SMALL SCHEMES, BIG CHANGES - BARNSTAPLE
This sign in "Newport Life and Cycle" area has been wrong aligned for several months; encourages vandalism and feeling of neglect in area
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by North Devon Cycling Forum // 0 threads
This sign in "Newport Life and Cycle" area has been wrong aligned for several months; encourages vandalism and feeling of neglect in area
Created by North Devon Cycling Forum // 0 threads
Removal of hazardous barrier on cycle path ending on Rose Lane; making turns from road onto path very hazardous!
Created by North Devon Cycling Forum // 0 threads
Removal of hazardous barrier bars and severe cutting back of bushes on Hollowtree Cycle path; this is an hazarous obstruction on this narrow passage which gets intensely used.
Created by North Devon Cycling Forum // 0 threads
Severe cutting back of bushes on Hollowtree Cycle Path; this is an obstruction on this narrow passage which gets intensely used!
Created by North Devon Cycling Forum // 0 threads
Hazardous side road crossing Coney Avenue on Hollowtree Road, priority change required; turning drivers should give way to cyclists!
Created by North Devon Cycling Forum // 0 threads
Button Toucan Crossing Hollowtree Road not working (Lidl side, button north side)
Created by North Devon Cycling Forum // 0 threads
The Square: signage required to guide cyclists into subway (for Town Centre, Braunton and Tarka Trail) and onto Square (for Sticklepath via Long Bridge and bike parking "The Square")
Created by North Devon Cycling Forum // 0 threads
Rock Park corner: arrow on cycle path to direct cyclists onto road before the New Road Roundabout. This to clarify cycling route FROM Town Centre TO Newport.
Created by North Devon Cycling Forum // 0 threads
Replacement of last yellow “No entry to the Square from 23rd May” sign on Glouster Rd by signs with just “No entry to the Square”.
This makes clear that traffic calming of the Taw Vale route in favour of sustainable transport is PERMANENT and not temporarily!
Created by North Devon Cycling Forum // 0 threads
Two-way traffic for cyclists on Barbican Terrace-Litchdon Street, allowing to cycle from the Strand to Summerland Street
Created by North Devon Cycling Forum // 0 threads
Open or remove barrier to make use of Richmond Street as connecting route easier
Created by North Devon Cycling Forum // 0 threads
Gate under Western Bypass was closed two years ago, only to annoy cyclists? Incovenenient and annoying; re-open gate please!
Created by North Devon Cycling Forum // 0 threads
Removal of annoying gate on ramp Western Bypass-Tarka Trail; where is the cattle which needs to be held back by this gate?
Created by North Devon Cycling Forum // 0 threads
Surface and lighting improvements route Rugby Ground Alley Way/Car Park
20 mph speed limit on Fair View Road/Pilton Quay between Abbey Road and Pilton Causeway (Yeo Dale Hotel)
Upgrade footpath on river bank to shared path (with new shared path signs), making the full connection between Abbey Road and Rolle Quay.
Created by North Devon Cycling Forum // 0 threads
This NCN sign on North Walk has been wrong aligned for several years! "Welcome to Barnstaple"; great impression for visitors on NCN3 and NCN27!
New high-profile bike parking at main entrance Civic Centre
New bike parking Boutport Street at Green Lanes shopping entrance
New bike parking Boutport Street near Post Office/Butchers Row (also to reduce illegal pavement parking!)
New bike parking Church alley way (next to co-op on High Street); info signs at this location already regularly informally used as stands
More capacity bike parking Cattle Market (end of Holland Walk)
Re-allocate benches and bike-park on pavement next to the Square and removal of first taxi rank space; all required to create a logical off-road route connecting Boutport St
Allow cyclists to cycle on pavement next to the Square FROM Boutport Street TO The Strand
Created by North Devon Cycling Forum // 0 threads
Allow cyclists to turn right from Boutport Street onto Boutport Street (in front of the Post Office) - arrow signage on tarmac?
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by David Earl // 1 thread
"14/0447/FUL | Change of use from motor bike show room to supermarket with cafe [without cooking facilities] and installation of air compressor unit. | 192 Green End Road Cambridge Cambridgeshire CB4 1RN"
The Dalmeny Park house builders have installed new chicanes on NCN route 1. Unfortunately none of these meet the guidlines for chicanes on cycling facilities.
Created by Martin A // 1 thread
This attractive former railway line would provide a useful off-road link between Ripley Greenway and Derby for commuters and leisure users.
Created by Heather Coleman // 1 thread
As described in the winter 2019 Camcycle magazine there is a group working on getting some improvements to the Trumpington busway. The magazine concentrates on the northern end of the busway but we are also seeking upgrades to the Addenbrookes spur junction and the crossing at Hobson Avenue/Lime Avenue as well as adding pedestrian footpath from the Hills Road Bridge all the way to Drury Avenue.
The group would like to start getting this out to users of the path for input, discussion and help with campaigning. Many Biomedical Campus commuters presumably use this path frequently, even daily. It would be great to get some input.
Created by Andrew Clegg // 2 threads
The garage at the end of radcliffe road uses the end of this road as a car storage area, which often results in the access onto the cyclepath being obstructed.
Created by Rogerdodge // 1 thread
Kingston Council have opened the consultation on this route, open until 17th November
Created by David Wilcox // 1 thread
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton Street
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.
An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
Created by Kevin Ablitt // 1 thread
Having grown up in this area I know it well. Bolton Lane and Christchurch Street could benefit from 20 mph, Cobbold Street and Withipoll Street would be more pedestrian and cyclist friendly if they had filtered permeability. Cobbold Street is extremely busy at school times as parents drop off or collect, make it closed half way to motors and this would cut out through traffic . Likely to be very contentious.
Created by Ian Seeley // 0 threads
There is a tree stump about 3 feet high on the cycle track. It's particularly difficult to see at night when travelling east bound and should be completely removed and the cycle track resurfaced.
Created by Tim P // 1 thread
Portsdown Hill Road & James Callaghan drive are a set of roads along the top of Portsdown Hill that is currently used by a lot of cyclists for commuting, touring and leisure facilties due to the forts, views and open areas around it.
As such, it's a well known tourist spot to stop for a burger or take a picnic and fly a kite.
However, being on top of an exposed hill results in significant side winds which results in cyclists being blown about by gusts, and therefore all cyclists need to take primary position on this road to give them space. As a 40mph road, many drivers have significant issues with cyclists taking primary, and therefore perform many punishment/close passes.
The affect of this on cycling in the area is many
1) More people would cycle from the surrounding areas ( Waterlooville, Havant, Fareham/Lee on Solent ) to work at QA Hospital or the businesses on the hill if there were better cycle infrastructure.
2) More people would cycle from the surrounding area & to enjoy the space & views if it felt safer to get there.
Created by Stephan Matthiesen // 0 threads
Contraflow bike lane in Salisbury Rd for easier access from Southside to Commonwealth Pool, Pollock Halls and Holyrood Park.
I cycle past this junction a lot, and sometimes the lights are red so I wait and look at the lanes and wonder why they're like this.
Created by FrenchyF // 0 threads
There should be a dropped kerb at the foot of Braidwood Gate, leading to Dumbiedykes
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Created by Adam Edwards // 2 threads
Shared use cycle path under construction but delayed completion now set for the end of February 2016. The path with extend the route from Hatfield station up to the town centre and then via the not so good on road lanes to the University and Business Park.
Created by Andrew Woodward // 0 threads
This is the approach to Kew Gardens station and is an area with many shops and cafe’s. Enabling this street to become 2-way for cycling will make access to the station and shops more convenient for cyclists and should therefore bring economic benefits to the area. Streetview: http://goo.gl/maps/P4spf
Created by Simon Still // 2 threads
Our proposals at a glance
Transport for London (TfL), together with Lambeth Council would like to know your views on proposals for improvements which will include:
To complement this scheme we have been working with Lambeth Council to develop a Low Traffic Neighbourhood in the nearby residential areas to the east of the A23. This will complement the A23 scheme by protecting local streets from through traffic and will help deliver wider objectives such as creating Healthy Routes on local roads. Visit the consultation page of Lambeth’s website from the 22 February 2020 to find out more.
Created by Dominic Fee // 1 thread
This issue covers Westminster City Council's proposals for a Quietway route from Green Park to Marylebone
Created by Richard Jennings // 1 thread
The Avenues Shambles
Few people who live in the area will be happy with the situation on The Avenues. A couple of years ago the city won a grant to improve cycle routes around the city, called a “Cycle City Ambition Grant”. The first route to be improved was the one that came along the Avenues, known as the “Pink” route. After two years of planning, public meetings and proposals we are left with the dangerous inadequate mess we see today.
Why is The Avenues Special?
Far more bikes use The Avenues than any other road in the city, "nearly 700,000 in 2016 according to the Air Quality Status Report for 2018. Most are students at UEA or workers at the Hospital and Research Parks. It’s also the route hundreds of children should be using to cycle to the City Academy School, so the potential number of cyclists could be even higher if the road were not so dangerous. Logically it should have been the highest priority for providing proper cycle tracks, but it didn’t turn out like that.
Why is it bad?
The road markings only allow enough space for one direction of flow on a two way street, so if it needs to pass traffic has to drive in the cycle lanes and when it gets busy the cycle lane simply disappear. There is basically far too much traffic for this type of design.
Why did we end up with this mess?
That’s a good question but there are clues, take a look on Tombland and the expensive paving around the cathedral gate. All this meant there just wasn’t enough money left to build the proposed cycle tracks and the present botch is the result. The council decided that the cost of doing The Avenues didn’t represent good value for money, yet doing Tombland did. This is a very suspect situation which has left us with an unacceptable, dangerous mess that simply can’t be left as it is.
What can be done?
Created by Dawes Jaguar // 0 threads
There is scope here for creating a short cycle path to complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Dawes Jaguar // 0 threads
College Walk is in a terrible state and the ancient and totally obsolete street lamps no longer turn on at night and off during the day.
Created by Gregory Williams // 2 threads
This provides a flatter, shorter, and traffic-free alternative to the National Cycle Route 18 alignment via Sole Street.
Martin Lucas-Smith // 1 thread
This junction is currently very poor. Cyclists end up doing awkward manoeuvres and visibility is not good.
It is possible this could be improved as part of the Chisholm Trail.
How could this junction be redesigned to make it best practice?
Created by Steven Moseley // 6 threads
Of and relating to Colchester Borough Council.