East Dulwich - Covid-19 Experimental Travel Measures

Please sign in to vote.

Added by James London Cyclist

Southwark is committed to quickly rolling out schemes to make travel safe and healthy as lockdown eases. The East Dulwich are has been identified as a priority.

On the 30 June we installed Phase 1 of the East Dulwich Streetspace measures, which is a permeable road closure (a closure to all motor vehicles but not to cycles or pedestrians) on Melbourne Grove, south of Tell Grove.

The East Dulwich Streetspace Phase 2 measures will be installed on 3rd September. Details of these are below and aim to re-purpose the street space for pedestrians, cyclists and the local community:

• a permeable closure using planters (a closure to all motor vehicles but not to cycles or pedestrians) on Melbourne Grove at the junction with Grove Vale

• a permeable closure using planters on Derwent Grove at the junction with Grove Vale

• a permeable closure using planters on Elsie Road at the junction with Grove Vale

• a permeable closure using planters on Tintagel Crescent at the junction with Grove Vale

• a school street closure during school drop-off and pick-up on Tintagel Crescent and Elsie Road (residents and emergency services will still be permitted entry)

We want to hear from you about the effects of these measures.

Deadline

December 31st, 2020
https://eastdulwichstreetspace.commonplace.is/

Location

Issues nearby
Back to top