SMALL SCHEMES, BIG CHANGES - BARNSTAPLE
Hazardous side road crossing Coney Avenue on Hollowtree Road, priority change required; turning drivers should give way to cyclists!
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by North Devon Cycling Forum // 0 threads
Hazardous side road crossing Coney Avenue on Hollowtree Road, priority change required; turning drivers should give way to cyclists!
Created by North Devon Cycling Forum // 0 threads
Button Toucan Crossing Hollowtree Road not working (Lidl side, button north side)
Created by North Devon Cycling Forum // 0 threads
The Square: signage required to guide cyclists into subway (for Town Centre, Braunton and Tarka Trail) and onto Square (for Sticklepath via Long Bridge and bike parking "The Square")
Created by North Devon Cycling Forum // 0 threads
Rock Park corner: arrow on cycle path to direct cyclists onto road before the New Road Roundabout. This to clarify cycling route FROM Town Centre TO Newport.
Created by North Devon Cycling Forum // 0 threads
Replacement of last yellow “No entry to the Square from 23rd May” sign on Glouster Rd by signs with just “No entry to the Square”.
This makes clear that traffic calming of the Taw Vale route in favour of sustainable transport is PERMANENT and not temporarily!
Created by North Devon Cycling Forum // 0 threads
Two-way traffic for cyclists on Barbican Terrace-Litchdon Street, allowing to cycle from the Strand to Summerland Street
Created by North Devon Cycling Forum // 0 threads
Open or remove barrier to make use of Richmond Street as connecting route easier
Created by North Devon Cycling Forum // 0 threads
Gate under Western Bypass was closed two years ago, only to annoy cyclists? Incovenenient and annoying; re-open gate please!
Created by North Devon Cycling Forum // 0 threads
Removal of annoying gate on ramp Western Bypass-Tarka Trail; where is the cattle which needs to be held back by this gate?
Created by North Devon Cycling Forum // 0 threads
Surface and lighting improvements route Rugby Ground Alley Way/Car Park
20 mph speed limit on Fair View Road/Pilton Quay between Abbey Road and Pilton Causeway (Yeo Dale Hotel)
Upgrade footpath on river bank to shared path (with new shared path signs), making the full connection between Abbey Road and Rolle Quay.
Created by North Devon Cycling Forum // 0 threads
This NCN sign on North Walk has been wrong aligned for several years! "Welcome to Barnstaple"; great impression for visitors on NCN3 and NCN27!
New high-profile bike parking at main entrance Civic Centre
New bike parking Boutport Street at Green Lanes shopping entrance
New bike parking Boutport Street near Post Office/Butchers Row (also to reduce illegal pavement parking!)
New bike parking Church alley way (next to co-op on High Street); info signs at this location already regularly informally used as stands
More capacity bike parking Cattle Market (end of Holland Walk)
Re-allocate benches and bike-park on pavement next to the Square and removal of first taxi rank space; all required to create a logical off-road route connecting Boutport St
Allow cyclists to cycle on pavement next to the Square FROM Boutport Street TO The Strand
Created by North Devon Cycling Forum // 0 threads
Allow cyclists to turn right from Boutport Street onto Boutport Street (in front of the Post Office) - arrow signage on tarmac?
Created by North Devon Cycling Forum // 0 threads
Allow cyclists to turn left from Butchers Row onto Boutport Street (current sign only allows taxis to do this!)
Created by North Devon Cycling Forum // 0 threads
Allow cyclists to use Cross Street/Butchers Row at all times to cycle FROM Strand TO Boutport Street (one way)
Created by North Devon Cycling Forum // 0 threads
Allow cyclists to use Joy Street/High Street at all times to cycle FROM Boutport Street TO Rolle Quay Roundabout (one way)
Created by North Devon Cycling Forum // 0 threads
Boutport Street: new signs to confirm cyclist's right to go both ways: Alexandra Rd-Post Office. Current signs have a mixture of "buses and taxis only" and only occasionally a mention about bicycles.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Shaun McDonald // 1 thread
Comment from Cycle Ipswich meeting 10-2014:
"Need dedicated cycle tracks for cycle traffic from new NW Ipswich development".
Anon // 1 thread
Our Healthy Streets: Dulwich
Recent projects and engagement with residents in the Dulwich area have shown a common theme that there is too much traffic in the area, and this is having an adverse effect on local life.
We want to work with residents to address these concerns about traffic volume and its impact on the community.
Phase 1 of 429 April to 7 June
In this first phase we want to hear from you about the issues in this area. We are completely open to your ideas, later phases will look in more detail at possible solutions.
Get involved
Created by Thomas Lancaster // 0 threads
Coming off the Scholars Greenway out of Farnham Park, cyclists currently have to detour along Park Row and the heavily trafficked Castle Street and The Borough to get to The Woolmead, East Street development and South Street to the Station. Bear Lane is wide enough to accept a contraflow to The Woolmead. The Woolmead is currently one way but designated for 2-way traffic as part of the East Street (Brightwells) development.
Created by MikeF // 0 threads
When cycling along western park road towards mutley. On sections that have speed bumps without the traffic islands/bollards, car/taxi drivers dangerously position their cars (across both lanes) at speed to avoid the speed bumps. Friday & Saturday nights is the worst time with the taxi's.
Created by Stefano B // 1 thread
New TFL survey on the proposed Wembley to Willesden Junction CS.
Have your say - Healthy Streets improvements between Wembley and Willesden Junction
Transport for London (TfL) and the London Borough of Brent are working together to develop Healthy Streets improvements between Wembley and Willesden Junction. These changes would make it easier and safer to walk, cycle, and use public transport in the area. Making the area safer, greener and reducing car travel. In this area, every year, people are seriously injured, some fatally. This cannot go on, and the Mayor has set a target to reduce the number of deaths and serious injuries on London’s roads to zero by 2041. Toxic air quality and high levels of physical inactivity are also contributing to premature deaths and poor health, especially in children. Together we want to improve this, particularly around schools. We know to achieve this some compromises will have to be made especially how much we use cars to travel. We want to create a better environment for everyone who wants to travel to and around the borough. So we are inviting local people to tell us how they currently travel around the area and what changes they would like us to make that would help and encourage more people to choose active travel options in the community.
Have your say - Your feedback at this early stage of planning will be used to help design future proposals which would be consulted on in late 2020/early 2021.
Please complete the following survey by 22 March 2020 to help us better understand how you travel and any travel issues or priorities in the areas of Wembley Central, Tokyngton, Stonebridge, Harlesden, and Kensal Green. Please email wembleywillesdenjct@tfl.gov.uk if you have any questions, comments or suggestions.
Created by Dawes Jaguar // 0 threads
There is scope here for creating a short cycle path to complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Sam Saunders // 0 threads
The south-west bound advisory cycle lane, marked with dotted lines and with a small traffic island to funnel cycles into it (creating a pinch-point) seems to be regularly used a car park. If the parking is being encouraged or allowed, the island and the markings should be removed to allow the hazard to be more clearly seen. Preferably, the parking should be disallowed and a mandatory cycle lane should be installed.
Created by Andrew Woodward // 0 threads
This is the approach to Kew Gardens station and is an area with many shops and cafe’s. Enabling this street to become 2-way for cycling will make access to the station and shops more convenient for cyclists and should therefore bring economic benefits to the area. Streetview: http://goo.gl/maps/P4spf
Created by Kevin Ablitt // 1 thread
Having grown up in this area I know it well. Bolton Lane and Christchurch Street could benefit from 20 mph, Cobbold Street and Withipoll Street would be more pedestrian and cyclist friendly if they had filtered permeability. Cobbold Street is extremely busy at school times as parents drop off or collect, make it closed half way to motors and this would cut out through traffic . Likely to be very contentious.
Created by Charlie Halliday // 1 thread
Proposed changes to Elles Road crossing creating a corral style refuge and improving sight lines by removing vegetation.
Proposed changes to centre of roundabout to create cycle paths.
Created by Heather Coleman // 1 thread
As described in the winter 2019 Camcycle magazine there is a group working on getting some improvements to the Trumpington busway. The magazine concentrates on the northern end of the busway but we are also seeking upgrades to the Addenbrookes spur junction and the crossing at Hobson Avenue/Lime Avenue as well as adding pedestrian footpath from the Hills Road Bridge all the way to Drury Avenue.
The group would like to start getting this out to users of the path for input, discussion and help with campaigning. Many Biomedical Campus commuters presumably use this path frequently, even daily. It would be great to get some input.
Created by Stephan Matthiesen // 1 thread
A large number of brick strips have been installed across the path in Magdalene Glen in early 2017.
While these do nothing at all to deter fast cyclists, they are a real pain for slow cyclists, people with arthritic hands (due to the vibrations and need to grip the handlebar very strongly).
It is not clear if there has been any consultation about these measures. Neither Spokes nor anybody on the CEC forum seems to have been aware of the plans.
Created by Dawes Jaguar // 1 thread
This path is supposed to be a shared use path, part of the Merritts Brook Greenway. Unfortunately it is the same width as a bicycle and completely unlit. It emerges at an informal crossing upon which cyclists are instructed to dismount. Cyclists are then expected to pedal along the pavement. It's completely useless and unnecessary, as there is a better route via Charfield Close.
Created by Simon Still // 1 thread
In response to resident requests to reduce vehicle speeds and to provide a continuous low-traffic cycling “Quietway” route between Shepherd’s Bush and Kensington High Street, the Council is proposing some changes on Russell Road and other local streets.
Possible changes and implications
On Russell Road, where our surveys confirm that traffic speeds are high, we propose removing the existing chicanes, as these do not work well. This will mean we can create a small amount of additional resident parking. Instead, to reduce traffic speeds, we propose seven sinusoidal humps along the length of Russell Road. They would be spaced in line with national guidance on the optimum spacing to encourage drivers to keep to a consistent speed, thereby minimising accelerating, braking and associated noise and emissions. Sinusoidal humps are designed so that, when driven over at lower speeds, they are noticeably more comfortable to drive over than traditional humps. We have recently introduced sinusoidal humps in St James’s Gardens and we also use them when we resurface roads that have traditional humps - for example, in Abbotsbury Road near Holland Park.
We also propose to remove the centre line to encourage drivers to slow down and take more care whilst driving. In addition, in response to reports of vehicles cutting the corner at the sharp turn onto Russell Gardens, we propose hatching markings, to encourage drivers to position themselves correctly when making the turn.
Other proposed measures
At Russell Road’s junction with Kensington High Street, a new pavement build-out on the west side and introduction of a raised table across Russell Road to slow turning traffic and provide a shorter crossing distance for pedestrians.
Removal of the island at the north end of Elsham Road to provide more space to exit from the cycling contra-flow lane.
Removal of the cycling feeder lane and introduction of an advanced stop line at the junction of Lower Addison Gardens with Holland Road to improve cycle safety.
Removal of approximately three metres of parking to improve entry into the existing segregated cycling facility on Addison Gardens bridge and to provide a safe waiting space for cyclists wishing to turn into Hansard Mews.
Permit contra-flow cycling through Hansard Mews, providing access to Shepherd’s Bush and Holland Park Avenue.
Alterations to the surface of the inclined section of Hansard Mews (approximately 30 metres) to reduce the slip hazard, especially in wet conditions, while minimising the change in appearance.
Introduction of wayfinding signs and road markings along Russell Road, Russell Gardens, Elsham Road, Lower Addison Gardens and Hansard Mews at points where a change of direction is required. We estimate there would need to be around 15-20 signs and symbols across the area.
Created by Chris Neston // 2 threads
This section of the A540 is Dual carriageway North of the Welsh Road (A550) towards Hoylake ( 60 mph) and single carriageway south of it towards Chester ( 50mph). It is used by hundreds of cyclists every week, yet is extremely dangerous to them and there have been numerous collisions and several cyclists have died along here. It provides a vital link between the lanes of Wirral and those of Chester and North Wales. It also houses the world famous Eureka cyclists cafe.
Ideally the whole of the A540 from Chester to Hoylake needs a cycle path, but to provide one over the relatively short section between Mudhouse Lane and Woodbank Lane would make an incredible difference for a small outlay. North of the A550 there is plenty of room alongside the existing road. South is more difficult but not insurmountable.
Created by Colin Wing // 2 threads
This is the proposed route of Quietway 16 in Westminster
Nominal deadline set to clear this from the Consultation Map.