SMALL SCHEMES, BIG CHANGES - BARNSTAPLE
Upgrade footpath Holland Street to shared path (with new sign)
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Upgrade footpath Holland Street to shared path (with new sign)
Created by North Devon Cycling Forum // 0 threads
Lower kerb (some tarmac in gutter against kerb?) at end of Holland Street (jct strand)
Created by North Devon Cycling Forum // 0 threads
The Strand jct cross street; new sign explaining cyclists are allowed to go both ways
Created by North Devon Cycling Forum // 0 threads
Removal of confusing and hazardous bicycle pictorials on on-road "two way" (!) cycle lane Sticklepath Terrace
20 mph speed limit on Long Bridge section between The Square and Severn Brethren desired
Created by North Devon Cycling Forum // 0 threads
Sequence of lights Seven Brethren: current waiting time to cross town centre lane over 2 mins! Needs reducing!
This is one of the seven routes called Strategic Cycle Routes or SCR where Newcastle City Council wants to drastrically improve cycling experience, to increase cycling level six-fold across the city.
This is one of the seven routes called Strategic Cycle Routes or SCR where Newcastle City Council wants to drastrically improve cycling experience, to increase cycling level six-fold across the city.
This is one of the seven routes called Strategic Cycle Routes or SCR where Newcastle City Council wants to drastrically improve cycling experience, to increase cycling level six-fold across the city.
This is one of the seven routes called Strategic Cycle Routes or SCR where Newcastle City Council wants to drastrically improve cycling experience, to increase cycling level six-fold across the city.
This is one of the seven routes called Strategic Cycle Routes or SCR where Newcastle City Council wants to drastrically improve cycling experience, to increase cycling level six-fold across the city.
This is one of the seven routes called Strategic Cycle Routes or SCR where Newcastle City Council wants to drastrically improve cycling experience, to increase cycling level six-fold across the city.
Created by Katja Leyendecker // 1 thread
This is one of the seven routes called Strategic Cycle Routes or SCR where Newcastle City Council wants to drastrically improve cycling experience, to increase cycling level six-fold across the city.
Created by David Earl // 1 thread
Consultation February 2014 (see thread)
Created by David Earl // 0 threads
Car Parks P, F1 And F2
Addenbrookes
Hills Road
To provide education centre, private hospital, hotel, conference centre,
ancillary space, associated car parking and public realm works to replace
existing surface parking to accommodate 42,600sqm of development.
Created by David Earl // 1 thread
Churchill College
Storeys Way
Cambridge
CB3 0DS
Erection of new building comprising 68 study bedrooms, shared kitchens, and meeting room, associated external works and tree and shrub planting together with alterations to South Court building (grade II listed) to widen pedestrian / wheelchair access.
Created by David Earl // 0 threads
St Clements Gardens
Thompsons Lane
CB5 8AH
Erection of new student accommodation comprising 72 study bedrooms
together with ancillary kitchens, common rooms, porter's office, plant and store rooms, cycle parking (including 13 dedicated external spaces for Bishop Bateman Court) and associated external works following demolition of 1-8 St Clements Gardens.
Created by Paul L // 0 threads
There is a long-established cycle route via Broom Rd, lower Teddington Rd but that runs into congestion in Hampton Wick High Street. A cycle lane could join to the cycle track across Kingston Bridge. There is generally no room for 2 traffic lanes but a cycle lane + general traffic lane would fit.
Created by Paul L // 0 threads
Tedington railway bridge is the steepest hill in Teddington and the roundabouts make cycling at busy times stop-start. There are sections of off-road track but they pushy you back onto the road at narrow sections. What is needed is a comprehensive scheme with protected crossings of Park Rd and Waldegrave rd parallel to the existing zebras.
Created by Katja Leyendecker // 0 threads
It's a busy ped / cycle route to school and the city centre. Yet the (toucan) crossing prioritises motor traffic hurtling past at 40mph (speed limit). Drivers frequently ignore red lights. The alignment, crossing space and phasing could be much fairer to pedestrians and cyclists using this crossing.
Newcastle City Council said this crossing is looked at, but their wheels turn too slowly.
Created by Katja Leyendecker // 0 threads
It's a route to school and a natural route for Gosforth residents to walk and cycle into the city centre. Yet it's incredibly over-run by inconsiderate drivers, speeding and blighted by pavement parking. It's 20mph but due to its rat-run nature feels like a motorway thorough-fare. There are blind spots at the metro bridge crossings either end which are dangerous to navigate too. Drivers turning into Ilford / Rectory are also cutting corner, so you'd find a situation of an oncoming cars in your traffic lane.
Newcastle City Council have said there's nothing they can do. I don't believe that to be true. I think they are putting drivers needs before the needs of people walking and cycling.
Created by Paul L // 1 thread
There is an existing cycleroute linking Stanley Rd and Fifth Cross Rd via a toucan. Putting a bidirectional cycle track adjacent to the footway on the E side of Hampton Rd would tie in Wellesey Rd with Strawberry Hill station and quiet routes to Twickenham.
Created by Paul L // 0 threads
The cycle route from Ranelaugh Drive towards Isleworth involves crossing the footway. A dropped kerb has been provided (but no other markings) but this is frequently blocked by parked cars. A solution would be to place a bollard either side of the dropped section.
Created by Shaun McDonald // 1 thread
http://www.travelipswich.co.uk/what-is-happening-and-where/orchard-street-area/
What’s Proposed:
January 2014
* New cycle facilities to allow cyclists to travel northbound on Orchard Street.
* A 'No Entry except for cyles' sign to be placed on the St Helen's Street/Orchard Street junction.
Created by Shaun McDonald // 3 threads
http://www.travelipswich.co.uk/what-is-happening-and-where/barrack-corner/
Barrack Corner
Description: New toucan crossing. No entry at Barrack Lane
Planned Start:Mid April 2014 Planned Finish Works due to last 6 weeks
Location:
Expected Disruption:
Scheme Information:
One of the projects main objectives is to provide safe and convenient crossing facilities where the town’s main pedestrian and cycle routes cross busy main roads. This new scheme will link cycle facilities to the new Handford Road/ Portman Road junction.
The main objective for Barrack Corner is to extend the Portman Road pedestrian and cycle route northwards across Norwich Road by installing a new toucan crossing at the Norwich Road / Barrack Lane junction. This will link the housing areas north of Norwich Road with Ipswich Village and the east side of the town centre. To provide the crossing at the bottom of Barrack Lane it will be necessary to prohibit all vehicles except emergency vehicles from turning in or out of Barrack Lane at its junction with Norwich Road. This means drivers will use alternative routes, therefore access to the Barrack Lane Medical Centre will be signed from the Civic Drive /Berners Street roundabout and from the Norwich Road / Orford Street junction. Cycle access to / from Portman Road would be from a footway build out, which would be protected from parked cars by double yellow lines.
For further information, or to express comments, please contact us on travelipswich@suffolk.gov.uk
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by MJR // 2 threads
There was a Heritage Lottery Fund stage 1 project hoping to progress to stage 2 and work for 5 years from June 2014 to regenerate the "old town" around the Saturday Market Place. The initial draft contains no cycle measures but does mention cycle access policy, so may be persuaded to reinstate lost public cycle parking in places like opposite the old Post Office and might even be a way to fill in the missing link in National Cycle Network Route 1. The consultation papers are online at http://www.west-norfolk.gov.uk/default.aspx?page=26919 and open until 16 December.
The key cycling problem in this area is the difficulty of accessing Saturday Market Place without passing through the poor junction at its east end and the lack of signs telling cyclists to use Priory Lane to reach SMP.
Martin Lucas-Smith // 11 threads
Major planning application here - c. 10,000 homes
Created by Simon Redding // 2 threads
The railway path from Sheffield down through Staveley & Poolsbrook stops at Arkwright Town. Since an opencast / landfill was south of this point, there is no trace of the former railway line to join to the trails at Sutton Spring Wood. This is an important local link.
Create an off-road route along the railway line out to the east, which could ultimately form a route out to Collin.
A community consultation 'The Barnes Ponder' in October 2013 has show strong support for making Barnes a 20 mph neighbourhood .
“20mph is plenty enough speed on the roads!”
Created by Shaun McDonald // 1 thread
St Peter's Dock on the National Cycle Route 51 just north of Stoke Bridge has a really poor surface which collects water, also the old rails that are no longer used and no longer connect to the rest of the rail network are a hazard for cyclists and ideally should be removed.
Created by Andrew Woodward // 0 threads
Railway footbridge should have a ramp/trough added to make it easier for cyclists to cross the railway. This would then create a quiet north/south route to Marshgate school as an alternative to Manor Road.
Created by Andrew Woodward // 2 threads
Ham Gate Avenue: As you cycle past parked vehicles which narrow the road by almost half you are trapped in a long tunnel. Impatient motorists who want to enter from the other end do so and simply drive at you forcing you practically into the gutter or off the road completely. Would it be ever possible to ban parking on this avenue and limit the speed to 20mph as it is in the park?
Note - there is a shared use segregated track alongside the road here (part of NCN 4) but it is frequently too narrow to cope with the volumes of cyclists and pedestrians; it is overhung with low tree branches and the surface is poor.
Created by Jack Thurston // 1 thread
There are currently around 6 or 8 cages for cycle parking. One bike per cage. While this is great for anyone lucky manages to find an unused cage, often they're all used. Some additional Sheffield type stands required.
Created by Fraser Stephens // 1 thread
RAISED AT PUBLIC MEETING 10-04-2014
The infamous missing link in the Llanfoist-Brynmawr cycle path (route 46) is a huge barrier to its safe use by children as well as those who find the steep section of the diversion route impossible to climb.
Created by Jamie // 1 thread
At the moment it is possible to cycle from Cambridge Road, near Madingley, to Girton, on a bridleway that crosses over the A428 and then passes under the M11 at the Girton Interchange. You can then cross three roads (A1307) and reach a pavement on the North-East side of the Interchange. Using the pavement you can then reach Washpit Lane and cycle up towards Girton. (The pavement is marked as a shared-use route on the OSM Cycle map, although I am not sure that it really is.)
Apart from having to be careful when crossing the A1307 junction it is a rather pleasant route to ride.
The Girton Interchange is being "improved" to reduce the bottleneck for cars. Does anyone know what plans there are to ensure that the current route through remains open and whether there are plans to improve the bridleway route through? Or will this be another example of roads being developed to the detriment of footpaths/bridleways.
Created by Andrea // 3 threads
In Museum Street and Upper Brook Street/Northgate Street it is very dangerous to cycle. Both roads are very narrow, have lots of buses pass through and there are contraflow cycle paths. On those you are very close to the buses (both directions) even if you wait on the pavements to let them through because you are worried about accidents. Can cyclepaths go through Elm Street, Tower Street or Tower Rampart instead?
Created by Fraser Stephens // 1 thread
RAISED AT PUBLIC MEETING 10-04-2014
If a foot/cycle bridge is not going to happen in the medium term, then how about some traffic calming measures to reduce driver's speed expectations over the bridge? Drivers who have just come of a dual carriage way at 70mph+ or have been zooming along the A40 at 60mph+ are suddenly sharing space with cyclists having had little warning that this is about to happen.
We suggest deploying traffic calming measures, such as marked cycle ways, belisha beacon crossings (much needed anyway!) and signage making it clear that care is required. If the speed limit was clearly lower, many drivers will not be so aggressively trying to overtake cyclists.
Created by Matthew Phillips // 1 thread
The route on the east side of the A167 past Crossgate Moor and Framwellgate Moor crosses a number of roundabouts. The cycle-path leads you across the roads very close to the roundabout, via the central refuge in the middle of the road. Some of these roads have two lane entry to the roundabout. Crossing both lanes at once is tricky as you have to have an eye on whether the traffic is about to move out onto the roundabout. If you have a longer vehicle, such as a bus, waiting, then the route to the refuge is blocked. There are no road markings to warn motorists that cyclists might be expected.
The route is probably going to be improved as part of the Great North Cycleway. If these roundabouts are to be made safe enough for children to use, major alterations will be required. (The route goes past Durham Johnston School so should be available to children.) The route should cross further from the mouth of the roundabout, preferably on a different-coloured surface, maybe raised.
Created by Grahame Cooper // 1 thread
Irlams O'th Height roundabout has been the location of a number of collisions involving cyclists (including myself and my daughter last September).
There was a consultation last year over proposals produced by Sustrans for the improvement of this, and I showed my comments (annotations on proposed plans) at a previous GMCC meeting. You can find this annotated document here: https://copy.com/tAIjQdMSxfcsq4fz (large PDF - need to download to see all pages).
A leaflet on the intended imrovements can be found here: http://www.urbanvision.org.uk/wp-content/uploads/2014/08/Cycling-Leaflet.pdf
I am disappointed with this for the following reasons:
- Extensive use of shared footways in the scheme (Salford Council seems to be in love with these, but they are bad).
- Southbound approach on A666 looks impractical & dangerous: a sharp left turn onto the shared footway right at the busy entrance to the roundabout!
- Whilst carriageway widths have been reduced, kerb radii at the mouth of entrances and exits do not seem to have been reduced, so "drivers looking right whilst accelerating left" will still pose a danger for cyclists who do not want to use the shared footways.
- Limited improvements to the subways (tile removal, lighting and resurfacing) will probably not result in an attractive facility for cyclists. Access to this from Bolton Road (northbound) looks awkward.
- There is no undertaking mentioned to ensure that facilities will be maintained and swept.
- I'm still not confident regarding the social safety of the off-road parts, especially in the dark winter months.
Those are my immediate reactions. Could be more to add.
Created by timlennon // 1 thread
Initial quietway consultation from Richmond. This is a thread to build RCC's response
Created by Sam Saunders // 1 thread
A northern stretch of Bristol's waymarked "Concorde Way" runs along a quiet residential street, Wordsworth Road. On the newest housing development as Bristol gives way to South Gloucestershire there is a barrier between the end of Wordsworth Road and the start of Eighth Avenue to prevent motor vehicles passing through. There is a raised curb, offset railings and large grey concrete bollards and only a narrow passage either side of one bollard for cyclists to ride through. Tricycles, cargo bikes, or trailers might be to be lifted over the raised curb. In dusk or darkness neither the bollards nor the curb are easy to see. There is a light on the traffic sign offering some help, but a less intimidating arrangements or reflective/high-visibility surfaces could be considered.
Hamish F // 0 threads
There are no contraflow signs when entering Devonshire Rd from Adermans Hill. Cyclists have reported hostility towards them as they ride "against the flow". The markings are correct as the cyclist enters Devonshire Rd from A105 but of course the drivers do not see that.
Where the quite good segregated cycle lane joins The Ride, DfT advice was certainly NOT followed. As per DfT advice, when cycle lanes are merged with the carriageway, it should be done via a length of dropped kerb that is flush with the carriageway and the cycle lane shouldn't be joined at a 90 degree angle to the road.
Here, the cycle lane runs parallel to the road for a short distance before it loops around a large boulder specifically placed to force cyclists around and then finally joins the road at a 90 degree angle.
The kerb, though dropped, is far from flush and creates a risk for cyclists joining the track from the road.
This junction between the road and the track should be scrapped and redone according to DfT guidelines.
Created by Paul James // 1 thread
The cycleways along the Thames Path and along Ducks Walk are not connected with the south/east side cycleway across Twickenham Bridge and only to the north/west side cycleway via a long detour through Old Deer Park or along The Avenue.
A ramped way down from the bridge would create a useful route for people into and out of Richmond town center that is currently only possible by using two flights of steps.
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by Andrew Woodward // 1 thread
The path linking Bank Lane to Palewell Fields is currently pedestrian only, with gates across it. Opening this up to cyclists would improve permeability and provide a quiet route to Richmond Park Academy school from Roehampton (east-west); and to Ibstock Place school from Sheen (west-east).
Created by SamGW // 1 thread
The Road between Great Wilbraham and Fulbourn is very well used by Cyclists, runners and walkers throughout the year. It is a single track road with a 60 MPH speed limit. A bicycle path here would encourage more people to cycle to Fulbourn and Cambridge. The path would significantly improve safety for cars, pedestrians and cyclists.
Despite the number of bridges that link Newcastle and Gateshead, there is not a single route across the Tyne that throws bike users in to conflict with either high volumes of motor vehicles at high speeds or that uses shared paths that create potential conflict with pedestrians.
Due to the amount of people who already cycle between Newcastle and Gateshead and the potential for this to grow, there should be at least one high level crossing that gives bike users there own space when crossing the Tyne.
Created by Shaun McDonald // 1 thread
It would be much safer to have cyclist priority on the slip roads here as is done in The Netherlands http://www.flickr.com/photos/smsm1/10046288016/ , or even the following example from Britain: http://www.cycling-embassy.org.uk/photos/good-cycling-facility-of-the-week/good-cycling-facility-of-the-week-14th-november-2013-0
The slip roads also need to be narrowed to slow motor vehicle speeds as does the turning radii of the roundabout.