PA_212931_GodboltFarm5
Development comprising 5 new dwellings, 1 with link attached garage, two with detached garages; incorporating access onto Great Tey Road, Little Tey.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Steven Moseley // 1 thread
Development comprising 5 new dwellings, 1 with link attached garage, two with detached garages; incorporating access onto Great Tey Road, Little Tey.
Created by Steven Moseley // 1 thread
A proposed rural exceptions site of seven homes (resubmission of 201984)
Created by Steven Moseley // 1 thread
Outline application to refurbish the host house µLittle Glebe' from 3no. existing dwelling units to revert to a single dwelling house, anderect two new houses with a new access onto Spring Lane.
Created by Steven Moseley // 1 thread
Someone appears to have dumped large rocks and rubble into the pot holes in Daws lane. This might make the area more passable to cars that use it to access the allotments but poses a severe danger to cyclist given the size of the rocks, and that the area is poorly lit and frequently flooded.
I tried reporting the issue to the council but received the response:
The issue you raised with us is the responsibility of the landowner. Unfortunately we do not have records of who is responsible for this location and we are therefore unable to take any action.
Created by David Green // 2 threads
I run 1-day Wheel Building Courses in Cambridge
These are well-established intensive 1-day practical courses offered at 'level 1 (beginner) and level 2* (refresher/intermediate) level.
You learn how to build strong and durable bicycle wheels in a controlled, supportive environment. Group size is kept small to ensure a high student-teacher ratio. All equipment is provided, but you can bring your own components to build if you want to.
For fully information, dates and booking details please visit https://www.cambridgewheelbuilding.co.uk/
* dependent on demand.
Created by Steven Moseley // 1 thread
Erection 3No. Commercial Units (Class E) and car parking.
Created by Steven Moseley // 1 thread
An application to determine if prior approval is required for a proposed: Change of Use of Agricultural Buildings to Dwellinghouses (Class C3), and for building operations reasonably necessary for the conversion.
Created by Steven Moseley // 1 thread
Change of Use from an existing Guest House to a House of Multiple Occupancy (HMO)
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Application reference & documents: 21/04952/FUL
Erection of new 2nd floor to provide two new dwelling units with balconies.
208 - 208A Cherry Hinton Road Cambridge CB1 7AW
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Change of use from residential (C3) to 6bed HMO for 6 persons (sui generis).
5 Britten Place Cambridge CB1 3TS
Cambridge
Application reference : 21/04935/FUL
Response to planning application for Lodge Lane business park expansion
https://www.ensembling.com/269152
Created by Jean Dollimore // 1 thread
A set of temporary measures was implemented in September 2020 with a view to reducing through traffic in Arlington Road and the surrounding streets. Further measures were added later to make the scheme more effective.
Camden reports the following changes in the local area:
- a 15% increase in cycle volumes
- 43% decrease in motor traffic
- 15% decrease in traffic-related collisions
Camden is consulting on making all of these measures permanent with the following enhancements:
Jamestown Road: restriction on eastbound motor vehicles. Replace the planter with a traffic island
Inverness Street: no access for motor vehicles to Arlington Road. Replace the planters with traffic islands and widen the footway outside Cavendish School. NOTE: At our meeting on Monday’ 15th Nov, it was suggested we should ask for a School Street for Cavendish School.
Buck Street: no way in and out for motor vehicles from Kentish Town Road
Arlington Road (south of junction of Delancey Street): restriction on northbound motor vehicles. Add a traffic island and greening, raise carriageway.
Mornington Street: no way in and out for motor vehicles at the junction with Albert Street
Albert Street: no way in and out for motor vehicles at the junction with Mornington Place. Replace planters with removable bollards
Mornington Place: no way in and out for motor vehicles at the junction with Clarkson Row/Mornington Terrace. Replace planters with removable bollards. New tree and planting on Mornington Street. New Sustainable Urban Drainage System (SUDS) on Clarkson Row
New junction designs and other changes
Delancey Street @ Albert Street - remove the right turn lane (from Albert Street) and build out the footway. NOTE: the original Delancey-Pratt scheme indicated the entry to a new contraflow cycle here. We should aim to keep that.
Delancey Street @Arlington Road Raise the junction.
Parkway Cycle Hire Station: move to the southern corner of Albert Street.
Parkway junction with Arlington Road: lengthen the feeder lane on Parkway. NOTE (as suggested at our meeting on 15th) this cycle lane should extend over the space occupied by the cycle hire station.
Parkway junction with Albert Street: double yellow lines
Parkway junction with Arlington Road: widen eastern footway to north of junction and remove two parking spaces.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Demolition of existing garage and erection of two 3-bed semi-detached houses on 2.5 floors with car and cycle parking and bin storage on land adjacent No 1 Greville Road, Cambridge
Land Adj 1 Greville Road Cambridge Cambridgeshire CB1 3QJ
Cambridge
Application reference : 21/04756/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Conversion of existing house to form 2 studio flats.
84 Ramsden Square Cambridge CB4 2BL
Cambridge
Application reference : 21/04865/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of 2no. dwellings following demolition of existing bungalow
200 Perne Road Cambridge CB1 3NX
Cambridge
Application reference : 21/04797/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/04769/FUL | Two storey side extension to create a one bedroom, a two bedroom dwelling and a detached two bedroom dwelling in the garden. | 3 Forest Road Cambridge Cambridgeshire CB1 9JA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Convert and extend existing garage to rear to provide 1no. 1bed studio dwelling.Proposed dwelling with have its own parking bay and rear garden while maintaining a rear garden for the existing dwelling (No.11) with roadside parking to the front of the existing dwelling. proposed dwelling to meet minimum standards. neighbouring approved scheme on same build line No. 1 Latimer Close.
11 Peverel Close Cambridge CB5 8RW
Cambridge
Application reference : 21/04757/OUT
Created by Rosamund Humphrey (Admin Officer) // 1 thread
First floor and single storey rear extensions of existing bungalow to create 3no. flats.
538 Newmarket Road Cambridge CB5 8LL
Cambridge
Application reference : 21/04852/FUL
Created by Jean Dollimore // 1 thread
Following a fatality at this junction in August Camden Council installed a number of temporary changes to the junction in October.
This consultation concerns some more radical permanent changes
The proposals include:
Created by Steven Moseley // 1 thread
Construction of three 4-bedroom detached houses, each with an integralgarage, plus individual private driveways connecting to Marlowe Way. Retention of two TPO trees.
The busway path is currently closed south of Cambridge station - with a lorry parked on the cyclepath, a set of barriers right across the path and the bus tracks, and the driver standing there to obstruct traffic.
I
Created by Steven Moseley // 1 thread
Outline planning application with all matters reserved save for access for the demolition of all existing buildings and structures and the creation of a residential development with associated open space and infrastructure.
Created by Steven Moseley // 1 thread
Proposed 4 bedroom dwelling and garage/store
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of 2no flats with associated works and landscaping on unused land behind The Seven Stars Public House
The Seven Stars Public House 249 Newmarket Road Cambridge CB5 8JE
Cambridge
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by jpennycook // 1 thread
Request for a screening opinion for the erection of a motorway service area
Land At O/S Grid Ref 460946 147950 M3 Basingstoke Hampshire
Basingstoke
Application reference : 16/02767/ENSC
http://pad.basingstoke.gov.uk/DocumentViewer/?DocumentClassCode=DC&Folder1Reference=16/02767/ENSC
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099199.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099197.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/10/05/01100568.PDF
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
Created by Sefton // 1 thread
The Lovers Loan shared path through the Grange has at least 5 very tight barriers along its length, and missing dropped kerbs - especially at the crossing of Dick Place. Removing barriers or widening them would make it much more easy to use for bikes, buggies and wheelchairs. Even some double pushchairs don't fit!
Created by Chris Peck // 1 thread
A long, tortuous issue, where no progress has been made, despite large amounts of effort. Godalming High Street was recommended for adopting as a trial two-way working for cyclists in 2001, thanks to Alec McCalden's excellent presentation to the Planning Inspector at the time.
However, the trial was never carried out. Cyclists continue to use the street in both directions, as there are plenty of ways to get out of the way of oncoming cars.
The City of London has introduced dozens of contra-flow cycling schemes on narrow streets and lanes across the City. A third of all the cyclists are now using the contraflow. There has been 1 cycle crash three years post-introduction (there were 2 in the three years before). See here for more details: https://www.ucl.ac.uk/transport-institute/pdfs/Cheung_slides.pdf
Created by Charlie Halliday // 5 threads
Proposal to address Farnborough Town Action Plan reference CW39. Issue: Alexandra Road, safety, pedestrian and cycle links.
Consultation documents may be downloaded from:
http://www3.hants.gov.uk/transport-schemes-index/farnborough-alexandra-road.htm
They are also on view in the reception area at Rushmoor Borough Council Offices, Farnborough Road during the consultation period
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
St Neots is receiving some funding as part of the Future High Streets Fund - this could include investment in cycling and walking infrastructure.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
Camcycle's time and energy is consistently taken up removing exclusionary barriers (e.g. Biomedical Campus, A14 active travel bridges, Warren Road). We need to consider long-term ways to prevent new barriers going in and remove existing ones which prevent people of all ages and abilities cycling.
Created by Fraser // 0 threads
Travelling along Fore Street from the East where it splits with Key Street there are several traffic calming patches and speed bumps that are difficult and dangerous to negotiate on a bike.
In particular the three sections of cobbles; as the street becomes one way just before Fore Street Pools, just before you cross Star Lane, and just after crossing Star Lane.
They are so ragged that as a cyclist you have to almost come to a stop, where as other road users can travel over them at ~20mph.
This makes them extremely dangerous as just after accelerating away from the traffic lights you then need to slow almost to a stop and weave your way through the cobbles while the traffic behind you is expecting to carry on and the street is too narrow for them to safely overtake.
The section of Fore Street between Star Lane and Eagle Street has better speed humps (still not great, but a dream compared with the above mentioned cobble sections!) with flat section at the sides so that bikes may pass them safely. However the flat sections are occasionally blocked by parked vehicles forcing cyclists over the speed humps.
The less said about the time it takes to negotiate these three sets of traffic lights the better!
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by CycleSi // 2 threads
TfL are undertaking major junction improvements at several gyratory systems. All of them include protected cycle lanes/tracks, except Wandsworth!
The local London Cycle Campaign group is not campaigning and virtually defunct. We desperately need to organise local cyclists and campaigners all over London and beyond to challenge this bizarre scheme.
Oval, Vauxhall, Elephant & Castle, Stockwell, Archway, Aldgate, etc, etc are all getting extensive safe space for cycling.
TfL for some reason (I suspect the blame lies with the borough) have instead decided to claim that the awful shared footpaths and streets with no cycling infrastructure at all that have been designated as 'cycle routes' form part of a 'cycle network'. They are even planning to have Cycle Superhighway 8 run along Wandsworth High Street with not even a painted cycle lane - cyclists will be mixed in with extremely heavy bus traffic.
It seems like no-one is talking about this other than me!! Seriously-argh!!!!
Suggestions, ideas, offers to help campaign all welcome.
Created by Simon Nuttall // 1 thread
Is it legal or not to ride on either Christ's Lane or Milton's Walk ?
Always been a bit of a problem - worse for pedestrians than cyclists.
Detailed (re-)design is apparently underway.
Created by Colin Wing // 3 threads
This is the proposed route of Quietway 88 in Westminster. An alternative option uses the west side of Trafalgar Square instead of Cockspur Street.
Created by Simon Redding // 0 threads
The Jepson Road estate has great cycling infrastructure, but when you get to the west end of it, the path peters out and ends in a fence. Lots of cyclists then carry their bike over a fence and round the end of a culvert to Hartfield Close, but it would be better to just have a cycle gate in the fence straight on to Midland Terrace, which is likely to form part of NCN67 soon.
Created by Iain Lane // 2 threads
Press article in the post today: http://www.nottinghampost.com/Major-route-city-centre-overhauled-priority-buses/story-26177322-detail/story.html
Can't find plans just yet.
Since the changes to Mare St at Westgate St some vehicles travel past the children's centre in Triangle Road, at excessive speeds, to avoid the traffic light at Mare St . Can Hackney Council add a restriction in Triangle Road.
Created by Stephan Matthiesen // 1 thread
Cycle lanes in both directions needs urgent improvment. It's painted on but
- it is far too narrow, encouraging dangerous overtaking
- road surface in the gutter (=cycle lane) extremely bad, with deep&wide cracks, most covers have sunken etc.
- paint has faded
- parking (near the schools)
Many sections of Gilmerton Rd have hatching in the centre, wasting space; these sections would be wide enough for a segregated path (or wide lane protected by bollards/armadillos).
In the narrower sections, the existing bike lane should be removed completely because at the moment it increases the dangers (encouraging cyclists to be in the gutter between kerb and speeding cars).
Created by jennifer Kirner // 1 thread
I am bringing up the problem that cyclists and pedestrians have crossing East Road to get to ARU and the neighbouring residential area. It would be helpful have a discussion about how to create safe routes in this area and how to get them implemented.
When I am cycling, I find it dangerous and difficult to cross East Road from Petersfield or Bradmore Street and I resort to using the pedestrian crossings with my bike because it is.
This area that really needs addressing for improvements to safe cycling and I don’t understand why given the expansion of ARU this has not been addressed.
The junction of Mill Road/East Road is also pretty scary for cyclists and pedestrians. The crossing at the slip road at the corner of Petersfield is difficult for pedestrians because it has no traffic controls and cars come quickly round this corner making it dangerous for anyone who is not alert , who is not tall enough to see, or who can't move quickly. This includes the young, the old, someone in a wheelchair. I wouldn't fancy pushing a child in a buggy across either.
Basically, it seems to me that the Junction and East road are designed for motor vehicles and traffic flow not for pedestrians and cyclists. Can we try and address this?
Created by jpennycook // 1 thread
Erection of 40 dwellings to include 24 private homes and 16 affordable homes, associated parking, landscaping, amenity space and highway alterations
Land At Farleigh Road Farleigh Road Cliddesden Hampshire
Basingstoke
Application reference : 16/04690/FUL
Created by George Britton // 1 thread
Aldershot Urban Extension - Green Light from RBC
Created by Gregory Williams // 1 thread
Planning application Y12/0897/SH proposes the redevelopment of a significant portion Folkestone Harbour and surrounding land. The proposals include up to 1000 dwellings and up to 10000sqm of commercial landuse. NCR2 runs through the development area.
Created by jpennycook // 1 thread
15/04503/OUT | Outline application to include access to be considered, for up to 750 residential units with a mix of units, and a neighbourhood centre including principal community centre, private children's nursery, local retail facilities, indoor sports hall and three form entry primary school and ancillary development | Hounsome Fields Trenchard Lane Dummer Hampshire
Created by GG // 1 thread
For a long time I have wondered about a crowd-sourced cycleability map.
In this, people cycle along a link (accepting the first question of how to define the beginning and end of this) then give it a thumbs up or down. After enough people do this, then others can see how popular it is.
Some people wonder about subjectivity but I think this should be less of a problem with more voters.
The reason I am asking is because this method could apply to a potential commercial project for a Council which wants to drive around 100km of rural roads and use a panel of 4 experts to grade meaningful segments on a 1 to 7 scale according to their suitability for HGV movements.
Any views on whether this is already done within an app I am not aware of, or could be it done by anyone as an add-on to something else, or is it something CamCycle could offer as a commercial package (there may well be more than one local authority looking for this sort of thing)
POSSIBLE Cycle Route Between Lowedges Rd/Chesterfield Rd + Bradway Fire Station Sheffield S8........using existing 8ft wide pavements by upgrading to "shared use".........This could connect to the new cycling "on + off " road routes being developed in the Meadowhead School area
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?