Listed issues, most recent first:

  • Cambridge South West Travel Hub

    Created by Roxanne (Cycling Campaign Officer) // 1 thread

    GCP project:

    Junction 11 of the M11 is a key entry point into Cambridge. With significant growth in housing and employment in the area, upgrading the existing transport infrastructure in this area is vital to reduce congestion and improve access into the city.

    Congestion impacts on current bus journey times making journeys unreliable, unattractive and longer than necessary, as well as affecting the convenience and comfort of cycling trips on the corridor.

    By expanding the existing Travel Hub in Trumpington and creating more Travel Hub provision (either by creating multi-storey parking at the Trumpington site or a new Travel Hub to the west of Junction 11), car drivers can be encouraged to complete their journeys by bus. More Travel Hub use would help the flow of traffic and make employment sites such as the Cambridge Biomedical Campus, West and North Cambridge easier to reach.

    A consultation on increasing Travel Hub spaces to the south west of Cambridge ran until 21 December 2018. Thank you to those who attended our events and responded to the consultation. We will now collate the responses and publish a report in the Spring of 2019.

    The Cambridge South West Travel Hub Project is a component of the West of Cambridge package, which includes review and development options for Travel Hub facilities, creation of new Travel Hub locations, and enhancement or upgrade of existing facilities.

    Please sign in to vote.
  • Proposed New Healthy School Street Zone

    Created by Jean Dollimore // 1 thread

    Camden is consulting on a proposed Healthy School Street zone around the following schools:

    • South Hampstead High School (both junior and senior sites),
    • North Bridge House Pre-Preparatory School,
    • Southbank International School
    • Holy Trinity Primary School.

    Please sign in to vote.
  • Armley Gyratory Changes

    Created by M Stanley // 1 thread

    Leeds City Council are proposing major changes to the gyratory. The stated aim is to increase motor vehicle capacity at the junction which will in turn allow the removal of general motor traffic from areas of the city centre such as city square.

    Please sign in to vote.
  • Central London Cycle Grid Section 1: Queensbridge Rd b/w Hackney Rd & Whiston Rd

    From Hackney council:

    Help us improve cycling on Queensbridge Road between Hackney Road and Whiston Road

    We are seeking your views on proposals that will create a protected cycling route along Queensbridge Road to form part of a network of safe cycling routes between the Quietway link at Whiston Road and Quietway 13 at Columbia Road.

    Hackney Council is working in partnership with Tower Hamlets and Transport for London (TfL) to make cycle accessibility improvements on Queensbridge Road from Hackney Road to Dalston Lane as part of the Central London Cycle Grid (CLCG) from Bethnal Green to Dalston Lane. The improvements at Queensbridge Road are being developed in three sections:

    • Section I: Hackney Road – Whiston Road
    • Section II: Whiston Road – Middleton Road
    • Section III: Middleton Road – Dalston Lane

    Hackney, Tower Hamlets, and TfL are committed to making our streets safer for everyone. These changes aim to encourage more walking and cycling, improve air quality and reduce emissions within the local area. Hackney and Tower Hamlets recognise that streets are not just places to park vehicles or drive, but to walk and cycle on too. They are the places where we socialise and live our lives. An aspiration of both boroughs is to reclaim streets from motor traffic and congestion and transform them into attractive and liveable neighbourhoods.

    Queensbridge Road is one such street. Although it is a relatively wide road (about 10.5 metres wide), it was designed for the rapid transit of motorised vehicles and parking. The traffic islands and hatched road markings leave little room for other road users such as pedal cyclists and pedestrians. Between Hackney Road and Whiston Road, 28 collisions were recorded between 2013 and 2017. Sixteen of them involved pedal cyclists.

    The proposed improvements would change the nature of Queensbridge Road to make it a healthier, safer and more pleasant environment for walking and cycling, reflecting the needs of the local area, including its residential estates, Haggerston Park and Haggerston School.

    What are the proposals?

    The following measures are proposed:

    Queensbridge Road raised cycle tracks

    • Installing two metre wide raised cycle tracks between Hackney Road and Whiston Road. These will be next to the existing pavements on both sides of the road. The raised cycle tracks will be separated from motorised traffic by a kerb and from pedestrians by a pedestrian/cycle separator (see example of a separator on page 11 in the FAQs section).
    • Installing a mandatory cycle lane on the carriageway next to the cycle hire scheme at Kent Street.

    Dunloe Street shared zebra crossing

    • Installing a raised table with a parallel pedestrian/cycle crossing (shared zebra crossing for pedestrians and cyclists) at the junction of Dunloe Street and Queensbridge Road. The parallel crossing will allow cyclists and pedestrians to cross Queensbridge Road under the controlled conditions of a zebra crossing. The raised junction table will provide a step-free pedestrian crossing and help with encouraging drivers to keep to the 20mph speed limit.
    • Closing Dunloe Street on both arms with Queensbridge Road to motor traffic to reduce the potential conflict between turning traffic and pedal cyclists and reduce rat running.

    Hackney Road junction improvements

    • Installing a raised entry table at the junction of Hackney Road and Horatio Street to provide pedestrians with step-free crossing facilities.
    • Replacing the existing traffic islands on Hackney Road with wider pedestrian-friendly traffic islands.
    • Refurbishing the road and pavements around the junction.
    • Removing clutter such as redundant guard railings and signs at the junction. Installing double yellow lines between the pedestrian crossings at the junction.
    • Installing low level cycle signals with early release crossing facilities for cyclists at Queensbridge Road and Horatio Street, subject to junction capacity.

    Kent Street raised entry table and zebra crossing

    • Installing a raised entry table at the junction of Kent Street and Queensbridge Road for a step-free pedestrian/cycle crossing at this location.
    • Installing a raised table for the existing zebra crossing at Edith Street to provide controlled step-free crossing facilities for pedestrians when crossing Queensbridge Road. Due to the nature of the road at this location, a parallel pedestrian/ cycle crossing was considered unsuitable.

    Refurbishment of pavements and carriageways

    • The existing pavements adjacent to the raised cycle tracks will be refurbished using standard paving materials. Blended pedestrian crossings will be installed at Kent Street and Dunloe Street side road junctions to highlight the priority of pedestrians over pedal cycles and motorised traffic from the side roads (see example of a blended crossing on page 11 in the FAQs section).

    Whiston Road junction

    • Installing ‘advanced stop lines’ (ASLs) for cyclists at the southern arm of Queensbridge Road connected to the raised cycle track with road markings.
    • Low level cycle signals with early release crossing facilities for cyclists will be considered as part of Section II between Whiston Road and Middleton Road.

    Please download the plans below for more details

    Layout plans from Hackney Road to Whiston Road

    Location plan

    Layout plans from Hackney Road to Whiston Road

    Detail 1: Dunloe Street junction

    Detail 2: Hackney Road junction

    Detail 3: Kent Road junction

    What are the potential impacts of the proposals?

    • If approved, these proposals would provide safe, protected cycling facilities for cyclists between Hackney Road and Whiston Road. Six collisions resulting in slight personal injuries were recorded in 2017 between Hackney Road and Whiston Road, three of which involved pedal cyclists.
    • They would also provide step free crossing facilities for pedestrians at side roads and at controlled pedestrian crossing points.
    • The reduced road width would help reduce the average traffic speeds (outside Haggerston School) to under 20mph.
    • The proposals would help improve accessibility for pedal cyclists and pedestrians at major junctions such as at Hackney Road.
    • Schemes of this nature are expected to contribute to improved air quality as they both regulate private motor vehicle traffic and reduce capacity. The introduction of cycle lanes also increases the distance between polluting vehicles and pedestrians and residents, reducing the effects of pollution.

    Parking

    • The proposals would affect all the parking on Queensbridge Road between Hackney Road and Whiston Road where the existing parking bays will be removed.
    • The existing car club and loading bay at Queensbridge Road will be relocated to Dunloe Street (east). A new electric charging point will also be installed on the same bay.
    • A parking stress survey confirmed that the existing parking bays on the side roads are able to absorb the impact of displaced cars from Queensbridge Road.
    • The existing residents parking bay on Horatio Street would be changed slightly to create space for passing cyclists.
    • The single yellow line between pedestrian crossings at the Hackney Road junction would be converted to double yellow lines.
    • Parking for visitors to the Columbia Road Flower Market would still be available at the ‘pay and display’ parking bays on Yorkton Street, Scawfell Street and Thurtle Road.

    Future schemes

    The rest of the cycle grid to the north of Whiston Road will be consulted on and developed as follows:

    • Section II: Whiston Road to Middleton Road (2020–2021)
    • Section III: Middleton Road to Dalston Lane (2021–2022)

    What happens next?

    Your views will be taken into account as part of the detailed design process. We will publish the consultation responses as well as the decisions made at consultations.hackney.gov.uk  

    To keep up to date with this and other plans, please visit hackney.gov.uk/street-consultations

    Permanent works

    If the scheme goes ahead, following consultation, we expect construction works to start in January 2020.

    Frequently Asked Questions

    Q. What is a raised cycle track? Can pedestrians and motorised traffic use the cycle track?

    A. A raised cycle track is a section of highway where pedal cyclists have right of way. It is vertically separated from motorised traffic by a kerb and from pedestrians by a raised pedestrian/cycle separator.

    Q. What is a parallel pedestrian and cyclist crossing? Who has priority when crossing the road on this type of crossing?

    A. A parallel pedestrian and cyclist crossing works like a zebra crossing that allows cyclists and pedestrians to cross the road, giving priority over motorised traffic. Vehicles should stop at the ‘Give Way’ road markings, as in conventional zebra crossings.

    Q. What are blended pedestrian crossings and will traffic give way to pedestrians at them?

    A. Blended crossings are pedestrian crossing points designed to slow down vehicles when entering or exiting side roads, encouraging vehicles to give way to pedestrians crossing the road.

    Q. What is a parallel pedestrian and cyclist crossing? Who has priority when crossing the road on this type of crossing?

    A. A parallel pedestrian and cyclist crossing works like a zebra crossing that allows cyclists and pedestrians to cross the road, giving priority over motorised traffic. Vehicles should stop at the ‘Give Way’ road markings, as in conventional zebra crossings

    Please sign in to vote.
  • Charging for cycle parking in multi-storey car parks

    Created by Edward Leigh // 1 thread

    We know we need thousands more cycle parking spaces in future to meet ambitions to reduce car trips into the city and cope with the huge population and employment growth that the region is already committed to in its Local Plans. There is very little highway space available in the city centre, so we need to re-purpose other spaces, such as multi-storey car parks. I want to see if we can develop a policy to put to the City Council that they could act on. We've been discussing locations for new cycle parks for years (see linked Camcycle article), so what's the hold-up?

    Please sign in to vote.
  • Dog Kennel Hill Bus Lane Widening

    Created by Sean Howes // 1 thread

    Dog Kennel Hill Bus Lane Widening

    Closes 29 Sep 2019

    Opened 23 Aug 2019

    Contact

    Lola Olanlokun

    (Project Manager)

    Highways

    highways@southwark.gov.uk

    Overview

    We want to improve bus journey times along Dog Kennel Hill, as it has been identified that the bus lane is on a steep hill in this section and cyclists can hold up buses significantly as the lane is currently too narrow for buses to safely overtake cyclists travelling up the hill.

    In order to support this, we are proposing to widen the northbound bus lane on Dog Kennel Hill, either side of the junction with Albrighton Road. We are also considering changing the bus lane hours of operation to 24 hours a day 7 days a week. This will reduce conflict with other vehicle types and help buses keep to timetable.

    These proposals should improve journey times for passengers using the 40, 176, 185 and 484 bus routes. By making bus travel more reliable, this supports Transport for London's Healthy Streets indicator: 'People choose to walk, cycle and use public transport'.

    To do this and maintain the carriageway width for other vehicles, we plan to reduce the width of the central reservation. This will involve the transplanting of one tree, but we plan to plant an additional new tree, so the net impact would be additional tree cover.

    Please see the plan for these works here:

    If the project goes ahead, works will be undertaken in early 2020. We would try to minimise any disruption, and no full road closure should be required.

    Why We Are Consulting

    As there may be some disruption for local residents during construction, we want to make sure you have the opportunity to review the proposals and let us know if you have any concerns.

    Please sign in to vote.
  • 'Southwark Spine' (North)

    Created by Sean Howes // 1 thread

    Traffic order has been raised for the Southwark Spine North section we need to gather feedback for any objections and urgent suggestions. 

    Focus only on issues that are serious as its going to go in most as is.

    Please sign in to vote.
  • Hi Events

    Tom McKeown // 2 threads

    Events to promote cycling within Histon and Impington. Raise awareness for groups other activities.

    Please sign in to vote.
  • Thessaly Road SW8

    Created by Simon Munk // 1 thread

    Council says:

    Wandsworth Council would like to hear your views on proposed improvements for pedestrians and cyclists along Thessaly Road, enhancing access and the local environment.

    As motorised vehicle movements are relatively low on Thessaly Road, the proposals aim to provide safer infrastructure for more vulnerable road users.

    The proposed introduction of raised, controlled crossing points would benefit pedestrians, particularly school children visiting local community facilities and St George’s Primary School, whilst also slowing traffic speeds along Thessaly Road.

    Within the scope of the scheme, Thessaly Road would also have new raised ‘Copenhagen style’ junctions with side roads, to create an improved pedestrian and cycle user experience and slow down traffic joining Thessaly Road. ‘Copenhagen style’ junctions allow cyclists and pedestrians to have priority over vehicles exiting the side roads. The scheme will also include installation of new high-quality paving materials and new cycle parking.

    A segregated cycle track would provide a safe route for cyclists between Battersea Park Road at the north end (which is the subject of proposed improvements being developed in partnership with Transport for London) and Wandsworth Road and Lambeth to the south. It would also provide a safe route to the two new Northern Line Extension stations opening in 2021.

    The proposals include improvements to the public realm at the junction of Condell Road, Deeley Road and Battersea Park Road, featuring new seating areas and new planting.

    The scheme is part of a package of infrastructure improvements in the area which include proposals for a Controlled Parking Zone and a colourful ‘Happy Street’ redesign for the Thessaly Road rail bridge, all funded by contributions from developers in the area.

    In line with strategic masterplans for the Vauxhall Nine Elms Battersea Opportunity Area, Thessaly Road has been identified as a key strategic link for cycle and pedestrian movements from north to south through the opportunity area, and so the proposed improvements reflect the need to meet changing demands of this growing central London area.

    It is important for the Council to know the views of local residents and businesses before progressing with any improvements.

    Please sign in to vote.
  • Camden Street/Camden Road Safety Improvements

    Created by John Chamberlain // 2 threads

    TfL are consulting on changes to the junction of Camden Street with Camden Road. These include a new pedestrian crossing on Camden Road, cycle ASLs on all three approaches and a left-turn ban plus cycle feeder lane on Camden Street.

    The consultation is at https://consultations.tfl.gov.uk/roads/camden-street-camden-road/  This includes a plan of the proposed layout and a Healthy Streets checklist (which shows minor improvements).

    You can respond direct to TfL via the website or by email to consultations@tfl.gov.uk. We will put in our formal response before the 29th September deadline, incorporating responses gathered here.

    Please sign in to vote.
  • SE Bermondsey parking study

    Created by Sean Howes // 1 thread

    Overview

    We are conducting a parking study in the South East (SE) Bermondsey area, shown outlined in blue below, with a view to introducing a parking zone.

    We have received numerous requests from residents and businesses, including a petition, requesting parking controls from a number of streets within the area shown below.

    A parking study is an opportunity for the council to assess the parking issues in a certain area by asking the local residents and businesses how they view parking on their street and whether they would like a parking zone to be introduced.

    A parking zone is a network of streets covered by parking controls. Each street is marked out with either parking bays or double yellow lines.

    The council will analyse responses on a road by road basis and make recommendations to the decision maker on zone boundary and operation days and times based on the street by street analysis.

    Any parking controls that we introduce will take into account the results of the consultation as well as existing highway safety issues in the proposed zone, feedback from emergency services, and our wider transport policies reflecting our responsibilities to air quality and active travel.

    We would like to hear your views on the proposal.

    Please read the consultation booklet and consider the proposed layout design, both attached below, before completing the questionnaire online or by post via the freepost address, by Sunday 22 September 2019.

    For more general information about parking in Southwark visit www.southwark.gov.uk/parking

    Why We Are Consulting

    Since the neighbouring Thorburn Square parking zone was implemented in October 2018 (results of which are summarised here), we have received numerous requests from residents, including a petition, requesting parking controls to be extended into the area to the east of St James Road to address the issue of increased parking pressure.

    The study area includes a section of streets in the north of the study area surrounding the Blue where businesses have voiced concern about parking pressure from commuters.

    We have had discussions with residents, and met with businesses before launching this consultation to discuss parking issues so that our consulation and design best fits the needs of both residents and local businesses and which complements the Good Growth Fund project at The Blue, currently underway.

    Free parking for traders and customers is currently offered at the The Blue car park and improvements to these parking arrangements are being managed separately by the housing parking team alongside the Good Growth Fund project.

    Please sign in to vote.
  • S/2896/19/FL Imperial War Museum Hotel

    Created by Matthew // 1 thread

    Construction of a 168 bedroom hotel with ancillary facilities, associated access, gates, car parking (including reconfigured conference centre car parking), cycle parking and landscaping.

    Please sign in to vote.
  • Cowley Road potholes

    Created by David Green // 1 thread

    There is a dangerous group of cavities developing around the ironworks at the 'T junction' which cyclists have to negotiate every morning, while the new cyclepath to the SciencePark is unavailable.

    Please sign in to vote.
  • loose surface on busway path

    Richard G // 1 thread

    There is a lot of non-slip surface, that red colour stuff, that has rubbed off and collected just on the bend as the path goes under the bridge, as you leave the P&R

    Last week, I came past just as someone was being helped back up again, after their bike slipped on the loose surface.. It feels quite treacherous as you cycle over it.

    I cant see anywhere, who to contact about removing all the loose material.

    Anyone know a good point of contact to report to?

    thanks, Richard

    Please sign in to vote.
  • 17/1527/NMA1 213 Mill Road - including changes to cycle parking

    Created by Matthew // 1 thread

    Non-material amendment on application 17/1527/FUL to include changes to Dutch's Corner, townhouses, Mews houses and landscape. Dutch's Corner changes are as follows: raised height of dormer, omission of 3 rooflights, fenestration changes and removal of recess on Ross Street elevation. Townhouse changes are as follows: reconfiguration of rooflights, reduction in bay window depth, 175mm increase to wall and internal changes. Mew houses changes are as follows: fenestration changes, amended position of house, step in roof height relocated, reduced green roof area, amendments to size of basement and front courtyards, relocated cycle store. 5 new trees omitted.

    213 Mill Road Cambridge CB1 3BE

    Cambridge

    Application reference : 17/1527/NMA1

    Please sign in to vote.
  • Four Lamps roundabout

    Created by Matthew // 2 threads

    The Four Lamps roundabout at the junction of Victoria Avenue, Jesus Lane, Maid's Causeway, Short Street and King Street was built when traffic flows were anticipated to be much higher than they actually are today.

    Please sign in to vote.