Land south of Coldham's Lane (2023)
23/04590/OUT Latest in a long sequence of attempts to develop landfill and 'lakes' either side of The Tins path.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
23/04590/OUT Latest in a long sequence of attempts to develop landfill and 'lakes' either side of The Tins path.
Tom McKeown // 1 thread
First and second floor extension above the existing ground floor commercial Business and Service premises (Use Class E) and Library (Use Class F1(d)) to create 15 No. residential apartments including a communal terrace, together with an associated communal entrance/service building (including first and second floor commercial units (Use Class E)), cycle parking, refuse provision, landscaping, the reconfiguration of the established car park, substation and associated infrastructure works.
Land Adjacent To School Hill Histon Cambridgeshire CB24 9JE
South Cambridgeshire
Application reference : 23/04537/FUL
Created by Edward Bainton // 1 thread
Crossing from Bright Street to Geneva Street, the cycle lights do not sense the bike. You can sit through 10 phases and you never get a green light.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
A place to gather threads about cycling issues in Peterborough and any consultations on active travel schemes in the area.
Created by Isaac // 1 thread
Recent roadworks have left the cycle lane entering Cambridge in an unusable state. There are large bumps across the width of the cycle lane which makes cycling along it dangerous. Needs to be fixed asap.
Erection of 12 dwellings, including 3 affordable dwellings, and associated works including alterations to access to the site and creation of second access.
Land At Ditton Walk Cambridge Cambridgeshire
Cambridge
Application reference : 23/04380/FUL
Not shown in the plans, but suggested in the D&A: a pedestrian link between Ditton Walk and the Trail
Created by Campbell Mccaig // 1 thread
A real lack of strimming too making some paths nearly unuseable.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Plans for the 2024 AGM are well-underway!
Please join us on Saturday 20 January, 2-5pm at Storey's Field Centre (main hall).
Created by Gregory Williams // 1 thread
The River Dour Greenway sign pointing into Lorne Road from the shared path beside Buckland Avenue is missing. Previous Google StreetView imagery shows the sign which has gone missing:
Created by Gregory Williams // 1 thread
Bollards on the path used by the River Dour Greenway between Alfred Road and Brookfield Place limit access for people with trailers or on tandems.
Created by Martin Wheatley // 1 thread
Absolutely disgraceful deposit of mud by tractor drivers hauling harvested beets on Fen Lane (the back way to the north of Swaffham Bulbeck which many of us use to bypass the unpleasant B1102 through the village). In my opinion it is not currently safely passable on a bike. I was on foot, in wellingtons, and found it hard to stay upright. The number of tractors and the aggressive speed at which they are being driven is an additional hazard. Until this is cleared up, the options are the main road through the village, or (somewhat longer but much less busy), divert via High Street, Quarry Lane and Heath Road back on to the B1102 and the Greenway to Swaffham Prior north of the village.
Created by Gregory Williams // 3 threads
There isn't a suitable cycling route between Buckland Valley and Dover Christ Church Academy. The hill is steep and traffic levels on Melbourne Avenue.
Created by Gregory Williams // 1 thread
There is a comparatively new shared path linking Burgess Road to Alyesham's station. However the Burgess Road end of the shared path doesn't have a dropped kerb to allow a transition between road and path and vice-versa.
23/04054/FUL (4 flats) replaces 23/01815/FUL (8 flats, withdrawn) without resolving conflict with shared-use path.
Application reference : 23/04054/FUL
Created by Gregory Williams // 1 thread
The sign towards the Town Centre is missing. Previous view of the sign here:
Created by Gregory Williams // 1 thread
The sign pointing into Alfred Road at Lorne Road is missing.
sound+fury // 1 thread
Refurbishment and retrofit of existing building with new fourth storey, rooftop plant and rear extension, new cycle parking and landscaping adjacent to the building together with new cycle hub in existing basement car park under Castle Court
Babbage House Castle Park Cambridge Cambridgeshire CB3 0AT
Cambridge
Application reference : 23/04037/FUL
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Announcement from Cam Conservancy:
https://www.camconservancy.org/public-announcement
Tree management Programme 2023/24 A recent tree survey has identified the necessity for pruning and in some cases felling dangerous trees to ensure the safety of those using the Halingway.A ‘TTRO’ Temporary Traffic Regulation Order has been approved to temporarily close sections of the Halingway/towpath (Chesterton to Clayhithe) between 1 November until 31 March 2024.
The Conservancy appreciates this may cause some temporary inconvenience, however these works are necessary and have been planned to ensure the safety of those who use the Halingway and the staff carrying out the works.
Street Light FCND004 on Falala Way (NCN1) - Not Working Fault Number: 750068
Created by Owaldron // 1 thread
See Picture, Reported to CCC. However, I have a hunch that it may be the responsibility of 'LandMarc' on behalf of the MOD as I think they would own that land.
Created by Gregory Williams // 1 thread
A better cycle connection is needed to Rough Common, avoiding the need to use the A290 Whitstable Road or A2050 and Palmars Cross Hill.
20mph sign has twisted round and a sign directing to the station is pointing slightly in the wrong direction
Created by Gregory Williams // 1 thread
The cycle route on AE18 between AE429 and East Stour Farm has become overgrown and difficult to cycle through.
Created by Gregory Williams // 1 thread
Chilham station is signposted from National Cycle Route 18 via Pickelden Lane. However, the link towards NCR18 isn't signed from Chilham station and the portion along the A28 corridor isn't signed as a cycle route. The A28 is too busy for normal cycling. The path on the south side between Pickelden Lane and Chilham station should be made into shared use.
The incident has been reported to Kent Police as criminal damage, Crime Ref: 46/139801/23.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Created by Sarah Wood // 0 threads
There are several pedestrian refuges along the road particularly at the western end of the road. The refuges cause a pinch point for cyclists. The road marking confuse priorities between those using the on road cycle path and other traffic.
Created by Sarah Wood // 0 threads
This contraflow infrastructure is hazardous for several reasons: the path is very narrow - realistically around 0.5m wide, the cyclists is riding in the gutter, at risk of being doored and catching wing mirrors. What caught me out was a vehicle travelling North and turned right to access an entrance. Our sight lines were blocked by parked vehicles in parking bays to the right of the cycle path. Until this situation is addressed cyclists will continue to be vulnerable along this section of the road.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by ambrosen // 1 thread
Sustrans route 4 coming from the canal path on its main route into Bath city centre has a high level of traffic conflict and the need to filter between two tight lanes of traffic with a large proportion of LGVs coming down the A36 Beckford Road.
The right turn from Sydney Place southbound into Great Pulteney Street is signposted as no right turn as well as being route 4, and has no refuge to turn from.
It should be possible to route the path through Sydney Gardens as the Darlington Place/Sydney Place westbound/Great Pulteney Street junction has been improved to increase pedestrian flows.
Some non-cycling residents are also concerned about cyclists using the pavement in this area too.
Created by David Wilcox // 3 threads
Proposal
To investigate options to provide a safe, continuous route from St James Barton Roundabout to the top of Park Street.
Rationale
Marlborough Street/Upper Maudlin Street/Perry Road/Park Row (known as the Scope Route) is the most desirable route for cyclists from the east of the city to the University, the Triangle, Clifton etc but is heavily trafficked with little cycle provision.
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF proposals.
Created by Matt Turner // 1 thread
Castle Street cycle lane is a contraflow cycle lane on a one way street in Sheffield. It has been here since March 1997 and allows cyclists enter the city centre from the network of cycle paths on the East, avoiding some big arterial routes with no cycling provision.
For the past 15 years this cycle lane has been plagued by Hackney Carriage drivers parking illegally on this cycle lane, blocking cyclists access and forcing them into oncoming traffic. This has been the case for over a decade.
There is a taxi rank on the pavement side of the cycle lane, taxis often fill up this rank and overflow, parking in the cycle lane, blocking the way for cyclists.
Created by Chris Neston // 2 threads
The cycle path crosses the soutbound exit from the M53 at Cheshire Oaks. The exit is light controlled for traffic as they enter the roundabout. This provides a safe time for cyclists to ride across the sliproad. However the lights are not visible to cyclist on the path and there is no light provided to advise cyclists when they can cross.
This makes it very difficult and dangerous for cyclists to know when they can safely cross. This would require no physical change to the road layout simply a new light to show cyclists when to cross.
Created by David Green // 1 thread
My employer is planning to relocate from central cambridge to the Cambridge Business Park (near Waterbeach). There is currently no decent cycle (or footpath!) access to this business park which avoids riding along the A10. I am a confident cyclist but I am not looking forward to riding to work along sections of the A10.
Are there any plans for cycle route construction which the campaign can, perhaps, help accelerate?
Created by HVS // 2 threads
The A41 ring road cuts across a useful quiet route north-west out of Chester, which is an alternative to the traffic-free Greenway (which is unlit, and slippery in icy conditions). Crossing the A41 during busy periods - e.g. when commuting at rush-hour - can be a slow and potentially very dangerous process, especially after dark. A better crossing for cyclists and pedestrians, or a lower speed limit on the A41 (or both), would be very helpful here.
[Original version of map was wrong; I've now updated it.]
Created by Andrew Woodward // 0 threads
Cyclist coming from the river come up Friars Lane exit and have to currently route right round Richmond Green because it is one way. Many do not and simply cycle across the green. The path across the green should be formally opened up to cyclists - as a share path with pedestrian priority - or a seperate track provided along the south side of Richmond Green.
Martin Lucas-Smith // 1 thread
The permeability gate between Hooper Street and Kingston Street is obstructive as it only allows passage in one direction at a time.
Given the ever-increasing amount of cycling in areas like this, it's time to get this replaced with a simple bollard arrangement that would allow two-way passage whilst still enable the emergency services to unlock for access in an emergency.
Created by Charlie // 1 thread
Confusion created by inconsistent design in the two parts of the new segregated cycle path - one bit is clearly segrated with a distinct red surface; the other bit appears on first glance to be shared-use but on closer inspection is intended to be segregated. Why was this allowed to happen? There are also considerable problems with traffic flow which could have been eliminated with a little more thought. I dispair of Bristol City Council's ability to get anything right!
Created by Shaun McDonald // 1 thread
Is this really the best that Edinburgh can do for the flagship national cycle network route 1 to get it to cross Clerk Street? You have to go through a pile of bins, on to the pavement to get round a barrier and then try and judge it right to cross the road, or use the nearby pedestrian crossing.
Created by Fraser Stephens // 1 thread
RAISED AT PUBLIC MEETING 10-04-2014
The infamous missing link in the Llanfoist-Brynmawr cycle path (route 46) is a huge barrier to its safe use by children as well as those who find the steep section of the diversion route impossible to climb.
Created by timlennon // 1 thread
Initial quietway consultation from Richmond. This is a thread to build RCC's response
Created by Sam Saunders // 1 thread
A northern stretch of Bristol's waymarked "Concorde Way" runs along a quiet residential street, Wordsworth Road. On the newest housing development as Bristol gives way to South Gloucestershire there is a barrier between the end of Wordsworth Road and the start of Eighth Avenue to prevent motor vehicles passing through. There is a raised curb, offset railings and large grey concrete bollards and only a narrow passage either side of one bollard for cyclists to ride through. Tricycles, cargo bikes, or trailers might be to be lifted over the raised curb. In dusk or darkness neither the bollards nor the curb are easy to see. There is a light on the traffic sign offering some help, but a less intimidating arrangements or reflective/high-visibility surfaces could be considered.
Created by Grahame Cooper // 1 thread
Irlams O'th Height roundabout has been the location of a number of collisions involving cyclists (including myself and my daughter last September).
There was a consultation last year over proposals produced by Sustrans for the improvement of this, and I showed my comments (annotations on proposed plans) at a previous GMCC meeting. You can find this annotated document here: https://copy.com/tAIjQdMSxfcsq4fz (large PDF - need to download to see all pages).
A leaflet on the intended imrovements can be found here: http://www.urbanvision.org.uk/wp-content/uploads/2014/08/Cycling-Leaflet.pdf
I am disappointed with this for the following reasons:
- Extensive use of shared footways in the scheme (Salford Council seems to be in love with these, but they are bad).
- Southbound approach on A666 looks impractical & dangerous: a sharp left turn onto the shared footway right at the busy entrance to the roundabout!
- Whilst carriageway widths have been reduced, kerb radii at the mouth of entrances and exits do not seem to have been reduced, so "drivers looking right whilst accelerating left" will still pose a danger for cyclists who do not want to use the shared footways.
- Limited improvements to the subways (tile removal, lighting and resurfacing) will probably not result in an attractive facility for cyclists. Access to this from Bolton Road (northbound) looks awkward.
- There is no undertaking mentioned to ensure that facilities will be maintained and swept.
- I'm still not confident regarding the social safety of the off-road parts, especially in the dark winter months.
Those are my immediate reactions. Could be more to add.
Created by Paul James // 1 thread
The cycleways along the Thames Path and along Ducks Walk are not connected with the south/east side cycleway across Twickenham Bridge and only to the north/west side cycleway via a long detour through Old Deer Park or along The Avenue.
A ramped way down from the bridge would create a useful route for people into and out of Richmond town center that is currently only possible by using two flights of steps.
Martin Lucas-Smith // 11 threads
Major planning application here - c. 10,000 homes
Created by SamGW // 1 thread
The Road between Great Wilbraham and Fulbourn is very well used by Cyclists, runners and walkers throughout the year. It is a single track road with a 60 MPH speed limit. A bicycle path here would encourage more people to cycle to Fulbourn and Cambridge. The path would significantly improve safety for cars, pedestrians and cyclists.
Created by Simon Redding // 2 threads
The railway path from Sheffield down through Staveley & Poolsbrook stops at Arkwright Town. Since an opencast / landfill was south of this point, there is no trace of the former railway line to join to the trails at Sutton Spring Wood. This is an important local link.
Created by Andrew Woodward // 0 threads
Railway footbridge should have a ramp/trough added to make it easier for cyclists to cross the railway. This would then create a quiet north/south route to Marshgate school as an alternative to Manor Road.
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Where the quite good segregated cycle lane joins The Ride, DfT advice was certainly NOT followed. As per DfT advice, when cycle lanes are merged with the carriageway, it should be done via a length of dropped kerb that is flush with the carriageway and the cycle lane shouldn't be joined at a 90 degree angle to the road.
Here, the cycle lane runs parallel to the road for a short distance before it loops around a large boulder specifically placed to force cyclists around and then finally joins the road at a 90 degree angle.
The kerb, though dropped, is far from flush and creates a risk for cyclists joining the track from the road.
This junction between the road and the track should be scrapped and redone according to DfT guidelines.