Cars blocking Bird Cage Walk
Cars parking across the end of Bird Cage Walk at school leaving time make the path less accessible and more dangerous for cyclists and pedestrians.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Gregory Williams // 1 thread
Cars parking across the end of Bird Cage Walk at school leaving time make the path less accessible and more dangerous for cyclists and pedestrians.
Created by Gregory Williams // 1 thread
The Bird Cage Walk cycle path stops short of properly serving Hales Place. Cycling through the Farleigh Road underpass isn't indicated at permitted, nor is cycling to the road at Hever Place. There is prospect that a better cycle connection for Hales Place could be developed, keeping cyclists away from motor vehicles.
Created by Gregory Williams // 1 thread
There isn't any cycle parking at St. Stephen's Community Centre.
Created by Gregory Williams // 1 thread
There isn't any cycle parking beside the Hales Place shop to encourage people to choose to cycle.
Created by Gregory Williams // 1 thread
Several barriers across the path at Hackington Place, where cyclists need to dismount for a short section, make access for tandems and cycles with trailers difficult.
Created by Gregory Williams // 1 thread
This pair of steps limit access between Canterbury's cycle network and The Old Tannery.
Created by Gregory Williams // 1 thread
Signs towards Sustrans routes to help divert cyclists away from the dangerous A2 dual carriageway.
However, the routes shown aren't totally accurate. All of the best routes for these destinations will head towards and onto NCR18. First, turn right onto the A28 at the traffic lights (walk across using the nearby controlled crossing if needed), then turn left into Ten Perch Road. Head across at the first roundabout, then almost across (11 o'clock position) onto shared cycle path at the second roundabout. This leads to NCR18 (Great Stour Way). At the T-junction with the Great Stour Way, turn left to head towards Chartham and Ashford. Turn right to head into Canterbury and towards Whitstable (via NCR1) and RCR16 (via NCR1 bound towards Sandwich (Not towards Whitstable when you see the signs)).
The pictured sign needs correcting, and the onward signs need to be added, since they're not present.
Created by Gregory Williams // 1 thread
Steps at each end of Tonford Lane bridge make it difficult to take wheeled modes of transport such as bicycles, scooters, push chairs, wheelchairs, and mobility scooters from one side of the river to the other.
sound+fury // 1 thread
Refurbishment of the building including internal slab openings with steel framing, roof replacement and raising the flat roof finish height, parapet works, new plant, substation, external alterations and temporary removal of shopfront to facilitate MRI installation (first phase).
163 - 167 Mill Road Cambridge Cambridgeshire CB1 3AN
Cambridge
Application reference : 23/03068/FUL
Created by Gregory Williams // 1 thread
There isn't any cycle parking serving the shops on the upper portion of St. Dunstan's Street.
Created by Gregory Williams // 1 thread
The is no cycle parking serving the shops at Hales Drive, despite there being sufficient space for stands and the shops being adjacent to Canterbury's cycle network.
Created by Gregory Williams // 1 thread
There is no cycle parking serving the shops at the Reed Avenue / Sturry Road junction, despite them being adjacent to part of Canterbury's signed cycle network and having plenty of space that stands could be installed in.
Created by Gregory Williams // 1 thread
There is no cycle parking along the road of Wincheap, despite there being several shops and commercial premises alongside the road.
Created by Josh Grantham // 1 thread
The signalised crossing of The Fen Causeway is up for renewal. We've been asked for comment
Created by Gregory Williams // 1 thread
The surface on the section of NCR1 from the road northwards and beside the field is deteriorating. I feel that it puts some people off of using the route.
Created by Gregory Williams // 1 thread
Proposal to remove motor vehicle access along this route, still permitting cyclists and pedestrians.
Created by Gregory Williams // 1 thread
Removal of wall, addition of cycle hub, and planters. Re-paving surfaces.
Created by Gregory Williams // 1 thread
The plan appears to show that the proposed cycle hub will replace the existing cycle parking. I believe that the cycle hub is just for hire cycles, therefore it'd be a loss of capacity for non-hire cycles.
Created by Gregory Williams // 1 thread
Proposed changes to paving and addition of planters at St. George's Square. An opportunity to add cycle parking lost by the recent changes at St. George's Street the the north-west appears to have been missed.
Created by Gregory Williams // 1 thread
Proposals for changes to road and path surfaces, addition of cycle hub, planters, and trees. The pelican crossing is proposed to be retained. The cycle hub appears to be just for hire bicycles, without capacity for non-hire bicycles.
Created by Josh Grantham // 1 thread
23/03080/OUT | Outline application for demolition of existing structures and redevelopment for employment (office and laboratory) floorspace E(g)(i)(ii) alongside a new amenity building (including F2(b)(c)), country park and associated infrastructure with all other matters reserved for future determination apart from access, layout, scale. | Former Waste Water Treatment Facility Cambridge Road Hauxton Cambridgeshire CB22 5HT
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
A project from Greater Cambridge Shared Planning to inform urban design.
Created by Josh Grantham // 1 thread
23/02696/FUL | Demolition of 3 residential properties (known as Fossdene, Winside and The Gables) and the erection of five residential buildings for postgraduate students as well as two storey and single storey extensions to The Knott for postgraduate accommodation and the provision of cycle and bin stores, landscaping and car parking including new boundary treatments. |Fossdene Whinside The Gables Mount Pleasant Cambridge Cambridgeshire CB3 0BL
Created by Martin Wheatley // 1 thread
People cycling being abused by drivers for not using cyclepaths, even where they are sub-standard or useless.
sound+fury // 1 thread
Change of use from an office (Use Class E(g)(i)) to a state funded school (Use Class F1(a))
72 Hills Road Cambridge Cambridgeshire CB2 1LA
Cambridge
Application reference : 23/02904/PRIOR
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by MJR // 2 threads
There was a Heritage Lottery Fund stage 1 project hoping to progress to stage 2 and work for 5 years from June 2014 to regenerate the "old town" around the Saturday Market Place. The initial draft contains no cycle measures but does mention cycle access policy, so may be persuaded to reinstate lost public cycle parking in places like opposite the old Post Office and might even be a way to fill in the missing link in National Cycle Network Route 1. The consultation papers are online at http://www.west-norfolk.gov.uk/default.aspx?page=26919 and open until 16 December.
The key cycling problem in this area is the difficulty of accessing Saturday Market Place without passing through the poor junction at its east end and the lack of signs telling cyclists to use Priory Lane to reach SMP.
Martin Lucas-Smith // 11 threads
Major planning application here - c. 10,000 homes
Created by Simon Redding // 2 threads
The railway path from Sheffield down through Staveley & Poolsbrook stops at Arkwright Town. Since an opencast / landfill was south of this point, there is no trace of the former railway line to join to the trails at Sutton Spring Wood. This is an important local link.
Create an off-road route along the railway line out to the east, which could ultimately form a route out to Collin.
A community consultation 'The Barnes Ponder' in October 2013 has show strong support for making Barnes a 20 mph neighbourhood .
“20mph is plenty enough speed on the roads!”
Created by Shaun McDonald // 1 thread
St Peter's Dock on the National Cycle Route 51 just north of Stoke Bridge has a really poor surface which collects water, also the old rails that are no longer used and no longer connect to the rest of the rail network are a hazard for cyclists and ideally should be removed.
Created by Andrew Woodward // 0 threads
Railway footbridge should have a ramp/trough added to make it easier for cyclists to cross the railway. This would then create a quiet north/south route to Marshgate school as an alternative to Manor Road.
Created by Andrew Woodward // 2 threads
Ham Gate Avenue: As you cycle past parked vehicles which narrow the road by almost half you are trapped in a long tunnel. Impatient motorists who want to enter from the other end do so and simply drive at you forcing you practically into the gutter or off the road completely. Would it be ever possible to ban parking on this avenue and limit the speed to 20mph as it is in the park?
Note - there is a shared use segregated track alongside the road here (part of NCN 4) but it is frequently too narrow to cope with the volumes of cyclists and pedestrians; it is overhung with low tree branches and the surface is poor.
Created by Jack Thurston // 1 thread
There are currently around 6 or 8 cages for cycle parking. One bike per cage. While this is great for anyone lucky manages to find an unused cage, often they're all used. Some additional Sheffield type stands required.
Created by Fraser Stephens // 1 thread
RAISED AT PUBLIC MEETING 10-04-2014
The infamous missing link in the Llanfoist-Brynmawr cycle path (route 46) is a huge barrier to its safe use by children as well as those who find the steep section of the diversion route impossible to climb.
Created by Jamie // 1 thread
At the moment it is possible to cycle from Cambridge Road, near Madingley, to Girton, on a bridleway that crosses over the A428 and then passes under the M11 at the Girton Interchange. You can then cross three roads (A1307) and reach a pavement on the North-East side of the Interchange. Using the pavement you can then reach Washpit Lane and cycle up towards Girton. (The pavement is marked as a shared-use route on the OSM Cycle map, although I am not sure that it really is.)
Apart from having to be careful when crossing the A1307 junction it is a rather pleasant route to ride.
The Girton Interchange is being "improved" to reduce the bottleneck for cars. Does anyone know what plans there are to ensure that the current route through remains open and whether there are plans to improve the bridleway route through? Or will this be another example of roads being developed to the detriment of footpaths/bridleways.
Created by Andrea // 3 threads
In Museum Street and Upper Brook Street/Northgate Street it is very dangerous to cycle. Both roads are very narrow, have lots of buses pass through and there are contraflow cycle paths. On those you are very close to the buses (both directions) even if you wait on the pavements to let them through because you are worried about accidents. Can cyclepaths go through Elm Street, Tower Street or Tower Rampart instead?
Created by Fraser Stephens // 1 thread
RAISED AT PUBLIC MEETING 10-04-2014
If a foot/cycle bridge is not going to happen in the medium term, then how about some traffic calming measures to reduce driver's speed expectations over the bridge? Drivers who have just come of a dual carriage way at 70mph+ or have been zooming along the A40 at 60mph+ are suddenly sharing space with cyclists having had little warning that this is about to happen.
We suggest deploying traffic calming measures, such as marked cycle ways, belisha beacon crossings (much needed anyway!) and signage making it clear that care is required. If the speed limit was clearly lower, many drivers will not be so aggressively trying to overtake cyclists.
Created by Matthew Phillips // 1 thread
The route on the east side of the A167 past Crossgate Moor and Framwellgate Moor crosses a number of roundabouts. The cycle-path leads you across the roads very close to the roundabout, via the central refuge in the middle of the road. Some of these roads have two lane entry to the roundabout. Crossing both lanes at once is tricky as you have to have an eye on whether the traffic is about to move out onto the roundabout. If you have a longer vehicle, such as a bus, waiting, then the route to the refuge is blocked. There are no road markings to warn motorists that cyclists might be expected.
The route is probably going to be improved as part of the Great North Cycleway. If these roundabouts are to be made safe enough for children to use, major alterations will be required. (The route goes past Durham Johnston School so should be available to children.) The route should cross further from the mouth of the roundabout, preferably on a different-coloured surface, maybe raised.
Created by Grahame Cooper // 1 thread
Irlams O'th Height roundabout has been the location of a number of collisions involving cyclists (including myself and my daughter last September).
There was a consultation last year over proposals produced by Sustrans for the improvement of this, and I showed my comments (annotations on proposed plans) at a previous GMCC meeting. You can find this annotated document here: https://copy.com/tAIjQdMSxfcsq4fz (large PDF - need to download to see all pages).
A leaflet on the intended imrovements can be found here: http://www.urbanvision.org.uk/wp-content/uploads/2014/08/Cycling-Leaflet.pdf
I am disappointed with this for the following reasons:
- Extensive use of shared footways in the scheme (Salford Council seems to be in love with these, but they are bad).
- Southbound approach on A666 looks impractical & dangerous: a sharp left turn onto the shared footway right at the busy entrance to the roundabout!
- Whilst carriageway widths have been reduced, kerb radii at the mouth of entrances and exits do not seem to have been reduced, so "drivers looking right whilst accelerating left" will still pose a danger for cyclists who do not want to use the shared footways.
- Limited improvements to the subways (tile removal, lighting and resurfacing) will probably not result in an attractive facility for cyclists. Access to this from Bolton Road (northbound) looks awkward.
- There is no undertaking mentioned to ensure that facilities will be maintained and swept.
- I'm still not confident regarding the social safety of the off-road parts, especially in the dark winter months.
Those are my immediate reactions. Could be more to add.
Created by timlennon // 1 thread
Initial quietway consultation from Richmond. This is a thread to build RCC's response
Created by Sam Saunders // 1 thread
A northern stretch of Bristol's waymarked "Concorde Way" runs along a quiet residential street, Wordsworth Road. On the newest housing development as Bristol gives way to South Gloucestershire there is a barrier between the end of Wordsworth Road and the start of Eighth Avenue to prevent motor vehicles passing through. There is a raised curb, offset railings and large grey concrete bollards and only a narrow passage either side of one bollard for cyclists to ride through. Tricycles, cargo bikes, or trailers might be to be lifted over the raised curb. In dusk or darkness neither the bollards nor the curb are easy to see. There is a light on the traffic sign offering some help, but a less intimidating arrangements or reflective/high-visibility surfaces could be considered.
Hamish F // 0 threads
There are no contraflow signs when entering Devonshire Rd from Adermans Hill. Cyclists have reported hostility towards them as they ride "against the flow". The markings are correct as the cyclist enters Devonshire Rd from A105 but of course the drivers do not see that.
Where the quite good segregated cycle lane joins The Ride, DfT advice was certainly NOT followed. As per DfT advice, when cycle lanes are merged with the carriageway, it should be done via a length of dropped kerb that is flush with the carriageway and the cycle lane shouldn't be joined at a 90 degree angle to the road.
Here, the cycle lane runs parallel to the road for a short distance before it loops around a large boulder specifically placed to force cyclists around and then finally joins the road at a 90 degree angle.
The kerb, though dropped, is far from flush and creates a risk for cyclists joining the track from the road.
This junction between the road and the track should be scrapped and redone according to DfT guidelines.
Created by Paul James // 1 thread
The cycleways along the Thames Path and along Ducks Walk are not connected with the south/east side cycleway across Twickenham Bridge and only to the north/west side cycleway via a long detour through Old Deer Park or along The Avenue.
A ramped way down from the bridge would create a useful route for people into and out of Richmond town center that is currently only possible by using two flights of steps.
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by Andrew Woodward // 1 thread
The path linking Bank Lane to Palewell Fields is currently pedestrian only, with gates across it. Opening this up to cyclists would improve permeability and provide a quiet route to Richmond Park Academy school from Roehampton (east-west); and to Ibstock Place school from Sheen (west-east).
Created by SamGW // 1 thread
The Road between Great Wilbraham and Fulbourn is very well used by Cyclists, runners and walkers throughout the year. It is a single track road with a 60 MPH speed limit. A bicycle path here would encourage more people to cycle to Fulbourn and Cambridge. The path would significantly improve safety for cars, pedestrians and cyclists.
Despite the number of bridges that link Newcastle and Gateshead, there is not a single route across the Tyne that throws bike users in to conflict with either high volumes of motor vehicles at high speeds or that uses shared paths that create potential conflict with pedestrians.
Due to the amount of people who already cycle between Newcastle and Gateshead and the potential for this to grow, there should be at least one high level crossing that gives bike users there own space when crossing the Tyne.
Created by Shaun McDonald // 1 thread
It would be much safer to have cyclist priority on the slip roads here as is done in The Netherlands http://www.flickr.com/photos/smsm1/10046288016/ , or even the following example from Britain: http://www.cycling-embassy.org.uk/photos/good-cycling-facility-of-the-week/good-cycling-facility-of-the-week-14th-november-2013-0
The slip roads also need to be narrowed to slow motor vehicle speeds as does the turning radii of the roundabout.