  • A406 North Circular: Bridge Lane to Golders Green Road and Golders Green Road/Brent Street junction

    Created by Simon Munk // 1 thread

    Overview
    We are proposing improvements for pedestrians and cyclists along the A406 North Circular from Bridge Lane to Golders Green Road and at the A406 junction with Golders Green Road and Brent Street. The proposals include converting some sections of footway to shared use for pedestrian and cyclists, and a new staggered shared pedestrian/cycle ‘toucan’ crossing on the westbound carriageway, adjacent to the Woodlands retaining wall.
    The proposals for the crossing are in response to safety concerns that pedestrians are crossing the A406 independently and using the central reservation as a waiting area, rather than using the pedestrian footbridge located at the junction. The existing pedestrian footbridge will remain as a secondary crossing point for pedestrians and dismounted cyclists to use.

    We propose the following:
    - A new ‘toucan’ crossing for pedestrians and cyclists on the A406 North Circular westbound carriageway, adjacent to A406 Woodlands retaining wall. This would involve widening the central reservation by 4 metres to accommodate the crossing, central waiting area and guard railing, which in turn would require minor widening of the carriageway into the footway on the north west corner of the junction
    - New shared use footway for pedestrian and cyclists at the A406 junction with Golders Green Road and Brent Street. This would involve resurfacing the footways on three of the four corners of the junction to ensure surface consistency; we would also resurface the footway north of the junction to link to our current footway works at the Woodlands retaining wall. Signage and tactile paving would be used
    - Improve the shared use footway facilities from south of Bridge Lane to link to existing shared use facilities north of Courtleigh Gardens. This would involve resurfacing the footway to ensure surface consistency and adding new signage
    - Build a retaining wall to enable widening of the footway into the grass verge embankment just south of Bridge Lane
    - Widen the existing unsignalised crossing located across Golders Green Road to 3.2 metres to enhance facilities for the north/south movement
    - Introduce Advanced Stop Lines for cyclists on the Brent Street and Golders Green Road approaches

    Please sign in to vote.
  • Fountain Roundabout

    Created by Andy Allan // 2 threads

    The Fountain Roundabout is a major barrier to cycling around New Malden. It's a large, multi-lane roundabout with no cycling facilities (and poor pedestrian crossing provision too). Lying just to the south of New Malden High Street it's key to unlocking short journeys by bike to the town centre.

    Please sign in to vote.
  • A13 Commercial Road between New Road and Jubilee Street

    Created by Simon Munk // 1 thread

    TfL Overview:
    We would like your views on proposals to improve safety, journey time reliability and the urban realm on Commercial Road between New Road and Jubilee Street in the London Borough of Tower Hamlets.
    We have identified a higher rate of collisions along this stretch of road compared to similar roads in London, particularly involving pedestrians, cyclists and motorcyclists. Therefore, we are proposing a scheme that is designed to reduce the number of collisions involving these vulnerable road users.
    The area also suffers from vehicle congestion, particularly at peak times. Parked vehicles prevent buses from using the eastbound bus lane at busy times, which causes delays to bus passengers.

    What are we proposing?
    We are proposing to implement a number of changes to improve conditions for bus passengers and vulnerable road users. These include:

    Pedestrians
    - Raised carriageway with coloured surfacing on Commercial Road between Turner Street and Sidney Street to help lower traffic speeds and reduce collisions. There would still be a detectable kerb height between the road and the footway
    - Converting the pedestrian crossing outside Watney Market to a wider straight crossing and relocating it closer to the market. This would mean pedestrians crossing in one stage rather than waiting on a central island. Pedestrian “Countdown” at the crossing would also be provided.
    - Providing a wider crossing point for schoolchildren outside Mulberry School for Girls and installing electronic signs to make drivers more aware of schoolchildren crossing
    - Raising the level of all side road entrances and providing kerb build outs to reduce traffic speeds, making it easier for pedestrians to cross
    - Providing a continuous footway across the following side roads to give priority to pedestrians and a smoother crossing surface: Richard Street; Jane Street; Anthony Street; Fenton Street; Buross Street; Hungerford Street; Bromehead Street
    - Reducing kerb heights, particularly around Watney Market, to help pedestrians
    - Installing low level central islands to help pedestrians cross the road informally
    - Upgrading pavements where damaged or uneven

    Other Road Users
    - Re-surfacing sections of the road to provide a smoother surface for cyclists and motorcyclists and to reduce noise
    - Making Turner Street “no entry” to motor traffic (except cycles) from Commercial Road in order to improve safety outside Mulberry School for Girls and to prevent vehicles queuing back onto Commercial Road at busy times. Access would still be possible using other routes, and motorists would be able to exit Turner Street onto Commercial Road as they do now
    - Widening bus lanes to 4.5 metres to allow cyclists and motorcyclists to pass buses more safely. We would create space for this by changing the hours of operation of the parking bays on the North side of Commercial Road
    - Converting some existing parking bays into two new loading bays.
    - Changing parking controls where necessary on the north side of Commercial Road by converting existing ‘all day’ parking (Mon-Sat 7am-7pm) to off-peak times (Mon-Sat 10am-4pm). This would allow the bus lane to operate at peak times (Mon-Sat 7-10am and 4-7pm)
    - Providing Advanced Stop Lines for cyclists at junctions to let them wait ahead of other traffic

    Urban Realm Improvements
    - New tree planting where conditions allow.
    - Improving the urban realm – reducing clutter, better paving and a more pleasant environment particularly around Watney Market

    Please sign in to vote.
  • Thames Path Quietway - Pensinsula Ward Proposals

    Created by Simon Munk // 1 thread

    Royal Borough of Greenwich are working with its partners Transport for London (TfL) and Sustrans to develop proposals for new ‘Quietway’ routes, to enhance facilities for people cycling or walking, whilst minimising impacts on other road users. This set of schemes would implement improvements along the cross-Peninsula section of the ‘Thames Path Quietway’ in Peninsula Ward. Further proposals for sections of this route in other Wards will be brought forward for consultation in due course.

    What is being proposed?
    For this set of proposals, we are consulting on the following schemes in the Peninsula ward:
    (a) Old Woolwich Road, junction with Lassell Street (scheme ref: QTP3b)
    A more people-friendly junction has been designed to benefit pedestrians and cyclists. This includes kerb build-outs to tighten the junction, particularly on the north side of Old
    Woolwich Road at its junction with Lassell Street, to improve the crossing point for
    pedestrians and slow vehicle speeds. One car parking space will be lost as a result.
    (b) Gibson Street, junction with Banning Street (scheme ref: QTP3c)
    New kerb build-outs are proposed at the junction of Gibson Street with Banning Street,
    which will move the ‘give way’ markings forward and so improve sight lines for cyclists
    turning right out of Gibson Street. In addition a ‘cycle hangar’ secure cycle parking facility is proposed for the wide footway space on the south-western side of this junction (corner of Enderby Street and Banning Street). No car parking spaces will be lost as a result of the proposals.
    (c) Southern Park (adjacent to Ecology Park; scheme ref: QTP8)
    An existing, well-lit, hard standing path borders the southern and eastern perimeter of the Southern Park (adjacent to the Ecology Park), linking West Parkside with the riverside path at Greenwich Yacht Club. No changes are proposed to this path itself; however it is proposed to clearly sign this section only as ‘shared use’ for cyclists and pedestrians. At the existing Toucan crossing at the junction with West Parkside/ Southern Way, extra space will be created by removal of a small section of wooden fencing, and relocation of a small tree.
    (d) Riverside, junction with Lombard Wall (scheme ref: QTP9a)
    Priority will be given to the Thames Path route, providing extra safety and security for
    pedestrians and cyclists. A raised table at the junction of Lombard Wall as it meets Riverside will slow any vehicular traffic. The western side footway will be improved for pedestrians. No car parking spaces will be lost from the proposals.
    (e) Riverside, junction with Anchor and Hope Lane (scheme ref: QTP9b)
    Priority will be given to the Thames Path route, providing extra safety and security for
    pedestrians and cyclists. The cycleway will be realigned to better connect with Riverside,
    and the junction will be resurfaced in green to provide increased awareness of cyclists. No car parking spaces will be lost from the proposals.

    Please sign in to vote.
  • Billet Road E17

    Created by Simon Munk // 1 thread

    The Council has successfully secured funding from Transport for London (TfL) to improve safety for all road users along the whole length of Billet Road. In the last 5 years a total of 62 accidents which involved injuries and fatalities were recorded making this a particular unsafe area within the Borough. The scheme aims to reduce accidents along the road whilst improving the overall safety for all road users.
    In September and October 2015, we sent a survey to local people asking them to identify problems along the road and to tell us what they would like to see to help improve road safety. The results of the survey showed that people were most concerned about crossing the road, getting around the area and not feeling safe when travelling along the road.
    The top improvements people would like to see were; slower traffic, safer crossing points, protected cycle lanes and better pavements.
    We also asked Emergency Services about the issues they faced and what they would like to see to help improve road safety.

    Proposals
    Based on the results of the survey and the feedback from Emergency Services we have
    developed a set of proposals that aim to make improvements for all road users:
    • Bus stop improvements to provide better access for passengers including disabled users.
    • Improve and raise the existing zebra and signal crossings.
    • A new raised zebra crossing on Billet Road near Cecil Road.
    • 20mph speed limit along Billet Road.
    • Better and energy efficient street lighting.
    • Tree planting and footway resurfacing along the road.
    • A new raised road table at Billet Road’s junction with Guildway to reduce traffic speed.
    • Two-way, fully segregated east and west cycle track.
    • New ‘floating’ style bus stop to improve safety for cyclists and bus passengers.
    • Raised areas at junctions that prioritise pedestrians and slow traffic down.
    • De-cluterring of street furniture such as removing redundant posts and signs along Billet Road and side road entrances.
    • Parking bays relocated at certain unsafe locations along the road to be converted to
    segregated cycle track. New parking bays will be provided nearby.
    • Various waiting and loading restriction at locations of concern to improve road safety
    and ensure smooth flow of traffic.
    • Anti-skid surface to help prevent vehicles from skidding.
    Please note there are also a number of locations on the road where future improvements works will be happening outside of this scheme. These are highlighted as ‘future improvement works’ on the plan.

    Please sign in to vote.
  • Traffic changes proposed for Cable Street, CS3 and area

    Created by Simon Munk // 1 thread

    The council is consulting with the public about making changes to traffic movements in and around Cable Street.
    The proposed changes are designed to alleviate the number of vehicles cutting through Cable Street to avoid congestion on The Highway.
    There are a number of vehicles using Brodlove Lane and Cable Street as a ‘rat run’ to travel from The Highway to Butcher Row.
    The changes to be considered by the public include one-way parts of Cable Street.
    It is also proposed that a number of measures be introduced to make the area safer for pedestrians and cyclists.
    A new bus lane will be created on a short section of Cable Street between Sutton Street and Watney Street. This will be supported by the closure of the north end of King David Lane to all motor vehicles.
    The changes will see a significant reduction in the amount and speeds of traffic using Cable Street and surrounding roads.
    In preliminary consultation with businesses and residents, the council was told cyclists are uncomfortable using the narrow two-way cycle lane.
    The council proposes the cycle lane be widened for cyclists travelling against the traffic, with cyclists travelling the other way joining the main flow of reduced traffic.
    The area between Shadwell Overground and DLR stations and Sutton Street will be completely redesigned to ensure priority for pedestrians.
    The proposals will also see the introduction of pocket parks and improved community spaces to make the area look and feel more attractive.
    Mayor of Tower Hamlets, John Biggs, said: “We have developed these proposals after being made aware of initial concerns from residents, businesses and people who travel through the area. These detailed and well developed plans will improve the area for all road users. We welcome any comments to ensure that we have taken everything into consideration.”
    Cllr Ayas Miah, cabinet member for environment, added: “For far too long the safety of people using Cable Street has not been given enough priority. These proposed changes will stop vehicles from cutting through the area for the benefit of pedestrians and cyclists. The aesthetic changes proposed will enable all local people to be proud of the area that they live or work in.”
    Full details of the proposals are being sent to 5,000 addresses along Cable Street and in the surrounding area.

    Please sign in to vote.
  • Bedfont Road Cycling Improvements, Hounslow

    Created by Simon Munk // 1 thread

    The London Borough of Hounslow is proposing cycling and pedestrian improvements on Bedfont Road, an important link between the A30 Great South West Road and Chertsey Road that is served by the H26 bus route.
    This scheme's primary aim is to widen areas of footway in order to provide a 3m wide shared pedestrian and cycle route along the length of Bedfont Road, improving access to homes, businesses, and leisure facilities such as Bedfont Lakes. The proposals also include improved pedestrian crossing facilities and bus accessibility, which would particularly benefit vulnerable road users.

    Please sign in to vote.
  • A10 Stamford Hill and Clapton Common junction consultation

    Created by Harry Fletcher-Wood // 1 thread

    TfL note that this junction has "one of the highest collision rates in all of Hackney" and so have "come up with some proposals that aim to make this junction safer for all road users".

    The substantive changes include Advanced Stop Lanes for people cycling, continuous footways across some side roads, realignments to traffic islands and the provision of more/longer parking.

    Please make share your thoughts Tuesday 23rd February so Natalie and I can collate them.

    Please sign in to vote.
  • Leyton Town Centre mini-Holland

    Created by Simon Munk // 1 thread

    These pages are publicly viewable and for cyclists to discuss consultation responses. Always make sure you *also* respond to the public consultation at its site too!

    Waltham Forest council says:
    Waltham Forest is changing and we want you to be part of it. Thanks to a funding pot of £27 million from Transport for London, we’re delivering the Mini-Holland Programme to make our streets fit for everyone to use, whether you walk, cycle, use public transport or drive.
    In 2014, nearly 900 people were injured on our roads and air pollution in Waltham Forest is on the increase. At peak times of the day, we have up to 6,000 extra cars on our roads due to the school run; we need to do something about it so that everyone can get from A to B safely.
    The Mini-Holland Programme is about making our streets work for everyone and our borough a better place to live, work and visit. By creating designated space for cycling, creating routes that better connect our town centres and redesigning some of our public areas we want to help families get about safely, cut down unnecessary traffic outside your home, and work with businesses so that people want to spend time in our borough and get the most out of this once in a lifetime opportunity.

    Giving your views on the proposed designs
    We want everyone who lives and works in the local area to have their say on the scheme design and help shape the proposals.
    To help manage the consultation and feedback we receive, we are asking you to rate and comment on groups of proposals rather than individual measures, and to tell us what else you would like to see.
    The proposals for the Leyton Town Centre scheme include improving some of the public spaces with plants, trees and public art, changing the way vehicles access some roads to reduce unnecessary traffic outside people’s homes, new and improved crossings to help people who walk and cycle, traffic direction changes and road safety improvements.
    As some of these changes are linked they need to be introduced together, so we have grouped them and are asking for your views by group or ‘series’ of proposals. For example, a new public space with plants, trees and seating may only be possible if access to a road is changed, making it open only to people walking and cycling.
    Please read each proposal carefully, and tell us your thoughts on each one using the comment section at the bottom of each proposal page. Depending on how much you write, we expect the survey to take no more than 10 minutes to complete.

    What’s planned in Leyton Town Centre?
    We have four town centre schemes in the Mini-Holland Programme, one of which is Leyton. These schemes will better connect Leyton, Leytonstone, Chingford and Highams Park, making it easier for people to walk and cycle for local journeys with new and improved walking and cycling routes. The town centre schemes will also improve the look and feel of these key areas whilst linking in with the four Village schemes in Walthamstow, making them more enjoyable places, boosting business for our local economy and giving our residents a sense of pride in their borough.
    The Leyton Town Centre scheme area includes over 11,000 addresses and people walk and cycle through it to get to Leyton Underground Station, Leyton Midland Road Rail Station, the Olympic Park, Westfield shopping centre as well as local shops and amenities.
    We’re planning to make a range of improvements to the area, from reducing the amount of non-local traffic using local streets where residents like you live, to better walking and cycling routes to help you get around more easily and safely if you choose to walk or cycle. We’ll also be investing in new public spaces and improving how the area looks, with new plants and greenery, to encourage more people to spend their time in the area. The proposed design also includes a mix of road and traffic changes which are outlined on the map.

    In June 2015, we sent a survey to all addresses in the scheme area to understand your concerns and how we can use this Mini-Holland funding to deliver what you want in your local area. Over 500 people took part, providing over 690 individual comments which we analysed and used to shape the next stage of the plans.
    This feedback helped create an early design, which we presented to 41 residents as well as businesses that came to our co-design workshops in October 2015. During these workshops you told us what you thought of the proposed design, which has helped develop the scheme.
    We have been speaking to key stakeholders, including the emergency services and schools, to make sure the design enables them to do their important work day to day. We will continue to engage with these groups as the scheme progresses through to final design and completion. We have also used information about traffic movements and traffic survey data to design a scheme that will benefit all road users. More information about this design is detailed in these proposals and we are asking for your views on it.

    What happens next?
    All of the feedback received will be grouped, carefully analysed and used to shape the final design.
    Where there are elements of the scheme that are not well supported by residents and businesses, we will look at these again. Where it’s possible to make changes based on your comments and suggestions we will, and where we can’t we will explain why. A summary of the results and feedback will be sent to everyone who took part after the public consultation stage has ended. This will set out the results and how they have been used to help shape the final design. This will also be available on the website for everyone to see.
    Before we get to the design stage, Transport for London (TfL) will also need to approve all of our plans as the funders of the Mini-Holland programme.

    Please sign in to vote.
  • Leytonstone Town Centre mini-Holland

    Created by Simon Munk // 1 thread

    These pages are publicly viewable and for cyclists to discuss consultation responses. Always make sure you *also* respond to the public consultation at its site too!

    Waltham Forest council says:

    Waltham Forest is changing and we want you to be part of it. Thanks to a funding pot of £27 million from Transport for London, we’re delivering the Mini-Holland Programme to make our streets fit for everyone to use, whether you walk, cycle, use public transport or drive.
    In 2014, nearly 900 people were injured on our roads and air pollution in Waltham Forest is on the increase. At peak times of the day, we have up to 6,000 extra cars on our roads due to the school run. We need to do something about this so that everyone can get from A to B easily and safely.
    The Mini-Holland Programme is about making our streets work for everyone and our borough a better place to live, work and visit. By creating designated space for cycling, creating routes that better connect our town centres and redesigning some of our public areas we want to help families get about safely, cut down unnecessary traffic outside your home and work with businesses so that people want to spend time in our borough and get the most out of this once in a lifetime opportunity.

    How do I take part?
    We want everyone who lives and works in the local area to have their say on the scheme design and help shape the proposals. To help manage the consultation and feedback we receive, we are asking you to rate and comment on groups of proposals rather than individual measures, and to tell us what else you would like to see.
    Please read each proposal carefully, and tell us your thoughts on each one using the comment section at the bottom of each proposal page. Depending on how much you write, we expect the survey to take no more than 10 minutes to complete.

    What’s planned in Leytonstone Town Centre?
    We have four town centre schemes in the Mini-Holland Programme, one of which is Leytonstone. These schemes will better connect Chingford, Highams Park, Leyton and Leytonstone through key walking and cycling routes, making areas of the borough easier to get to for people who want to walk and cycle for local journeys. The town centre schemes will also improve the look and feel of these four key areas whilst linking in with the four Village schemes in Walthamstow, making them more enjoyable places to spend time and money, boosting business for our local economy and giving our residents a sense of pride in their borough.
    The Leytonstone Town Centre scheme area has over 8,000 addresses and lots of people currently walk and cycle through it to get to the High Road, Leytonstone Underground Station, Leytonstone High Road Rail Station, Queen Elizabeth Olympic Park and Hollow Ponds. We’re planning to make improvements so that if you choose to walk or cycle it’s easier for you to get about. For example, we know that Grove Green Road is a key cycling route through Leytonstone, so we’re planning to improve this by creating segregated areas, where possible, making it safer and easier for people who cycle and vehicles to share the road.
    We’re also planning to install blended ‘Copenhagen’ style crossings on a series of side streets, which extend the pavement across the road, meaning vehicles need to give way to pedestrians and people on cycles. We recognise that there is a place for cars in our borough, but want to make our roads safer by creating junctions that encourage drivers to slow down and take extra care at key points. We’ll also be investing in new public spaces and improving how the area looks with plants and greenery, to encourage more people to spend their time and money in the area. The proposed design also includes a mix of road and traffic direction changes which are shown on the map below.

    What has happened so far?
    In June 2015, we sent a survey to all 8,000 addresses in the scheme area to understand your concerns and aspirations and what you want to see in your local area. Over 340 people responded, providing over 440 individual comments, which we analysed and used to shape the next stage of the plans.
    This feedback helped create an early design which was presented to over 60 residents who attended our codesign workshops in September and October 2015. During these workshops local residents and businesses told us their views of the proposed design to help us make sure this scheme fits everyone’s needs. We have been speaking to key stakeholders (including the emergency services and schools) to make sure the design enables them to do their important work.
    We will continue to engage with these groups as the scheme progresses through to final design and completion. We have also used information about traffic movements and traffic survey data to design a scheme that benefits all road users. More information about this design is detailed in these proposals and we are asking for your views on it.

    What happens next?
    All of the feedback received will be grouped, carefully analysed and used to shape the final design. Where there are elements of the scheme that are not well supported by residents and businesses, we will look at these again. Where it’s possible to make changes based on your comments and suggestions we will, and where we can’t we will explain why.
    A summary of the results and feedback will be sent to everyone who took part after the public consultation stage has ended. This will set out the results and how they have been used to help shape the final design. This will also be available on the website for everyone to see.
    Before we get to the design stage, Transport for London (TfL) will also need to approve the plans as the funders of the Mini-Holland Programme.

    Please sign in to vote.
  • A1010 South Enfield Mini-Holland

    Created by Simon Munk // 1 thread

    These pages are publicly viewable and for cyclists to discuss consultation responses. Always make sure you *also* respond to the public consultation at its site too!

    Enfield council says:

    This is a unique opportunity for Enfield to transform the look and feel of this vital local road for the benefit of the whole community, whether they cycle or not. It will improve the urban realm, slow and calm traffic in busy town centres and make conditions for cycling and pedestrians much safer. The scheme aims to encourage more people to walk and cycle, reducing the many short car journeys around our community. See details below for more information on the scheme.

    Please sign in to vote.
  • Central London Cycling Grid Borough High Street/Newcomen Street junction

    Created by Simon Munk // 1 thread

    Overview
    We are seeking your views on proposed changes to the junction of Borough High Street with Union Street and Newcomen Street. The proposals are part of the Central London Cycling Grid - a network of cycle routes in Zone 1.
    This junction forms part of the Blackfriars to Tower Bridge Road route. The London Borough of Southwark consulted on other parts of this route in October 2015 – further details can be found here:
    What are we proposing?
    Our proposals aim to improve safety for cyclists and accommodate the predicted increase in cyclists along this route. The design would provide a more direct route for eastbound cyclists by removing a long detour and allowing them to proceed along Newcomen Street. By altering the signal phasing of the junction, we would also enable cyclists on Borough High Street to turn onto the new route.
    Why are we proposing this?
    The Blackfriars to Tower Bridge Road Route will provide a safer and more pleasant journey through a section of the city that is already popular among commuters as well as recreational cyclists. Transport for London and Southwark Council have identified certain junctions and sections of the proposed route that could be modified to improve cycle accessibility as well as safety for all users of the road, including pedestrians.
    By closing a short section of Newcomen Street to motor vehicles and creating two-way access to the junction, we will remove a long detour from the cycle route. Changes to signal phasing at the junction, and modifications to existing street furniture, will create safer routes for cyclists without affecting pedestrian accessibility.
    At construction stage the junction would also be resurfaced. Proposals for this junction are:
    Union Street
    Existing contra-flow cycle lane retained for cyclists travelling westbound on Union Street. This would connect to Southwark Council’s proposals for Union Street.
    Existing advanced stop line extended to 5m with a cycle feeder lane. These extended facilities would provide cyclists with a larger waiting area in front of motor traffic, improving their visibility, and allowing them to safely move away at the traffic lights.
    Borough High Street
    Dedicated low-level cycle signals to inform cyclists of when to safely proceed across Borough High Street from Union Street and Newcomen Street.
    Pedestrian islands widened to improve pedestrian accessibility across Borough High Street.
    Cyclists permitted to turn left onto Union Street and Newcomen Street. This movement is currently banned and would remain banned for other vehicles. This allows cyclists on Borough High Street to join the route. The signal phasing would be altered to permit this movement. NOTE: All vehicles (including cyclists) would continue to be banned from turning right into Union Street or Newcomen Street.
    All-round pedestrian signal phase retained so that pedestrians can safely make all movements across the junction at the same time.
    Newcomen Street
    Section of Newcomen Street closed to motorised traffic. Bollards would be installed approximately 30m west of the junction to enforce road closure to motorised traffic except for emergency access. NOTE: Newcomen Street is a borough-owned road and this aspect of the scheme would be progressed by the London Borough of Southwark.
    Two-way cycling permitted on Newcomen Street allowing cyclists travelling eastbound to proceed directly from Union Street, and turn left from Borough High Street.
    Existing footways widened to improve pedestrian accessibility.
    We have carried out traffic modelling for this proposal. The results indicate that the proposed changes can be accommodated without undue delay to any road user.

    Please sign in to vote.
  • Trafford Waters

    Created by Jonathan Keenan // 1 thread

    Large housing development near to Trafford centre, Manchester Ship Canal and Bridgewater Canal. There is potential for huge increase in traffic and the plans have very little/no cycle infrastructure planned in.

    The plans show 5 lane roads and roundabouts with a simple ASL and no other infrastructure. This is an opportunity for the developers to connect the new estate into a wider cycle network, particularly the cycle path on Barton Dock Road (which needs improvement). The Bridgewater Canal will not have enough capacity in the future and is not suitable for year round commuting.

    Urgent attention needs to be given to the main roads surrounding the site and the development used as a catalyst to improve the below standard infrastructure already in place nearby.

    Please sign in to vote.

76 threads found for 'consultations':

No library items found for 'consultations'.

No planning applications found for 'consultations'.

Back to top