Barnes Residents want 20mph
A community consultation 'The Barnes Ponder' in October 2013 has show strong support for making Barnes a 20 mph neighbourhood .
“20mph is plenty enough speed on the roads!”
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
A community consultation 'The Barnes Ponder' in October 2013 has show strong support for making Barnes a 20 mph neighbourhood .
“20mph is plenty enough speed on the roads!”
Martin Lucas-Smith // 1 thread
The Cambridge News sadly reports that a 16-year-old cyclist is dead after a crash on Milton Road.
Created by Heather Coleman // 4 threads
I'm creating this as a general "issue" in the hope that people will put different threads here for problems they have with building sites, generally associated with deliveries. Listing those problems and any action or complaints they've taken personally, and also asking how further complaints can be made.
I can't help feeling we should be talking to the council about making it a condition of planning permission that deliveries that either require "odd" movements of HGVs eg, reversing and taking ages doing so, or parking on the street eg while delivering scaffolding, should not take place during "rush hour", especially on roads that are busy and are major cycle routes.
Created by MJR // 0 threads
http://www.bromptondock.co.uk reports that their docks are offline for upgrades until January 2014. I don't know why or when in January they will return. People with bikes out have just had to keep them until January (free of charge I think).
Created by Heather Coleman // 2 threads
The members' list has just had a post from a Tess Jones saying:
> FYI
> I wasn't able to go to the exhibition, but proposals are here:
>
> http://cambridgeforumconsultation.com/
I've replied that as someone who works on site, this is the first I've heard about this. There are various implications, that need looking at, before we decide if and what we need to say in the consulation.
Created by MB // 0 threads
The cycle (and pedestrian) path between the Telegraph pub & Tibbetts corner needs repair & maintenance. Undergrowth has grown over it, narrowing the path, there are cracks & ridges where tree roots or wear & tear have deteriorated the path & the path markings are no longer clear.
In addition, the route through the car park is often strewn with broken glass and pot holes.
If the path were widened back to its original width, resurfaced & remarked, there would be less conflict between pedestrians & cyclists.
Created by Matthew Phillips // 1 thread
The route on the east side of the A167 past Crossgate Moor and Framwellgate Moor crosses a number of roundabouts. The cycle-path leads you across the roads very close to the roundabout, via the central refuge in the middle of the road. Some of these roads have two lane entry to the roundabout. Crossing both lanes at once is tricky as you have to have an eye on whether the traffic is about to move out onto the roundabout. If you have a longer vehicle, such as a bus, waiting, then the route to the refuge is blocked. There are no road markings to warn motorists that cyclists might be expected.
The route is probably going to be improved as part of the Great North Cycleway. If these roundabouts are to be made safe enough for children to use, major alterations will be required. (The route goes past Durham Johnston School so should be available to children.) The route should cross further from the mouth of the roundabout, preferably on a different-coloured surface, maybe raised.
Created by Matthew Phillips // 1 thread
There is a demand for access to the University from Belmont and areas to the east of Durham. Creating a route across the playing fields towards Old Durham would shorten journeys and give a mostly off-road route.
It would require a new bridge and a tarmac surface. Note sure if there would be issues of potential flooding. Not sure if the University would co-operate with route across its land.
Created by MJR // 2 threads
There is a group of councils and others (including the RAC) calling itself A47 Alliance with a website at http://www.a47alliance.co.uk/ calling for a road upgrade.
The A47 is a significant barrier to cycling in many places, such as the single-carriageway stretch from Tilney All Saints near King's Lynn to Swaffham that blocks several desired east-west cycle routes - it is narrow with much heavy HGV traffic, so it's a challenge to cross and feels no fun for most people to ride along. It is possible that any upgrades could be "cycle-proofed" (to use current jargon) to unblock these routes.
KLWNBUG has asked if CycleNation and CTC groups can be be invited to join the alliance.
Created by MJR // 2 threads
There was a Heritage Lottery Fund stage 1 project hoping to progress to stage 2 and work for 5 years from June 2014 to regenerate the "old town" around the Saturday Market Place. The initial draft contains no cycle measures but does mention cycle access policy, so may be persuaded to reinstate lost public cycle parking in places like opposite the old Post Office and might even be a way to fill in the missing link in National Cycle Network Route 1. The consultation papers are online at http://www.west-norfolk.gov.uk/default.aspx?page=26919 and open until 16 December.
The key cycling problem in this area is the difficulty of accessing Saturday Market Place without passing through the poor junction at its east end and the lack of signs telling cyclists to use Priory Lane to reach SMP.
Created by MJR // 0 threads
This is Norfolk county matters application http://eplanning.norfolk.gov.uk/PlanAppDisp.aspx?AppNo=Y/2/2013/2013 due to be heard in a meeting starting Fri 6 Dec 2013 10am at County Hall, Norwich. 7 cycle parking spaces were proposed. I objected for KLWNBUG on the grounds that 26 should be provided. Norfolk County Council Highways suggested 14 spaces and a Standard Highway Condition (27 I think) which would leave it to the Borough Council to enforce, who don't have a great track record on that in my experience. The Borough Green Infrastructure Officer didn't comment on cycle parking. Norfolk Police seem OK with the final revision. NCC planning officer suggested that if the 14 are used then it could be expanded without further application and confirmed that as a county development, there's no scope for section 106 funds for building cycle tracks to neighbouring villages.
Created by Caroline Page // 1 thread
Significant domestic car parking in the advisory cycle lane of westbound lane combines with heavy traffic jams to obstruct/block westbound passage to cyclists in rush hour. Generally there is a section of this route where pavement pushing is unavoidable
Created by WillC // 0 threads
Road narrows at pedestrian island; pavement cut away but insufficient and not usable because of surface. Creates danger as it suggest to vehicles that there is more space than there is. Passing cyclists is dangerous.
County Council is building a cycleway that will run for a mile from Boxworth End in Swavesey to Buckingway Business Park and over the A14 to Cambridge Services. This will also be available for horse riders, as it links to bridleways in the area.
Martin Lucas-Smith // 1 thread
Cycleway being built by the County Council - will run for a mile-and-a-half between Wandlebury Country Park and Babraham Research Campus, a major science development hub.
Created by George Coulouris // 7 threads
This issue is intended to act a repository for material that can be used to back-up the LCC's 2014 Local Election Campaign 'Asks'. There are 6 'asks' that were finalised and agreed at the LCC's AGM on 19 October 2013:
1. Safe routes to schools
2. Areas without through motor traffic (AWTTs)
3. Protected space on main roads/major junctions
4. Safe cycle routes via parks and canals (Greenways)
5. 20mph speed limits
6. Liveable town centres
so we'll have 6 threads under this Cyclescape issue where we can collect explanations, discussions and most importantly concrete illustrations of what is meant by each ask.
Created by Heather Coleman // 1 thread
Sorry, being a bit tongue in cheek here, but this just made me cross. And no-one has to follow this issue if they don't want to!
website here
http://www.zizzi.co.uk/venue/index/cambridge-benet-street
I've been "in touch" and left these comments:
"Your Cambridge Bene't St restaurant is allegedly "inspired by the huge cycling community". Therefore how come, in the "get directions" bit of the page, the only transport options are "car", "walk" or "train"? I know how to get from my place of employment to Bene't St by bike and even that there's a large underground cycle park just around the corner but, frankly, this is poor, and your marketing people need a rocket.
I will be posting the url of the restaurant and these comments on Cyclescape to see what the rest of the huge cycling community think."
I'll see what reply I get from their "customer experience team" and post it here as a thread when I do hear back from them.
Created by Jose Ferraro // 1 thread
As the cycle lane on Twickenham Road only goes into Park Road you need to leave the cycle lane to continue along Twickenham Road. At these two roads split there is a very deep crack that almost threw me over my handlebars as my front wheel dropped down it.
This must have been there for quite a while as it is visible on google maps at the allocated point!!
Created by Andrea Casalotti // 1 thread
Here is an ambitious plan for a Bicycle Boulevard from Shoreditch to Fitzrovia, along Old Street, Clerkenwell Road and Theobalds Road, open only to bicycles, buses and motor traffic for local access only.
a. It is now the most cycled route in London, showing that it is the desired EW route.
b. It is of variable width, therefore trying to accommodate bikes, buses, and through traffic in a consistent and safe way is impossible. In other words, a compromise will be a botch job.
c. There will not be mixing of buses and bicycles: bicycles will have a dedicated two way cycle lane on the South side of the street.
d. The Boulevard stops being a mega- EW-rat-run. Motor traffic will have to use Pentonville/City Road.
More details here: https://docs.google.com/presentation/d/1yw9mkHhGZaVBKYJs6FxyhC1Z4nNYVl-IFH-aR1ScK9U/pub?start=false#slide=id.p
Campaign for a 300m section of the unguided busway between Milton Road and the pedestrian and cyclists access at the end of Nuffield Close to be built as a road, providing a more direct access for lorries and cars to the trading estate.
Nuffield Road’s residential section should then be cut-off for motorised through traffic just past Discovery Way, turning the first part of Nuffield Road into a residential close.
Petition: http://iitm.be/ChestertonTrafficReduction
Picture Gallery: http://iitm.be/NuffieldRoad
Created by Andrew Clegg // 2 threads
The majority of motor traffic turns right from Union Road to head north on Radcliffe Road, and vice versa. Radcliffe Road is a home zone southwards of this junction, with associated streetscaping, and NCN 23 follows the length of Radcliffe Road.
The main problem is when heading North, where some nice streetscaping prevents drivers having a good view of any traffic exiting the home zone. A lesser problem is when heading South, where motor vehicles often pull out in front of you (presumably because they think that everyone will be turning left).
The most obvious quick fix would be to put a stop sign at the end of union road.
Area Committees are a joint meeting attended by both city and county councillors. They decide on planning issues in the area, but also have a role in the allocation of community development money from S106 contributions. They offer an opportunity to engage with multiple councillors at once, through the Open Forum section and speaking on specific Agenda items. The East Area's website is here: https://www.cambridge.gov.uk/east-area-committee
Speaking at these meetings is a good way of making your feelings on matters the councils control public.
Area Committees are a joint meeting attended by both city and county councillors. They decide on planning issues in the area, but also have a role in the allocation of community development money from S106 contributions. They offer an opportunity to engage with multiple councillors at once, through the Open Forum section and speaking on specific Agenda items. The North Area's website is here: https://www.cambridge.gov.uk/north-area-committee
Speaking at these meetings is a good way of making your feelings on matters the councils control public.
Just wondering if a decision has been made about the future of the junction.
If you look on Crash map http://www.crashmap.co.uk/Search there is a pattern of accidents on Countess Crescent pre-closure near the school. In fact it looks like an accident hotspot!
During the closure I was happy for my children to cycle up to the co-op to access the high street to go shopping, meet friends, etc. Not now! We live south of the railway line. When the closure was in place Countess Crescent became by accident a Cycling Boulevard. You can see from the dates on crashmap that it worked perfectly well as a Cycling Boulevard and was extremely safe (no accidents), so no trial would be required to determine if it is safer as a Cycling Boulevard as it has already taken place.
The junction would be the ideal place to be part of a Cycling Boulevard type infrastructure to gain access to the high street and perhaps up to the swimming pool via Parsonspool. Cars would still have easy routes to the high street and swimming pool with a cycling boulevard system in place and cyclists/pedestrians would also have a safe and enjoyable route. That would be a safe and fair compromise for all road users, as all users would have safe and suitable routes.
Currently it is not safe for adults or children by bike. Bit of a time bomb going on the crashmap site data. A positive change made for cyclists/pedestrians will benefit people locally in a safe and healthy way.
To make restrictions only during school hours would be very short sighted, as this route is a main artery for all south of the railway to access all the clubs/shops/swimming north of the railway and vice versa for the children visiting hallhill or friends south of the railway. Basically children use this route at all hours not just in school hours. We should not compromise on child safety. The swimming pool is free all summer to the kids...what then?
As a byproduct of a cycling boulevard, perhaps safe access for cyclists from the south of the railway line would encourage more people to visit the high street and shop, enhancing the local economy.
Please can you let me know of any developments.
For your info, a Bicycle Boulevard in Holland is a 'Woonerf', a living street:
http://www.telegraph.co.uk/motoring/road-safety/9086705/Why-woonerfs-will-change-how-we-drive.html
Created by Richenda // 1 thread
Apparently TfL commissioned "...to explore the opportunity of a pedestrian river crossing ....". They may not think bikes should also be included, but they should!
http://www.telegraph.co.uk/luxury/travel/4162/a-garden-bridge-across-the-thames.html
http://www.gardenbridgetrust.org/index.html
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Created by Sarah Wood // 0 threads
There are several pedestrian refuges along the road particularly at the western end of the road. The refuges cause a pinch point for cyclists. The road marking confuse priorities between those using the on road cycle path and other traffic.
Created by Sarah Wood // 0 threads
This contraflow infrastructure is hazardous for several reasons: the path is very narrow - realistically around 0.5m wide, the cyclists is riding in the gutter, at risk of being doored and catching wing mirrors. What caught me out was a vehicle travelling North and turned right to access an entrance. Our sight lines were blocked by parked vehicles in parking bays to the right of the cycle path. Until this situation is addressed cyclists will continue to be vulnerable along this section of the road.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by ambrosen // 1 thread
Sustrans route 4 coming from the canal path on its main route into Bath city centre has a high level of traffic conflict and the need to filter between two tight lanes of traffic with a large proportion of LGVs coming down the A36 Beckford Road.
The right turn from Sydney Place southbound into Great Pulteney Street is signposted as no right turn as well as being route 4, and has no refuge to turn from.
It should be possible to route the path through Sydney Gardens as the Darlington Place/Sydney Place westbound/Great Pulteney Street junction has been improved to increase pedestrian flows.
Some non-cycling residents are also concerned about cyclists using the pavement in this area too.
Created by David Wilcox // 3 threads
Proposal
To investigate options to provide a safe, continuous route from St James Barton Roundabout to the top of Park Street.
Rationale
Marlborough Street/Upper Maudlin Street/Perry Road/Park Row (known as the Scope Route) is the most desirable route for cyclists from the east of the city to the University, the Triangle, Clifton etc but is heavily trafficked with little cycle provision.
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF proposals.
Created by Matt Turner // 1 thread
Castle Street cycle lane is a contraflow cycle lane on a one way street in Sheffield. It has been here since March 1997 and allows cyclists enter the city centre from the network of cycle paths on the East, avoiding some big arterial routes with no cycling provision.
For the past 15 years this cycle lane has been plagued by Hackney Carriage drivers parking illegally on this cycle lane, blocking cyclists access and forcing them into oncoming traffic. This has been the case for over a decade.
There is a taxi rank on the pavement side of the cycle lane, taxis often fill up this rank and overflow, parking in the cycle lane, blocking the way for cyclists.
Created by Chris Neston // 2 threads
The cycle path crosses the soutbound exit from the M53 at Cheshire Oaks. The exit is light controlled for traffic as they enter the roundabout. This provides a safe time for cyclists to ride across the sliproad. However the lights are not visible to cyclist on the path and there is no light provided to advise cyclists when they can cross.
This makes it very difficult and dangerous for cyclists to know when they can safely cross. This would require no physical change to the road layout simply a new light to show cyclists when to cross.
Created by David Green // 1 thread
My employer is planning to relocate from central cambridge to the Cambridge Business Park (near Waterbeach). There is currently no decent cycle (or footpath!) access to this business park which avoids riding along the A10. I am a confident cyclist but I am not looking forward to riding to work along sections of the A10.
Are there any plans for cycle route construction which the campaign can, perhaps, help accelerate?
Created by HVS // 2 threads
The A41 ring road cuts across a useful quiet route north-west out of Chester, which is an alternative to the traffic-free Greenway (which is unlit, and slippery in icy conditions). Crossing the A41 during busy periods - e.g. when commuting at rush-hour - can be a slow and potentially very dangerous process, especially after dark. A better crossing for cyclists and pedestrians, or a lower speed limit on the A41 (or both), would be very helpful here.
[Original version of map was wrong; I've now updated it.]
Created by Andrew Woodward // 0 threads
Cyclist coming from the river come up Friars Lane exit and have to currently route right round Richmond Green because it is one way. Many do not and simply cycle across the green. The path across the green should be formally opened up to cyclists - as a share path with pedestrian priority - or a seperate track provided along the south side of Richmond Green.
Martin Lucas-Smith // 1 thread
The permeability gate between Hooper Street and Kingston Street is obstructive as it only allows passage in one direction at a time.
Given the ever-increasing amount of cycling in areas like this, it's time to get this replaced with a simple bollard arrangement that would allow two-way passage whilst still enable the emergency services to unlock for access in an emergency.
Created by Charlie // 1 thread
Confusion created by inconsistent design in the two parts of the new segregated cycle path - one bit is clearly segrated with a distinct red surface; the other bit appears on first glance to be shared-use but on closer inspection is intended to be segregated. Why was this allowed to happen? There are also considerable problems with traffic flow which could have been eliminated with a little more thought. I dispair of Bristol City Council's ability to get anything right!
Created by Shaun McDonald // 1 thread
Is this really the best that Edinburgh can do for the flagship national cycle network route 1 to get it to cross Clerk Street? You have to go through a pile of bins, on to the pavement to get round a barrier and then try and judge it right to cross the road, or use the nearby pedestrian crossing.
Created by Fraser Stephens // 1 thread
RAISED AT PUBLIC MEETING 10-04-2014
The infamous missing link in the Llanfoist-Brynmawr cycle path (route 46) is a huge barrier to its safe use by children as well as those who find the steep section of the diversion route impossible to climb.
Created by timlennon // 1 thread
Initial quietway consultation from Richmond. This is a thread to build RCC's response
Created by Sam Saunders // 1 thread
A northern stretch of Bristol's waymarked "Concorde Way" runs along a quiet residential street, Wordsworth Road. On the newest housing development as Bristol gives way to South Gloucestershire there is a barrier between the end of Wordsworth Road and the start of Eighth Avenue to prevent motor vehicles passing through. There is a raised curb, offset railings and large grey concrete bollards and only a narrow passage either side of one bollard for cyclists to ride through. Tricycles, cargo bikes, or trailers might be to be lifted over the raised curb. In dusk or darkness neither the bollards nor the curb are easy to see. There is a light on the traffic sign offering some help, but a less intimidating arrangements or reflective/high-visibility surfaces could be considered.
Created by Grahame Cooper // 1 thread
Irlams O'th Height roundabout has been the location of a number of collisions involving cyclists (including myself and my daughter last September).
There was a consultation last year over proposals produced by Sustrans for the improvement of this, and I showed my comments (annotations on proposed plans) at a previous GMCC meeting. You can find this annotated document here: https://copy.com/tAIjQdMSxfcsq4fz (large PDF - need to download to see all pages).
A leaflet on the intended imrovements can be found here: http://www.urbanvision.org.uk/wp-content/uploads/2014/08/Cycling-Leaflet.pdf
I am disappointed with this for the following reasons:
- Extensive use of shared footways in the scheme (Salford Council seems to be in love with these, but they are bad).
- Southbound approach on A666 looks impractical & dangerous: a sharp left turn onto the shared footway right at the busy entrance to the roundabout!
- Whilst carriageway widths have been reduced, kerb radii at the mouth of entrances and exits do not seem to have been reduced, so "drivers looking right whilst accelerating left" will still pose a danger for cyclists who do not want to use the shared footways.
- Limited improvements to the subways (tile removal, lighting and resurfacing) will probably not result in an attractive facility for cyclists. Access to this from Bolton Road (northbound) looks awkward.
- There is no undertaking mentioned to ensure that facilities will be maintained and swept.
- I'm still not confident regarding the social safety of the off-road parts, especially in the dark winter months.
Those are my immediate reactions. Could be more to add.
Created by Paul James // 1 thread
The cycleways along the Thames Path and along Ducks Walk are not connected with the south/east side cycleway across Twickenham Bridge and only to the north/west side cycleway via a long detour through Old Deer Park or along The Avenue.
A ramped way down from the bridge would create a useful route for people into and out of Richmond town center that is currently only possible by using two flights of steps.
Martin Lucas-Smith // 11 threads
Major planning application here - c. 10,000 homes
Created by SamGW // 1 thread
The Road between Great Wilbraham and Fulbourn is very well used by Cyclists, runners and walkers throughout the year. It is a single track road with a 60 MPH speed limit. A bicycle path here would encourage more people to cycle to Fulbourn and Cambridge. The path would significantly improve safety for cars, pedestrians and cyclists.
Created by Simon Redding // 2 threads
The railway path from Sheffield down through Staveley & Poolsbrook stops at Arkwright Town. Since an opencast / landfill was south of this point, there is no trace of the former railway line to join to the trails at Sutton Spring Wood. This is an important local link.
Created by Andrew Woodward // 0 threads
Railway footbridge should have a ramp/trough added to make it easier for cyclists to cross the railway. This would then create a quiet north/south route to Marshgate school as an alternative to Manor Road.
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Where the quite good segregated cycle lane joins The Ride, DfT advice was certainly NOT followed. As per DfT advice, when cycle lanes are merged with the carriageway, it should be done via a length of dropped kerb that is flush with the carriageway and the cycle lane shouldn't be joined at a 90 degree angle to the road.
Here, the cycle lane runs parallel to the road for a short distance before it loops around a large boulder specifically placed to force cyclists around and then finally joins the road at a 90 degree angle.
The kerb, though dropped, is far from flush and creates a risk for cyclists joining the track from the road.
This junction between the road and the track should be scrapped and redone according to DfT guidelines.