Things tagged 'consultation'

571 issues found for 'consultation':

  • Stepney Way and Sidney Street junction

    Created by Alex Jenkins // 1 thread

    CONSULTATION RUBRIC:

    Three collisions have occurred at the Stepney Way / Sidney Street junction over a three year period causing four slight injuries. All three collisions occurred due to failing to look properly when turning out of the junction or hitting a vehicle in front.

    Improving road user behaviour is key to reducing collisions and although changes in layout can’t fully resolve this, redesign of our streets can help.

    The Stepney Way/Sidney Street junction is currently being invested in to improve the safety of the junction and the environment you live in.

    We propose to:

    Introduce traffic lights at the existing give-way junction to make it safer for pedestrians to cross.
    Implement a pedestrian only stage at the junction – this means all traffic lights will be held on red to road users to allow pedestrians to cross the junction safely.
    Provide advanced stop lines marked on each arm of the junction to benefit cyclists.
    Remove the guard rails, kerb build outs and the zebra crossing as the new traffic lights will provide a safer crossing facility.

    Please sign in to vote.
  • Transforming Fiveways Croydon

    Created by Simon Munk // 1 thread

    TfL says:

    Working in partnership with Croydon Council, we are proposing major changes to the road layout in Waddon, Croydon. Currently congestion is high, bus passengers frequently experience delays, and there is poor provision for cyclists and pedestrians. Our proposals would make Fiveways junction simpler and increase capacity to accommodate expected traffic growth arising from population and economic growth in the area.

    The project would also improve conditions for walking and cycling, with better cycle links between central Croydon and Sutton, and simpler pedestrian journeys and new public spaces. The proposals aim to make the streets more accessible and people-friendly, supporting the development of Waddon as a local centre.

    What are we proposing?

    Following our 2015 consultation on initial proposals, we are now planning the following changes:

    A23 Purley Way, Waddon Station Bridge / A232 Croydon Road

    Replacing the A23 (Purley Way) bridge over the railway with a wider structure (and realigning it to the west) to ease traffic congestion and installing new semi-segregated cycle lanes. This would require acquisition of property to the west of the bridge
    Fiveways Corner, Waddon

    Simplifying Fiveways Corner by realigning Denning Avenue to reduce the number of junction arms from five to four. This would require acquisition of property at Fiveways Corner
    Providing signalised pedestrian and cycle crossings and cycle advanced stop lines on all arms of the junction
    Creating a new public space and installing new cycle parking

    A232 Epsom Road

    Improving pedestrian access to Waddon Station by widening footways and improving crossing facilities
    Introducing segregated ‘stepped’ cycle lanes in both directions, removing all parking bays and converting Epsom Road to two-way traffic from the junction with the A23 to Duppas Hill Road
    Permitting the left-turn from the A23 into Epsom Road

    A232 Stafford Road

    Introducing a new northbound bus lane on Stafford Road between Fiveways Corner and the junction with Epsom Road, and creating inset parking bays on Stafford Road to allow for safer cycling and bus lane widening
    Banning the left turn from Stafford Road into Epsom Road

    Why are we proposing this?

    We want to make the Waddon area a safer, more accessible and pleasant place for all users. The current road layout was not designed to handle the current levels of traffic and, with further growth expected in the London Borough of Croydon and more widely, we need to make changes to ensure the road network supports this growth.

    The proposals aim to:

    Upgrade the public space and the pedestrian environment throughout the Fiveways area and support Croydon Council’s aspiration to develop Waddon as a local centre
    Provide enhanced cycling facilities to link with existing and proposed cycle routes into and out of Central Croydon
    Improve pedestrian, cyclist and bus-user access to Waddon station, and public transport
    Increase traffic capacity along the A23 and A232 and reduce congestion, allowing for future growth
    Improve journey times for all road users using the A23 and A232 in the Fiveways area
    Following our earlier consultation in 2015, we are now inviting your views on our detailed design proposals.

    Road layout changes

    A23 Purley Way

    As part of the scheme, we propose to realign and widen Waddon Station bridge. This proposal provides an opportunity to replace the bridge, which would otherwise require significant work to maintain by 2031. To enable these improvements it would be necessary to replace the existing bridge with a wider structure, which would be relocated west of the current alignment. This would mean that some property immediately to the west of the existing bridge would need to be acquired. Our proposals would:

    Increase the number of traffic lanes from two to three in each direction
    Introduce two-metre wide cycle lanes in both directions on the A23 bridge, with segregation at junctions for left turns, improving cycling connections
    Create footways with a minimum of two metre width on each side of the carriageway
    An artist’s impression of junction of A232 Croydon Road with A23 Purley Way

    Epsom Road

    Opening up Epsom Road to two way traffic. This would remove A232 traffic from the junction at Fiveways Corner. The carriageway would be widened to the north side only
    Introducing new 1.5 metre wide ‘stepped’ cycle lanes in both directions on Epsom Road to provide a new east-west cycle link from Croydon Road to Duppas Hill Road
    Removing the parking bays from Epsom Road to provide space for two-way traffic and new cycle lanes
    Allowing southbound vehicles to turn left from the A23 (Purley Way) into Epsom Road and making access to the A232 more direct. This would reduce the amount of traffic using Stafford Road and reduces congestion at the Fiveways Corner junction
    Epsom Road / Stafford Road junction

    Banning the left turn from Stafford Road into Epsom Road, providing a simpler junction with realigned pedestrian crossing facilities on the key desire line. This would bring the crossing closer to the station and make it easier for pedestrians to access Waddon Station
    Improving journey times by allowing for more time for the green signal phase
    Stafford Road

    Introducing a new northbound bus lane on Stafford Road, operating from Monday to Saturday between 07.00 and 10.00, and 16.00 and 19.00. Cyclists, motorcyclists, and taxis would be able to use the bus lane
    Relocating southbound bus stop ‘WB’, served by routes 154 and 157, approximately 60 metres north on Stafford Road, to a new position opposite Fernleigh Close
    Changing 58 metres of parking bay on the northbound side and 76 metres on the southbound side of Stafford Road to be inset into the footway. This would allow cycles to pass parked cars whilst staying within the bus lanes. Six metres of parking bay on the southbound side would be removed

    Fiveways Corner

    To improve the junction for all users, we propose to:

    Realign Denning Avenue to remove it from the Fiveways Corner junction, re-routeing it to join the A23 opposite the retail park (entrance to Morrisons). This would reduce the number of arms on the junction from five to four, introducing a crossroads arrangement which would simplify the junction and improve road capacity. This would decrease the number of signal phases required at the junction reducing waiting times for traffic on all approaches to the junction
    Create a new, attractive public space for people to sit and rest at, supporting Croydon Council’s aspirations for Waddon to have a local centre at Fiveways
    Upgrade all pedestrian crossing facilities to provide signalised controlled facilities at all arms around the junction. Crossings facilitating north-south cycle movements along the A23 would be upgraded to ‘toucan’ cycle friendly crossings.
    Provide new cycle facilities, including cycle parking, and Advanced Stop Lines.
    Introduce a left turn lane on Stafford Road (southern arm) for northbound traffic for the A23 to improve capacity at the junction
    Allow the right turn for southbound traffic on Stafford Road (northern arm) into the northbound A23 Purley Way
    New and upgraded cycle facilities

    The scheme would provide for new and enhanced cycle facilities which link in with the existing local cycle network as well as creating a new east-west cycling route through the Fiveways Croydon area. The proposals would provide a safer environment for cycling by introducing the following changes:

    New 1.5 metre wide cycle lanes in both directions on Epsom Road, to provide a new east-west cycle link from Croydon Road to Duppas Hill Road. The cycle lanes would be ‘stepped’, meaning they would be at a height of approximately 75mm above the road level, and 75mm below the footway
    New 2 metre wide cycle lanes in both directions on the A23 Purley Way bridge, with segregation at junctions for left turns. This would improve the connection for cyclists and remove the barrier to east-west cycle movement currently formed by the A23
    Separate phases for northbound cyclists and left-turning traffic at the junction of A23 Purley Way with Croydon Road
    New eastbound cycle lane on Croydon Road on the approach to the A23
    New advanced stop lines at the junction of Stafford Road with Epsom Road and on Stafford Road at Fiveways Corner
    Partially inset parking bays on both sides of Stafford Road, to allow cycles to pass parked cars whilst staying within the bus lane. Stafford Road would form part of the new cycle link from Sutton to Croydon town centre
    Shared pedestrian / cyclist signalised ‘toucan’ crossings at each of the signal-controlled junctions
    New cycle parking facilities
    Pedestrian and public space improvements

    The proposed public space and pedestrian improvements include:

    Creating new public spaces at Fiveways Corner and on the A23 (Purley Way) Waddon Bridge
    Creating attractive places for pedestrians to sit and rest
    Tree-planting and introducing new green spaces
    Relocating the pedestrian crossing on Epsom Road from its junction with Duppas Hill Road to opposite the Waddon Hotel, to provide more direct access to Waddon Station
    Introducing signalised pedestrian crossing facilities on A23 Purley Way junctions with A232 Croydon Road, and Epsom Road
    Signalised crossings on all arms of Fiveways Corner and more direct crossings
    We are also looking at opportunities to make the following changes to the public spaces in the area:

    Localised improvements to the general appearance of Stafford Road and Epsom Road
    Improving lighting, decluttering, and repaving where required
    Changes to parking and loading

    To deliver the proposed changes to the road layout, we would need to make the following changes to parking and loading:

    Removing the parking bays from Epsom Road to accommodate two-way traffic and new cycle lanes
    Removing six metres of parking bay on the southbound side of Stafford Road and changing the remaining parking bays on both sides to be inset into the pavement
    Changes to bus services

    We are proposing to change the location of two existing stops in Fiveways Croydon:

    Bus stop ‘WB’, served by routes 154 and 157, would be moved approximately 60 metres north on Stafford Road, to a new position opposite Fernleigh Close.
    Bus stop ‘WD’, served by routes 119 and 663 would be moved to match the new alignment of Denning Avenue

    Potential impacts of the scheme

    We cannot deliver all the benefits of the scheme by undertaking work only within the existing highway boundary. Some private property would therefore need to be acquired to undertake the scheme.

    We are talking to the owners of properties affected by the proposals and we will keep them informed of the progress of the scheme. If you are concerned about the potential impacts of the scheme on your property, please contact us.

    What changes would there be to traffic flow?

    Our proposals would result in changes to journey times for road users. Most journey times for motorists and bus passengers are predicted to get shorter or remain similar to that experienced today, whilst a minority are predicted to get longer at busy times.

    What environmental changes would there be?

    The proposals would result in some environmental changes in the Fiveways area:

    Air Quality
    We expect that the proposed changes would improve air quality in the Waddon area, by reducing traffic congestion, though there are some isolated instances where traffic flows are forecast to increase. To mitigate this impact, we would plant trees and plants where possible.

    Noise
    We expect the proposals would have an overall slight negative impact on noise pollution, as a few more sites around Fiveways would be expected to experience an increase, rather than a decrease, in noise levels.

    The existing noise level experienced by the majority of properties in the area where the A23 and A232 meet is between 60 and 75 decibels – a similar noise level to two people having a conversation, a shower running or vacuum cleaner being operated.

    Of the few people living or working close to the A23 / A232 intersection who are predicted to experience an increase in noise levels, the majority are expected to experience between three to five decibel increases in noise.

    A small number of properties will experience an increase above five decibels. We are in discussions with the owners of these properties to agree suitable mitigation measures.

    Community and built environment

    Our design team is working to produce a bridge design proposal which blends in and is as aesthetically pleasing as possible. We also propose planting trees alongside the bridge embankments. We are in discussion with residents and property owners to discuss the proposed changes to the bridge alignment and the road layout.

    We will request an ‘Environmental Screening Opinion’ from Croydon Council’s Planning department in July 2017. The Council is expected to advise whether a full Environmental Impact Assessment and Statement are required with the outcome expected to be known by later this summer. The full Environmental Evaluation Report and supporting evidence will be made available here once it is published. If you do not wish to submit feedback before viewing these documents, please wait until this is available before responding.

    Tree planting and tree removal
    The proposed design requires the removal of approximately 50 trees and includes the planting of over 80 new street trees.

    New rows of trees would also be planted on the proposed embankments along the A23 Purley Way over the railway line west of Waddon Station, and the row of six mature lime trees to the east of this section of the road would be retained.

    Next steps

    We will analyse and consider all responses to consultation to help inform our decision on how best to proceed with the proposals. We will also consider other factors, such as the availability of funding and deliverability. We expect to publish the results of the consultation and our planned next steps in late 2017.

    Should we decide to go ahead with the proposals, we would aim to start construction around summer 2020, with the new highway arrangement operational in autumn 2022.

    Please sign in to vote.
  • Tooting Bec Road consultation

    Created by jon_events // 2 threads

    TfL are now consulting on these proposals. I ran a petition several years ago now, which I hope nudged City Hall into action.

    Really pleased that we have some solid proposals on the table. It's clear that TfL could do better.

    Please sign in to vote.
  • Nine Elms Lane and Battersea Park Road

    Created by Simon Munk // 1 thread

    TfL says:
    We are seeking your view on our proposals for Nine Elms Lane and Battersea Park Road; developed through dialogue with the Nine Elms Vauxhall Partnership.
    We propose to transform the 2.5km stretch of road from the Vauxhall Gyratory, along Nine Elms Lane and Battersea Park Road to Macduff Road, connecting to Cycle Superhighway 8 (CS8). Our proposed changes would act as a backbone to the major developments taking place in the area, improving conditions for pedestrians, cyclists, and bus passengers, as well creating a more pleasant and characterful street environment and a sense of destination to the area.
    Our proposals are being funded through contributions from developers administered by London Borough of Wandsworth.
    Ahead of these proposals and in response to the ongoing levels of construction in the area, we will implement a small scale, interim scheme during summer 2017 which looks to increase safety in the area and enhance the urban realm. More information on this scheme can be found here.

    What are we proposing?
    We are proposing a complete redesign of the road layout on Nine Elms Lane and the eastern part of Battersea Park Road to deliver improvements for pedestrians, cyclists and bus users and accommodate future growth of the area. Proposals include:
    New, wide footways
    23 new and improved signalised crossing points
    A new cycle route on the south of the Thames from CS8 at Macduff Road to Vauxhall Gyratory, featuring:
    ‘Stepped’ cycle tracks in both directions (see below) from Vauxhall Gyratory to the new Battersea Power Station London Underground entrance
    Dedicated segregation and allocated time for cyclists at some junctions
    Bus stop bypasses provided in some locations
    Stepped cycle tracks are vertically separated from the footway and main carriageway.
    Increase in bus lanes to provide reliable journey times to bus passengers
    Improved junctions by upgrading signals at 5 junctions and providing 3 new signalised junctions
    Improvements to the street environment, which would see high quality finishes, repaving and new trees planted where possible
    We would ensure all design and construction is closely coordinated with our plans to transform Vauxhall gyratory.

    Why are we proposing this?
    As part of the Mayor’s Opportunity Area Planning Framework, Vauxhall, Nine Elms and Battersea has been identified as an area for major redevelopment. Nine Elms Lane and the eastern part of Battersea Park Road is a major gateway and transport artery for the area.
    Development is well underway and will be continuing in the coming years, which includes over 40 major developments with new residential and office units, two new town centres at Battersea Power Station and Vauxhall and two new London Underground stations on a new Northern Line Extension, at Nine Elms and Battersea. 20,000 new homes are being built, creating 22,000 construction jobs and a further 25,000 new jobs between now and 2027. Significant improvements are also being made to the public realm, which will include a new 11-acre Nine Elms Park linking Battersea Power Station to Vauxhall Cross.
    In response to these levels of development and the change in land use, we have been presented with an opportunity to enhance the highway, creating a backbone to the development and a destination where customers are encouraged to walk, cycle and use public transport.
    The proposals form part of the Mayor of London’s plan for Healthy Streets – a long-term vision to encourage more Londoners to walk and cycle by making London’s streets healthier, safer and more welcoming. We are proposing substantial improvements for pedestrians, cyclists and bus passengers in the area to help encourage more people to use these healthy and sustainable forms of transport.

    Summary of the proposed changes

    Cycling facilities
    New segregated cycle lanes in both directions along most sections of the route. We would make space for these by reallocating space from general traffic and realigning traffic lanes
    Improvements to safety for cyclists provided through early starts at certain junctions, a cycle only stage at certain junctions, bus stop bypasses and two-stage right turn facilities
    New signalised junctions at Savona Street and Battersea Park Road, Thessaly Road and Battersea Park Road, and Cringle Street and Nine Elms Lane
    Ponton Road would see a redesigned junction providing cyclists travelling westbound with a cycle only green stage at the traffic light. Cyclists travelling eastbound, straight across the junction, continuing on Nine Elms Lane would be provided with a bypass lane
    Cycle only stages would be provided at Kirtling Street and Ponton Road.

    Road design and layout
    New signalised junction at Savona Street to incorporate the opening of the new road opposite called Prospect Way
    New signalised junction at Thessaly Road, subject to outcome of the P5 Bus extension consultation
    New signalised junction at Cringle Street to manage traffic in and out of the new side road, provide an early start for cyclists and new pedestrian crossing points
    Banned left turn from Battersea Park Road into Cringle Street for all traffic due to the tight turn
    Bus facilities
    Widened bus lanes, where possible to provide passing space for cyclists around buses waiting at stops
    Around 2km of bus lanes between Vauxhall Gyratory and Prince of Wales Drive, created by removing central islands and realigning traffic lanes
    Changes to bus lane hours of operation to provide reliable journey times to bus passengers through the area
    We are separately consulting on a proposed extension to bus route P5 to Battersea Power Station. Please see consultation here. This proposal will be assessed and taken forward separately to the proposed changes for Nine Elms Lane and Battersea Park Road
    Pedestrian facilities and crossings
    Where space allows, junctions would have footway buildouts to reduce pedestrian crossing widths and provide additional space for pedestrians
    The new signalised junction at Savona Street would provide signalised pedestrian facilities on the north, south and west arms of the junction
    The Kirtling Street junction would see a new signalised pedestrian crossing on the western arm
    The new Cringle Street junction would see new signalised pedestrian crossings on all arms of the junction
    A new signalised staggered pedestrian crossing would be provided outside Riverside Court
    We have used computer analysis to help us ensure our proposals are fit for future growth in pedestrian numbers

    Journey times for motorists and bus passengers
    We have carried out traffic modelling analysis to predict how the proposals might affect journey times through the scheme area. A summary of this analysis is available

    Parking and loading
    The disabled parking bay outside The Battersea Medical Centre would be extended to 12 metres long to provide 2 parking spaces. It would also be relocated onto the footway
    All on-street parking bays would have consistent hours of operating, allowing off peak peaking and/or loading

    Deliveries and servicing
    We continue to work with businesses and freight operators to minimise the impact of these proposals on their operations. If your home or workplace is on or near the proposed route, please let us know if the proposals could affect your deliveries, collections and servicing. We would encourage you to discuss the proposals with companies undertaking these operations.

    Environment
    Our proposals aim to improve the quality of life in the area by:
    Reducing the dominance of traffic, allowing people to better enjoy the area
    Increasing provision for active modes - walking and cycling
    Exploring opportunities and working with developers to achieve more greening
    Creating a sense of place with the proposed new urban realm high quality finishes which would look to include Sustainable Urban Drainage solutions in our proposals
    Although we do not expect an increase to the number of motor vehicles in the area, our proposals may change how traffic moves around some roads, which may result in some associated and localised changes to air quality and noise levels. Environmental surveys and modelling would take place as part of our ongoing evaluation of these proposals.

    Equalities
    In considering the design of our streets, we closely consider the needs of all users throughout the design process. On significant infrastructure projects, we:
    Complete Equality Impact Assessments (EIA) at the outset of the project, to review potential impacts on equality target groups, including disabled people
    Carry out public consultations, including targeted engagement with specific users such as (amongst many others): Royal National Institute of Blind People, Guide Dogs for the Blind, Age Concern, Transport for All, and the National Autistic Society
    Ensure we comply with established guidance – such as the Design Manual for Roads and Bridges – which includes detailed requirements for disabled people
    The EIA for Nine Elms Lane and Battersea Park Road will continue to be developed following the outcome of this public consultation, incorporating feedback received.

    Next steps
    We will analyse and consider all of the responses received to the consultation, and publish our response later this year. Construction of the scheme would be subject to the outcome of this consultation, and further approvals. Should we decide to go ahead, we would aim to start construction in 2020/2021.

    Please sign in to vote.
  • Tower Hamlets Local Infrastructure Fund consultation

    Created by Alex Jenkins // 1 thread

    The council is consulting on the Local Infrastructure Fund (LIF) to give local people a say in defining the infrastructure priorities for their areas.

    The consultation period will run for six weeks from 27 June 2017 to 8 August 2017.

    Tower Hamlets has grown rapidly in recent years, and a number of new housing and employment developments have been built across the borough. Additional growth is expected in the future and the council recognises that this can put pressure on local services and infrastructure - that is, on areas like transport, schools, healthcare facilities and parks/open spaces.

    To deal with the impacts, developers are required to pay a financial contribution called the Community Infrastructure Levy (CIL). The borough has apportioned to each LIF Area, 25 per cent of the money from which the income was generated. Please refer to the LIF Area Profile documents for the specific amounts collected so far for each LIF Area. The council must then use this money to support the development of the local area, by addressing the demands that development places on the area, and by making sure the right infrastructure and services are in place for residents.

    In addition to understanding local people’s infrastructure priorities, the council is engaging with local people and giving them an opportunity to nominate projects that they would like to see delivered in their neighborhood. These can be new or existing projects already identified by the council in the LIF Area Profiles. Prior to the allocation of funding to any project and in line with the regulations, you will need to clearly demonstrate how the project will deliver the provision, improvement, replacement, operation and/or maintenance of infrastructure or anything else that is concerned with addressing the demands that development places on an area.

    This consultation provides local people with an opportunity to nominate up to three (new or existing) projects. Prior to the allocation of the funding to any project and in line with the regulations it will need to be clearly demonstrated how the project will deliver the provision, improvement, replacement, operation or maintenance of infrastructure or provides anything else that is concerned with addressing the demands that development places on an area.

    Please sign in to vote.
  • Waterloo roundabout

    Created by Simon Munk // 1 thread

    We want your views on proposals to help inform our LCC response.

    TfL says:

    Overview:
    We want your views on our proposals to create a better Waterloo. We’ve developed these proposals over the past 10 years by working with local stakeholders and the community. The original vision can be found here. Our proposals aim to create a healthier and safer environment for people to walk and cycle and use public transport as well as support the regeneration and growth of Waterloo. These proposals aim to improve the quality of life in the area by:
    Reducing the dominance of traffic, allowing people to better enjoy the area
    Creating a healthier and safer environment
    Planting more trees to replace the removal of trees which will have the potential to benefit biodiversity, landscaping and wildlife
    Creating a sense of place with the proposed new public square
    Creating a focal point for Waterloo, helping build on it as a cultural destination and support the regeneration and growth of Waterloo
    Keeping buses and traffic moving through the area.
    The proposals form part of the Mayor of London’s plan for Healthy Streets - a long-term vision to encourage more Londoners to walk and cycle and use public transport by making London’s streets healthier, safer and more welcoming.

    What we are proposing

    Our proposals would:
    Create a new tree-filled public square supporting civic and cultural life of the area by moving the existing bus stops from Tenison Way to an improved bus station on Waterloo Road, closing the south-west arm of the roundabout and changing the remaining carriageway to two-way traffic
    Introduce segregated cycle lanes making cycling around Waterloo roundabout safer
    Create new pedestrian routes and permanently remove some subways (but keep others) to help create more direct walking routes towards the river Thames. The subways can be unpleasant and divisive, inaccessible to large sections of the community
    Widen the footways on Waterloo Road to give more space to pedestrians and waiting bus passengers by narrowing the carriageway through removing a section of bus lane
    Relocate northbound and southbound bus stops to keep traffic moving on Waterloo Road
    Ban the right turns from Waterloo Road into Stamford Street and from Concert Hall Approach (except for buses) to keep traffic moving.

    Why We Are Consulting

    Encourage more walking and cycling and use of buses by
    Making it easier, safer and more pleasant
    Keeping buses and traffic moving through the area
    Provide a sense of place and improve the environment by
    Creating a new, high-quality, traffic-free, green public space to become a focal point for Waterloo supporting the civic and cultural life of the area
    Support the regeneration and growth of Waterloo
    Currently the area is overcrowded and difficult to navigate for pedestrians, bus passengers and cyclists. This is exacerbated by street clutter and level differences that make it confusing and harder for people to get to where they want to go.
    It will get even busier because of major planned developments, including increasing capacity at Waterloo station. The roundabout is dominated by motor traffic and can be intimidating and unpleasant to walk and cycle.
    By giving cyclists more space and time to pass through the area more easily, and by providing new signalised crossings, a new public space and wider footways for pedestrians and waiting bus passengers, we can encourage more people to use these healthy and sustainable forms of transport, whilst keeping other traffic moving.
    Waterloo is a very important transport hub with Europe’s busiest rail station, a strategic bus interchange, and large numbers of cyclists and some key cycle routes passing through it.
    It is also home to international visitor and cultural attractions, workplaces, residents and academic institutions.
    Our proposals are designed to improve safety for vulnerable road users by introducing dedicated facilities, such as signalised pedestrian crossings, new cycle lanes and separate cycle signals. Waterloo roundabout is one of 33 locations across London we are prioritising as part of our Safer Junctions programme.
    Overall, these proposals are designed to make it easier, safer and more attractive to walk, cycle and use public transport in the area, and to prepare for and stimulate further growth and regeneration.

    Potential effects of our proposals

    Journey times
    We expect the proposals would result in changes, both positive and negative, to journey times for motorists, bus passengers and cyclists once complete. Click here for the information (PDF) that explains the impacts we expect our proposals to have on journey times and is accompanied by a more detailed table of data.

    Walking
    We want to make walking more convenient and attractive. There are a number of places where overcrowding is common such as Tenison Way and Waterloo Road:
    The proposed new public space would provide lots more room for pedestrians and create a key focal point in the local area with crossings relocated to where people want to cross
    Wider and clearer footways would reduce overcrowding on Waterloo Road
    Walking routes would be opened up, improving way finding and permeability.

    Cycling
    Taken from survey data in 2013 cyclists make-up 40% of traffic around Waterloo roundabout in the AM peak.
    We want to make cycling in Waterloo easier, safer and more attractive. Our proposals provide dedicated time and space for cyclists and aim to reduce road casualties by addressing the patterns of past collisions:
    Segregated cycle lanes around the new peninsula. The impact of this is balanced with bus and general traffic movements by making some strutural changes to the roundabout
    Separate cycle signals on traffic lights would reduce the number of conflicts with general traffic
    Existing cycle parking stands would be relocated
    The cycle hire docking station outside Kings College would be relocated
    We are working with other teams delivering projects that would provide better and safer connections to existing and planned cycle routes.

    Bus passengers
    Waterloo is a strategic part of the London bus network, with some of its busiest routes serving the area, used by 20,000 passengers a day. Our proposals aim to encourage more people onto buses and keep all traffic moving:
    An improved bus station and new public square would provide a much improved interchange and waiting environment for bus passengers
    Wider footways on Waterloo Road would provide a larger and safer area for waiting bus passengers and accommodate future growth in numbers
    Bus stops would be relocated from Tenison Way to the improved bus station on Waterloo Road and the northbound and southbound bus stops on Waterloo Road would be consolidated.
    A short section of bus lane on Waterloo Road would be removed to keep traffic moving.

    General traffic
    We want to reduce the dominance of traffic around Waterloo by creating an environment which encourages people to walk, cycle or use public transport. As a result:
    There would be some changes to general traffic journey times as a result of these proposals. We would remove the south-western side of the roundabout to create the new public space. Traffic would flow two-way around the new peninsula
    The section of northbound bus lane on Waterloo Road from the junction with The Cut would be removed to provide more space for pedestrians. Buses would share the general traffic lane and pull-in to the relocated bus stops allowing traffic to pass
    The right turn from Waterloo Road into Stamford Street and the right turn from Concert Hall Approach (except for buses) would be banned to keep traffic moving through the area.
    We do not develop proposals to introduce traffic restrictions without carefully considering the potential impacts and exploring alternative solutions. The restrictions are proposed to either address a safety issue, or help the signalised junction operate more efficiently and minimise potential journey time delays to road users.

    Deliveries and servicing
    Some changes to existing servicing arrangements may be required. If your home or workplace is on or near the proposed changes, please let us know if the proposals could affect your deliveries, collections and servicing. We would encourage you to discuss the proposals with companies undertaking these operations.

    Taxis
    The main taxi rank is on Station Approach and is not affected by these proposals.

    Rail and London Underground users
    Network Rail has a programme of works to increase capacity at Waterloo Station and London Underground has plans to increase Bakerloo and Northern Line services, increasing the numbers of people using Waterloo to interchange. Our proposals would make it easier and more attractive for passengers to continue their journeys on foot, cycle or bus.

    Environment
    Air pollution is one of the most significant challenges facing London, affecting the health of all Londoners. As part of the plans for new measures to tackle London’s current poor air quality, we have been consulting on proposals to bring forward the introduction of the London Ultra Low Emission Zone (ULEZ).
    A number of other schemes to improve London’s air quality are planned, including taking steps to reduce air pollution from our bus fleet, reducing emissions from taxis and private hire vehicles, setting up five ‘Low Emission Neighbourhoods’ and expanding the electric vehicle charging network, as well as making it simpler to use. We are investing to make London’s streets healthy, safe and attractive places to walk and cycle. Enabling more journeys to be made on foot or by bike can help reduce private vehicle use and associated emissions. Click here for more information on how we are creating Healthy Streets and click here for the draft Mayor's Transport Strategy. Our proposals aim to improve the quality of life in the area by:

    Reducing the dominance of traffic, allowing people to better enjoy the area
    Exploring opportunities to achieve more greening
    Creating a sense of place with the proposed new public square and providing additional seating.
    As our proposals for Waterloo would change how traffic moves around the area, we expect there would be some associated and localised changes to air quality and noise levels. We will be carrying-out environmental surveys and environmental modelling to help our design development.

    Security barriers on Waterloo Bridge
    The Metropolitan Police Service has installed barriers to increase security on London’s busiest bridges. Our proposals will aim to ensure that the security of all road users is maintained in the future.

    Working with the local community
    TfL has been working with Lambeth Council and engaging with businesses, local stakeholders and the Mayor to develop these proposals over the years. These are the planning documents and guidance consulted on with the local community that have helped us develop these proposals:
    A local college, Morley College, has produced a photo record to capture the sense of place and character of the area that these proposals will build on. These photos will be on show at the public events and around Waterloo.
    There is a public art poem by the poet Sue Hubbard called “Eurydice” on the wall of one the subways we propose to remove. The poem was written as part of the renovation of the South Bank especially for the underpass that leads from Victory Arch at Waterloo Station to the BFI IMAX cinema. We will work with local stakeholders to investigate how we can include the poem in the new public space.

    Next steps
    Subject to the outcome of this consultation, should we proceed with these proposals, we would look to start construction in late 2019 for a period of up to 18 months.
    We are aware that there is a lot of construction occurring in the Waterloo area and these changes are likely to cause further disruption. We would work with the local community, Lambeth Council, SBEG, WeAreWaterloo and surrounding developers to coordinate works and deliveries to minimise this impact as far as possible.

    Previous consultations
    As part of the Mayor’s Better Junctions Review we made improvements at the roundabout to reduce accidents by providing more priority and road space for cyclists, particularly at the junctions with Stamford Street and Waterloo Road.
    Later the speed limit was reduced to 20mph and will be retained under these proposals.

    Please sign in to vote.
  • Lambeth Bridge North & South

    Created by Simon Munk // 1 thread

    TfL says:

    Overview:
    We have developed proposals to transform the road layout at the northern and southern roundabouts at Lambeth Bridge to create a safer environment for cycling and walking. We would also make changes to some approach roads and to the bridge itself.
    Focussing on road safety, our proposals are designed to keep traffic moving along these key routes, whilst providing a better balance to the way that space on the road is allocated.
    Our proposals would require changes to the way general traffic moves through the area, including new left or right turn traffic restrictions on some roads at each end of the bridge.

    What are we proposing?
    We propose to convert both the northern and the southern roundabouts of Lambeth Bridge into crossroad junctions, with traffic signals and signalised pedestrian crossings. At each junction, dedicated space would be given for cyclists and new pedestrian areas would be created.
    To support these transformational plans, changes to the road layout are also proposed on Lambeth Bridge itself, at the Millbank north junction with Great Peter Street and along Lambeth Palace Road. These layout changes include two general traffic lanes at each exit from the bridge, the introduction of a signalised pedestrian crossing at the Millbank north junction with Great Peter Street, and the extension of the southbound bus lane on Lambeth Palace Road.
    We have also developed public realm improvements, sensitive to the heritage of the area. These designs propose to further enhance the look and feel of the area so that we can promote a real sense of place to Lambeth Bridge and its surrounds.
    The Metropolitan Police Service has installed barriers to increase security on London’s busiest bridges. Our proposals will aim to ensure that the security of all road users is maintained in the future.

    We are also seeking views on:
    Longer-term plans for the pedestrian underpass at Albert Embankment
    A potential new location for the palm tree at Lambeth Bridge north
    The current traffic speed at Lambeth Bridge north and south

    Why are we proposing it?

    Safety
    Our proposals are designed to improve safety at both northern and southern roundabouts by introducing dedicated facilities for vulnerable road users, such as signalised pedestrian crossings, new cycle lanes and separate cycle signals. The northern roundabout in particular has a high proportion of collisions involving cyclists, and is one of 33 locations across London we are prioritising as part of our Safer Junctions programme.

    Healthy Streets to encourage walking and cycling
    The proposals form part of the Mayor of London’s long-term vision to encourage more Londoners to walk and cycle by making London’s streets healthier, safer and more welcoming. Both roundabouts and Lambeth Bridge are currently dominated by motor traffic and can be intimidating and unpleasant places to walk and cycle. By giving cyclists space and time to pass through the junction more easily, and by providing new signalised crossings and clearer footways for pedestrians, we can encourage more people to use these healthy and sustainable forms of transport, whilst keeping other traffic moving.

    Building a local cycle network
    Lambeth Bridge and its roundabouts lie on busy cycle commuter routes. Making the area safer and more welcoming for cyclists would help build connections to existing infrastructure, such as Cycle Superhighway Route 8 on Millbank, and planned improvements, such as Westminster Bridge and Central London Grid routes. The following map shows how our proposals would build on cycling connectivity in the area.

    The impacts of our proposals

    Journey times
    Our proposals have been designed to not have a disproportionate impact on other road users. However we expect there would be changes, both positive and negative, to journey times for motorists, bus passengers and cyclists.
    More detailed information on the traffic impacts of the Lambeth Bridge proposals, including tables of the likely journey time impacts, can be found here https://consultations.tfl.gov.uk/roads/lambeth-bridge/user_uploads/traffic-impacts-and-data-table.pdf
    Should these proposals go ahead, we would take a number of steps to ensure that the changes made along the route are balanced. We are investing in advanced traffic signal technology to allow us to better manage traffic depending on differing conditions at any given time.

    Turning restrictions
    Our proposals include a number of restrictions to turning movements:

    ‘Straight-ahead only’ for traffic exiting Millbank north
    A time-of-day banned right-turn from Millbank south onto Lambeth Bridge during the evening peak
    A banned left-turn for northbound traffic from Millbank south into Horseferry Road
    ‘Straight-ahead only’ for traffic exiting Horseferry Road
    A banned left-turn from Lambeth Palace Road onto Lambeth Road.
    A banned right-turn from Lambeth Road onto Lambeth Palace Road.
    We do not develop proposals to introduce traffic restrictions without carefully considering the potential impacts and exploring alternative solutions. The restrictions are proposed either to address a safety issue or to help the signalised junction operate more efficiently, minimising potential journey time delays to road users.

    The environment

    Air and noise
    Although the designs for Lambeth Bridge north and south are not expected to increase the number of motor vehicles in the area, our proposals may change how traffic moves around some roads, which may result in some associated and localised changes to air quality and noise levels. Environmental surveys and modelling would take place as part of our ongoing evaluation of these proposals.

    Tree removal
    Our proposals require the removal or relocation of a number of trees in order to accommodate the new road layout:
    The iconic phoenix palm tree at the centre of the roundabout on the northern side of Lambeth Bridge would look to be relocated
    Seven trees at the centre of the roundabout on the southern side of Lambeth Bridge would need to be removed
    One tree at the junction of Millbank and Great Peter Street would need to be removed
    New trees will be planted at Lambeth Bridge north and south as part of proposed urban realm improvements. Subject to the outcome of consultation, tree species would be determined during detailed design.

    Visual environment
    Our proposed urban realm improvements aim to improve the look and feel of the area, as shown in our artists’ impressions.

    Features include:
    Reducing the dominance of traffic, allowing pedestrians and cyclists to better enjoy the area
    Increasing the surface area of the public realm by approximately 1,370 square metres at Lambeth Bridge north and approximately 1,790 square metres at Lambeth Bridge south
    Attracting more visitors to the area and local attractions such as Victoria Tower Gardens
    Planting new trees bringing overall benefits for the area’s biodiversity and landscape
    Providing new seating
    New footway materials to improve the look of the streets along Albert Embankment, Lambeth Palace Road, Millbank and Lambeth Bridge
    The removal of unnecessary and duplicate poles, signs and other street furniture
    Upgrades where necessary to existing lighting and drainage
    Provision of more cycle parking
    An opportunity to provide additional Cycle Hire stations
    Upgraded wayfinding for example to Newport Street Gallery
    Equalities
    In considering the design of our streets, we closely consider the needs of all users throughout the design process. On significant infrastructure projects, we:

    Complete Equality Impact Assessments (EqIA), to review potential impacts on equality target groups, including disabled people
    Carry out public consultations, including targeted engagement with specific users such as (amongst many others): Royal National Institute of Blind People, Guide Dogs for the Blind, Age Concern, Transport for All, and the National Autistic Society
    Ensure we comply with established guidance – such as the Design Manual for Roads and Bridges – which includes detailed requirements for disabled people
    The EqIA for Lambeth Bridge north and south will continue to be developed following the outcome of this public consultation, incorporating feedback received.

    Other options considered but not taken forward
    We considered a number of alternative designs before taking forward our current proposals.
    At Lambeth Bridge south, we considered retaining the roundabout, but this provided minimal benefits for cyclists. We also considered ‘hold the left’ turn facilities on Lambeth Road and Lambeth Bridge, which separate cyclists from other traffic with separate traffic signals. However this scenario would have caused significant traffic queueing due to the extra signal phase required and was difficult to accommodate due to the structure of the bridge.
    We also considered a number of designs at Lambeth Bridge north including a signalised junction and a ‘Dutch style’ roundabout with a physically separated cycle track around the edge of the roundabout. However, our modelling indicated that this would have had significant impact on journey times for other road users in the area, including thousands of bus passengers.
    Having considered a number of designs, we believe the current proposals would achieve the best balance for all road users.

    Related schemes
    Lambeth north interim scheme
    During March 2017, we delivered interim safety improvements at Lambeth Bridge northern roundabout.
    The changes were timed to bring improvements whilst we continued with plans to re-work the junction's layout for the long-term.

    Next steps
    Subject to the outcome of this consultation, should we proceed with these proposals, we would look to start construction in late 2018.
    Although construction would cause some disruption, we would take steps to minimise this as far as possible.
    Building in late 2018 would allow us to coordinate with major planned maintenance work on Lambeth Bridge, and with work currently taking place at Westminster Bridge South.

    Please sign in to vote.
  • Stirling Corner A1/A411 roundabout dangerous cycle route

    Created by JonC // 2 threads

    Stirling Corner is the roundabout where the A411 (Barnet Lane / Barnet Road linking Borehamwood to Barnet) crosses the A1 and it also provides access to a separate service road with various retail outlets. The A1 is a 50 mph, 6-lane dual carriageway and this is the last roundabout before the A1M.

    There is an at grade, circular pedestrian & cyclist route around the entire roundabout, which crosses each of the 5 arms via refuges in the middle of each. On the west side, the A1 cycle route uses part of this circular cycle route to cross two arms of the roundabout. Speed, volume and unpredictability of traffic makes using most parts of this circular cycle route extremely hazardous.

    It is a high volume roundabout with up to 4 lanes of traffic and traffic flow is partially controlled by traffic lights at 2 places on the roundabout and at 2 entry points (see diagram). There are no traffic lights on the west or north sides.

    At the two entry points controlled by lights (A1 northbound & A411 westbound) there is no ‘green man’ light to assist pedestrians or cyclists.

    The most dangerous crossing points are the two 3-lane exits from the roundabout serving the A1. A possible safer east-west route would be to take pedestrians/cyclists via the centre of the roundabout, making use of the existing traffic lights (and converting them to Toucan).

    Please sign in to vote.
  • Alperton Community School Road Safety Improvements Phase 2

    Created by Simon Munk // 1 thread

    What is this consultation about?
    In October 2016, the London Borough of Brent consulted local residents on Phase 1 of the Alperton Urban Realm Scheme. Following substantial completion of this phase we are now asking for your views on Phase 2 of the scheme.

    Why are we proposing changes?
    The London Borough of Brent is currently expanding Alperton Community School. To support this, a temporary zebra crossing and a 20mph speed limit were implemented in January 2017. The second phase of the Alperton Community School expansion is currently on-going and this will accommodate up to 1,740 students once it is completed in January 2018. As part of this expansion, the Council is now proposing an extended urban realm scheme on Ealing Road outside Alperton Station and Alperton Community School.
    The scheme is designed to create a Healthy Street by transforming the quality of the pedestrian environment along Ealing Road and providing an attractive, accessible and people-friendly street.
    This will in turn reduce vehicle speeds and encourage children to walk and cycle to school.

    What are the proposed improvements?
    The proposed scheme is shown graphically in the attached drawing and includes the following
    measures:
    - A wide parallel zebra/cycle crossing and long raised speed table (with 50mm kerb) to assist blind and partially sighted pedestrians) on Ealing Road between the Station forecourt and Mount Pleasant. This will provide a safe crossing point for the school students and give priority to pedestrians accessing the school and station
    - The existing bus stops will be relocated. The northbound stop will be relocated closer to Mount Pleasant and the southbound stop will be relocated south of the railway bridge.
    - The existing signalized crossing under the railway bridge will be removed and replaced with a new zebra crossing closer to the relocated southbound bus stop.
    - The kerb on the south side of the proposed parallel crossing will be built out from the railway bridge to no. 185 Ealing Road to reduce the pedestrian crossing distance and reduce vehicle speeds;
    - Introduction of a longer loading bay outside Alperton Children’s Centre, a new disabled/ loading bay outside no. 173 Ealing Road and a new loading bay outside the Atlip Centre ;
    - Introduction of new speed cushions to reduce vehicle speeds in the 20mph Zone;
    - Repaving of the footway, driveways and resurfacing of the carriageway for the extent of the scheme;
    - Extensive urban realm and landscaping and improvements including new seating, trees, planters and cycle stands.

    Please sign in to vote.
  • Consultation: Euston Station Area Planning Principles

    Created by George Coulouris // 1 thread

    Camden are consulting on the long-term future of the area around Euston station area:
    "Euston station is changing, with HS2 Ltd preparing for construction, and Network Rail, Crossrail 2 and Transport for London also thinking about how to design the station.
    We are preparing a plan for development in the Euston station and tracks area with the Greater London Authority and Transport for London, which will both inform, and be informed by, emerging designs for the stations at Euston."

    The perspective is long-term, but the timeline (http://www.eustonareaplan.info/timeline/) calls for the finalisation of a Planning Brief by Spring 2018. This initial consultation is on the design principles. It will inform a detailed brief that will be the subject of further consultation in early 2018 and finalised in summer 2018.

    We (Camden Cycling Campaign) intend to submit a response to this initial consultation. Please take a look at the Key Principles - Euston Station Area Planning Brief 220517.pdf document and make your suggestions for ensuring that the area will become a much better cycling environment.

    Please sign in to vote.
  • Barnet Air Quality Action Plan 2017-2021

    Created by JonC // 1 thread

    Barnet Council say:

    Overview

    ...So that we can continue to improve air quality across the borough we have produced a new draft Air Quality Action Plan 2017- 2022 (AQAP) which is also part of the council’s duty to contribute to London Local Air Quality Management.

    This new plan builds on our previous plan and outlines the steps the council will take from 2017 to 2022 to improve air quality across the borough. The plan gives details on how the council will:

    - continue to meet its statutory obligations for managing air quality;
    - work across many council services and with partners to minimise emissions from transport, existing buildings, and new developments, including Brent Cross and other regeneration projects within the borough;
    - continue to raise awareness of air quality issues to the public and encourage residents to do their bit to reduce levels of pollution and raise awareness of the importance to reduce their exposure to poor air quality; and
    - work in partnership with others to press for more action to be taken at all levels of government.

    We are now consulting with residents on the contents and the actions we have identified in our draft Air Quality Action Plan 2017 - 2022. To find out more about our proposals please take the time to read the full Air Quality Action Plan 2017 - 2021 here.

    Why We Are Consulting

    Our draft Air Quality Action Plan will ensure we can continue to monitor how we are doing and sets out clear targets on what we want to achieve by 2022.

    Before we finalise the draft plan we want to give residents the opportunity to have their say to ensure the plan is appropriate for all our local communities.

    The consultation is open to everyone and asks your views on the overall document, its actions and how we can all support this work.

    Please sign in to vote.
  • Peckham Rye to Dulwich Quietway

    Created by Luce // 1 thread

    New QW in preconsultation phase - possible changes:

    * Raised table at jct/ of Friern and Goodrich Rd. ;
    * Sinusoidal humps completed all along Friern rd.;
    * 'Greening' of modal filters at Peckham Rye/ Friern & Upland/ Friern;
    * Potential for either a segregated bidirectional cycle lane from Etherow st. & across the junction of Barry rd. (helping cyclists to turn right down Woodwarde) or the signalisation of the junction of Etherow and Barry rd. (the former would require the relocation of the bus stand at the top of Barry rd.);
    * Tightening up of the jct. of Eynella and Woodewarde rd. (build out);
    * Build out of of western corner of Beauval rd./ Woodwarde rd. - potential for pocket park;
    * (Dependent on TFL modelling) removal of traffic islands on jct. of Lordship ln. and Barry rd./ Eyenella - de-cluttering of jct. - question of what turns are allowed and needed & the regulation of these.

    Please sign in to vote.
  • Chalk Farm Goods Yard Planning Framework

    Created by John Chamberlain // 1 thread

    From Camden Council's website:

    "Significant redevelopment may take place in the Camden Goods Yard area in the coming years. If this occurs, the London Borough of Camden wants to ensure a strategic and coordinated approach is taken to deliver the best outcomes for our communities. This framework sets out the Council’s vision and key objectives for this part of the borough."

    Please sign in to vote.
  • Star & Garter Hill junction

    Created by Simon Munk // 1 thread

    Richmond Council says:

    "As part of the development works which have been undertaken in the area, the Council has secured funding to improve the footway and carriageway in the immediate vicinity of Star & Garter Hill / Richmond Gate. The improvements works are planned to take place in July and will include: resurfacing the footway and carriageway, upgrading the existing traffic islands / refuges, implementing a new footway that joins up to Richmond Park, and general improvements to the signage and street furniture. As part of this works, there will also be the introduction of a drop off / collection bay outside the Royal Star & Garter development."

    No apparent cycling improvements.

    Please sign in to vote.
  • Hatton Garden Conservation Area Appraisal and Management Plan

    Created by Jean Dollimore // 1 thread

    This Hatton Garden Conservation Area Appraisal and Management Strategy contains a fascinating study of the buildings and streetscapes in the Hatton Garden area.

    It contains a brief section on "Movement" in Sections 5.29-5.32 on page 58 and a figure on page 59. Deals with motor vehicles, pedestrians and buses but it forgets cycles.

    "Opportunities for enhancement". P 81 briefly outlines "Traffic and movement: strengths, weaknesses and opportunities."
    This should recognise the potential contribution of cycling

    New and improved cycle routes are shown on a map on page 83 (reproduced in this issue's image).They recognise the following:
    - Theobalds- Clerkenwell Road alignment
    - Rosebery Avenue
    - Hatton Garden

    Also should include at least:
    -The CS6 alignments (being built this year)
    - Grays Inn Road as a GRID link
    - permeability links e.g. through Back Hill/Eyre Street Hill to Hatton Garden and via Laystall Street

    Please sign in to vote.
  • Have your say on the transformation of Oxford Street

    Created by Simon Munk // 1 thread

    Westminster Council/TfL/London Assembly Overview:

    "Oxford Street is one of the best known shopping destinations in the world. Around half a million people visit or work in the street and surrounding area every day and thousands of people and families live close by.

    Oxford Street is already very busy and growth in London’s population and economy will bring even more people to the area.

    There are lots of issues. Pedestrian spaces can get crowded. We recognise there is a road safety problem and air quality in the area is poor. Significant congestion delays passengers using buses and taxis.

    Unless we take action now, these issues will worsen as London continues to grow, threatening the success of Oxford Street and the surrounding district.

    The introduction of the Elizabeth line in late 2018 provides a once in a generation opportunity to tackle these challenges and make the district into the world’s best outdoor shopping experience and an unrivalled place to live, work and visit.

    Transport for London (TfL), Westminster City Council and the Mayor of London are working closely together to transform Oxford Street and the surrounding streets.

    We want to create a better environment, address poor air quality, support its cultural heartland and thriving business district and deliver improved neighbourhoods.

    We want to know your thoughts before we make any decisions. We would like to hear from everyone who visits, works or lives in the area so please get involved in this important consultation."
    Cllr Robert Davis MBE DL, Westminster City Council, Deputy Leader and Cabinet Member for Business, Culture and Heritage
    Valerie Shawcross CBE, Deputy Mayor for Transport
    Mike Brown MVO, Commissioner, Transport for London

    Please sign in to vote.
  • TfL Proposals for Shoreditch High Street between Hackney Road and New Inn Yard

    Natalie G // 1 thread

    Junction of Shoreditch High Street with Rivington Street and Calvert Avenue:

    The following measures would make it safer and more comfortable for cyclists to travel east-west through this staggered junction across Shoreditch High Street:

    We would introduce a right-turn ban for all traffic except cycles exiting Rivington Street into Shoreditch High Street. This would improve safety for cyclists waiting to turn into Rivington Street and pedestrians using the nearby pedestrian crossing. Our latest traffic counts show a maximum of 33 vehicles per hour making this right turn, and we are satisfied alternative routes exist
    We would remove a southbound general traffic lane on Shoreditch High Street to accommodate two new right-turn pockets and three new traffic islands. The traffic islands would protect road users waiting to turn right into either Rivington Street (cycles only) or Calvert Avenue (all traffic)
    We would reduce the size of the footway by a small amount on the northern corner of Shoreditch High Street and Calvert Avenue to accommodate the turning movements of larger vehicles once the new traffic islands are in place
    Junction of Shoreditch High Street and Hackney Road:

    We would enlarge the traffic island to the west of the southbound slip road, reducing the carriageway width and the number of southbound lanes from two to one. This would create more footway space for pedestrians and reduce the distance people have to cross. Making this section of road a single lane for motor traffic would also create space for an advisory southbound cycle lane and reduce the likelihood of conflict between cyclists and motor traffic
    Shoreditch High Street:

    We would install a new southbound bus lane (operational Monday to Saturday, 7am to 7pm) in place of a general traffic lane from south of Rivington Street to the pedestrian crossing opposite New Inn Yard. This bus lane would also be available to cycles, taxis, motorcycles and coaches. The loading bay outside the Ace Hotel, and the existing bus stand and bus stops on Shoreditch High Street would not be affected by the bus lane

    Please sign in to vote.
  • Berkeley Square North Public Realm Improvement Scheme

    Created by Dominic Fee // 1 thread

    Westminster Cycling Campaign has received an email from Westminster City Council inviting us as a stakeholder to comment on the Berkeley Square North Public Realm Improvement Scheme proposals.

    We believe that this is a consultation for stakeholders and not the wider public. Nevertheless we are putting this online on Cyclescape and inviting people to give input to Westminster Cycling Campaign / London Cycling Campaign's response, because Grosvenor has been publicising its 20 Year Vision for the area (http://www.grosvenorlondon.com/getattachment/Contact/about/public-realm/Projects/berkeley-square/150710_BSQ-Consultation-Boards_LR.pdf), including an article in the Evening Standard (http://www.standard.co.uk/news/london/inhospitable-berkeley-square-roads-to-be-reclaimed-for-cyclists-and-pedestrians-in-4m-scheme-a3508771.html), and because of this publicity we've received quite a lot of correspondence about Berkeley Square.

    I think it's important that we distinguish between comments on Grosvenor's 20 Year Vision (for which I note the PDF is dated July 2015) and comments on this much more detailed Berkeley Square North Public Realm Improvement Scheme (for which I note the drawings are dated March 2017 and we emailed on 3 April 2017).

    Please sign in to vote.
  • Kingsbury Road Proposed Public Realm Improvements Scheme

    Created by Simon Munk // 1 thread

    Brent council says:

    We are proposing to introduce a Public Realm Improvements Scheme in Kingsbury Town Centre between Kingsbury roundabout and Valley Drive as shown on the enclosed plan. The proposed scheme will include: A new 20 mph Zone, footway renewal, new Cycle lane, new parking and loading arrangements, new crossing facilities and new street furniture including trees, seats, benches and Cycle stands.

    Please sign in to vote.
  • Charlton Riverside Formal Consultation

    Created by Simon Munk // 1 thread

    Greenwich Council says:
    We want to know your initial views on the draft master plan for Charlton Riverside. Please read the public consultation document and associated documents attached to this listing.
    Description:
    The Council is preparing a new planning policy document. This document will support the existing Core Strategy policies and provide additional detail on the future of Charlton Riverside.
    Royal Greenwich is committed to the regeneration of Charlton Riverside and the creation of a new, sustainable neighbourhood providing both jobs and homes in a balanced way.

    This materplan includes Woolwich Road and a potential parallel new road.

    Please sign in to vote.
  • Draft Golders Green Station Planning Brief

    Created by Simon Munk // 1 thread

    Barnet council says:

    Overview

    The council is consulting on the draft Golders Green Station Planning Brief which will help to shape any future development of Golders Green Bus Station and Underground Station, together with the adjoining depot, sidings and immediately surrounding public highways.

    We consider the site of Golders Green Station as an opportunity to provide a high quality mixed use development that sensitively integrates an improved public transport interchange within the distinctive historic environment of Golders Green.

    The Draft Planning Brief has been produced to ensure that any future development improves transport connectivity and land use integration, respects and enhances Golders Green, creates high quality public realm and supports the success and vibrancy of the town centre.

    The Draft Golders Green Station Planning Brief;

    Identifies development opportunities and constraints;
    Provides guidance;
    Sets out key planning policy considerations to establish a clear set of development parameters; and
    Outlines the council’s preferred approach to any future development.

    Why We Are Consulting

    We are consulting on the draft plans to redevelop the site and we want to hear the views of local people on the proposed developments. It is important that residents and other interested parties have their say in planning policy.

    Planning Briefs form a material consideration in the consideration of planning applications.

    The closing date for us to receive comments and feedback is Thursday 11 May 2017.

    The results will then be reported to the Council’s Policy and Resources Committee so that they can be taken into account when the final version of the Planning Brief is being considered for adoption.

    Please sign in to vote.

532 threads found for 'consultation':

No planning applications found for 'consultation'.

Back to top