Ponding
There's a new island here, which was constructed as part of the tram works. If you look at the attached picture you can see that when it is raining there is a large puddle which makes it difficult to cycle over.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Iain Lane // 1 thread
There's a new island here, which was constructed as part of the tram works. If you look at the attached picture you can see that when it is raining there is a large puddle which makes it difficult to cycle over.
Created by Iain Lane // 1 thread
The city council received a £6.1m grant from the D2N2 LEP to construct 4 radial routes. This is the first, a mixture of a physically segregated and a shared route.
I use this route twice every day and the cycle lane is always blocked by cars parked to use the shops or hotels on this street.
It makes the cycle lane pointless as I can't use it.
This isn't quite our area, I suspect, but I'm wondering if anyone in the group knows what's happening with the once-proposed new bridge at Burwell Lode? Back in 2010, the Campaign newsletter reported that, "The National Trust anticipates being able to build this 'in the next couple of years'"; from what I can find elsewhere on the web, new ramps were built near/to the existing (horrible) bridge in 2012-13.
Not an urgent enquiry - it's just the route to Ely via Reach is one I do fairly often with friends with small children/babies in trailers, and at the moment we have to detour via Bottisham to avoid it, so I wondered if the new bridge was still on the cards at all.
Thanks,
Rachael
Richard G // 1 thread
There seems to be a number of cars parking half in the cycle lane on the new Addenbrooke's road (Dame Mary Archer Way)
Is parking in a cycle lane an offence of some sort, and would it make a difference on what I think is a private road? (I think that those roads around Addenbrooke's are not normal in terms of ownership)
Vegetation breaking through the surface of a, basically brand new, shared use path surface at Smeaton Bing.
Created by Jenny Barnes // 2 threads
If the level crossings either side of farncombe station were cycle/ ped only, with bollards in nightingale rd at the farncombe street end, and on frith hill, farncombe would be divided into 3 areas for cars, each of which would need to come out onto distributor roads. Further, if the New pond rd end of summers Rd as far as Brioadwater school were made one way southwest bound, any traffic trying to bypass the a3100/ Meadrow would be unable to.
Access Walden is a campaign group based in Saffron Walden.
Their objective is to create a safe walking and cycling link between their town centre and Audley End railway station, a journey of two miles.
Created by Bracken VanRyssen // 1 thread
The Brook Lane road badly needs cycle infrastructure and there is definitely the space available and small changes here have the potential to have a big impact on the route. Easy changes would be to resurface and open up the ends of the Brook Lane service road to allow continuous movement along it, as well as putting in a crossing for the Yardley Wood road. On the easterly section a protected bicycle lane for cyclists ascending and descending the hill could be created by moving the parking in the left lane further away from the pavement and using the resulting space (especially important for cyclists travelling up the steep hill).
Created by Roxanne (Cycling Campaign Officer) // 1 thread
The path running in front of Petersfield Mansions (identified below in red) is only 1.2m wide. This means that when passing each other pedestrians and cyclists often have to use the grass which is problematic when it is wet and muddy. It is also difficult for residents of Petersfield Mansions when exiting their properties as there is very little space for people to manoeuvre around each other.
Usage of this path has increased over the years with more cyclists using the path to access the cycle racks which have been installed on Bradmore Street as part of the expansion of Anglia Ruskin University. It is therefore proposed to widen the path by 1metre to cater for this increased usage and to improve access from Mill Road with the removal of a short section of railing and the installation of a flush kerb.
Petersfield is owned by the City Council and the path in question is maintained by the County Council as highway.
The cost of these works is approximately £20,000 and this project will be joint funded by Cambridge City Council and Anglia Ruskin University.
The path marked in blue is maintained by the City Council and we hope to improve the surface of this path at the same time if funding can be identified.
If you have any comments regarding the widening of this path or would like more information please contact cyclingconsultations @ cambridge.gov.uk by 14th September 2015.
Anon // 1 thread
KCC consultation on reduction in speed limit to 40mph
http://consultations.kent.gov.uk/consult.ti/40mphspeedlimitheadcorn/consultationHome
Consultation closes 28 Sept 2015.
Created by Dexter Johnstone // 1 thread
Weston Street is an advisory cycle route and should link up with the University of Sheffield concourse. However, it does not and you currently have to cross 3 lanes of traffic. The road is often very busy. There should be a toucan crossing instead of the pedestrian crossing, a short off road cycle path across the large grass verge could link the crossing to Weston Street.
Created by Chris Paton // 0 threads
City of Edinburgh council have done good work trialling a segregated path for NCN1 on George Street. Although the trial is coming to an end it's clear from their documents and consultations that George Street will remain the primary east-west route for cyclists travelling through the city centre and more investment is planned.
The problem is that there is very poor access to this route from the West End for any cyclists who have come along Shandwick Place or Rutland Square (including cyclists from the big offices nearby). Heading east, cyclists have to go through the busy West End road junction and then brave cars sweeping into South Charlotte Street as they turn left while simultaneously needing to find a way across two lanes of traffic to the middle of the road to turn right onto George Street -- scary stuff even for a competent cyclist.
Space is always at a premium but there do seem to be options for improving this with minimal loss of road space. A two-way cycle path could be constructed across the paving to link Hope Street with Rutland Place. With careful design this could be done to minimise impact to the pedestrian space and with reconfigured light timings cyclists could emerge from Hope Street to turn left or right, and likewise cyclists from Shandwick Place and Princes Street could turn into the new path. In addition, a left turn strip at Lothian Road onto Rutland Place would provide access to this new path for cyclists from Rutland Square and Lothian Road.
Created by Bracken VanRyssen // 1 thread
The only cycle access to the train platforms at Solihull station is an extremely small lift, otherwise your only option is carrying your bicycle up and down the stairs which can be quiet challenging. A simple solution would be a wheeling rail at the edge of the stairway to guide wheels down slowly. I see quite a few people with bicycles using the train and I myself do so on a weekly basis and two flights of stairs with a laden bicycle certainly make things tricky.
Created by WildNorthlands // 1 thread
Generally I'd say Brunswick St works well as a bike route but the gate between these two roads and the junction is poorly placed - in order to get through it you need to be on the wrong side of the road on a blind bend and it is common to find yourself coming head to head with a car coming the other way. if there were too gates for each direction, and the northbound was lined up with the cycle lane, it might help.
Created by Dominic Fee // 1 thread
Westminster City Council is undertaking a statutory consultation on the Traffic Management Orders (TMOs) needed to implement the East West Cycle Superhighway at Parliament Square. You can find a description and drawings of the proposals here:
http://westminstertransportationservices.co.uk/tmo/tmo_details.php?tt=2&id=909&cid=1
In Westminster Cycling Campaign we rarely respond to statutory TMO consultations because the proposals are either insignificant or, if they are significant, they've usually been subject to an earlier public consultation. It would be inappropriate for us to repeat points we've made previously, and we wouldn't be listened to.
Nevertheless I would encourage interested people to take a look at the Parliament Square drawings to check that the earlier design has been taken forward properly into a detailed design for construction. We have had a recent example where we did respond to a statutory TMO consultation in which the connection between part of the EWCS proposals (Savoy Street) and the rest of the highway network (a left-in left-out junction on the Strand) hadn't really been thought through. If we need to submit a response regarding Parliament Square, the deadline is 21 September 2015.
Created by Chris Peck // 1 thread
Route betweeen NCN 22 and Waverley Abbey - alternative to major road.
Single storey front, side and rear extensions.
58 Willingale Road Loughton Essex IG10 2DB
Epping Forest
Application reference : EPF/1025/15
Created by Heather Coleman // 4 threads
I can't find anywhere sensible to put such things so this is a general issue for people to start specific threads pertaining to temporary closures.
Created by Donald Noble // 1 thread
A barrier has been erected when the NCN7 cycle path joins the A86, presumably to stop children from cycling onto this busy road. However, this blocks the dropped kerb at this location, and no alternative is available without cycling some distance into Kingussie on a footpath which is not marked as shared use.
The barrier also limits the entrance to the cycle track, which could make it difficult for people with trailers or alternative bikes
Phil Wigglesworth // 1 thread
They're building lots of flats off Rustat Road, which is on a major cycle route and also is the main area for freloading railway station users.
There are some issues with control of the building work, specifically:
- trucks blocking Fanshawe and Rustat Road at peak times causing dangers to cyclists
- mud on the road making the Fanshawe/ Rustat road junction dangerous
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Outline application for the demolition of existing industrial and office units and 5 dwellings and the erection of up to 90 dwellings, together with associated garaging, parking, public open space, landscaping, access, highways drainage and infrastructure works. All matters reserved except access.
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Demolition of Daedalus House and construction of a new 7 storey office building comprising of 9026 sqm (GEA) of office floorspace (class B1); cycle parking spaces; associated plant; hard and soft landscaping; a basement with 51 car parking spaces and 7 motorcycle bays; infrastructure works. | Daedalus House Station Road Cambridge Cambridgeshire CB1 2RE
Created by Jean Dollimore // 1 thread
Official title: "CENTRAL LONDON CYCLE GRID - PRATT ST AND DELANCEY ST PROPOSED WALKING AND CYCLING IMPROVEMENTS"
This consultation proposes the construction of an important two-way east-west cycle route across Camden Town.
It will run from St Pancras Way along Pratt Street, across Royal College Street to Camden High Street, where a two-way cycle crossing will be provided.
It will then run two-way along Delancey Street as far as Mornington Terrace.
A later consultation on the continuation of this route to Regents Park is promised.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
The cycle lane on Billacombe Road is unusable due to car parking in it.
Created by George Lund // 2 threads
Transport for London are "proposing improvements for pedestrians and cyclists by providing signalised shared ‘Toucan’ crossings for pedestrians and cyclists on all four arms of Charlie Brown’s Roundabout. Presently there are no signalised crossings at the roundabout. Pedestrians and cyclists using the existing un-signalised informal crossing points need to wait for a safe gap in the traffic to cross, which can be difficult at times and make them feel unsafe."
Created by christhebull // 1 thread
This section of road is surprisingly hostile to cycle along on account of the restricted width, parked vehicles and high traffic speeds. I have had drivers behind me screech to a halt when they realised that they are likely to collide with me or an oncoming vehicle, and moving out to pass parked vehicles is needlessly stressful.
There is a vehicle activated "30 mph" light-up sign along this road but it is hopelessly inadequate, and more substantial methods of reducing traffic speed are going to be necessary.
Note also that the option of using Snowdon Road and then Fishponds Road is not only longer and steeper, but still involves awkward pinch points northbound along Fishponds Road. This is an important route linking the Hollies (halls of residence) and UWE Glenside with the centre of Fishponds and thus ought to be a priority within this area.
Created by Andrew Woodward // 2 threads
There is currently a cycle track to the David Lloyd sports centre from the Staines Rd; which turns into a muddy track, blocked at the exit to Uxbridge Road by a difficult and narrow gate.
Upgrading this short section of path with decent surfacing, streetlighting and removal of obstacles would provide a good link from the cycling facilities on the A316 and the Staines Road onto the schools in Hampton.
Created by Andrew Woodward // 1 thread
There is room on this pavement for a properly segregated cyclepath that would feed up to Christ's school and continue up as a quiet route up to near the top of Richmond Hill as an alternative to the busy and unpleasant Queen's Road.
RL // 1 thread
Drop kerb removed from Tanners Moat-Rougier Street pavement as part of Lendal gyratory works Feb-Mar 2018. Makes movement from Tanners Moat to Rougier St pavement difficult, hazardous, unattractive, painful for people with buggies, wheeled luggage, in mobility buggies, in wheelchairs or pushing same, people on bikes and all variants including heavy electro-assist models, laden with luggage (part of NCM65 avoiding pedestrian-only Scarborough bridge), with children, with trailers, and everyone who experiences pain from lifting/bumping a bike or anything else up a kerb.
Brings people on bikes and variants turning off Lendal bridge into Tanners Moat into conflict with those using the cycle cut-through as a dropped kerb. (The turn is already tricky.)
Council said it didn't do counts of who uses or the type of user on Tanners Moat before removing the drop kerb.
Undermines Government aim for most short journeys to be made on foot or on bike by 2040.
Does not support York's ageing population.
Undermines the tourism offer.
Created by jpennycook // 0 threads
Drivers are unaware/don't care/don't see cyclists in the cycle lane, so pull out of Lidl an Old Worting Road turning left, or turn right from Worting Road to Old Worting Road leading to very near misses. The cycle lane should be replaced with access to Old Worting Road near the bus stop, and improved access to Lidl provided.
Kate Ravilious // 0 threads
The padlocked barrier at the end of Hospital Fields Road is inaccessible for non-standard cycles, and difficult to pass through for anyone except the most able-bodied cyclists.
Created by Jon_B // 1 thread
Warwick Road is marked as an "Advisory Cycle Route" on the Suffolk County Council cycle map.
However, in morning rush hour it is frequently backed up a considerable distance heading south towards the traffic-light controlled 4 way junction with St Helens Street / Spring Road / Grove Lane.
There is an ASL on these lights, but in practice the carriageway is too narrow to allow cycles to pass the stopped traffic on the left hand side - particularly as the route is used by buses which occupy the space right up to the kerb.
Overtaking on the right is not a safe option where there is queue of stopped traffic as this is a two-way road with the added complication of traffic pulling out from Lancaster Road.
Given that the motorised traffic flow seems to be mainly south bound it would seem appropriate to make this a one-way street with a proper cycle lane including changing the phasing of the lights to allow cycles an advance phase to make the turn into Spring Road / St Helens Street.
One-way flow up another of the cross streets (probably Palmerston Road ) in the Northbound direction would complete the "loop" for cars and also ease traffic flow on that road which is currently difficult for cars or bikes to negotiate in a northbound direction in rush hour.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.
Created by Stephan Matthiesen // 0 threads
Need proper bicycle racks in front of Margiotta (there are a few wheelbenders in a corner)
Created by John Chamberlain // 1 thread
For the last year Torrington Place and Tavistock Place have had segregated cycle tracks on both sides of the street. This consultation is about making the current trial arrangement permanent. The current lightly segregated tracks would mostly become stepped tracks and there would be other improvements to junctions as well as increased space for pedestrians. There is a lot of local support but also significant opposition, mostly from residents of Judd and other streets where motor traffic volumes have increased. We think this can be corrected by the (separate) proposed changes to Judd Street and at Brunswick Square.
It's important that all cyclists and others in favour respond using the website below. Otherwise we are in danger of losing this flagship facility. You don't have to live in Camden but you do need to provide an address and postcode.
Martin Lucas-Smith // 2 threads
Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society. Construction of replacement facade, reinstatement and refurbishment of historic features and internal and external access and refurbishment works including enlargement of existing cafe (use class A3) and re-opening of 'footlight's' entertainment space (sui generis). Demolition of squash courts and un-listed 3-5 Round Church Street in the conservation area. Construction of new link building for access and ancillary uses for the Union Society. Construction of adjacent new building with ground floor restaurant (use class A3) with 41 room post-graduate student accommodation above (use class C2) together with basement storage and services.
Cambridge Union Society 9A Bridge Street Cambridge Cambridgeshire CB2 1UB
Application reference : 16/0673/FUL
Also a Listing Building Consent application: 16/0674/LBC Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society
Created by Jack Thurston // 0 threads
The four-way junction at Cross Street / Monk Street is dangerous for cyclists, with large vehicles making the turn, crossing onto the other side of the road. It is even more dangerous for pedestrians. There are no pedestrian crossings provided at this crossing requiring pedestrians to walk a very long way around to get from one side of Cross Street to the other, or to take a chance by crossing through the motor traffic.
Created by Adam Edwards // 1 thread
Map shows the route which Hertfordshire are upgrading as part of the Hatfield to Rail Station link footpath works. The plan is just for enhanced lighting, when what really should be done is to make this shared use.
Cyclists would then use the exisiting route from the station up French Horn Lane, push accross the Puffin crossing (or cycle on road), use the stub road to the phone exchange and then go shared us to the Toucan crossing to the Market Place. That is the start of the on and off road cycle route to the University and De Havilland Village, the Alban Way and beyond.
Without this link cyclists have to use Queensway and turn at the large fast two lanes wide roundabout at the junction with Wellfield Road. This is a major deterrnet to use.
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by Andy Allan // 0 threads
Heading southbound from New Malden along Malden Road, there is a segregated bike path for most of the route between the Fountain Roundabout and the A3. Unfortunately it ends around 100m before the A3 junction, and bikes are forced back onto the busy A2043.
It would be a good idea to link the bike path along the A2043 to paths around the roundabout, to make a joined up route.
Created by Kevin Ablitt // 0 threads
When traffic backs up on Spring Road from the Grove Lane lights motor vehicles cut through via Bartholomew Street, Alexandra Rd, Warwick and Lancaster Roads to Palmerston and then onto St Helens.
They travel fast and a group of five or more motor vehicle drivers copying each other is not unusual, at peak times.
To protect the residents of these narrow streets, filtered permeability would seem to be the only answer.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by Chris Peck // 1 thread
Route betweeen NCN 22 and Waverley Abbey - alternative to major road.
Created by Chris Peck // 0 threads
The railway bridge over Ockford Ridge results in a narrowing, just as the road bends. The footway here is left narrow, sightlines are poor and the surface is in a poor state.
this old fashioned barrier on a major cycleway needs a rethink
Created by North Devon Cycling Forum // 0 threads
This sign in "Newport Life and Cycle" area has been wrong aligned for several months; encourages vandalism and feeling of neglect in area
Created by Simon Still // 2 threads
For pedestrians
Relocate the crossing at the junction. At the moment pedestrians on the eastern side of Streatham High Road cannot see oncoming traffic around the bend and vehicles cannot see people crossing. By relocating the crossing that is currently north of the junction on Streatham High Road to where demand is higher and making it a straight-across signal-controlled crossing we can make it safer for all road users. This relocated crossing would replace the existing unsignalised crossing on the southern arm of the junction where there is significantly lower demand
Create a raised imprint block-paved effect crossing on Gleneldon Road indicating to drivers that pedestrians are likely to be crossing making it easier and safer for people approaching the relocated crossing.
For cyclists
Cycling would be permitted in the proposed bus lane on Tooting Bec Gardens (see below).
For bus passengers
Introduce a bus lane on Tooting Bec Gardens approaching the junction by removing some parking. 15 high-frequency bus routes pass through the junction. Delays resulting from the new crossing would be mitigated by a new 170 metre bus lane on Tooting Bec Gardens approaching the junction. There are often gaps in the parking so the proposal minimises the overall loss of parking spaces and makes more efficient use of the space (see the drawing for the location)
Ban the right-turn into and out of Shrubbery Road on Streatham High Road. Northbound buses are currently delayed by vehicles turning right into Shrubbery Road, approximately 150 metres north of the junction, because of a short right-turn pocket in the road. We therefore propose to ban the right-turn from Streatham High Road into Shrubbery Road for all traffic. There would also be a longer right-turn pocket to allow vehicles to queue without blocking traffic when turning into Sunnyhill Road. Vehicles turning right out of Shrubbery Road can also delay southbound traffic including buses so it is proposed that is banned too. Before we make the banned turns permanent we would monitor congestion and bus delays to confirm if it is necessary to mitigate the impact of the relocated crossing and making it controlled and will publish our findings
We would need to extend the right-turn ban from Mitcham Lane into Streatham High Road southbound to include buses. This wont have an impact on bus passengers as this turn is only used by buses 'not in service'. By fully banning the turn we reduce the traffic impact of the relocated crossing and making it controlled.
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing