Issues

This section lists issues - problems on the street network and related matters.

Issues always relate to some geographical location, whether very local or perhaps city-wide.

You can create a new issue using the button on the right.

Listed issues, most recent first:

  • Wintr Fair bins on cycle path

    Created by Amelie K // 0 threads

    Extra blue and black bins have been put along Gonville Place, near where the cyclist counter used to be. They narrow the cycle lane in real, and effectively. Their location generally is poorly thought through (if at all). They are clearly intended for visitors to the winter fun fair on Prkers Piece, who will be on foot, but to use the bins they need to cross the cycle lane.

    Please sign in to vote.
  • Barnet LIP

    Created by Simon Still // 2 threads

    The third Mayor’s Transport Strategy (MTS) was published in March 2018 and sets out a new strategic direction for transport in London. It aims to change the way people choose to travel with an overarching vision for 80% of all trips in London to be made on foot, cycle or using public transport by 2041.

    Each London Borough has to prepare a Local Implementation Plan (LIP) containing proposals for the implementation of the MTS in its area.

    Barnet’s draft LIP includes Barnet’s transport objectives and identifies key local issues, challenges and opportunities to achieving the overarching mode share aim and nine MTS outcomes. It includes a delivery plan that sets out, in broad terms, the proposals and resources that will deliver the LIP objectives and targets associated with indicators related to the MTS outcomes.

    A number of statutory consultees will be specifically invited to comment on the draft LIP, but we want everyone who lives in or visits the borough to have an opportunity to comment too.

    Give us your views

    A copy of the draft LIP is provided here. We would particularly like your views on:

    have the main challenges and opportunities to delivering the MTS vision and outcomes been identified (pages 24-60);
    are the borough transport objectives identified in the document (pages 26-29) suitable for addressing the challenges;
    should the LIP include other major proposals or general areas of work (pages 62-74 & 80-81);
    should any other targets be identified (pages 103-110)
    Please provide your comments by email to traffic.consultations@barnet.gov.uk(External link) including LIP3 in the title

    ,or by post FAO Jane Shipman, Re, Floor 11, Barnet House, 1255 High Road, London, N20 0EJ.

    Please sign in to vote.
  • Bexley LIP3

    Created by Simon Still // 1 thread

    This Consultation Draft Third Local Implementation Plan (Draft LIP) for Bexley sets out the proposed strategies that will form the basis for improvements to the local transport system until 2041, and how the Council will work towards achieving the Mayor’s Transport Strategy goals of:

    Healthy Streets and healthy people
    A good public transport experience
    New homes and jobs.
    The Draft LIP also includes transport-related objectives, a three-year Delivery Plan and Programme of Investment covering 2019/20 to 2021/22, and monitoring arrangements.

    The Council is undertaking a consultation exercise to seek the views of the public, local businesses and other interested parties and responses will be taken into account when drafting the final LIP document to be submitted to TfL early in 2019.

    A copy of the Draft LIP can be viewed or downloaded - Consultation Draft Third Local Implementation Plan (PDF, 8.7MB)

    Views or comments should be sent to the Transportation Planning team by emailing transportation.planning@bexley.gov.uk

    Please sign in to vote.
  • Brent LIP

    Created by Simon Still // 1 thread

    Statutory and public consultation on their draft documents is a requirement for Boroughs preparing their Local Implementation Plans. The draft London Borough of Brent Local Implementation Transport Plan (LIP3) sets out how the Borough Council proposes to implement the Mayor of London’s Transport Strategy at a local level in Brent. The plan uses the Borough’s Long Term Transport Strategy objectives and sets out how the future of transport for Brent will be provided up to 2041. It proposes a three-year programme of investment for the period 2019/20 - 2021/22. Under the Mayor’s Transport Strategy a further three year programme will be consulted on in the future. The full draft plan is available in the document section below. We would welcome your views on the draft LIP3 using this online questionnaire.

    Please sign in to vote.
  • Surface of Hospital Fields Road

    Kate Ravilious // 1 thread

    The surface of Hospital Field road in the westbound direction is becoming very poor in the area where cycles travel. This is of particular concern as the worst bit is the edge of what appears to be the resurfaced conduit which is exactly where you want to cycle. This means cyclists are moving out into the road to avoid the poor surface (dangerously so in places) potentially into the path of east bound vehicles who are avoiding parked cars on the north side.

    Please sign in to vote.
  • Ouse Bridge turning onto North Street nightmare

    Kate Ravilious // 1 thread

    Coming over Ouse Bridge and wanting to turn right onto North Street is very difficult and disconcerting for cyclists. You end up stranded in the middle of the road, with busy traffic passing on both sides, whilst waiting for a gap in the traffic in order to go right. It would be massively safer if some cycle priority lights could be added to enable cyclists to get across the junction before the traffic starts to move. These make a huge difference on the Skeldergate side of the junction.

    Please sign in to vote.
  • Orbital path access near Hospital

    Kate Ravilious // 1 thread

    Access to and from the orbital path (in both directions) on to Wiggington Road needs improving here. Lots of NHS staff and hospital visitors and patients use this route, and many more would if it were more accessible.

    Please sign in to vote.
  • Windmill Lane - dangerous junction

    Kate Ravilious // 1 thread

    Really dangerous junction for cyclists trying to get from Windmill Lane across Hull Road (or in reverse). Cars come into David Lloyd at speed, and don't expect to find cyclists or pedestrians crossing the road at this point.

    Please sign in to vote.
  • Hiscox Stonebow crossing needed

    Kate Ravilious // 1 thread

    Cycle/pedestrian crossing required at this point of Stonebow (near the Hiscox building). The cycle/pedestrian route running north-south is getting busier all the time, and it is difficult to cross Stonebow here.

    Please sign in to vote.
  • School Street for Arbury Primary School

    Created by Daniel Thomas // 1 thread

    Carlton Way gets a lot of through traffic during school run and both parent parking and commuter traffic create an unsafe environment for children going to Arbury Primary School or Pre-School.
    A School Street on the section of Carlton Way between Perse Way and Brimley Road and on Hall Farm Road between Carlton Way and Topham Way might be one way of substantially improving the situation.

    Please sign in to vote.
  • Merton Local Plan 2020 Consultation

    Merton Council are consulting on their new Local Plan 2020, which will be used as the basis for planning decisions in the future. Planning decisions are one of the ways in which cycling policies are put into practice, so it's really important that the Local Plan incorporates strong commitments to cycling and active transport.

    Merton Cycle Campaign will use the comments and discussion here to incorporate into our response to the Merton Consultation which closes 6 January; however to give us time to incorporate your comments please submit them here by noon on Sunday 30 December.

    Please sign in to vote.
  • City Changer Cargo Bike

    The county council cycling team are involved in a 3-year project funded by the EU’s Horizon 2020 Research Programme to grow delivery and passengers by bike, cargo bike and e-cargo bike in 100 cities. The project called 'City Changer Cargo Bike' was launched to an audience of EU institutions, national and regional governments, advocacy organisations and business leaders in October 2018.

    Please sign in to vote.
  • S/0101/18/CC Histon - New Primary School north of Garden Walk

    Created by Matthew // 1 thread

    Proposes new access onto Glebe Way cutting across shared-use pavement, interrupting it, putting give-way markings on the pavement and dropping the kerbs. Visibility splays are drawn to to the kerb instead of to the back of the pavement.

    Proposed pedestrian crossing further south will also place poles, obstructions and potential conflict into the narrow shared-use pavement.

    This is a real mess considering that they have plenty of space to widen the pavement and do it right.

    ...

    Erection of a 2FE (420 place) primary school and single storey 52 place pre-school nursery with associated vehicle and pedestrian access, car and cycle parking, vehicular drop off area with landscaping and playing fields, a pedestrian crossing, footpath widening and ancillary works.

    Please sign in to vote.
  • 18/1685/FUL 229 Milton Road - new dwelling in rear garden

    Created by Matthew // 1 thread

    Proposed cycle parking in garage does not meet diagram 15 requirements.

    Proposed: 5000mm by 2500mm
    Required: 7000mm by 3300mm

    ...

    Construction of 1No. 1 1/2 Storey Dwelling to land rear of No. 229 Milton Road, Cambridge

    229 Milton Road Cambridge CB4 1XQ

    https://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=PHD8DODXH8W00

    Cambridge

    Application reference : 18/1685/FUL

    Please sign in to vote.

This map shows all issues, whether points, routes, or areas:

Spinner Please wait…
Back to top