Issues

This section lists issues - problems on the street network and related matters.

Issues always relate to some geographical location, whether very local or perhaps city-wide.

You can create a new issue using the button on the right.

Listed issues, most recent first:

  • A Hazard Rich Environment

    Created by Sam Saunders // 0 threads

    A recent Bristol Cycling Campaign ride returned to Bristol from Nailsea using the Festival Way.
    Daylight was fading & they were already using front & rear cycle lights (which would be "side on" to approaching traffic whilst crossing B3128).
    The final North Somerset stretch after Long Ashton crosses the B3128 to use the off-road route past the Dovecote.

    Concern was raised about the safety of this crossing to the central island due to:-

    traffic approaching at speed on a bend - potentially endangering "Bristol bound" cyclists
    Poor site line - "Bristol bound" cyclists view of approaching fast traffic is obstructed by both the bend & by vegetation
    low cycle capacity at the central island (for a Festival Way route potentially with significant numbers "stranded" on the island or left waiting to cross to it compounding the dangers of poor sight line).

    One of our concerned participating cyclists on that ride is the Chair of Bristol Civic Society.

    This location was previously raised in my snagging email of 12 April 2013 14:11 headed "Re: 24 April Cycle Forum reminder and item for discussion"
    .
    " 1.1.2 NCN 33 crossing B3128
    Vehicles approaching from the SE have a "cycle crossing" sign but will tree growth soon obstruct drivers vision when approaching?
    Does the central island have enough capacity for peak numbers crossing?"

    Please sign in to vote.
  • Cycle track priority over A14 slip roads

    Created by Shaun McDonald // 1 thread

    It would be much safer to have cyclist priority on the slip roads here as is done in The Netherlands http://www.flickr.com/photos/smsm1/10046288016/ , or even the following example from Britain: http://www.cycling-embassy.org.uk/photos/good-cycling-facility-of-the-week/good-cycling-facility-of-the-week-14th-november-2013-0

    The slip roads also need to be narrowed to slow motor vehicle speeds as does the turning radii of the roundabout.

    Please sign in to vote.
  • Pampisford to Granta Park proposed cycleway

    Created by David Earl // 1 thread

    The County Council has sent Cambridge Cycling Campaign an outline consultation on a proposed cycleway to Granta Park (the PDF will be attached to this issue in a thread). There's not a lot of detail about e.g. junctions, and nothing about how this relates to any extension of the cycleway between Wandlebury and Brabraham. It appears they have abandoned attempts to use the bridleway between Baraham and Abington and chosen a route along the A5050 instead.

    Please sign in to vote.
  • Carter Cycle Bridge Western Access Improvements

    Created by Edward Leigh // 2 threads

    Hidden away in the planning application for the Skanska development around the new Northern Access Road to Cambridge station are detailed proposals for the redesigned cycle access to the western end of Carter Bridge:
    http://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=MPYVR2DX08L00
    [Scroll down to 'CARTER CYCLE BRIDGE WESTERN ACCESS IMPROVEMENTS'.]

    My concern is that the new junction with the bridge on-ramp will be difficult and dangerous to negotiate for cyclists and pedestrians. With 450 cycle movements towards the city at peak time, this will be a busy junction where cyclists are moving rapidly as they descend the slope. Those cyclists heading for the station will have to break hard before turning across the path of oncoming cyclists and across the footway in order to join the new link path.

    This is undoubtedly an improvement on the existing arrangement (which involves crossing Devonshire Road twice to access the station), but two options that seem to have been considered in the past but rejected would be safer and more convenient:

    1) Opening a route via Ravensworth Gardens through the existing wall at the boundary of the station car park.

    2) Adding a cycle-only ramp joining the south side of the bridge opposite the stairway.

    Any thoughts?

    Please sign in to vote.
  • Cycle parking for shops in Ashburnham Rd, Ham

    Created by Kate // 1 thread

    I would like to propose the parade of shops in Ashburnham Road, opposite Ham Library as a spot that would greatly benefit from cycle parking. This spot was turned down for cycle parking in 2012 on the grounds that there is already cycle parking in Ham Street outside Hansel & Pretzel (opposite Grey Court School).

    The Ham Street cycle parking is not convenient for people who want to park their bikes in order to pop into the shops in Ashburnham Road. The cycle parking in the library is reserved for library users only. As you can see from the attached photos people end up laying their bikes down on the pavement, thereby causing an obstruction for pedestrians.

    2 or 3 Sheffield stands would be sufficient to solve this problem.

    I have obtained signatures from all but one of the shops in Ashburnham Road in support of this idea. The remaining one also supports the idea but they want to be sure that the parking would not be directly outside their shop, thereby possibly obstructing deliveries.

    My suggestion would be to put stands either as a group on the corner next to the mosaic and the Indian takeaway restaurant, or to locate them on the opposite side of the road to the shops, in a similar way to the ones in Back Lane, Ham (see attached photo).

    As I am sure you are aware, convenient cycle parking not only encourages people to use their bikes but has also been proven to help the local economy as people are more likely to stop and use the local shops if they can easily park their bikes nearby.

    Please sign in to vote.
  • 'Quick Wins' - minor cycling infrastructure improvements in Camden

    Created by George Coulouris // 2 threads

    Camden officers have indicated that they would like to receive prioritised list of suggestions for (very) minor improvements throughout the borough that will make cyclists feel better catered for. Examples of changes that will be considered:
    - dropped kerbs
    - obstructive barriers (i.e. anti-motor cycle barriers)
    - stretches of poor road surface (such that you have slow down on a Brompton or weave around holes)
    - Feeders into ASLs that are too short or non-mandatory

    Changes that shouldn't be suggested for this initiative include:
    - anything that would require a local consultation
    - anything that involves changes to parking provision
    - individual pot-holes

    To compile a list, we want suggestions from members. The Council's deadline is Monday November 25th. So can we have members' suggestions by Wednesday November 20th please. That will allow time for us to compile a list and circulate it here for comment.

    Please sign in to vote.
  • Cycle lane infringement on Pembroke Street and Downing Street

    Created by Richard Jennings // 2 threads

    Because of queuing for the Grand Arcade car park, amongst other things, the mandatory cycle lane on Pembroke Street and Downing Street is routinely abused by motor vehicles – one every 66 seconds on a Saturday afternoon http://www.cyclestreets.net/galleries/221/.

    The corner at Free School Lane is a particular concern because vehicles traveling east can't see oncoming cycles.

    Please sign in to vote.
  • lack of queue busting cycle lane

    Created by Heather Coleman // 1 thread

    Since they appear to have changed the phasing at the lights at Cherry Hinton Road the other side of the railway bridge this morning, it becomes ever more apparent that if you have queueing traffic all the way southbound from Station Road to Cherry Hinton Road, the lack of even a narrow "queue-busting" cycle lane here, combined with the shocking state of the kerbside approx 9 inches of road surface (uneven cobbles and slabs, very slippery, very difficult even to use while scooting your bike along by a foot on the pavement), that cyclists are being seriously held up. Once the advisory lane outside the Centennial Hotel (well obeyed by drivers this morning in general apart from when the right hand turn queue for Brooklands Ave starts) ends, you just get stuck in a queue of kerb-car-car traffic and cannot access the ASL at the junction with Brookgate, in order to take advantage of the cycle lanes which queue-bust you across the railway bridge.

    This leads to a) pavement cycling, b) people nipping in and out of a queue of vaguely stationary/starting to move traffic c) nipping back infront of traffic which is starting to move at the lights after white lining to get past the queue. All of the cars stuck in that queue will have to wait at least two cycles of the lights at Cherry Hinton Road before proceeding and thus are just an obstruction.

    Given that this is a relatively recently refurbished/altered road, I suppose this should have been spotted at the time.

    What can be done about it retrospectively? If the traffic light phasing at Cherry Hinton Road stays as it is, there will be an accident before too long.

    Please sign in to vote.
  • Changes on Cherry Hinton Road approach to Hills Road

    Created by David Earl // 1 thread

    What on earth do they think they are doing here? The cycle lane alongside the new development on Cherry Hinton Road (former Tim Brinton motors) has been removed (after being closed for months) and now splits into two, one part directing cycles onto what looks like it will become an exceptionally narrow cycleway on the pavement (which ends up rejoining the road just at the lights on the far left); or diverting cycles in a weird swerve out into the road to meet the sides of the constant queue of vehicles.

    Please sign in to vote.
  • Green Ring Everlasting Lane section

    Created by mike1727 // 1 thread

    "The St. Albans Green Ring route will run approximately parallel to Everlasting Lane in Batchwood Everlasting Lane is an un-surfaced green lane that can be used as an alternative route to avoid traffic. "

    It is proposed to construct a new tarmac path across the recreation ground in Temple View from access on Temple View going North West to an entrance onto Everlasting Lane"

    Feasibility study pages 15-17
    Googlemap ref http://goo.gl/maps/MjClP

    2.5m wide tarmac cyclepath sloping down from playing fields to Everlasting Lane max gradient 1:12 sides 1:2.5

    this appears to be option 3 from the feasibility study

    Questions:
    Why was Sutrans' reccomended route not taken up?

    Will there be a cycling right of way accross the Recreation ground to provide a legal link to City Hospital?

    Will cycle parking be installed in the Recreation Ground?

    What work is being planned on the Everlasting lane section of this route? (In particular surfacing and width)

    Will lighting be installed?

    Please sign in to vote.
  • Green Ring Bernards heath section 2

    Created by mike1727 // 0 threads

    2.5m bound gravel cycle path following existing informal route "proposed to widen and reconstruct the existing path through the Recreational Ground to Sandridge Road. "

    Feasibilty study page 24
    Googlemaps ref http://goo.gl/maps/97an1

    Questions:
    What is being planned for the crossing of Sandridge road and when will it be delivered?

    Sustrans reccomendation:
    Cross Sandridge Road via a central refuge – consider creating another central refuge
    on Sandridge Road to the north east of Boundary Lane for cyclists wishing to travel in
    that direction. An alternative would be to create a Zebra crossing at this location
    without a central refuge. This would avoid the pinch point created by a refuge for
    those cycling along Sandridge Road.

    Please sign in to vote.
  • Green Ring Bernards Heath section 1

    Created by mike1727 // 1 thread

    Link between NCN 6 near Townsend Drive to Edward Beaufort Drive

    "It is proposed to cross Bernard’s Heath on a 2.5 metre width hard-surfaced gravel pathway running approximately parallel to Heath Farm Lane. It will follow the existing informal route through the Heath. "

    Feasibilty study page 23
    google map reference

    Questions:
    Please ensure any bollards/posts at each end of the section allow sufficent width for tandems and bike trailers.

    When is additional work on this link due?

    Feasibility study reccomended :

    •Widen roadside footway to maximum available using Highways land to rear of footway between Edmund Beaufort Drive and new crossing of Harpenden Road

    • Cross Harpenden Road using Toucan on crest of hill

    We could do with some photos of this please.

    Please sign in to vote.
  • Burtons Road

    Created by Paul L // 0 threads

    Burtons road has been part of the borough cycle network usually acting as a quiet parallel to Queens Rd. Unfortunately growth of traffic has led to it being a rat-run at peak times despite numerous road humps. As parking leaves space for only one vehicle this makes it unpleasant to cycle.

    Please sign in to vote.
  • Infringement of East Road cycle lane

    Created by David Earl // 2 threads

    The new flats at the fire station seem to be attracting delivery vehicles to unload in the cycle lane at the west end of East Road. The wide lane here is separated from the road by cross hatching. Should we ask for physical segregation on this short length, e.g armadillos. Would delivery vehicles still bump over them to park are make matters worse to get round them? Would a barrier be effective?

    Please sign in to vote.

This map shows all issues, whether points, routes, or areas:

Back to top