Lack of cycle link between Buckland Valley and Dover Christ Church Academy
There isn't a suitable cycling route between Buckland Valley and Dover Christ Church Academy. The hill is steep and traffic levels on Melbourne Avenue.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Gregory Williams // 3 threads
There isn't a suitable cycling route between Buckland Valley and Dover Christ Church Academy. The hill is steep and traffic levels on Melbourne Avenue.
Created by Gregory Williams // 1 thread
There is a comparatively new shared path linking Burgess Road to Alyesham's station. However the Burgess Road end of the shared path doesn't have a dropped kerb to allow a transition between road and path and vice-versa.
23/04054/FUL (4 flats) replaces 23/01815/FUL (8 flats, withdrawn) without resolving conflict with shared-use path.
Application reference : 23/04054/FUL
Created by Gregory Williams // 1 thread
The sign towards the Town Centre is missing. Previous view of the sign here:
Created by Gregory Williams // 1 thread
The sign pointing into Alfred Road at Lorne Road is missing.
sound+fury // 1 thread
Refurbishment and retrofit of existing building with new fourth storey, rooftop plant and rear extension, new cycle parking and landscaping adjacent to the building together with new cycle hub in existing basement car park under Castle Court
Babbage House Castle Park Cambridge Cambridgeshire CB3 0AT
Cambridge
Application reference : 23/04037/FUL
Created by Roxanne (CEO) // 1 thread
Announcement from Cam Conservancy:
https://www.camconservancy.org/public-announcement
Tree management Programme 2023/24 A recent tree survey has identified the necessity for pruning and in some cases felling dangerous trees to ensure the safety of those using the Halingway.A ‘TTRO’ Temporary Traffic Regulation Order has been approved to temporarily close sections of the Halingway/towpath (Chesterton to Clayhithe) between 1 November until 31 March 2024.
The Conservancy appreciates this may cause some temporary inconvenience, however these works are necessary and have been planned to ensure the safety of those who use the Halingway and the staff carrying out the works.
Street Light FCND004 on Falala Way (NCN1) - Not Working Fault Number: 750068
Created by Owaldron // 1 thread
See Picture, Reported to CCC. However, I have a hunch that it may be the responsibility of 'LandMarc' on behalf of the MOD as I think they would own that land.
Created by Gregory Williams // 1 thread
A better cycle connection is needed to Rough Common, avoiding the need to use the A290 Whitstable Road or A2050 and Palmars Cross Hill.
20mph sign has twisted round and a sign directing to the station is pointing slightly in the wrong direction
Created by Gregory Williams // 1 thread
The cycle route on AE18 between AE429 and East Stour Farm has become overgrown and difficult to cycle through.
Created by Gregory Williams // 1 thread
Chilham station is signposted from National Cycle Route 18 via Pickelden Lane. However, the link towards NCR18 isn't signed from Chilham station and the portion along the A28 corridor isn't signed as a cycle route. The A28 is too busy for normal cycling. The path on the south side between Pickelden Lane and Chilham station should be made into shared use.
The incident has been reported to Kent Police as criminal damage, Crime Ref: 46/139801/23.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
This is a space for discussion around Cambridgeshire County Council's proposal (published on 27th September 2023).
Created by Gregory Williams // 1 thread
The cycle parking at Morrisons needs improvement. It is situated at the far end of trolley park with only some surveillance, rather than adjacent to the entrance where it would receive better surveillance. The capacity is limited by the fact that only one side of the railings can be used.
Created by Gregory Williams // 1 thread
The cycle / pedestrian route signs at the junction between the Crab & Winkle Way and Oyster Bay Trail at Stream Walk / Albert Street / Action Road have gone missing.
Created by Gregory Williams // 1 thread
2 cycle storage units.
Dragonfly House Mayfly Close Canterbury Kent CT1 1HS
Canterbury
Application reference : CA/23/01343
Created by Josh Grantham // 1 thread
Erection of 14no residential dwellings and associated works including demolition of existing dwelling.
16 The Lanes Over Cambridgeshire CB24 5NQ
South Cambridgeshire
Application reference : 23/03395/FUL
Created by Gregory Williams // 3 threads
A safe cycle route is needed to link Wingham with Canterbury. The current A257 road environment is not attractive for cycling, due to high motor traffic volumes and speeds.
Created by Gregory Williams // 1 thread
The cycle parking provision at Whitefriars is minimal and at the periphery. Well surveilled provision is needed close to the shops that it will serve.
Created by Gregory Williams // 1 thread
The streetscape has recently been repaved in St. George's Street, but it lacks cycle parking.
Created by Gregory Williams // 0 threads
The cycle parking outside Faversham Pools doesn't support bicycles properly and is poor because it doesn't encourage the frame of the bicycle to be locked.
Created by Heather Coleman // 1 thread
Starter; instructions for who to report overhanging or overgrown vegetation which is obstructing a cycle or footpath. Place for people to discuss specific examples as they seem to currently be spread out all over Cyclescape so hard to find.
Created by Gregory Williams // 1 thread
The section of the Crab & Winkle Way / NCR1 linking Westgate Court Avenue to Duke's Meadow is narrow, has sharp corners, and has poor visibility. This means that it can be difficult for cyclists and pedestrians to pass and see one another.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Chris Peck // 1 thread
Route betweeen NCN 22 and Waverley Abbey - alternative to major road.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by Kevin Ablitt // 0 threads
When traffic backs up on Spring Road from the Grove Lane lights motor vehicles cut through via Bartholomew Street, Alexandra Rd, Warwick and Lancaster Roads to Palmerston and then onto St Helens.
They travel fast and a group of five or more motor vehicle drivers copying each other is not unusual, at peak times.
To protect the residents of these narrow streets, filtered permeability would seem to be the only answer.
Created by Caroline Page // 1 thread
Eastbound cyclists wishing to avoid the double roundabout at this point are routed onto the pavement, across the exit for the Shell garage (often to the surprise of exiting drivers), and then (still across pavement) onto a piece of decommissioned road used as access and double-sided parking for a parade of shops. This road has a separate car entrance from the roundabout.
Its a lethal combination -I have personally once been hit by a car turning fast from the roundabout on the road entrance as I entered it from the bike route. The driver was very angry because it was my fault that she didn't look out for me. You then have to cycle between two sets of parked cars/vans: there are frequent hazards: suddenly opened doors, people reversing/leaving the parking place without looking behind.
At the end, the cyclist is signed again onto pavement heavily used by schoolchildren/old people at the eastbound Heath Road Roundabout bus stop, before being routed back onto the road along the pull-off for the bus itself.
My personal view is that this scheme has been created and signed by a maniac
Bike users can turn right and cycle contra flow using a very narrow on road cycle path. Motorised traffic cannot do this, Park Road is one way to motorised traffic. Traveling down Queens Road there is no signage to suggest that bike users can turn right. Once into Park
Road there is awkward raised 'island' to manoeuvre around. Suggest signage saying right turn for bikes only and reconsider design of Island to make it less of an obstacle.
Created by Andy Allan // 0 threads
Heading southbound from New Malden along Malden Road, there is a segregated bike path for most of the route between the Fountain Roundabout and the A3. Unfortunately it ends around 100m before the A3 junction, and bikes are forced back onto the busy A2043.
It would be a good idea to link the bike path along the A2043 to paths around the roundabout, to make a joined up route.
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by Adam Edwards // 1 thread
Map shows the route which Hertfordshire are upgrading as part of the Hatfield to Rail Station link footpath works. The plan is just for enhanced lighting, when what really should be done is to make this shared use.
Cyclists would then use the exisiting route from the station up French Horn Lane, push accross the Puffin crossing (or cycle on road), use the stub road to the phone exchange and then go shared us to the Toucan crossing to the Market Place. That is the start of the on and off road cycle route to the University and De Havilland Village, the Alban Way and beyond.
Without this link cyclists have to use Queensway and turn at the large fast two lanes wide roundabout at the junction with Wellfield Road. This is a major deterrnet to use.
Well lane has been blocked to through motor traffic creating a nice quietway for walking and cycling.
However where it meets Percival Road a dropped kerb has not been installed meaning that cycles, pushchairs and wheelchairs have to bump down to cross Percival.
A couple of dropped kerbs and perhaps a parking restriction would really open this up as a nice cycle quietway.
Created by Stephan Matthiesen // 0 threads
Road was converted to one-way recently, forcing cyclists from Kings Buildings out onto busy West Mains Rd where previously they could cycle within the campus to the toucan at the NE corner.
Created by Jack Thurston // 0 threads
The four-way junction at Cross Street / Monk Street is dangerous for cyclists, with large vehicles making the turn, crossing onto the other side of the road. It is even more dangerous for pedestrians. There are no pedestrian crossings provided at this crossing requiring pedestrians to walk a very long way around to get from one side of Cross Street to the other, or to take a chance by crossing through the motor traffic.
Martin Lucas-Smith // 2 threads
Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society. Construction of replacement facade, reinstatement and refurbishment of historic features and internal and external access and refurbishment works including enlargement of existing cafe (use class A3) and re-opening of 'footlight's' entertainment space (sui generis). Demolition of squash courts and un-listed 3-5 Round Church Street in the conservation area. Construction of new link building for access and ancillary uses for the Union Society. Construction of adjacent new building with ground floor restaurant (use class A3) with 41 room post-graduate student accommodation above (use class C2) together with basement storage and services.
Cambridge Union Society 9A Bridge Street Cambridge Cambridgeshire CB2 1UB
Application reference : 16/0673/FUL
Also a Listing Building Consent application: 16/0674/LBC Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society
Created by John Chamberlain // 1 thread
For the last year Torrington Place and Tavistock Place have had segregated cycle tracks on both sides of the street. This consultation is about making the current trial arrangement permanent. The current lightly segregated tracks would mostly become stepped tracks and there would be other improvements to junctions as well as increased space for pedestrians. There is a lot of local support but also significant opposition, mostly from residents of Judd and other streets where motor traffic volumes have increased. We think this can be corrected by the (separate) proposed changes to Judd Street and at Brunswick Square.
It's important that all cyclists and others in favour respond using the website below. Otherwise we are in danger of losing this flagship facility. You don't have to live in Camden but you do need to provide an address and postcode.
Created by Stephan Matthiesen // 0 threads
Need proper bicycle racks in front of Margiotta (there are a few wheelbenders in a corner)
Created by Cycling Dumfries // 1 thread
At the moment there are toucan crossings from the Whitesands up to the High Street past the lower entrance to the Loreburne Centre (where the buses stop) but there is no actual cycle path so you end up illegally on the pavement. It would be a useful route otherwise, as long as cyclists can get past the bus stops (and waiting bus passengers).
Kate Ravilious // 1 thread
no cyclist ever uses this junction as the engineers intended. It doesn't function well and is dangerous. Needs reviewing.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.
Created by Peter Loader // 0 threads
The Maple Cross to Rickmansworth cycle route is one-way along Berry Lane (between Church Lane and Field Way, Mill End).
Created by Jon_B // 1 thread
Warwick Road is marked as an "Advisory Cycle Route" on the Suffolk County Council cycle map.
However, in morning rush hour it is frequently backed up a considerable distance heading south towards the traffic-light controlled 4 way junction with St Helens Street / Spring Road / Grove Lane.
There is an ASL on these lights, but in practice the carriageway is too narrow to allow cycles to pass the stopped traffic on the left hand side - particularly as the route is used by buses which occupy the space right up to the kerb.
Overtaking on the right is not a safe option where there is queue of stopped traffic as this is a two-way road with the added complication of traffic pulling out from Lancaster Road.
Given that the motorised traffic flow seems to be mainly south bound it would seem appropriate to make this a one-way street with a proper cycle lane including changing the phasing of the lights to allow cycles an advance phase to make the turn into Spring Road / St Helens Street.
One-way flow up another of the cross streets (probably Palmerston Road ) in the Northbound direction would complete the "loop" for cars and also ease traffic flow on that road which is currently difficult for cars or bikes to negotiate in a northbound direction in rush hour.
I know this has been proposed before, but I wanted to add an issue to Cyclescapes in the hope that it might come up again. We can collect reports and evidence here.
Reopening the Belmont Viaduct to cyclists and pedestrians could greatly shorten and improve a lot of journeys into and across Durham.
Previously Durham Council (before the County Council?) were awarded lottery funding for this. I think the issue was with landowners, and so the funding got diverted to projects outside of the city.
Created by Dan // 1 thread
Traffic lights will not change for cyclists when on the sensor (at night).
Created by Adam Edwards // 1 thread
Hatfield has the makings of a good cycle path network. However, the cycle path from the station to the town centre ends at the west end of French Horn Lane and fails to then connect to the University to the south or the Business Park (EE HQ, etc) to the west.
WelHatCycling are lobbying (most recently our MP Grant Shapps) to get this missing link filled. The route is shown on the map and is entirely unobstructed. The key work is a toucan crossing of Queensway, needed not only for the cycle route, but also to open up the north east end of the town centre to passing trade from people cycling and walking via the town centre.
Kate Ravilious // 0 threads
The padlocked barrier at the end of Hospital Fields Road is inaccessible for non-standard cycles, and difficult to pass through for anyone except the most able-bodied cyclists.
Created by jpennycook // 0 threads
Drivers are unaware/don't care/don't see cyclists in the cycle lane, so pull out of Lidl an Old Worting Road turning left, or turn right from Worting Road to Old Worting Road leading to very near misses. The cycle lane should be replaced with access to Old Worting Road near the bus stop, and improved access to Lidl provided.
Martin Lucas-Smith // 4 threads
The cycle lanes here are a mish-mash of narrow legacy infrastructure, and are often awkward to use.