  • Camberwell Green junction

    Created by Elizabeth E. // 1 thread

    TfL are making changes to junction because of safety issues.

    For Cyclists:

    Two-stage right turns at the junction in the west to south and east to north directions
    An early release at the traffic lights on all four arms of the junction
    Deeper Advanced Stop Lines (ASLs)
    Mandatory cycle lane on Camberwell Church Street westbound approach to operate at all times
    St Giles bus stop moved further west from the Vicarage Grove junction to improve safety of left turning cyclists on the LCN 23 cycle route
    Resurfacing throughout the junction.
    Retention of the 20mph speed limit at the junction and on all the approaches.

    Please sign in to vote.
  • Nine Elms Lane and Battersea Park Road

    Created by Simon Munk // 1 thread

    TfL says:
    We are seeking your view on our proposals for Nine Elms Lane and Battersea Park Road; developed through dialogue with the Nine Elms Vauxhall Partnership.
    We propose to transform the 2.5km stretch of road from the Vauxhall Gyratory, along Nine Elms Lane and Battersea Park Road to Macduff Road, connecting to Cycle Superhighway 8 (CS8). Our proposed changes would act as a backbone to the major developments taking place in the area, improving conditions for pedestrians, cyclists, and bus passengers, as well creating a more pleasant and characterful street environment and a sense of destination to the area.
    Our proposals are being funded through contributions from developers administered by London Borough of Wandsworth.
    Ahead of these proposals and in response to the ongoing levels of construction in the area, we will implement a small scale, interim scheme during summer 2017 which looks to increase safety in the area and enhance the urban realm. More information on this scheme can be found here.

    What are we proposing?
    We are proposing a complete redesign of the road layout on Nine Elms Lane and the eastern part of Battersea Park Road to deliver improvements for pedestrians, cyclists and bus users and accommodate future growth of the area. Proposals include:
    New, wide footways
    23 new and improved signalised crossing points
    A new cycle route on the south of the Thames from CS8 at Macduff Road to Vauxhall Gyratory, featuring:
    ‘Stepped’ cycle tracks in both directions (see below) from Vauxhall Gyratory to the new Battersea Power Station London Underground entrance
    Dedicated segregation and allocated time for cyclists at some junctions
    Bus stop bypasses provided in some locations
    Stepped cycle tracks are vertically separated from the footway and main carriageway.
    Increase in bus lanes to provide reliable journey times to bus passengers
    Improved junctions by upgrading signals at 5 junctions and providing 3 new signalised junctions
    Improvements to the street environment, which would see high quality finishes, repaving and new trees planted where possible
    We would ensure all design and construction is closely coordinated with our plans to transform Vauxhall gyratory.

    Why are we proposing this?
    As part of the Mayor’s Opportunity Area Planning Framework, Vauxhall, Nine Elms and Battersea has been identified as an area for major redevelopment. Nine Elms Lane and the eastern part of Battersea Park Road is a major gateway and transport artery for the area.
    Development is well underway and will be continuing in the coming years, which includes over 40 major developments with new residential and office units, two new town centres at Battersea Power Station and Vauxhall and two new London Underground stations on a new Northern Line Extension, at Nine Elms and Battersea. 20,000 new homes are being built, creating 22,000 construction jobs and a further 25,000 new jobs between now and 2027. Significant improvements are also being made to the public realm, which will include a new 11-acre Nine Elms Park linking Battersea Power Station to Vauxhall Cross.
    In response to these levels of development and the change in land use, we have been presented with an opportunity to enhance the highway, creating a backbone to the development and a destination where customers are encouraged to walk, cycle and use public transport.
    The proposals form part of the Mayor of London’s plan for Healthy Streets – a long-term vision to encourage more Londoners to walk and cycle by making London’s streets healthier, safer and more welcoming. We are proposing substantial improvements for pedestrians, cyclists and bus passengers in the area to help encourage more people to use these healthy and sustainable forms of transport.

    Summary of the proposed changes

    Cycling facilities
    New segregated cycle lanes in both directions along most sections of the route. We would make space for these by reallocating space from general traffic and realigning traffic lanes
    Improvements to safety for cyclists provided through early starts at certain junctions, a cycle only stage at certain junctions, bus stop bypasses and two-stage right turn facilities
    New signalised junctions at Savona Street and Battersea Park Road, Thessaly Road and Battersea Park Road, and Cringle Street and Nine Elms Lane
    Ponton Road would see a redesigned junction providing cyclists travelling westbound with a cycle only green stage at the traffic light. Cyclists travelling eastbound, straight across the junction, continuing on Nine Elms Lane would be provided with a bypass lane
    Cycle only stages would be provided at Kirtling Street and Ponton Road.

    Road design and layout
    New signalised junction at Savona Street to incorporate the opening of the new road opposite called Prospect Way
    New signalised junction at Thessaly Road, subject to outcome of the P5 Bus extension consultation
    New signalised junction at Cringle Street to manage traffic in and out of the new side road, provide an early start for cyclists and new pedestrian crossing points
    Banned left turn from Battersea Park Road into Cringle Street for all traffic due to the tight turn
    Bus facilities
    Widened bus lanes, where possible to provide passing space for cyclists around buses waiting at stops
    Around 2km of bus lanes between Vauxhall Gyratory and Prince of Wales Drive, created by removing central islands and realigning traffic lanes
    Changes to bus lane hours of operation to provide reliable journey times to bus passengers through the area
    We are separately consulting on a proposed extension to bus route P5 to Battersea Power Station. Please see consultation here. This proposal will be assessed and taken forward separately to the proposed changes for Nine Elms Lane and Battersea Park Road
    Pedestrian facilities and crossings
    Where space allows, junctions would have footway buildouts to reduce pedestrian crossing widths and provide additional space for pedestrians
    The new signalised junction at Savona Street would provide signalised pedestrian facilities on the north, south and west arms of the junction
    The Kirtling Street junction would see a new signalised pedestrian crossing on the western arm
    The new Cringle Street junction would see new signalised pedestrian crossings on all arms of the junction
    A new signalised staggered pedestrian crossing would be provided outside Riverside Court
    We have used computer analysis to help us ensure our proposals are fit for future growth in pedestrian numbers

    Journey times for motorists and bus passengers
    We have carried out traffic modelling analysis to predict how the proposals might affect journey times through the scheme area. A summary of this analysis is available

    Parking and loading
    The disabled parking bay outside The Battersea Medical Centre would be extended to 12 metres long to provide 2 parking spaces. It would also be relocated onto the footway
    All on-street parking bays would have consistent hours of operating, allowing off peak peaking and/or loading

    Deliveries and servicing
    We continue to work with businesses and freight operators to minimise the impact of these proposals on their operations. If your home or workplace is on or near the proposed route, please let us know if the proposals could affect your deliveries, collections and servicing. We would encourage you to discuss the proposals with companies undertaking these operations.

    Environment
    Our proposals aim to improve the quality of life in the area by:
    Reducing the dominance of traffic, allowing people to better enjoy the area
    Increasing provision for active modes - walking and cycling
    Exploring opportunities and working with developers to achieve more greening
    Creating a sense of place with the proposed new urban realm high quality finishes which would look to include Sustainable Urban Drainage solutions in our proposals
    Although we do not expect an increase to the number of motor vehicles in the area, our proposals may change how traffic moves around some roads, which may result in some associated and localised changes to air quality and noise levels. Environmental surveys and modelling would take place as part of our ongoing evaluation of these proposals.

    Equalities
    In considering the design of our streets, we closely consider the needs of all users throughout the design process. On significant infrastructure projects, we:
    Complete Equality Impact Assessments (EIA) at the outset of the project, to review potential impacts on equality target groups, including disabled people
    Carry out public consultations, including targeted engagement with specific users such as (amongst many others): Royal National Institute of Blind People, Guide Dogs for the Blind, Age Concern, Transport for All, and the National Autistic Society
    Ensure we comply with established guidance – such as the Design Manual for Roads and Bridges – which includes detailed requirements for disabled people
    The EIA for Nine Elms Lane and Battersea Park Road will continue to be developed following the outcome of this public consultation, incorporating feedback received.

    Next steps
    We will analyse and consider all of the responses received to the consultation, and publish our response later this year. Construction of the scheme would be subject to the outcome of this consultation, and further approvals. Should we decide to go ahead, we would aim to start construction in 2020/2021.

    Please sign in to vote.
  • Waterloo roundabout

    Created by Simon Munk // 1 thread

    We want your views on proposals to help inform our LCC response.

    TfL says:

    Overview:
    We want your views on our proposals to create a better Waterloo. We’ve developed these proposals over the past 10 years by working with local stakeholders and the community. The original vision can be found here. Our proposals aim to create a healthier and safer environment for people to walk and cycle and use public transport as well as support the regeneration and growth of Waterloo. These proposals aim to improve the quality of life in the area by:
    Reducing the dominance of traffic, allowing people to better enjoy the area
    Creating a healthier and safer environment
    Planting more trees to replace the removal of trees which will have the potential to benefit biodiversity, landscaping and wildlife
    Creating a sense of place with the proposed new public square
    Creating a focal point for Waterloo, helping build on it as a cultural destination and support the regeneration and growth of Waterloo
    Keeping buses and traffic moving through the area.
    The proposals form part of the Mayor of London’s plan for Healthy Streets - a long-term vision to encourage more Londoners to walk and cycle and use public transport by making London’s streets healthier, safer and more welcoming.

    What we are proposing

    Our proposals would:
    Create a new tree-filled public square supporting civic and cultural life of the area by moving the existing bus stops from Tenison Way to an improved bus station on Waterloo Road, closing the south-west arm of the roundabout and changing the remaining carriageway to two-way traffic
    Introduce segregated cycle lanes making cycling around Waterloo roundabout safer
    Create new pedestrian routes and permanently remove some subways (but keep others) to help create more direct walking routes towards the river Thames. The subways can be unpleasant and divisive, inaccessible to large sections of the community
    Widen the footways on Waterloo Road to give more space to pedestrians and waiting bus passengers by narrowing the carriageway through removing a section of bus lane
    Relocate northbound and southbound bus stops to keep traffic moving on Waterloo Road
    Ban the right turns from Waterloo Road into Stamford Street and from Concert Hall Approach (except for buses) to keep traffic moving.

    Why We Are Consulting

    Encourage more walking and cycling and use of buses by
    Making it easier, safer and more pleasant
    Keeping buses and traffic moving through the area
    Provide a sense of place and improve the environment by
    Creating a new, high-quality, traffic-free, green public space to become a focal point for Waterloo supporting the civic and cultural life of the area
    Support the regeneration and growth of Waterloo
    Currently the area is overcrowded and difficult to navigate for pedestrians, bus passengers and cyclists. This is exacerbated by street clutter and level differences that make it confusing and harder for people to get to where they want to go.
    It will get even busier because of major planned developments, including increasing capacity at Waterloo station. The roundabout is dominated by motor traffic and can be intimidating and unpleasant to walk and cycle.
    By giving cyclists more space and time to pass through the area more easily, and by providing new signalised crossings, a new public space and wider footways for pedestrians and waiting bus passengers, we can encourage more people to use these healthy and sustainable forms of transport, whilst keeping other traffic moving.
    Waterloo is a very important transport hub with Europe’s busiest rail station, a strategic bus interchange, and large numbers of cyclists and some key cycle routes passing through it.
    It is also home to international visitor and cultural attractions, workplaces, residents and academic institutions.
    Our proposals are designed to improve safety for vulnerable road users by introducing dedicated facilities, such as signalised pedestrian crossings, new cycle lanes and separate cycle signals. Waterloo roundabout is one of 33 locations across London we are prioritising as part of our Safer Junctions programme.
    Overall, these proposals are designed to make it easier, safer and more attractive to walk, cycle and use public transport in the area, and to prepare for and stimulate further growth and regeneration.

    Potential effects of our proposals

    Journey times
    We expect the proposals would result in changes, both positive and negative, to journey times for motorists, bus passengers and cyclists once complete. Click here for the information (PDF) that explains the impacts we expect our proposals to have on journey times and is accompanied by a more detailed table of data.

    Walking
    We want to make walking more convenient and attractive. There are a number of places where overcrowding is common such as Tenison Way and Waterloo Road:
    The proposed new public space would provide lots more room for pedestrians and create a key focal point in the local area with crossings relocated to where people want to cross
    Wider and clearer footways would reduce overcrowding on Waterloo Road
    Walking routes would be opened up, improving way finding and permeability.

    Cycling
    Taken from survey data in 2013 cyclists make-up 40% of traffic around Waterloo roundabout in the AM peak.
    We want to make cycling in Waterloo easier, safer and more attractive. Our proposals provide dedicated time and space for cyclists and aim to reduce road casualties by addressing the patterns of past collisions:
    Segregated cycle lanes around the new peninsula. The impact of this is balanced with bus and general traffic movements by making some strutural changes to the roundabout
    Separate cycle signals on traffic lights would reduce the number of conflicts with general traffic
    Existing cycle parking stands would be relocated
    The cycle hire docking station outside Kings College would be relocated
    We are working with other teams delivering projects that would provide better and safer connections to existing and planned cycle routes.

    Bus passengers
    Waterloo is a strategic part of the London bus network, with some of its busiest routes serving the area, used by 20,000 passengers a day. Our proposals aim to encourage more people onto buses and keep all traffic moving:
    An improved bus station and new public square would provide a much improved interchange and waiting environment for bus passengers
    Wider footways on Waterloo Road would provide a larger and safer area for waiting bus passengers and accommodate future growth in numbers
    Bus stops would be relocated from Tenison Way to the improved bus station on Waterloo Road and the northbound and southbound bus stops on Waterloo Road would be consolidated.
    A short section of bus lane on Waterloo Road would be removed to keep traffic moving.

    General traffic
    We want to reduce the dominance of traffic around Waterloo by creating an environment which encourages people to walk, cycle or use public transport. As a result:
    There would be some changes to general traffic journey times as a result of these proposals. We would remove the south-western side of the roundabout to create the new public space. Traffic would flow two-way around the new peninsula
    The section of northbound bus lane on Waterloo Road from the junction with The Cut would be removed to provide more space for pedestrians. Buses would share the general traffic lane and pull-in to the relocated bus stops allowing traffic to pass
    The right turn from Waterloo Road into Stamford Street and the right turn from Concert Hall Approach (except for buses) would be banned to keep traffic moving through the area.
    We do not develop proposals to introduce traffic restrictions without carefully considering the potential impacts and exploring alternative solutions. The restrictions are proposed to either address a safety issue, or help the signalised junction operate more efficiently and minimise potential journey time delays to road users.

    Deliveries and servicing
    Some changes to existing servicing arrangements may be required. If your home or workplace is on or near the proposed changes, please let us know if the proposals could affect your deliveries, collections and servicing. We would encourage you to discuss the proposals with companies undertaking these operations.

    Taxis
    The main taxi rank is on Station Approach and is not affected by these proposals.

    Rail and London Underground users
    Network Rail has a programme of works to increase capacity at Waterloo Station and London Underground has plans to increase Bakerloo and Northern Line services, increasing the numbers of people using Waterloo to interchange. Our proposals would make it easier and more attractive for passengers to continue their journeys on foot, cycle or bus.

    Environment
    Air pollution is one of the most significant challenges facing London, affecting the health of all Londoners. As part of the plans for new measures to tackle London’s current poor air quality, we have been consulting on proposals to bring forward the introduction of the London Ultra Low Emission Zone (ULEZ).
    A number of other schemes to improve London’s air quality are planned, including taking steps to reduce air pollution from our bus fleet, reducing emissions from taxis and private hire vehicles, setting up five ‘Low Emission Neighbourhoods’ and expanding the electric vehicle charging network, as well as making it simpler to use. We are investing to make London’s streets healthy, safe and attractive places to walk and cycle. Enabling more journeys to be made on foot or by bike can help reduce private vehicle use and associated emissions. Click here for more information on how we are creating Healthy Streets and click here for the draft Mayor's Transport Strategy. Our proposals aim to improve the quality of life in the area by:

    Reducing the dominance of traffic, allowing people to better enjoy the area
    Exploring opportunities to achieve more greening
    Creating a sense of place with the proposed new public square and providing additional seating.
    As our proposals for Waterloo would change how traffic moves around the area, we expect there would be some associated and localised changes to air quality and noise levels. We will be carrying-out environmental surveys and environmental modelling to help our design development.

    Security barriers on Waterloo Bridge
    The Metropolitan Police Service has installed barriers to increase security on London’s busiest bridges. Our proposals will aim to ensure that the security of all road users is maintained in the future.

    Working with the local community
    TfL has been working with Lambeth Council and engaging with businesses, local stakeholders and the Mayor to develop these proposals over the years. These are the planning documents and guidance consulted on with the local community that have helped us develop these proposals:
    A local college, Morley College, has produced a photo record to capture the sense of place and character of the area that these proposals will build on. These photos will be on show at the public events and around Waterloo.
    There is a public art poem by the poet Sue Hubbard called “Eurydice” on the wall of one the subways we propose to remove. The poem was written as part of the renovation of the South Bank especially for the underpass that leads from Victory Arch at Waterloo Station to the BFI IMAX cinema. We will work with local stakeholders to investigate how we can include the poem in the new public space.

    Next steps
    Subject to the outcome of this consultation, should we proceed with these proposals, we would look to start construction in late 2019 for a period of up to 18 months.
    We are aware that there is a lot of construction occurring in the Waterloo area and these changes are likely to cause further disruption. We would work with the local community, Lambeth Council, SBEG, WeAreWaterloo and surrounding developers to coordinate works and deliveries to minimise this impact as far as possible.

    Previous consultations
    As part of the Mayor’s Better Junctions Review we made improvements at the roundabout to reduce accidents by providing more priority and road space for cyclists, particularly at the junctions with Stamford Street and Waterloo Road.
    Later the speed limit was reduced to 20mph and will be retained under these proposals.

    Please sign in to vote.
  • Lambeth Bridge North & South

    Created by Simon Munk // 1 thread

    TfL says:

    Overview:
    We have developed proposals to transform the road layout at the northern and southern roundabouts at Lambeth Bridge to create a safer environment for cycling and walking. We would also make changes to some approach roads and to the bridge itself.
    Focussing on road safety, our proposals are designed to keep traffic moving along these key routes, whilst providing a better balance to the way that space on the road is allocated.
    Our proposals would require changes to the way general traffic moves through the area, including new left or right turn traffic restrictions on some roads at each end of the bridge.

    What are we proposing?
    We propose to convert both the northern and the southern roundabouts of Lambeth Bridge into crossroad junctions, with traffic signals and signalised pedestrian crossings. At each junction, dedicated space would be given for cyclists and new pedestrian areas would be created.
    To support these transformational plans, changes to the road layout are also proposed on Lambeth Bridge itself, at the Millbank north junction with Great Peter Street and along Lambeth Palace Road. These layout changes include two general traffic lanes at each exit from the bridge, the introduction of a signalised pedestrian crossing at the Millbank north junction with Great Peter Street, and the extension of the southbound bus lane on Lambeth Palace Road.
    We have also developed public realm improvements, sensitive to the heritage of the area. These designs propose to further enhance the look and feel of the area so that we can promote a real sense of place to Lambeth Bridge and its surrounds.
    The Metropolitan Police Service has installed barriers to increase security on London’s busiest bridges. Our proposals will aim to ensure that the security of all road users is maintained in the future.

    We are also seeking views on:
    Longer-term plans for the pedestrian underpass at Albert Embankment
    A potential new location for the palm tree at Lambeth Bridge north
    The current traffic speed at Lambeth Bridge north and south

    Why are we proposing it?

    Safety
    Our proposals are designed to improve safety at both northern and southern roundabouts by introducing dedicated facilities for vulnerable road users, such as signalised pedestrian crossings, new cycle lanes and separate cycle signals. The northern roundabout in particular has a high proportion of collisions involving cyclists, and is one of 33 locations across London we are prioritising as part of our Safer Junctions programme.

    Healthy Streets to encourage walking and cycling
    The proposals form part of the Mayor of London’s long-term vision to encourage more Londoners to walk and cycle by making London’s streets healthier, safer and more welcoming. Both roundabouts and Lambeth Bridge are currently dominated by motor traffic and can be intimidating and unpleasant places to walk and cycle. By giving cyclists space and time to pass through the junction more easily, and by providing new signalised crossings and clearer footways for pedestrians, we can encourage more people to use these healthy and sustainable forms of transport, whilst keeping other traffic moving.

    Building a local cycle network
    Lambeth Bridge and its roundabouts lie on busy cycle commuter routes. Making the area safer and more welcoming for cyclists would help build connections to existing infrastructure, such as Cycle Superhighway Route 8 on Millbank, and planned improvements, such as Westminster Bridge and Central London Grid routes. The following map shows how our proposals would build on cycling connectivity in the area.

    The impacts of our proposals

    Journey times
    Our proposals have been designed to not have a disproportionate impact on other road users. However we expect there would be changes, both positive and negative, to journey times for motorists, bus passengers and cyclists.
    More detailed information on the traffic impacts of the Lambeth Bridge proposals, including tables of the likely journey time impacts, can be found here https://consultations.tfl.gov.uk/roads/lambeth-bridge/user_uploads/traffic-impacts-and-data-table.pdf
    Should these proposals go ahead, we would take a number of steps to ensure that the changes made along the route are balanced. We are investing in advanced traffic signal technology to allow us to better manage traffic depending on differing conditions at any given time.

    Turning restrictions
    Our proposals include a number of restrictions to turning movements:

    ‘Straight-ahead only’ for traffic exiting Millbank north
    A time-of-day banned right-turn from Millbank south onto Lambeth Bridge during the evening peak
    A banned left-turn for northbound traffic from Millbank south into Horseferry Road
    ‘Straight-ahead only’ for traffic exiting Horseferry Road
    A banned left-turn from Lambeth Palace Road onto Lambeth Road.
    A banned right-turn from Lambeth Road onto Lambeth Palace Road.
    We do not develop proposals to introduce traffic restrictions without carefully considering the potential impacts and exploring alternative solutions. The restrictions are proposed either to address a safety issue or to help the signalised junction operate more efficiently, minimising potential journey time delays to road users.

    The environment

    Air and noise
    Although the designs for Lambeth Bridge north and south are not expected to increase the number of motor vehicles in the area, our proposals may change how traffic moves around some roads, which may result in some associated and localised changes to air quality and noise levels. Environmental surveys and modelling would take place as part of our ongoing evaluation of these proposals.

    Tree removal
    Our proposals require the removal or relocation of a number of trees in order to accommodate the new road layout:
    The iconic phoenix palm tree at the centre of the roundabout on the northern side of Lambeth Bridge would look to be relocated
    Seven trees at the centre of the roundabout on the southern side of Lambeth Bridge would need to be removed
    One tree at the junction of Millbank and Great Peter Street would need to be removed
    New trees will be planted at Lambeth Bridge north and south as part of proposed urban realm improvements. Subject to the outcome of consultation, tree species would be determined during detailed design.

    Visual environment
    Our proposed urban realm improvements aim to improve the look and feel of the area, as shown in our artists’ impressions.

    Features include:
    Reducing the dominance of traffic, allowing pedestrians and cyclists to better enjoy the area
    Increasing the surface area of the public realm by approximately 1,370 square metres at Lambeth Bridge north and approximately 1,790 square metres at Lambeth Bridge south
    Attracting more visitors to the area and local attractions such as Victoria Tower Gardens
    Planting new trees bringing overall benefits for the area’s biodiversity and landscape
    Providing new seating
    New footway materials to improve the look of the streets along Albert Embankment, Lambeth Palace Road, Millbank and Lambeth Bridge
    The removal of unnecessary and duplicate poles, signs and other street furniture
    Upgrades where necessary to existing lighting and drainage
    Provision of more cycle parking
    An opportunity to provide additional Cycle Hire stations
    Upgraded wayfinding for example to Newport Street Gallery
    Equalities
    In considering the design of our streets, we closely consider the needs of all users throughout the design process. On significant infrastructure projects, we:

    Complete Equality Impact Assessments (EqIA), to review potential impacts on equality target groups, including disabled people
    Carry out public consultations, including targeted engagement with specific users such as (amongst many others): Royal National Institute of Blind People, Guide Dogs for the Blind, Age Concern, Transport for All, and the National Autistic Society
    Ensure we comply with established guidance – such as the Design Manual for Roads and Bridges – which includes detailed requirements for disabled people
    The EqIA for Lambeth Bridge north and south will continue to be developed following the outcome of this public consultation, incorporating feedback received.

    Other options considered but not taken forward
    We considered a number of alternative designs before taking forward our current proposals.
    At Lambeth Bridge south, we considered retaining the roundabout, but this provided minimal benefits for cyclists. We also considered ‘hold the left’ turn facilities on Lambeth Road and Lambeth Bridge, which separate cyclists from other traffic with separate traffic signals. However this scenario would have caused significant traffic queueing due to the extra signal phase required and was difficult to accommodate due to the structure of the bridge.
    We also considered a number of designs at Lambeth Bridge north including a signalised junction and a ‘Dutch style’ roundabout with a physically separated cycle track around the edge of the roundabout. However, our modelling indicated that this would have had significant impact on journey times for other road users in the area, including thousands of bus passengers.
    Having considered a number of designs, we believe the current proposals would achieve the best balance for all road users.

    Related schemes
    Lambeth north interim scheme
    During March 2017, we delivered interim safety improvements at Lambeth Bridge northern roundabout.
    The changes were timed to bring improvements whilst we continued with plans to re-work the junction's layout for the long-term.

    Next steps
    Subject to the outcome of this consultation, should we proceed with these proposals, we would look to start construction in late 2018.
    Although construction would cause some disruption, we would take steps to minimise this as far as possible.
    Building in late 2018 would allow us to coordinate with major planned maintenance work on Lambeth Bridge, and with work currently taking place at Westminster Bridge South.

    Please sign in to vote.
  • Peckham Rye to Dulwich Quietway

    Created by Luce // 1 thread

    New QW in preconsultation phase - possible changes:

    * Raised table at jct/ of Friern and Goodrich Rd. ;
    * Sinusoidal humps completed all along Friern rd.;
    * 'Greening' of modal filters at Peckham Rye/ Friern & Upland/ Friern;
    * Potential for either a segregated bidirectional cycle lane from Etherow st. & across the junction of Barry rd. (helping cyclists to turn right down Woodwarde) or the signalisation of the junction of Etherow and Barry rd. (the former would require the relocation of the bus stand at the top of Barry rd.);
    * Tightening up of the jct. of Eynella and Woodewarde rd. (build out);
    * Build out of of western corner of Beauval rd./ Woodwarde rd. - potential for pocket park;
    * (Dependent on TFL modelling) removal of traffic islands on jct. of Lordship ln. and Barry rd./ Eyenella - de-cluttering of jct. - question of what turns are allowed and needed & the regulation of these.

    Please sign in to vote.
  • Star & Garter Hill junction

    Created by Simon Munk // 1 thread

    Richmond Council says:

    "As part of the development works which have been undertaken in the area, the Council has secured funding to improve the footway and carriageway in the immediate vicinity of Star & Garter Hill / Richmond Gate. The improvements works are planned to take place in July and will include: resurfacing the footway and carriageway, upgrading the existing traffic islands / refuges, implementing a new footway that joins up to Richmond Park, and general improvements to the signage and street furniture. As part of this works, there will also be the introduction of a drop off / collection bay outside the Royal Star & Garter development."

    No apparent cycling improvements.

    Please sign in to vote.
  • Have your say on the transformation of Oxford Street

    Created by Simon Munk // 1 thread

    Westminster Council/TfL/London Assembly Overview:

    "Oxford Street is one of the best known shopping destinations in the world. Around half a million people visit or work in the street and surrounding area every day and thousands of people and families live close by.

    Oxford Street is already very busy and growth in London’s population and economy will bring even more people to the area.

    There are lots of issues. Pedestrian spaces can get crowded. We recognise there is a road safety problem and air quality in the area is poor. Significant congestion delays passengers using buses and taxis.

    Unless we take action now, these issues will worsen as London continues to grow, threatening the success of Oxford Street and the surrounding district.

    The introduction of the Elizabeth line in late 2018 provides a once in a generation opportunity to tackle these challenges and make the district into the world’s best outdoor shopping experience and an unrivalled place to live, work and visit.

    Transport for London (TfL), Westminster City Council and the Mayor of London are working closely together to transform Oxford Street and the surrounding streets.

    We want to create a better environment, address poor air quality, support its cultural heartland and thriving business district and deliver improved neighbourhoods.

    We want to know your thoughts before we make any decisions. We would like to hear from everyone who visits, works or lives in the area so please get involved in this important consultation."
    Cllr Robert Davis MBE DL, Westminster City Council, Deputy Leader and Cabinet Member for Business, Culture and Heritage
    Valerie Shawcross CBE, Deputy Mayor for Transport
    Mike Brown MVO, Commissioner, Transport for London

    Please sign in to vote.
  • Kingsbury Road Proposed Public Realm Improvements Scheme

    Created by Simon Munk // 1 thread

    Brent council says:

    We are proposing to introduce a Public Realm Improvements Scheme in Kingsbury Town Centre between Kingsbury roundabout and Valley Drive as shown on the enclosed plan. The proposed scheme will include: A new 20 mph Zone, footway renewal, new Cycle lane, new parking and loading arrangements, new crossing facilities and new street furniture including trees, seats, benches and Cycle stands.

    Please sign in to vote.
  • Charlton Riverside Formal Consultation

    Created by Simon Munk // 1 thread

    Greenwich Council says:
    We want to know your initial views on the draft master plan for Charlton Riverside. Please read the public consultation document and associated documents attached to this listing.
    Description:
    The Council is preparing a new planning policy document. This document will support the existing Core Strategy policies and provide additional detail on the future of Charlton Riverside.
    Royal Greenwich is committed to the regeneration of Charlton Riverside and the creation of a new, sustainable neighbourhood providing both jobs and homes in a balanced way.

    This materplan includes Woolwich Road and a potential parallel new road.

    Please sign in to vote.
  • Draft Golders Green Station Planning Brief

    Created by Simon Munk // 1 thread

    Barnet council says:

    Overview

    The council is consulting on the draft Golders Green Station Planning Brief which will help to shape any future development of Golders Green Bus Station and Underground Station, together with the adjoining depot, sidings and immediately surrounding public highways.

    We consider the site of Golders Green Station as an opportunity to provide a high quality mixed use development that sensitively integrates an improved public transport interchange within the distinctive historic environment of Golders Green.

    The Draft Planning Brief has been produced to ensure that any future development improves transport connectivity and land use integration, respects and enhances Golders Green, creates high quality public realm and supports the success and vibrancy of the town centre.

    The Draft Golders Green Station Planning Brief;

    Identifies development opportunities and constraints;
    Provides guidance;
    Sets out key planning policy considerations to establish a clear set of development parameters; and
    Outlines the council’s preferred approach to any future development.

    Why We Are Consulting

    We are consulting on the draft plans to redevelop the site and we want to hear the views of local people on the proposed developments. It is important that residents and other interested parties have their say in planning policy.

    Planning Briefs form a material consideration in the consideration of planning applications.

    The closing date for us to receive comments and feedback is Thursday 11 May 2017.

    The results will then be reported to the Council’s Policy and Resources Committee so that they can be taken into account when the final version of the Planning Brief is being considered for adoption.

    Please sign in to vote.
  • Bromley-by-Bow and Marshgate Lane

    Created by Simon Munk // 1 thread

    From TfL:

    Overview
    We are working with the London Boroughs of Tower Hamlets and Newham and the London Legacy Development Corporation to enhance the transport links and public realm at Bromley-by-Bow and Marshgate Lane. The proposals would make it easier for people to cross both the A12 and Stratford High Street by providing new or upgraded pedestrian and cycle facilities, improving access for vehicles, enabling new bus routings, encouraging more walking and cycling, and connecting local communities and new developments in the surrounding area.

    What are we proposing?
    We would like your views on our initial ideas to change the road layout at Bromley-by-Bow and Marshgate Lane.

    Bromley-by-Bow
    Two signalised junctions on the A12, to the north of Bromley-by-Bow station, would provide access to proposed residential and commercial development to the east of the A12
    Vehicles travelling northbound on the A12 would be able to turn right to access these new developments directly, without having to make a u-turn at Bow roundabout
    A bus-only link across the A12 would connect Bromley-by-Bow and new developments to the east
    Signalised crossings, replacing the existing subway at Three Mill Lane, and improvements to the subway at Bromley-by-Bow station would make crossing the A12 easier and more accessible for pedestrians and cyclists
    The proposals would also give west Bromley-by-Bow better links to the open space around the River Lea, the Lea River Park & Leaway, and the Three Mills historic buildings and park
    A segregated cycle track on the east side of the A12 would help improve access to the local cycle network, including the Lea Valley Towpath and Cycle Superhighway 2

    Marshgate Lane
    A new link road, connecting Marshgate Lane with Sugarhouse Lane and creating a four-arm junction with A118 Stratford High Street, would allow buses, cyclists and pedestrians to cross the Bow Back River via a new bridge, improving access to Pudding Mill Lane station and the Queen Elizabeth Olympic Park

    Enabling future bus changes
    In addition to making the area more accessible for pedestrians and cyclists, the proposals for Bromley-by-Bow and Marshgate Lane would enable the creation of a new bus link. This would run from the west of the A12 at Bromley-by-Bow, through new developments either side of the River Lea, and north to the Queen Elizabeth Olympic Park. Any potential changes to bus routes in the area would be subject to a future and separate consultation.

    Traffic impacts
    Should we decide to take the proposals forward to the next stage of design, we would undertake traffic modelling to understand any potential effects of the changes, and summarises the results as part of a further stage of consultation on detailed proposals.

    Why are we proposing this?
    Bow and the wider area are changing. Local regeneration, growth in housing and the legacy development of the Queen Elizabeth Olympic Park are all expected to contribute to changing demands on the transport network. Our key aims for the area are:

    Making the A12 Blackwall Tunnel Northern Approach easier to cross. People prefer being able to cross streets at their convenience. Fast-moving or heavy traffic can make this difficult
    Supporting growth and local businesses by providing better access to new developments, encouraging more walking and cycling, and connecting communities
    Creating a more liveable place. People are more likely to use our streets when their journey is interesting and stimulating, with attractive views, buildings, planting, and where other people are using the street

    Bow Interchange
    In spring 2015 we consulted on improvements to make it easier for pedestrians to cross Bow Interchange safely and provide a new area of public space. Seven new signalised crossings, including two pedestrian/cycle crossings, were opened in June 2016, improving connectivity between Bow and Stratford. You can find more information on the 2015 consultation at: tfl.gov.uk/roads/bow-vision

    We have looked at further options to redesign Bow Interchange and remove both the roundabout and flyover, giving pedestrians and cyclists more direct access to facilities. However, we have now deferred development of this scheme until we can identify the significant funding required to take the plans forward.

    Public exhibitions
    We will be holding the following public exhibitions, where you can view the proposals, speak to members of the project team and submit your response to the consultation:

    Kingsley Hall, Powis Road, London E3 3HJ

    TBC
    Saturday 8 April, 1200-1600
    Thursday 20 April, 1600-2000

    The Vision for Bow and the Healthy Streets Approach
    The pedestrian improvements at Bow Interchange were delivered as part of the Vision for Bow: a place which all road users, passing through, find accessible, safe and connected. You can find more information on the Vision for Bow at tfl.gov.uk/roads/bow-vision

    Announced in February 2017, the Healthy Streets Approach incorporates the objectives and principles of the Vision for Bow. We will therefore deliver the proposals at Bromley-by-Bow and Marshgate Lane as part of this approach, which sets out a long-term plan for improving Londoners’ and visitors’ experiences of our streets, helping everyone to be more active and enjoy the health benefits of being on our streets. You can find more information on the Healthy Streets Approach at tfl.gov.uk/healthy-streets

    Other developments in the Bow area
    The overview map above includes proposals for road layout changes in the Bow area that would be delivered by organisations other than Transport for London. We have included these to show how our proposals fit in to the wider regeneration of the Bow area. These changes are included in the Bromley-by-Bow and Pudding Mill Supplementary Planning Documents, which were consulted on by the London Legacy Development Corporation (LLDC) in winter 2016. Details of these consultations can be found below.

    Please sign in to vote.
  • Sloane Street project

    Created by Simon Munk // 1 thread

    Kensington & Chelsea council said:

    "The scheme aims to reduce the dominance of traffic and create an attractive high-quality environment.
    In partnering with Cadogan as the majority landowner, and Transport for London, (TfL), we have the unique opportunity to improve the public realm not only on borough-controlled roads and pavements but also in areas of the street that are in private ownership."

    Please sign in to vote.
  • Finchley Central town centre strategy

    Created by Simon Munk // 1 thread

    Barnet council says:

    The Finchley Central Town Centre Project commenced in mid-2016 to generate a town centre plan for Finchley Central. This project aims to deliver a comprehensive strategy for the Town Centre to identify and enable future investment in the town centre.

    In order to develop this strategy, we have been involving residents, councillors and businesses in a number of community engagement exercises and consultations including but not limited to ‘Shaping Finchley’s Future’ in November 2016, ‘Hello, is it Finchley you are looking for’ a highsteet consultation base set up outside Tesco with local residents on the 17th and 21st September 2016 and a business survey conducted the Summer of 2016.

    At the Shaping Finchley’s Future event, a number of residents indicated that they would like to see this initial draft strategy in order to provide more in depth feedback. In response to this, we have made the draft strategy available here and are seeking feedback.

    The Town Centre Plan aims to:
    - establish civic centres and public spaces at the core of the high street.
    - support vital employment clusters as a key employment hub for the borough.
    - identify development growth opportunities within the Town Centre.
    - make the most of heritage assets by proposing high quality public realm improvements and reaffirming the historical identity of the area.
    - improve gateways through developments, focusing on the two station gateway points into Finchley Central.
    - ease pedestrian and cycle movement with long-term wider transport infrastructure improvements.
    - create an inclusive high street that serves both local residents and worker throughout the week whilst supporting the evenining and weekend economy.
    - establish a unique identity for the town centre which celebrates its unique charactre and asssets both historically and in present time.

    The strategy has been developed in the context of the council’s Entrepreneurial Barnet Strategy and the place-based commissioning approach, which focusses on joining up council services in order to provide a better overall experience for residents and businesses.

    Please sign in to vote.
  • Pre-submission consultation (Regulation 14) on Knightsbridge Neighbourhood Plan

    Created by Simon Munk // 1 thread

    Knightsbridge forum description:

    The Knightsbridge Neighbourhood Forum is inviting views on its proposals for a neighbourhood development plan and associated documents.

    This is a pre-submission consultation in accordance with the requirements of the Localism Act 2011 and Regulation 14 of the Neighbourhood Planning (General) Regulations 2015 (as amended).

    The consultation documents may be found at the link below on the Knightsbridge Neighbourhood Forum’s website:

    Part One: Knightsbridge Neighbourhood Plan, 2017-2036 (4.7MB)
    Part Two: Knightsbridge Management Plan – proposed actions that are not planning policies (2.9MB)
    Part Three: Knightsbridge Evidence Base – comprising supporting evidence for Part One (15.7MB)
    Executive Summary (3.0MB)
    Hyde Park Barracks - Preliminary healthcheck note by Christopher Lockhart-Mummery QC (3.0MB)
    Further evidence and related information (see link below)
    Letter to consultees dated 8 December 2016 (0.6MB)
    http://www.knightsbridgeforum.org/planning/consultation/

    Please sign in to vote.
  • Effie Road – Options to introduce a traffic restriction gate

    Created by Simon Munk // 1 thread

    Hammersmith & Fulham description:

    Residents have told us that the volume of through traffic in Barclay and Effie Road is causing disruption through the day and particularly during the morning and evening peak rush hours.

    In October, we carried out a one-week traffic survey which has given us a clearer picture of traffic volumes and westbound ‘rat running’ traffic.

    In response, we are proposing putting a traffic restriction gate in Effie Road on an experimental basis for up to 18 months to see if this helps stop cars cutting through from Harwood Road and Fulham Road.

    Please sign in to vote.
  • Stratford Town Centre

    Created by Simon Munk // 1 thread

    Newham council say:

    We are working with Transport for London to transform Stratford town centre. This will include introducing two-way traffic around the Stratford Centre, improving bus services, and providing better facilities for pedestrians and cyclists.

    Changes to the one-way traffic system will allow for a better flow of traffic and reduce accidents in the area. It will also create a safer and more attractive town centre for everyone to enjoy.
    Our plans aim to encourage more people to visit the Broadway, High Street and Cultural Quarter and support our local businesses and cultural venues.

    As part of the plans, we want to:
    - introduce a two-way traffic ​system and road calming measures to reduce speeds
    - create separate cycle tracks to encourage more people to cycle through Stratford
    - widen the pedestrian crossing at Meridian Square and move other crossings to locations where pedestrians prefer to cross
    - improve the appearance of streets by resurfacing pavements, removing old street furniture and introducing new landscaping
    - enhance the public area near Theatre Square and St John’s Church.

    Please sign in to vote.
  • East Acton to Kensington Quietway

    Created by Simon Munk // 1 thread

    Hammersmith & Fulham say:

    The first of our new quietway routes starts in the north of the borough at the boundary with Kensington and Chelsea in Mitre Way, it then enters the southern edge of Wormwood scrubs and heads towards East Acton tube station before finishing at the A40 westway cycle crossover. The full quietway route starts at St Mark's Road in Kensington and Chelsea and finishes at East Acton.
    The quietway will run along the southern edge of Wormwood scrubs including a new shared access track into the scrubs which will improve the access into the scrubs and create a short link to the existing track alongside the athletics stadium, and to Hammersmith Hospital.

    Please sign in to vote.
  • Bloomberg London Building Cannon Street

    Created by Simon Munk // 1 thread

    The City Corporation is proposing some changes in the streets around the new Bloomberg London building in Cannon Street. The main objectives of the changes are to control deliveries along that length of Cannon Street by providing loading bays and to convert the southern section of Walbrook to a pedestrian and cycle zone.

    Please sign in to vote.
  • Forest Road - Palmerston Road to Hoe Street

    Created by Simon Munk // 1 thread

    Broadly this is a plan for fully segregated tracks on both sides of the road between Palmerston Road e17 and Hoe Street E17. It is the third Forest Road consultation and further detail can be found on the Commonplace website. Previous consultation results may be found on the www.enjoywalthamforest.co.uk microsite.
    This introduction from the Commonplace consultation website:
    "Creating a safer environment
    Results from our perception survey in May 2015 showed that 80 per cent of people who took part felt that some parts of Forest Road felt unsafe. To address this, we want to make a number of road safety improvements, to help you get about more easily."

    Please sign in to vote.
  • Wheatfield Way area

    Created by Jon Fray // 1 thread

    Kingston Council is consultig on proposals for the Wheatfield Way area. KCC needs to evaluate the proposals and respond to the Council by 18th July 2016.

    Please sign in to vote.

76 threads found for 'consultations':

No library items found for 'consultations'.

No planning applications found for 'consultations'.

Back to top