  • Little Ealing Lane Raised Table Cycle Track

    Created by Space Pootler // 2 threads

    1. Relocation of the existing zebra crossing on Little Ealing Lane closer to Weymouth Avenue The crossing will be installed on a raised table which will help to slow down traffic. Existing parking spaces directly outside Little Ealing Primary School will be relocated which will improve visibility for drivers exiting Weymouth Avenue.

    2. Installation of a new shared zebra crossing outside Mount Carmel Primary School. This will help parents and pupils of this school to cross the road safely, and make it easier for cyclists to turn right from Radbourne Avenue into Little Ealing Lane. The new zebra will be also raised which will help to further reduce speeds of vehicles. This will result in removal of existing School Keep Clear markings.

    3. Cycle track adjacent to footway to separate cyclists form motor traffic on the section of the road where they are at the most risk. The track will also provide a safer link between Radbourne Avenue and Weymouth Avenue, which is part of a proposed ‘Quietway’ cycle route linking Brentford and Ealing. This will also result in removal of existing School Keep Clear markings which will be replaced by double yellow lines.

    Please sign in to vote.
  • A13 Commercial Road between New Road and Jubilee Street

    Created by Simon Munk // 1 thread

    TfL Overview:
    We would like your views on proposals to improve safety, journey time reliability and the urban realm on Commercial Road between New Road and Jubilee Street in the London Borough of Tower Hamlets.
    We have identified a higher rate of collisions along this stretch of road compared to similar roads in London, particularly involving pedestrians, cyclists and motorcyclists. Therefore, we are proposing a scheme that is designed to reduce the number of collisions involving these vulnerable road users.
    The area also suffers from vehicle congestion, particularly at peak times. Parked vehicles prevent buses from using the eastbound bus lane at busy times, which causes delays to bus passengers.

    What are we proposing?
    We are proposing to implement a number of changes to improve conditions for bus passengers and vulnerable road users. These include:

    Pedestrians
    - Raised carriageway with coloured surfacing on Commercial Road between Turner Street and Sidney Street to help lower traffic speeds and reduce collisions. There would still be a detectable kerb height between the road and the footway
    - Converting the pedestrian crossing outside Watney Market to a wider straight crossing and relocating it closer to the market. This would mean pedestrians crossing in one stage rather than waiting on a central island. Pedestrian “Countdown” at the crossing would also be provided.
    - Providing a wider crossing point for schoolchildren outside Mulberry School for Girls and installing electronic signs to make drivers more aware of schoolchildren crossing
    - Raising the level of all side road entrances and providing kerb build outs to reduce traffic speeds, making it easier for pedestrians to cross
    - Providing a continuous footway across the following side roads to give priority to pedestrians and a smoother crossing surface: Richard Street; Jane Street; Anthony Street; Fenton Street; Buross Street; Hungerford Street; Bromehead Street
    - Reducing kerb heights, particularly around Watney Market, to help pedestrians
    - Installing low level central islands to help pedestrians cross the road informally
    - Upgrading pavements where damaged or uneven

    Other Road Users
    - Re-surfacing sections of the road to provide a smoother surface for cyclists and motorcyclists and to reduce noise
    - Making Turner Street “no entry” to motor traffic (except cycles) from Commercial Road in order to improve safety outside Mulberry School for Girls and to prevent vehicles queuing back onto Commercial Road at busy times. Access would still be possible using other routes, and motorists would be able to exit Turner Street onto Commercial Road as they do now
    - Widening bus lanes to 4.5 metres to allow cyclists and motorcyclists to pass buses more safely. We would create space for this by changing the hours of operation of the parking bays on the North side of Commercial Road
    - Converting some existing parking bays into two new loading bays.
    - Changing parking controls where necessary on the north side of Commercial Road by converting existing ‘all day’ parking (Mon-Sat 7am-7pm) to off-peak times (Mon-Sat 10am-4pm). This would allow the bus lane to operate at peak times (Mon-Sat 7-10am and 4-7pm)
    - Providing Advanced Stop Lines for cyclists at junctions to let them wait ahead of other traffic

    Urban Realm Improvements
    - New tree planting where conditions allow.
    - Improving the urban realm – reducing clutter, better paving and a more pleasant environment particularly around Watney Market

    Please sign in to vote.
  • Nottm City Council Review of barriers on rights of way

    Created by Hugh McClintock // 1 thread

    Comments welcome please on this consultation about barriers on rights of way.

    Pedals believes that any kind of barriers should be avoided as far as possible, especially those of the A-frame design. If access controls really are needed they should take the form of bollards (or staggered bollards) rather than barrier.

    Message of 22 Feb 2016 from John Lee, Nottm City Council

    Morning all

    Some of you will recall taking part in its preparation.

    We are in the process of reviewing the attached Policy. The policy was in response to complaints about the design of barriers the council have used on rights of way to deal with motorcycles and users safety. Although barriers help deter illegal use some designs were causing problems for disabled citizens, mobility scooters, double buggies and cyclists. When deciding whether a barrier is the best solution for a particular problem/location, the policy has helped provide a consistent approach.

    As part of the review do you have any comments on the policy, for example is there anything else the policy should include so the rights of way network is kept free from unnecessary obstructions and is accessible by all? Please forward onto any contacts who may have an interest.

    Please could I have your comments by Monday 21st March.

    Regards

    John Lee
    Public Rights of Way
    Traffic and Safety
    Development and Growth
    Nottingham City Council
    Loxley House
    Station Street
    Nottingham
    NG2 3NG

    Tele: 0115 8765246
    Mobile: 07976 794880
    www.nottinghamcity.gov.uk/rightsofway

    Please sign in to vote.
  • Highcliffe Rd & Bluebell Wood

    Created by WildNorthlands // 0 threads

    Highcliffe Rd is used as a rat-run between Fulwood and Bents Green/Ecclesall. It's a difficult road for cyclists as it starts off very steeply and is quite narrow, with cars parked on the uphill side. There is an alternative route through the woods - a bridleway that if brought up to standard would provide a very pleasant alternative for cyclists heading to/from Bents Green, with a direct link to NCN6.

    Please sign in to vote.
  • Quiet way on Essex place, Chiswick

    Created by T Harris // 1 thread

    Hounslow Cycling has been asking for a Quietway on Essex Place as a way of getting to Belmont Primary School.

    Lendlease currently have a planning application to redevelop the area

    Please sign in to vote.
  • Poor lane marking eastbound at Park and Ride on Madingley Road

    Created by Ben Brierton // 1 thread

    The new road layout here means that eastbound cyclists travelling straight-on find themselves in the left-turn lane, stopped by a Red light, and blocking traffic turning left into the Park and Ride who have a Green left turn filter.

    The road markings seem to expect cyclists in this lane to go straight ahead, even though it's the left turn lane, because it is guided into the onward eastbound cycle lane. Just feels wrong and leaves cyclists vulnerable to the left turning traffic.

    There should be a 'redmac' cycle lane between the left turn lane and the right hand lane. The road markings should guide cyclists from this lane into the eastbound cycle lane instead of from the left turn lane.

    Please sign in to vote.
  • Lack of westbound cycle lane before M11 on Madingley Road

    Created by Ben Brierton // 1 thread

    The new road layout on the westbound approach to M11 turning on Madingley Road has poor provision for cyclists.

    Cyclists going westbound now have to take the second lane for a few hundred metres with traffic passing at speed on both sides. Traffic passing in the left lane will be taking the slip road onto the M11 and traffic in the second lane will be going straight on.

    Please sign in to vote.
  • Transport Strategy for East Cambridgeshire

    What is the Draft Transport Strategy for East Cambridgeshire?

    We have drafted a transport strategy to tackle the current and future transport pressures in and around the district, and to help support growth in East Cambridgeshire. The purpose of this strategy is to:

    Provide a detailed policy framework and Action Plan of potential transport improvements for the area, addressing current problems and consistent with the policies of the third Cambridgeshire Local Transport Plan 2011-2031 (LTP3).
    Support the East Cambridgeshire Local Plan, and take account of the committed and predicted levels of growth, detailing the transport infrastructure and services necessary to deliver this growth.

    The strategy contains details of the schemes proposed in the short and medium term as well as the longer term schemes as proposed in the Long Term Transport Strategy.

    We want the views of anyone who lives, works, visits or travels through East Cambridgeshire in order to improve this draft transport strategy. Let us know your views on the strategy objectives, policies and the action plan of proposed transport improvements for the area by answering the questionnaire before the 8th April 2016.

    View the TSEC consultation leaflet (pdf, 1MB) for a summary of the information we are consulting on and answer the questionnaire. Alternatively, hard copies of the consultation leaflet and questionnaire are available at libraries and doctors surgeries around East Cambridgeshire or by request via the contact details below.

    Come to talk to us and fill in a questionnaire at one of the public exhibitions below:

    Please sign in to vote.
  • Chapeltown Rd Leeds

    Created by dpattinson // 1 thread

    Although cycle lanes are marked in parts along Chapeltown Rd going out of town, it is quite dangerous, especially where there is parking for the shops along the west side of Chapeltown Rd. A particular concern is just after the pedestrian crossing lights past Mexborough St, opposite Costcutters. The vehicle lane narrows for the pedestrian island in the middle of the road, but straight after it are car parking spaces which protrude out into the road, creating a bottleneck so cyclists have to go into the middle of the vehicle lane to get around cars parked there. I've had a few close calls there as impatient vehicles try to push past where there is no room.

    It is almost normal during peak hour to have to negotiate cars parked on double yellow lines across the cycle lane.

    Please sign in to vote.
  • Historic Core Conservation Area Appraisal

    Martin Lucas-Smith // 1 thread

    Cambridge City Council is consulting on an update to its Historic Core Conservation Area Appraisal.

    The Historic Core Conservation Area Appraisal covers 70+ streets in the city centre which are defined according to their significance. This significance can be their historical, architectural or social impact on the character and appearance of Cambridge.

    The original appraisal, which was published in 2006, has been reviewed to ensure that it is up to date with any new developments within the city centre, and that any new pressures on the historic heart of Cambridge are recognised. This revised document is now out to public consultation.

    Please sign in to vote.
  • Concrete obstruction at Calverley Bridge

    Created by M Stanley // 1 thread

    Large piece of concrete partially blocking access. If this was put here to stop motorbikes, then it is obviously ineffective due to eroded bank on right hand side.

    Reported to Leeds City Council via online reporting system 26/02/2016

    Please sign in to vote.
  • Gunnersbury Avenue & Chiswick Roundabout TfL consultation

    Created by T Harris // 2 threads

    ‘Segregated cycleway’ planned for western side of Gunnersbury Avenue (next to park and cemetery)
    Transport for London are proposing widening the cycleway on the western side of Gunnersbury Avenue, next to the cemetery and park.

    ‘Shared pavement’ planned for eastern side of Gunnersbury Avenue
    TfL are proposing to make a 5m wide ‘shared use area for pedestrians and cyclists’ on the eastern side.

    Please sign in to vote.
  • New dedicated cycle lanes at Hammersmith gyratory

    TfL overview
    We are proposing a number of changes at Hammersmith gyratory, King Street, Beadon Road and Hammersmith Road as part of our Road Modernisation Plan, in partnership with Hammersmith & Fulham Council (H&F Council).The proposals aim to deliver a safer and more direct east-west cycle route through Hammersmith town centre.

    What are we proposing?
    We are proposing to create a direct, kerb-segregated two-way route for cyclists across the northern side of the gyratory, with separate cycle signals to protect them from traffic. This would remove the need to cycle round the gyratory, mixing with fast-moving traffic, and break a key barrier to cycling in west London.

    To improve conditions and safety for cyclists we would:
    - Provide a segregated two-way cycle track on the north side of Hammersmith gyratory. Cyclists would be physically separated from traffic by a kerb. We would make room for the cycle track by reallocating space from some sections of the wide pavement on the south side of the road
    - Separate cyclist and motor vehicle movements at junctions; cyclists would have their own traffic signals which would be green at different times to those for motor traffic
    - Extend the eastbound contraflow cycle track on King Street to allow cyclists to reach the gyratory from Hammersmith Town Hall without having to follow Studland Street, Glenthorne Road and Beadon Road. The cycle track would be ‘stepped’, meaning it would be at a height between the road and footway, and become physically separated with a kerb east of Lyric Square. We would make room for the cycle track by reallocating some space from the pavement on the south side of King Street
    - Provide a short two-way section of cycle track on Queen Caroline Street to allow access to Black’s Road and Hammersmith Bridge Road
    - Enable cyclists to pass through the island at the junction of Hammersmith Broadway and Butterwick, and increase the size of the island to accommodate cyclists and pedestrians

    We would also make the following changes in the area:
    - Provide a new bus lane on Beadon Road, between Glenthorne Road and Hammersmith Broadway
    - Remove the pedestrian crossing between the south side of Hammersmith Broadway and Shepherd’s Bush Road to allow for provision of the segregated cycle track
    - Install pedestrian countdown signals at the crossings of King Street, Beadon Road, Shepherd’s Bush Road, Queen Caroline Street, Hammersmith Broadway and Butterwick
    - Widen the footway on King Street where possible to provide more space for pedestrians in this busy area
    - Raise the carriageway to footway level on King Street opposite Lyric Square to make crossing more convenient for pedestrians and encourage slower motor vehicle speed
    - De-clutter pavements by rationalising locations of street furniture
    - Increased cycle parking
    - Relocate one loading bay and two disabled parking bays on Black’s Road to provide space for additional taxi rank spaces

    Why are we proposing this?
    TfL is investing £4bn in the Capital’s vital road network to ensure London’s roads are able to meet the needs of a growing population. As part of this plan, we are reviewing junctions and gyratories across London to make them safer for all road users, including cyclists, and to make journey times more reliable. Hammersmith gyratory is used by many cyclists each day, and can be an intimidating place to cycle. Hammersmith is one of the Mayor of London’s 33 priority “Better Junctions”.
    H&F Council’s cycling strategy sets out an ambitious plan to increase the number of people cycling in the borough to reach eight per cent of all journeys. Part of this plan is to deliver a segregated cycle route along the A315 corridor, a key commuter route for cyclists. Hammersmith gyratory lies on this route.
    We are proposing to give cyclists dedicated space and separate cycle signals at junctions on the northern side of the gyratory. This would offer cyclists a more comfortable and direct route between King Street and Hammersmith Road, bridging the gap in the proposed A315 cycling route that the gyratory currently creates.

    Removal of the pedestrian crossing
    To ensure cyclists have adequate space to wait for a green signal on the island at the south of Shepherd’s Bush Road, we would need to remove the existing pedestrian crossing that connects this island to the south side of Hammersmith Broadway.
    Although the crossing is less well-used than others in the area, its removal would mean pedestrians would have to find alternative routes. Those walking between the south side of Hammersmith Broadway and the west side of Shepherd’s Bush Road would need to cross Queen Caroline Street and Beadon Road. Those walking between the south side of Hammersmith Broadway and the east side of Shepherd’s Bush Road would have a choice between crossing Queen Caroline Street, Beadon Road and Shepherd’s Bush Road or crossing Hammersmith Broadway at its junction with Butterwick.
    The vast majority of pedestrians crossing Hammersmith Broadway from outside the Piccadilly Line tube station use the most western of the two crossings.

    Impact on buses
    Beadon Road is narrow and carries a high volume of buses and general traffic. To reduce delays currently experienced by buses approaching the gyratory, we would provide a new bus lane on Beadon Road between Glenthorne Road and Hammersmith Broadway, replacing one of the two general traffic lanes.
    We also would need to relocate bus stop Z5 on the gyratory, which is currently used for emergency purposes only, to Butterwick.

    How would bus and traffic journey times be affected?
    Our proposals would affect some journey times through the area. In the main these changes would not be significant, with some bus and general traffic journeys getting shorter and some getting longer. The most notable increases in journey times will be for traffic approaching Hammersmith gyratory from Fulham Palace Road in the morning and evening peaks.

    Impact on other road users
    We propose to relocate the position of one loading bay on Shepherd’s Bush Road, with the existing dimensions remaining, in order to allow for an increase in the size of the existing taxi rank.

    How does this fit in with the wider plans for Hammersmith town centre?
    TfL and H&F Council are working together on ambitious plans for a long-term transformation of Hammersmith town centre.
    We are proposing shorter-term improvements to improve safety and connectivity for existing cyclists and support the Council’s cycling strategy to increase the number of new cyclists in the area. This plan is separate to, and does not affect longer term proposals for the area, however these proposals would be integrated with any future schemes.

    Delivery of the wider A315 cycling improvements
    TfL and H&F Council are also working together on plans for an east-west cycling route along the A315. Plans for this route either side of Hammersmith gyratory are currently being developed, with public consultation planned to take place later this year.

    Please sign in to vote.
  • A205 Stanstead Road junction with Brockley Rise/Cranston Road

    Created by Simon Munk // 1 thread

    TfL Overview
    We are proposing to make changes on A205 Stanstead Road at two locations. One proposal includes improving the pedestrian crossing facilities at the junction of Brockley Rise and A205 Stanstead Road. The second proposal includes removing a loading bay from A205 Stanstead Road to Ravensbourne Road.

    What are we proposing?

    Brockley Rise
    We propose to install a new signal-controlled ‘staggered’ crossing on Brockley Rise. To achieve this, we propose to create a safer pedestrian waiting area by widening the central reservation, while maintaining the two lane approaches to the junction heading south along Brockley Rise. We propose to improve the footway layout by providing a suitable gradient at the crossing for all users, particularly pushchairs and wheelchairs users.
    We also propose to modify the loading and parking bays to allow for traffic to turn into Brockely Rise. The bay would be slightly shortened by 2.5m and moved north by 2.5m.

    Cranston Road
    Similar to Brockley Rise, we propose to install a new signal-controlled ‘staggered’ pedestrian crossing on Cranston Road. We would create a safer pedestrian waiting area by enlarging the central island. We would also improve the footway by providing a suitable gradient at the crossing for all users, particularly pushchairs and wheelchairs users.

    Please sign in to vote.
  • Junction of A100 Tower Bridge Road and Tanner Street

    Created by Simon Munk // 1 thread

    TfL Overview
    In partnership with the London Borough of Southwark, we have developed proposals to improve the provision for cyclists and other road users around Tower Bridge Road/Tanner Street junction, and we would like to hear your views.

    What are we proposing?
    The proposals are part of the Central London Grid – a network of cycle routes in Zone 1. The route passes along Tanner Street, Southwark Council consulted on proposals on the rest of the route in autumn 2015, including proposals for the one-way operation of Tanner Street. Our proposals aim to improve safety and create more space for cyclists, and have been coordinated with Southwark Council’s designs.
    Our proposals also include changes to traffic and bus lanes, as well as new traffic restrictions and improved pedestrian crossings.

    The enclosed consultation drawing shows the proposals for this junction. The numbered descriptions below correspond with the numbered labels on the drawing.
    1 Carriageway to be widened by 0.5 metres to improve traffic flow. There will still be sufficient width maintained on the footway.
    2 Centre lines to be altered to provide two northbound general traffic lanes further back from the junction with Druid Street
    3 New one-way westbound on Tanner Street between Tower Bridge Road and Archie Street to create space for a segregated two-way cycle track
    4 New one-way eastbound on Tanner Street between Tower Bridge Road and Pope Street to allow for contraflow cycle provision
    5 Segregated bi- directional cycle track to allow cyclists to approach and exit the junction with substantially reduced risk of conflict with motor vehicles
    6 New segregated contraflow cycle track to parallel crossing to allow for safer approach for cyclists, and to decrease potential conflict between modes of traffic. This would require the relocation of a loading bay (see 9 and 10)
    7 New parallel cycle/pedestrian crossing to connect the cycle route on Tanner Street and allow cyclists to conveniently cross Tower Bridge Road separately from pedestrians
    8 Cycle stands to be relocated to allow for widened traffic lanes on the approach to the junction, and to prevent conflict between traffic modes
    9 Loading bay relocated from Tanner Street to Tower Bridge Road to create space for the contraflow cycle track (see 6). The same operating hours will apply
    10 New position of relocated loading bay from Tanner Street (see 9)
    11 Loading bay relocated 12m south to provide enough space for traffic to merge. Operating hours will remain the same.
    12 New bus lane (Hours of operation: Mon –Sat, 7am-10am, 4pm-7pm) to make journeys faster and more reliable for bus passengers. We would create space by moving the centre line on this section of Tower Bridge Road.