Things tagged 'main-routes-phase-1a'

2 issues found for 'main-routes-phase-1a':

  • Lichfield Road Main Corridor Phase 1A

    Created by Chris Lowe // 0 threads

    "The Lichfield Road route follows the A5127 from the city centre to Erdington via Lancaster Circus, Corporation Street, Dartmouth Circus, Aston Road, Lichfield Road and Salford Circus. The Phase 1A works covers the section of the route from the B4144 Park Lane to Salford Circus via Lichfield Road.
    The route is comprised mainly of cycling facilities within existing bus lanes. On Lichfield Road, crossings are improved at the Waterlink Boulevard roundabout and the Cuckoo Road junction to provide cyclists a safer bypass to these busy junctions. Short sections of shared footway also provide links to the Birmingham and Fazeley Canal and Parallel Routes."

    This section of the route (Phase 1A) covers sheets 9 to 18 of the technical drawings.

    Please sign in to vote.
  • Bristol Street Corridor

    Created by Chris Lowe // 2 threads

    "The route comprises on-road measures along parts of Bromsgrove Street, Henstead Street and Wrentham Street. The route then continues along a new cycle track adjacent to the eastern footway of Bristol Street, through the existing pedestrian subway near Rickman Drive, and along the northern footway of Lee Bank Middleway and Islington Row Middleway to Five Ways, where it will link to other proposed BCR cycle routes."

    Please sign in to vote.

2 threads found for 'main-routes-phase-1a':

No library items found for 'main-routes-phase-1a'.

No planning applications found for 'main-routes-phase-1a'.

Back to top