
Cycle lanes in both directions needs urgent improvment. It's painted on but
- it is far too narrow, encouraging dangerous overtaking
- road surface in the gutter (=cycle lane) extremely bad, with deep&wide cracks, most covers have sunken etc.
- paint has faded
- parking (near the schools)
Many sections of Gilmerton Rd have hatching in the centre, wasting space; these sections would be wide enough for a segregated path (or wide lane protected by bollards/armadillos).
In the narrower sections, the existing bike lane should be removed completely because at the moment it increases the dangers (encouraging cyclists to be in the gutter between kerb and speeding cars).
Created by jennifer Kirner // 1 thread
I am bringing up the problem that cyclists and pedestrians have crossing East Road to get to ARU and the neighbouring residential area. It would be helpful have a discussion about how to create safe routes in this area and how to get them implemented.
When I am cycling, I find it dangerous and difficult to cross East Road from Petersfield or Bradmore Street and I resort to using the pedestrian crossings with my bike because it is.
This area that really needs addressing for improvements to safe cycling and I don’t understand why given the expansion of ARU this has not been addressed.
The junction of Mill Road/East Road is also pretty scary for cyclists and pedestrians. The crossing at the slip road at the corner of Petersfield is difficult for pedestrians because it has no traffic controls and cars come quickly round this corner making it dangerous for anyone who is not alert , who is not tall enough to see, or who can't move quickly. This includes the young, the old, someone in a wheelchair. I wouldn't fancy pushing a child in a buggy across either.
Basically, it seems to me that the Junction and East road are designed for motor vehicles and traffic flow not for pedestrians and cyclists. Can we try and address this?
Created by jpennycook // 1 thread
Erection of 40 dwellings to include 24 private homes and 16 affordable homes, associated parking, landscaping, amenity space and highway alterations
Land At Farleigh Road Farleigh Road Cliddesden Hampshire
Basingstoke
Application reference : 16/04690/FUL
Created by George Britton // 1 thread
Aldershot Urban Extension - Green Light from RBC
Created by Gregory Williams // 1 thread
Planning application Y12/0897/SH proposes the redevelopment of a significant portion Folkestone Harbour and surrounding land. The proposals include up to 1000 dwellings and up to 10000sqm of commercial landuse. NCR2 runs through the development area.
Created by jpennycook // 1 thread
15/04503/OUT | Outline application to include access to be considered, for up to 750 residential units with a mix of units, and a neighbourhood centre including principal community centre, private children's nursery, local retail facilities, indoor sports hall and three form entry primary school and ancillary development | Hounsome Fields Trenchard Lane Dummer Hampshire
Created by GG // 1 thread
For a long time I have wondered about a crowd-sourced cycleability map.
In this, people cycle along a link (accepting the first question of how to define the beginning and end of this) then give it a thumbs up or down. After enough people do this, then others can see how popular it is.
Some people wonder about subjectivity but I think this should be less of a problem with more voters.
The reason I am asking is because this method could apply to a potential commercial project for a Council which wants to drive around 100km of rural roads and use a panel of 4 experts to grade meaningful segments on a 1 to 7 scale according to their suitability for HGV movements.
Any views on whether this is already done within an app I am not aware of, or could be it done by anyone as an add-on to something else, or is it something CamCycle could offer as a commercial package (there may well be more than one local authority looking for this sort of thing)
POSSIBLE Cycle Route Between Lowedges Rd/Chesterfield Rd + Bradway Fire Station Sheffield S8........using existing 8ft wide pavements by upgrading to "shared use".........This could connect to the new cycling "on + off " road routes being developed in the Meadowhead School area
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?