No dropped kerb
No dropped kerb to enter or exit the East Craigs Path Network.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by HankChief // 0 threads
No dropped kerb to enter or exit the East Craigs Path Network.
Created by HankChief // 0 threads
No dropped kerb to enter or exit the East Craigs Path Network.
Created by TMiles // 0 threads
St Michael's Road can be a useful local route for west-bound cyclists avoiding the central junction in Headingley and its approach roads, dominated by queuing traffic or parked cars.
The current configuration could be improved to allow cyclists approaching the junction to cross directly from St Michael's Rd into the cycle box immediately in front of the traffic lights at the northern extremity of Cardigan Road.
A dedicated traffic signal, coordinated with the parallel pedestrian crossing (to the extreme right of the image), would allow cyclists to cross from the island in the foreground to the advanced stop line in the far lane.
These improvements would require very little actual ground work, instead making use of smarter signal control. Further adjustments to the sequencing could see cyclists granted a synchronized left turn into Kirkstall Lane.
Created by timlennon // 0 threads
Facilities to cycle to school are extremely limited, mostly involving sharing pavements which are busy in the morning. Lots of dropping of by car in a very restricted area, and disjointed, incomplete routes, especially around the South Circular, where no-one really wants to cycle, least of all with children.
Created by timlennon // 1 thread
No entrance to the school is accessible by bicycle for children, unless they cycle on the pavement. Even when they do, there are busy roads to be crossed with poor sightlines, or simply conflict with pedestrians.
This re-design (incl re-alignment) is a pure 1960s motorway scheme. Very disappointing.
Pedestrians and cyclists are virtually NOT considered here.
http://newcycling.org/sites/default/files/105_salters_church.pdf
Some rejigging
There some flaws in the design. Pedstrian desire lines are ignored leading to staggered / staged crossings. The whole design does not do much for the public realm in general and the area remains an 'urban motorway'.
The cycle lanes (width unknown) are an inadequate separation for the volume/speed of traffic and not even elephant footprints across to guide cyclists across the wide opening of the Regent bus stop entry have been included.
Regent Farm Road entry should be closed down.
We do not hold out much hope for the traffic light phasing. They will likely to be conventional highway design too.
Plan is downloadable here
http://newcycling.org/sites/default/files/104_regent_christon.pdf
Created by Katja Leyendecker // 0 threads
Major re-design
There are many flaws in this conventional highway road design. Pedestrian desire lines are disregarded. No cycle-specific light phasing has been included it seems. ASL are a token effort. No elephant footporints. But the biggest mistake is to keep the left-turn filter. It really puts cyclists directly at risk and in conflict with drivers - we urge council to remove that filter.
There also is a new right-turn lane into Knightsbridge which puts cyclists at risk of turning drivers. The entrance to Knightsbridge should also be necked-down for pedestrian and cyclist safety and comfort.
Plan is downloadable here
http://newcycling.org/sites/default/files/103_hollywood_pale_.pdf
Some re-adjustments. Includes cycle space and necking-down on Park Avenue are good.
Not so good is inconsistency in the cycle infrastructure design, and disregard to pedestrian desire lines over Park Avenue (which could be rectified by moving the raised table), and no necking-down of Harewood Road.
Plan is downloadable here
http://newcycling.org/sites/default/files/102_park_harewood.pdf
Created by Katja Leyendecker // 1 thread
Large scale re-design.
Looks okay, even quite innovative, some design clarificaitons are needed re: turning speeds / neckdowns, separation types, transitions
Plan is downloadable here http://newcycling.org/sites/default/files/101_broadway.pdf
Created by MJR // 1 thread
Downham Market has National Route 11 running through it roughly north-south but doesn't have much of a signposted cycle network otherwise. There are some useful cut-throughs so this looks like it could be an ideal market town for cycling with relatively little work.
Created by Kevin Ablitt // 1 thread
Having grown up in this area I know it well. Bolton Lane and Christchurch Street could benefit from 20 mph, Cobbold Street and Withipoll Street would be more pedestrian and cyclist friendly if they had filtered permeability. Cobbold Street is extremely busy at school times as parents drop off or collect, make it closed half way to motors and this would cut out through traffic . Likely to be very contentious.
20 mph speed limit for Newport area, enclosed by the river Taw, The Square, Belle Meadow Road, Inner Relief Road, Hollowtree Road, South Street and Park Lane.
Created by North Devon Cycling Forum // 0 threads
20 mph speed limit in Ashleigh Road area, especially on route Ashleigh Road-Barbican Lane
Created by North Devon Cycling Forum // 0 threads
Upgrade footpath and widening to shared path on north side of Ashleigh Road Approach Road (requiring NEW lay out of one-way Approach Road, moving parking bays to disused opposite south side of Approach Road). Current vegetation can be replanted as buffer between new shared path and main carriageway, so nice look of road won't be affected.
Created by North Devon Cycling Forum // 0 threads
Upgrade pelican crossing Inner Relief Road to toucan crossing, with ONE press on button to cross whole road!
Created by North Devon Cycling Forum // 0 threads
Upgrade footpath and widening to shared path between Oakleigh Road and pelican crossing on Inner Relief Road
Created by North Devon Cycling Forum // 0 threads
Upgrade footpath to shared space on triangle at start Summerland Street; natural feeding route on/off triangle to pelican crossing on Belle Meadow Road
Created by North Devon Cycling Forum // 0 threads
Upgrade pelican crossing Belle Meadow Road to toucan crossing, with ONE press on button to cross whole road!
Created by North Devon Cycling Forum // 0 threads
Upgrade footpath on east side of Queen Street and Queen Street Roundabout to shared path, from Hardaway Head to Pelican Crossing Belle Meadow Road (taking space from main carriage way)
Created by North Devon Cycling Forum // 0 threads
20 mph speed limit in Chanters Hill area, especially on route Sunset Heights-Sowden Lane
Created by North Devon Cycling Forum // 0 threads
Upgrade wide footpath on south side of Bear Street into shared path between Alexandra Road and Sunset Heights
Created by North Devon Cycling Forum // 0 threads
Upgrade pelican crossing Alexandra Road to toucan crossing, with ONE press on button to cross whole road!
Created by North Devon Cycling Forum // 0 threads
New Cycle Path on south side of Queen Street Car Park between Queen Street and Bear Street/Alexandra Road junction
Created by North Devon Cycling Forum // 0 threads
20 mph speed limit on Derby Road between Alexandra Road and St Mary's Road (in front of Yeo Valley School) and on St Mary's Road
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by DavidT // 2 threads
The current layout of the pedestrian crossing at the junction of Winchester road and Vermont close forces cyclists out of the cycle lane and into the flow of traffic. This is a risky maneuver and relies on the patience of the car driver behind the cyclist. A possible solution would be to be extend the cycle lane through the chicane, with give way markings so that pedestrians have right of way.
Southampton Cycling Campaign has received many reports of local cyclists having accidents on the cycle path outside the Dominos Pizza outlet at the southern end of The Avenue.
A recent incident was reported in the Southampton Echo, http://www.dailyecho.co.uk/news/10475081.Cyclist_hurt_in_road_crash/
Created by Shaun McDonald // 1 thread
There is a loading bay in the cycle contraflow cycle lane, which means that the cycle lane is blocked for cyclists as soon as a vehicle is parked there. This means that cyclists have to pull out into the path of oncoming buses, thus making the NCN route unsuitable to young children or inexperienced cyclists.
We have a tandem which fits in all the spaces on trains in Scotland (as far as I know), but we are prohibited from taking it on any except the East Coast line trains. I've been writing to various officials - elected and otherwise - and contributed to the recent review of the Scotrail franchise, but am not getting much joy. No one seems to think it is a big deal. But, for my family, with 2 kids aged 5 and 1, and no car, if we don't go by tandem and train, we can't go anywhere much. The tandem is not a luxury but a practical transport solution. Does anyone else want to join in and make this more than a one-woman issue?
(another related issue: even once the kids can ride their own bikes, we won't be able to use trains much since most only allow 2 reservations).
Created by Alex Oldman // 1 thread
Disused railway tracks on St Peters Dock provide short section of road surface that is dangerous to traverse from East to West by bike.
If you are avoiding crossing the tracks then you are forced into oncoming traffic.
If you cross the tracks, you are then potentially trapped between parked cars and the railway tracks, which can be dangerous.
The tracks are very slippery when wet or icy, and sections are often hidden underwater because there is poor drainage after heavy rain.
Ideally the tracks are totally removed, or the surface covered with concrete or tarmac.
Created by PeterMac // 1 thread
Redesign of Grey Street to remove the danger of cars reversing (blind) out parking bays into middle of the road.
Created by Gregory Williams // 1 thread
The A2 is a hostile environment for cycling. Cyclists should be directed away from using the A2 towards existing safe alternatives (e.g. RCR16) and the current A2 cycle signs should be removed.
Martin Lucas-Smith // 29 threads
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
Created by Andrea Casalotti // 1 thread
Here is an ambitious plan for a Bicycle Boulevard from Shoreditch to Fitzrovia, along Old Street, Clerkenwell Road and Theobalds Road, open only to bicycles, buses and motor traffic for local access only.
a. It is now the most cycled route in London, showing that it is the desired EW route.
b. It is of variable width, therefore trying to accommodate bikes, buses, and through traffic in a consistent and safe way is impossible. In other words, a compromise will be a botch job.
c. There will not be mixing of buses and bicycles: bicycles will have a dedicated two way cycle lane on the South side of the street.
d. The Boulevard stops being a mega- EW-rat-run. Motor traffic will have to use Pentonville/City Road.
More details here: https://docs.google.com/presentation/d/1yw9mkHhGZaVBKYJs6FxyhC1Z4nNYVl-IFH-aR1ScK9U/pub?start=false#slide=id.p
Created by DavidTheScientist // 1 thread
While some painted "cycle lane" does exist northbound, there is woefully little provision for cyclists considering the huge number that use this section of road each day, a large number of whom are those who work at the General Hospital and other nearby health centres. Southbound cyclists have no real provision of space at all, save a graduated stopline, where cars turning right often try to pass right-turning cycles on the inside. Dale road itself is extremely narrow by winchester road, with almost no pavement space for pedestrians.
Cyclists heading northbound on Winchester road must beat traffic off the line at Dale road to get to the painted centre of Winchester road. North of the traffic light at The Range, the cycle lane is almost non-existent, placing cyclists between 2 lanes of heavy traffic, and cyclists have to stop and wait in this dangerous area in order to turn right onto Wilton road. Furthermore, the road surface, especially at this part of Winchester road, is currently deplorable.
Surface, drainage and width issues.
Planned for upgrade as part of CEC 'family network'
No details/dates.
Was an issue 5 years ago (and before)
Created by Rohan Wilson // 1 thread
I've visited Riverside to Waterbeach with William Rayner of county cycling team. He's revising signage here and providing it along the St Ives corridor, with the old NCN 51 being renamed Regional Route 24 (blue patch). We've decided finally to continue to sign NCN 11 from Riverside Bridge to Waterbeach Station, and he's looking at suitable (hopefully temporary) wording to advise to follow NCN 51 to Bottisham for destinations beyond Waterbeach, which will hopefully eliminate misrouting those from outside the area.
Our inspection of existing signs showed that only one new signboard was provided on completion 5 years ago of Riverside Bridge. Signboards still send people via Green Dragon. Sustrans considers signage is an important part of any route project.
The intention is to sign Milton Country Park as a destination, not as part of the route, removing route signs within the park, and probably retaining Coles Road as the signed route through the village, though it would be much preferable to have improvements past the shops and the village green, pubs etc.
Retaining the route to Waterbeach as NCN will help keep the gap in people's awareness.
I am planning to contact again the landowner of the missing link between Bottisham Lock and Fen Road, Lode with a suggestion for a low-level route, southeast side of the Bottisham Lode floodbank which is the route of the public footpath, where signs forbid cycling. It might be considered more visually acceptable. All parish councils are for the route, including the one of which he is a member.
Created by David MacKay FRS // 1 thread
Our campaign for safer walking and cycling to/from NWCambridge now has a petition and a first video (of five) summarising our position.
See our new video summarising our petition:
https://youtu.be/hIlQAzsU0js?t=1s
I’d be delighted if you could promote this to your networks. Time is of the essence because a Senate House discussion is coming up [3 Nov 2015], and I will report the number of signatures on our petition there. (But signatures after the date will still be useful.)
More information:
http://tinyurl.com/EddingtonSafety
The petition:
http://www.ipetitions.com/petition/EddingtonSafety
Anyone is welcome to sign the petition; we ask people to use the Comment field to let us know if they are University Member / University employee / City resident / SouthCambs resident / etc.
For twitter purposes the recommended hashtag is #EddingtonSafety and there is an @EddingtonSafety account too.
Thanks very much
David
David J C MacKay FRS
djcm1@cam.ac.uk
Regius Professor of Engineering,
Cambridge University Engineering Department
Author of “Sustainable Energy - without the hot air” www.withouthotair.com
and “Information Theory, Inference, and Learning Algorithms” www.inference.eng.cam.ac.uk/mackay/
Girton resident and parent.
Cambridge Cycling Campaign Member
Created by londoncycler // 1 thread
Six inch high ridge near left side of north bound lane on the south side of the bridge forces cyclists too close to the kerb or into the path of motor vehicles. Issue reported via CTC pothole reporting site. Resurfacing required.
Created by Andy Allan // 1 thread
Garratt Lane at Earlsfield station sucks massively for cyclists, and is a jarring interruption to the Wandle Trail (Sustrans route 20). It would be great to extend the riverside path underneath the railway to avoid this dangerous stretch of road.
Created by Charlie // 1 thread
Confusion created by inconsistent design in the two parts of the new segregated cycle path - one bit is clearly segrated with a distinct red surface; the other bit appears on first glance to be shared-use but on closer inspection is intended to be segregated. Why was this allowed to happen? There are also considerable problems with traffic flow which could have been eliminated with a little more thought. I dispair of Bristol City Council's ability to get anything right!
Created by Andrew Woodward // 0 threads
Cyclist coming from the river come up Friars Lane exit and have to currently route right round Richmond Green because it is one way. Many do not and simply cycle across the green. The path across the green should be formally opened up to cyclists - as a share path with pedestrian priority - or a seperate track provided along the south side of Richmond Green.
Created by Matt Turner // 1 thread
Castle Street cycle lane is a contraflow cycle lane on a one way street in Sheffield. It has been here since March 1997 and allows cyclists enter the city centre from the network of cycle paths on the East, avoiding some big arterial routes with no cycling provision.
For the past 15 years this cycle lane has been plagued by Hackney Carriage drivers parking illegally on this cycle lane, blocking cyclists access and forcing them into oncoming traffic. This has been the case for over a decade.
There is a taxi rank on the pavement side of the cycle lane, taxis often fill up this rank and overflow, parking in the cycle lane, blocking the way for cyclists.
Created by David Wilcox // 3 threads
Proposal
To investigate options to provide a safe, continuous route from St James Barton Roundabout to the top of Park Street.
Rationale
Marlborough Street/Upper Maudlin Street/Perry Road/Park Row (known as the Scope Route) is the most desirable route for cyclists from the east of the city to the University, the Triangle, Clifton etc but is heavily trafficked with little cycle provision.
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF proposals.
Martin Lucas-Smith // 1 thread
The permeability gate between Hooper Street and Kingston Street is obstructive as it only allows passage in one direction at a time.
Given the ever-increasing amount of cycling in areas like this, it's time to get this replaced with a simple bollard arrangement that would allow two-way passage whilst still enable the emergency services to unlock for access in an emergency.
Created by HVS // 2 threads
The A41 ring road cuts across a useful quiet route north-west out of Chester, which is an alternative to the traffic-free Greenway (which is unlit, and slippery in icy conditions). Crossing the A41 during busy periods - e.g. when commuting at rush-hour - can be a slow and potentially very dangerous process, especially after dark. A better crossing for cyclists and pedestrians, or a lower speed limit on the A41 (or both), would be very helpful here.
[Original version of map was wrong; I've now updated it.]
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by Chris Neston // 2 threads
The cycle path crosses the soutbound exit from the M53 at Cheshire Oaks. The exit is light controlled for traffic as they enter the roundabout. This provides a safe time for cyclists to ride across the sliproad. However the lights are not visible to cyclist on the path and there is no light provided to advise cyclists when they can cross.
This makes it very difficult and dangerous for cyclists to know when they can safely cross. This would require no physical change to the road layout simply a new light to show cyclists when to cross.
Created by Kevin Ablitt // 1 thread
Motorised vehicles currently use the rat run through Milner Street to avoid the fraffic lights at Grove Lane/ St Helens St.
This is part of NCN 41 , any extra traffic passing through here detracts from the cycling experience and is negative for residents.
Cyclist comments are needed now !