Shilling's Yard, Parham Road, Canterbury [CA/10/01624]
Student accommodation and cycle parking.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Gregory Williams // 1 thread
Student accommodation and cycle parking.
Created by cobweb // 1 thread
They propose improving the 20mph signage in the city centre.
Created by Gregory Williams // 1 thread
Redevelopment of the Sittingbourne Mill site to include a superstore, approximately 150 new houses, and a park.
Created by cobweb // 1 thread
A dropped kerb with and footway extension to 'facilitate' cycle route.
Created by cobweb // 1 thread
A proposal to install lighting on the mid points of the footpaths on Parker's Piece.
Created by Gregory Williams // 1 thread
Proposed new cycle path beside Westwood Road. This closes a gap in the cycle path network in Thanet.
Created by cobweb // 1 thread
A proposal to light the Gough Way cycle/footpath with solar- powered, directional cats eyes. The footbridge will be upgraded soon, so this is the next step. The route is well used.
Created by cobweb // 1 thread
A proposal to put in a new cycle path on the southern side of Lammas Land. The comment next to this in the report dismisses it because of the access road. They feel the loss of green space outweighs the need for it.
Created by cobweb // 1 thread
This could be important given the traffic calming work that was approved for the section of road outside the rugby ground.
Created by Shaun McDonald // 1 thread
Recently near Petts Wood station there has been a similar junction where the main flow of traffic is round the corner, whilst being a crossroads, which has been changed to a mini roundabout which slows the traffic more and makes it easier for cyclists. http://osm.org/go/0EEBtsaNj-?m
I'm wondering if the same can happen here.
Created by cobweb // 1 thread
From the West/Central Area Committee agenda, a proposal to resurface the track from South Green Road to the start of the Grantchester Meadows path. They will consider whether to adopt this on 1st March.
Created by cobweb // 1 thread
In the Environmental Improvements Programme for the West Area Committee, (1st March) they are considering whether to adopt the proposal to ban right turns from Newnham Croft Street.
Created by Heather Coleman // 1 thread
A colleague asked if the gate from Downing to the Downing Site was open again, since he needed to go to Pathology. I said it wasn't, but why didn't he take the route I take, down Norwich St, Panton St, Tennis Court Road. Answer, "because I fell off my bike there, those speed humps are dangerous, and if you go slowly enough not to fall off, it's really slow".
Now I find that worrying. I go my way to avoid the awful traffic jams at the junction by the Catholic Church. I think most people would consider it a safer route. But if some cyclists are being put off going that way, and instead taking the zoo that is Regent St in preference, well, I don't think the traffic calming is doing the job intended.
Too late to fix this here, but we must make it a priority that any future traffic calming in the city or South Cambs doesn't inadvertently act as an anti-cyclist measure and force cyclists onto the much busier main roads which I'm sure everyone would prefer them not to use if there's a better a and quicker route. But if the traffic calming, that was presumably done, in part, to improve cycle safety, has failed, this is a waste of money. The speed humps on Bateman St, unless you do a slalom, you have to cycle over and the ones on Norwich St are viscious. I've just got good at taking them at speed as I've had plenty of practice.
Created by Robin Heydon // 15 threads
New station that will serve the northern part of Cambridge, specifically the Science Park - but also by extension through the guided bus, villages to Northstowe.
This provides a good opportunity to construct another section of the Chisholm Trail (especially a link over the river and on to Newmarket Road). We must also ensure that any footbridge provides facilities for those with bikes AND that there is adequate cycle parking.
The Times is running a campaign for cycle safety.
How can we best capitalise on this in Cambridge?
Created by Gregory Williams // 1 thread
Speed limit reduction from National Speed Limit to 30mph on this narrow section of road which forms part of National Cycle Route 1.
Created by Gregory Williams // 1 thread
Phase 2 of the River Dour Greenway will connect the existing portion of the River Dour Greenway cycle route with National Cycle Routes 1 and 2 on Dover's seafront. It'll also connect to Regional Cycle Route 17.
Created by Gregory Williams // 1 thread
The Oyster Bay Trail phase 2 will close a gap in the cycle network between the existing Oyster Bay Trail at Swalecliffe, Herne Bay and Reculver, the Viking Coastal Trail around Thanet, and the Crab & Winkle Way between Whitstable and Canterbury.
Created by Gregory Williams // 1 thread
This proposed cycle path will remove the need to climb a hill when following the Great Stour Way to reach Canterbury city centre. It'll also increase the proportion of traffic-free path used for the route and remove some areas of potential conflict with other road users due to parked cars.
Created by Gregory Williams // 1 thread
Completion of this section of the riverside cycle path will allow students to cycle virtually traffic free from the Parham Road Student Village into Canterbury city centre. Making this route cycleable will allow the existing and proposed developments at the Parham Road Student Village to fulfil their car-free objectives.
Martin Lucas-Smith // 1 thread
The pedestrian crossing joining the pavements here are frequently blocked by parked cars.
Martin Lucas-Smith // 1 thread
This development (a clear case of squeezing a quart into a pint-pot) has no cycle parking.
Martin Lucas-Smith // 1 thread
This attractive, car-free development - heavily used as a cycling and walking route - has gradually turned into an ugly car park in recent months following the temporary removal of enforcement. The County Council are proposing partial re-regulation of parking.
Created by Heather Coleman // 0 threads
An article in today's Cambridge News about the new shops in Orchard Park isn't encouraging reading.
Link to article is
http://www.cambridge-news.co.uk/Home/Build-us-some-more-shops-or-well-all-get-in-our-cars-17022012.htm
The headline says it all. They are proposing shops that will probably only act as "corner shops" so people will all drive along the A14 or Kings Hedges Road to Milton Tesco.
This seems on the face of it, to add to the general anti-cycling design that Orchard Park has had since the first bulldozers went into action. I don't know what others think, or what can be done about it. Presumably a too large supermarket isn't wanted there, as then it would become a magnet for people outside of Orchard Park to drive to, unless, but this is not a suggestion that is possible, it had virtually no car parking, just for the disabled, but lots of bike parking, and good smooth pedestrian paths to all the houses.
A 20mph limit in residential areas of Cambridge would vastly improve safety and enable more people to cycle. What extent should it cover and how can we achieve it?
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Chris Peck // 1 thread
Route betweeen NCN 22 and Waverley Abbey - alternative to major road.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by Kevin Ablitt // 0 threads
When traffic backs up on Spring Road from the Grove Lane lights motor vehicles cut through via Bartholomew Street, Alexandra Rd, Warwick and Lancaster Roads to Palmerston and then onto St Helens.
They travel fast and a group of five or more motor vehicle drivers copying each other is not unusual, at peak times.
To protect the residents of these narrow streets, filtered permeability would seem to be the only answer.
Created by Caroline Page // 1 thread
Eastbound cyclists wishing to avoid the double roundabout at this point are routed onto the pavement, across the exit for the Shell garage (often to the surprise of exiting drivers), and then (still across pavement) onto a piece of decommissioned road used as access and double-sided parking for a parade of shops. This road has a separate car entrance from the roundabout.
Its a lethal combination -I have personally once been hit by a car turning fast from the roundabout on the road entrance as I entered it from the bike route. The driver was very angry because it was my fault that she didn't look out for me. You then have to cycle between two sets of parked cars/vans: there are frequent hazards: suddenly opened doors, people reversing/leaving the parking place without looking behind.
At the end, the cyclist is signed again onto pavement heavily used by schoolchildren/old people at the eastbound Heath Road Roundabout bus stop, before being routed back onto the road along the pull-off for the bus itself.
My personal view is that this scheme has been created and signed by a maniac
Bike users can turn right and cycle contra flow using a very narrow on road cycle path. Motorised traffic cannot do this, Park Road is one way to motorised traffic. Traveling down Queens Road there is no signage to suggest that bike users can turn right. Once into Park
Road there is awkward raised 'island' to manoeuvre around. Suggest signage saying right turn for bikes only and reconsider design of Island to make it less of an obstacle.
Created by Andy Allan // 0 threads
Heading southbound from New Malden along Malden Road, there is a segregated bike path for most of the route between the Fountain Roundabout and the A3. Unfortunately it ends around 100m before the A3 junction, and bikes are forced back onto the busy A2043.
It would be a good idea to link the bike path along the A2043 to paths around the roundabout, to make a joined up route.
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by Adam Edwards // 1 thread
Map shows the route which Hertfordshire are upgrading as part of the Hatfield to Rail Station link footpath works. The plan is just for enhanced lighting, when what really should be done is to make this shared use.
Cyclists would then use the exisiting route from the station up French Horn Lane, push accross the Puffin crossing (or cycle on road), use the stub road to the phone exchange and then go shared us to the Toucan crossing to the Market Place. That is the start of the on and off road cycle route to the University and De Havilland Village, the Alban Way and beyond.
Without this link cyclists have to use Queensway and turn at the large fast two lanes wide roundabout at the junction with Wellfield Road. This is a major deterrnet to use.
Well lane has been blocked to through motor traffic creating a nice quietway for walking and cycling.
However where it meets Percival Road a dropped kerb has not been installed meaning that cycles, pushchairs and wheelchairs have to bump down to cross Percival.
A couple of dropped kerbs and perhaps a parking restriction would really open this up as a nice cycle quietway.
Created by Stephan Matthiesen // 0 threads
Road was converted to one-way recently, forcing cyclists from Kings Buildings out onto busy West Mains Rd where previously they could cycle within the campus to the toucan at the NE corner.
Created by Jack Thurston // 0 threads
The four-way junction at Cross Street / Monk Street is dangerous for cyclists, with large vehicles making the turn, crossing onto the other side of the road. It is even more dangerous for pedestrians. There are no pedestrian crossings provided at this crossing requiring pedestrians to walk a very long way around to get from one side of Cross Street to the other, or to take a chance by crossing through the motor traffic.
Martin Lucas-Smith // 2 threads
Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society. Construction of replacement facade, reinstatement and refurbishment of historic features and internal and external access and refurbishment works including enlargement of existing cafe (use class A3) and re-opening of 'footlight's' entertainment space (sui generis). Demolition of squash courts and un-listed 3-5 Round Church Street in the conservation area. Construction of new link building for access and ancillary uses for the Union Society. Construction of adjacent new building with ground floor restaurant (use class A3) with 41 room post-graduate student accommodation above (use class C2) together with basement storage and services.
Cambridge Union Society 9A Bridge Street Cambridge Cambridgeshire CB2 1UB
Application reference : 16/0673/FUL
Also a Listing Building Consent application: 16/0674/LBC Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society
Created by John Chamberlain // 1 thread
For the last year Torrington Place and Tavistock Place have had segregated cycle tracks on both sides of the street. This consultation is about making the current trial arrangement permanent. The current lightly segregated tracks would mostly become stepped tracks and there would be other improvements to junctions as well as increased space for pedestrians. There is a lot of local support but also significant opposition, mostly from residents of Judd and other streets where motor traffic volumes have increased. We think this can be corrected by the (separate) proposed changes to Judd Street and at Brunswick Square.
It's important that all cyclists and others in favour respond using the website below. Otherwise we are in danger of losing this flagship facility. You don't have to live in Camden but you do need to provide an address and postcode.
Created by Stephan Matthiesen // 0 threads
Need proper bicycle racks in front of Margiotta (there are a few wheelbenders in a corner)
Created by Cycling Dumfries // 1 thread
At the moment there are toucan crossings from the Whitesands up to the High Street past the lower entrance to the Loreburne Centre (where the buses stop) but there is no actual cycle path so you end up illegally on the pavement. It would be a useful route otherwise, as long as cyclists can get past the bus stops (and waiting bus passengers).
Kate Ravilious // 1 thread
no cyclist ever uses this junction as the engineers intended. It doesn't function well and is dangerous. Needs reviewing.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.
Created by Peter Loader // 0 threads
The Maple Cross to Rickmansworth cycle route is one-way along Berry Lane (between Church Lane and Field Way, Mill End).
Created by Jon_B // 1 thread
Warwick Road is marked as an "Advisory Cycle Route" on the Suffolk County Council cycle map.
However, in morning rush hour it is frequently backed up a considerable distance heading south towards the traffic-light controlled 4 way junction with St Helens Street / Spring Road / Grove Lane.
There is an ASL on these lights, but in practice the carriageway is too narrow to allow cycles to pass the stopped traffic on the left hand side - particularly as the route is used by buses which occupy the space right up to the kerb.
Overtaking on the right is not a safe option where there is queue of stopped traffic as this is a two-way road with the added complication of traffic pulling out from Lancaster Road.
Given that the motorised traffic flow seems to be mainly south bound it would seem appropriate to make this a one-way street with a proper cycle lane including changing the phasing of the lights to allow cycles an advance phase to make the turn into Spring Road / St Helens Street.
One-way flow up another of the cross streets (probably Palmerston Road ) in the Northbound direction would complete the "loop" for cars and also ease traffic flow on that road which is currently difficult for cars or bikes to negotiate in a northbound direction in rush hour.
I know this has been proposed before, but I wanted to add an issue to Cyclescapes in the hope that it might come up again. We can collect reports and evidence here.
Reopening the Belmont Viaduct to cyclists and pedestrians could greatly shorten and improve a lot of journeys into and across Durham.
Previously Durham Council (before the County Council?) were awarded lottery funding for this. I think the issue was with landowners, and so the funding got diverted to projects outside of the city.
Created by Dan // 1 thread
Traffic lights will not change for cyclists when on the sensor (at night).
Created by Adam Edwards // 1 thread
Hatfield has the makings of a good cycle path network. However, the cycle path from the station to the town centre ends at the west end of French Horn Lane and fails to then connect to the University to the south or the Business Park (EE HQ, etc) to the west.
WelHatCycling are lobbying (most recently our MP Grant Shapps) to get this missing link filled. The route is shown on the map and is entirely unobstructed. The key work is a toucan crossing of Queensway, needed not only for the cycle route, but also to open up the north east end of the town centre to passing trade from people cycling and walking via the town centre.
Kate Ravilious // 0 threads
The padlocked barrier at the end of Hospital Fields Road is inaccessible for non-standard cycles, and difficult to pass through for anyone except the most able-bodied cyclists.
Created by jpennycook // 0 threads
Drivers are unaware/don't care/don't see cyclists in the cycle lane, so pull out of Lidl an Old Worting Road turning left, or turn right from Worting Road to Old Worting Road leading to very near misses. The cycle lane should be replaced with access to Old Worting Road near the bus stop, and improved access to Lidl provided.
Martin Lucas-Smith // 4 threads
The cycle lanes here are a mish-mash of narrow legacy infrastructure, and are often awkward to use.