New cycle racks required in Redbourn
Local survey showed people want more bike racks in Redbourn
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by mike1727 // 0 threads
Local survey showed people want more bike racks in Redbourn
Footpath 32 is to be converted to be a bridleway. The footpath runs at the edge of a field parallel to the Wheathampstead road from the Hertswood Forest car park entrance to Nomansland. It will have a garpack surface for cycling/walking and a larger strip of grass for horse riding.
Funding comes largely from a Paths For Communities grant with other contributions from local sources.
Created by MB // 0 threads
Roehampton Lane is unsafe for cyclists with two or 3 lanes of fast, heavy traffic. Drivers jostle for position, change lanes, brake for the few meters of speed camera markings, undertake right turning vehicles & manoeuvre to accommodate or block (yes, block) buses. Cyclists present yet another hazard to motorists. It would be safer for both if cyclists were not on the road.
Many cyclists use the pavement here, despite the signs specifically indicating that it is not allowed & I don't blame them. The road is simply too unsafe and is an ideal candidate for a common sense approach to allowing cycling on the pavement or, in an ideal world, a segregated cycle path.
Created by mike1727 // 0 threads
St Peter's street roundabout is to be redesigned. STACC needs to engage to attempt to influence the design and ensure it is done properly.
Created by mike1727 // 1 thread
The King Harry lane end of the Causeway route is currently a no cycling area, making the route less effective and dangerous since many people will cycle this part of the route regardless.
Action is required by HCC/SADC to plan and install a bridge and change the route to allow the full length to be used.
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
The link is scheduled to be closed for water main installation for six weeks from 30 September.
Nearest alternative ways to cross the railway line are Sandpit Lane (busy road with splitter islands!) or bridge link to York Road (nice and quiet but steps to bridge)
The roadworks at the King William Junction seem to have been complete.
We should asses them and produce a report on what they are like to ride. It would be useful to produce an on bike video whowing what they look like from a cyclists' point of view in traffic, especially contrasting the Marshalswick lane experience with the Sadridge road experience.
There are ASLs on the Sandridge Road arms with feeder lanes but nothing on the Marshalswick Lane arms.
Created by WilliamNB // 1 thread
Charles Cross roundabout is dangerous to cyclists. When approaching from Royal Parade side, intending to continue east along Exeter Street, there are 3 lanes, of which the left-most is a left-turn-only bus lane.
Cyclists typically go into the middle lane when approaching the roundabout.
On the roundabout itself. there are 3 lanes heading uphill, 1 of which is the bus lane. Cyclists typically tend to take the middle lane and follow it around.
The trouble is, many vehicles in the right-hand lane on the roundabout leave the roundabout from that lane, to go straight up Charles Street, often cutting cyclists up in the process.
Vehicles coming down Charles Street often don't yield to cyclists on the roundabout, and the same happens with vehicles joining from Hampton/Ebrington Street. Those vehicles often try to cut across two lanes to get to the innermost lane of the roundabout.
There is a cycle lane along the southern edge of the roundabout, though that really is only of use for cyclists riding west along Exeter Street, towards Royal Parade. Cyclists wishing to exit the roundabout at either Charles Street or Hampton/Ebrington Street must leave the cycle lane.
Vehicles entering or leaving the parking in front of Staples often do not yield to cyclists.
Crossing Charles Cross from Exeter Street, while riding in a westerly direction has the benefit of using the bus lane, which allows cyclists to set off without having to compete with other traffic for road space.
Created by Adrian Taylor // 0 threads
Fulbourn School's travel policy leaflet this year suggests that kids should cycle to school along Pierce Lane. This is also what is suggested in the documentation for the Ida Darwin planning application.
I don't particularly fancy taking my kids to school along such a busy road each day.
Wouldn't it be more sensible to recommend a nearly traffic-free route through the village making use of the path connecting Dunmowe Way and Swifts Corner. This connects straight into the school, and using Caraway Road and Cherry Orchard is low-traffic almost all the way to the new Ida Darwin redevelopment.
No changes are required; the route is already good enough. However, removal of the bollards between Cherry Orchard and Caraway Road would allow cycle trailers through, and a few more dropped kerbs would help here and there.
Created by Andrew Woodward // 2 threads
Ham Gate Avenue: As you cycle past parked vehicles which narrow the road by almost half you are trapped in a long tunnel. Impatient motorists who want to enter from the other end do so and simply drive at you forcing you practically into the gutter or off the road completely. Would it be ever possible to ban parking on this avenue and limit the speed to 20mph as it is in the park?
Note - there is a shared use segregated track alongside the road here (part of NCN 4) but it is frequently too narrow to cope with the volumes of cyclists and pedestrians; it is overhung with low tree branches and the surface is poor.
Created by Andrew Woodward // 1 thread
Dear RCC - I have written because of a junction which is a frequent danger spot to cycle through. It is the junction where Dukes Avenue and Tudor Drive intersect with the A307 Upper Ham Road and Richmond Road.
1. The painted arrows in the middle of the junction suggest that turning traffic should pass on each other's left. This creates a serious blind spot for oncoming traffic and for the cyclist turning. Traffic code 181 suggests vehicles can pass either way but highlight that left to left is the more dangerous for this reason. 90% of the time motorists pass according to how the arrows are painted leaving a cyclist who is turning blind to oncoming traffic. The 10% of the time when a vehicle decides to turn right to right this puts them head on with a vehicle who may have decided to pass left to left. Very dangerous for a cyclist in either situation, there does't seem to be a safe way to tackle this junction as what ever you do.
https://www.gov.uk/using-the-road-159-to-203/road-junctions-170-to-183
2. Recently I was waiting to turn right on this junction (left to left position) when a motorist behind me undertook me to place himself to my left blocking oncoming traffic to pass on my left and therefor forcing them to drive at me and pass on my right. Simply because he didn't want to wait behind me until the coast was clear that I could turn.
3. Needless to say the ASL's at this junction are almost completely ignored.
I hate cycling past and turning at this junction. Is there any way it can be improved to become safer for cyclists? A short head start (green light for cyclists) would be ideal but I doubt this will ever happen.
Google Streetview shows the problem nicely: http://goo.gl/maps/8gdo2
Created by t1mmyb // 0 threads
Cycling south from Victoria Bridge Road to Brougham Hayes either involves a multi-stage walk across the pedestrian crossings at the junction, or, more riskily, cycling across the junction between traffic light phases on the other arms of the junction.
The exit from Victoria Bridge Road could have its own traffic light phase instead.
Created by Phil Lee // 1 thread
Are members aware that this bill would prevent us from virtually any activity at all during the 12 months before each and every election in the UK?
Details can be found at various sources online, but there is a summary on Youtube at http://www.youtube.com/watch?v=rDtFoPWBoLc
If this bill isn't defeated (or amended beyond all recognition) it will effectively stop us - and any similar group - from functioning at all.
Martin Lucas-Smith // 1 thread
The County Council are proposing to move to a model where both the car parking and the bus element of park and ride are charged for. Effectively this is presumably aimed at stopping park and cycle, which seems counter-productive in transport strategy terms.
Martin Lucas-Smith // 4 threads
The cycle lanes here are a mish-mash of narrow legacy infrastructure, and are often awkward to use.
Created by David Earl // 5 threads
Greater Anglia has just issued a consultation on cycles at stations and on trains
Created by Al Storer // 4 threads
A citywide (and indeed beyond) problem is poor consideration given to the needs of cyclists and pedestrians during road works- eg "cylist dismount" sign use
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
Created by aSemy // 0 threads
https://www.citizenspace.com/bristol/city-development/baldwin-street-cycle-safety-fund-scheme
Overview
The purpose of this scheme is to address the large number of crashes involving cycles on Baldwin St, at the junction with Queen Charlotte Street.
We propose extending the existing cycle track at Welsh Back and take it across the junction via a humped crossing. We have introduced a ‘floating bus stop’ to separate buses and cyclists. There will be a formal crossing point for pedestrians to access the stop from the footway.
A small number of parking places would be removed but loading, bus and taxi facilities are retained, although altered.
Created by Shaun McDonald // 0 threads
The legal pavement cycling is suddenly not allowed 3 car lengths before a cycle shop near this junction which has toucan crossings and cycle paths on all other sides of it. Why can't it be continued to the bike shop for a safe cycle route to/from the junction away from traffic?
Created by Shaun McDonald // 0 threads
The cycle cut through between Appold St and Worship St is often blocked by pedestrians or Taxis dropping off passengers. It's also too narrow, thus can only be used one way, and isn't suitable for higher levels of two way cycling.
Created by Jean Dollimore // 5 threads
Camden Council proposes major improvements to Cobden junction – the junction of Camden High Street with Crowndale Road and Hampstead Road at its southern end.
They propose the following measures:
- eliminate the unnecessary northbound road on the east side of the island
- gain extra footway space on the east side of the road (uses to include cycle parking, trees, seating)
- widen the footway outside Mornington Crescent Station
- safer, quicker and simpler pedestrian crossings
- improved link for cyclists to the Mornington Crescent quiet route (from Arlington Road).
- new ASL boxes with lead-in lanes on the approach to the junction from Eversholt Street, Crowndale Road and Hampstead Road.
- re-site the statue of Richard Cobden and the war memorial
Proposal for contraflow cycling on Crowndale Road:
A few months ago, we were shown designs for a contraflow on Crowndale Road between Hampstead Road and Bayham Street with some junction changes at the latter to accommodate it. Unfortunately, this was rejected by TfL on the grounds that it would delay buses. This consultation notes that the layout has been designed to accommodate the contraflow at a future date.
This consultation also says that in addition, alternative options for providing a west to east link are being explored at both Delancey Street / Pratt Street and Oakley Square. We need to encourage Camden to pursue these essential links. In the case of the latter, there is an urgent need to allow cyclists to make right turn right into Hampstead road from the southern end of Mornington Crescent.
See consultation on Camden Council website:
https://consultations.wearecamden.org/culture-environment/cobdenjunction
Created by Aidan Van de Weyer // 0 threads
The Hills Road / Regent Street axis of the Catholic Church junction was resurfaced overnight (28-29 August) as part of the junction upgrade.
Many of the damaged iron works (manhole covers, etc) have not been changed. Some are in a bad state and quite dangerous because they have worn smooth, sunk or tilted.
I have contacted the Traffic Signals team at CCC, as they seem to be responsible for the works, and they should be getting back to me.
If anyone else fancies having a go at finding out what is going on and whether anything can now be done, it would be very welcome.
Created by George Coulouris // 1 thread
For discussions on the design of the new website, following the CCC Committee decision to initiate the construction of a new CCC website.
A working party has been set up, consisting initially of George, Jean, Ben and Geoff.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Shaun McDonald // 1 thread
Comment from Cycle Ipswich meeting 10-2014:
"Need dedicated cycle tracks for cycle traffic from new NW Ipswich development".
Anon // 1 thread
Our Healthy Streets: Dulwich
Recent projects and engagement with residents in the Dulwich area have shown a common theme that there is too much traffic in the area, and this is having an adverse effect on local life.
We want to work with residents to address these concerns about traffic volume and its impact on the community.
Phase 1 of 429 April to 7 June
In this first phase we want to hear from you about the issues in this area. We are completely open to your ideas, later phases will look in more detail at possible solutions.
Get involved
Created by Thomas Lancaster // 0 threads
Coming off the Scholars Greenway out of Farnham Park, cyclists currently have to detour along Park Row and the heavily trafficked Castle Street and The Borough to get to The Woolmead, East Street development and South Street to the Station. Bear Lane is wide enough to accept a contraflow to The Woolmead. The Woolmead is currently one way but designated for 2-way traffic as part of the East Street (Brightwells) development.
Created by MikeF // 0 threads
When cycling along western park road towards mutley. On sections that have speed bumps without the traffic islands/bollards, car/taxi drivers dangerously position their cars (across both lanes) at speed to avoid the speed bumps. Friday & Saturday nights is the worst time with the taxi's.
Created by Stefano B // 1 thread
New TFL survey on the proposed Wembley to Willesden Junction CS.
Have your say - Healthy Streets improvements between Wembley and Willesden Junction
Transport for London (TfL) and the London Borough of Brent are working together to develop Healthy Streets improvements between Wembley and Willesden Junction. These changes would make it easier and safer to walk, cycle, and use public transport in the area. Making the area safer, greener and reducing car travel. In this area, every year, people are seriously injured, some fatally. This cannot go on, and the Mayor has set a target to reduce the number of deaths and serious injuries on London’s roads to zero by 2041. Toxic air quality and high levels of physical inactivity are also contributing to premature deaths and poor health, especially in children. Together we want to improve this, particularly around schools. We know to achieve this some compromises will have to be made especially how much we use cars to travel. We want to create a better environment for everyone who wants to travel to and around the borough. So we are inviting local people to tell us how they currently travel around the area and what changes they would like us to make that would help and encourage more people to choose active travel options in the community.
Have your say - Your feedback at this early stage of planning will be used to help design future proposals which would be consulted on in late 2020/early 2021.
Please complete the following survey by 22 March 2020 to help us better understand how you travel and any travel issues or priorities in the areas of Wembley Central, Tokyngton, Stonebridge, Harlesden, and Kensal Green. Please email wembleywillesdenjct@tfl.gov.uk if you have any questions, comments or suggestions.
Created by Dawes Jaguar // 0 threads
There is scope here for creating a short cycle path to complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Sam Saunders // 0 threads
The south-west bound advisory cycle lane, marked with dotted lines and with a small traffic island to funnel cycles into it (creating a pinch-point) seems to be regularly used a car park. If the parking is being encouraged or allowed, the island and the markings should be removed to allow the hazard to be more clearly seen. Preferably, the parking should be disallowed and a mandatory cycle lane should be installed.
Created by Andrew Woodward // 0 threads
This is the approach to Kew Gardens station and is an area with many shops and cafe’s. Enabling this street to become 2-way for cycling will make access to the station and shops more convenient for cyclists and should therefore bring economic benefits to the area. Streetview: http://goo.gl/maps/P4spf
Created by Kevin Ablitt // 1 thread
Having grown up in this area I know it well. Bolton Lane and Christchurch Street could benefit from 20 mph, Cobbold Street and Withipoll Street would be more pedestrian and cyclist friendly if they had filtered permeability. Cobbold Street is extremely busy at school times as parents drop off or collect, make it closed half way to motors and this would cut out through traffic . Likely to be very contentious.
Created by Charlie Halliday // 1 thread
Proposed changes to Elles Road crossing creating a corral style refuge and improving sight lines by removing vegetation.
Proposed changes to centre of roundabout to create cycle paths.
Created by Heather Coleman // 1 thread
As described in the winter 2019 Camcycle magazine there is a group working on getting some improvements to the Trumpington busway. The magazine concentrates on the northern end of the busway but we are also seeking upgrades to the Addenbrookes spur junction and the crossing at Hobson Avenue/Lime Avenue as well as adding pedestrian footpath from the Hills Road Bridge all the way to Drury Avenue.
The group would like to start getting this out to users of the path for input, discussion and help with campaigning. Many Biomedical Campus commuters presumably use this path frequently, even daily. It would be great to get some input.
Created by Stephan Matthiesen // 1 thread
A large number of brick strips have been installed across the path in Magdalene Glen in early 2017.
While these do nothing at all to deter fast cyclists, they are a real pain for slow cyclists, people with arthritic hands (due to the vibrations and need to grip the handlebar very strongly).
It is not clear if there has been any consultation about these measures. Neither Spokes nor anybody on the CEC forum seems to have been aware of the plans.
Created by Dawes Jaguar // 1 thread
This path is supposed to be a shared use path, part of the Merritts Brook Greenway. Unfortunately it is the same width as a bicycle and completely unlit. It emerges at an informal crossing upon which cyclists are instructed to dismount. Cyclists are then expected to pedal along the pavement. It's completely useless and unnecessary, as there is a better route via Charfield Close.
Created by Simon Still // 1 thread
In response to resident requests to reduce vehicle speeds and to provide a continuous low-traffic cycling “Quietway” route between Shepherd’s Bush and Kensington High Street, the Council is proposing some changes on Russell Road and other local streets.
Possible changes and implications
On Russell Road, where our surveys confirm that traffic speeds are high, we propose removing the existing chicanes, as these do not work well. This will mean we can create a small amount of additional resident parking. Instead, to reduce traffic speeds, we propose seven sinusoidal humps along the length of Russell Road. They would be spaced in line with national guidance on the optimum spacing to encourage drivers to keep to a consistent speed, thereby minimising accelerating, braking and associated noise and emissions. Sinusoidal humps are designed so that, when driven over at lower speeds, they are noticeably more comfortable to drive over than traditional humps. We have recently introduced sinusoidal humps in St James’s Gardens and we also use them when we resurface roads that have traditional humps - for example, in Abbotsbury Road near Holland Park.
We also propose to remove the centre line to encourage drivers to slow down and take more care whilst driving. In addition, in response to reports of vehicles cutting the corner at the sharp turn onto Russell Gardens, we propose hatching markings, to encourage drivers to position themselves correctly when making the turn.
Other proposed measures
At Russell Road’s junction with Kensington High Street, a new pavement build-out on the west side and introduction of a raised table across Russell Road to slow turning traffic and provide a shorter crossing distance for pedestrians.
Removal of the island at the north end of Elsham Road to provide more space to exit from the cycling contra-flow lane.
Removal of the cycling feeder lane and introduction of an advanced stop line at the junction of Lower Addison Gardens with Holland Road to improve cycle safety.
Removal of approximately three metres of parking to improve entry into the existing segregated cycling facility on Addison Gardens bridge and to provide a safe waiting space for cyclists wishing to turn into Hansard Mews.
Permit contra-flow cycling through Hansard Mews, providing access to Shepherd’s Bush and Holland Park Avenue.
Alterations to the surface of the inclined section of Hansard Mews (approximately 30 metres) to reduce the slip hazard, especially in wet conditions, while minimising the change in appearance.
Introduction of wayfinding signs and road markings along Russell Road, Russell Gardens, Elsham Road, Lower Addison Gardens and Hansard Mews at points where a change of direction is required. We estimate there would need to be around 15-20 signs and symbols across the area.
Created by Chris Neston // 2 threads
This section of the A540 is Dual carriageway North of the Welsh Road (A550) towards Hoylake ( 60 mph) and single carriageway south of it towards Chester ( 50mph). It is used by hundreds of cyclists every week, yet is extremely dangerous to them and there have been numerous collisions and several cyclists have died along here. It provides a vital link between the lanes of Wirral and those of Chester and North Wales. It also houses the world famous Eureka cyclists cafe.
Ideally the whole of the A540 from Chester to Hoylake needs a cycle path, but to provide one over the relatively short section between Mudhouse Lane and Woodbank Lane would make an incredible difference for a small outlay. North of the A550 there is plenty of room alongside the existing road. South is more difficult but not insurmountable.
Created by Colin Wing // 2 threads
This is the proposed route of Quietway 16 in Westminster
Nominal deadline set to clear this from the Consultation Map.