SMALL SCHEMES, BIG CHANGES - BARNSTAPLE
Upgrade footpath Holland Street to shared path (with new sign)
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Upgrade footpath Holland Street to shared path (with new sign)
Created by North Devon Cycling Forum // 0 threads
Lower kerb (some tarmac in gutter against kerb?) at end of Holland Street (jct strand)
Created by North Devon Cycling Forum // 0 threads
The Strand jct cross street; new sign explaining cyclists are allowed to go both ways
Created by North Devon Cycling Forum // 0 threads
Removal of confusing and hazardous bicycle pictorials on on-road "two way" (!) cycle lane Sticklepath Terrace
20 mph speed limit on Long Bridge section between The Square and Severn Brethren desired
Created by North Devon Cycling Forum // 0 threads
Sequence of lights Seven Brethren: current waiting time to cross town centre lane over 2 mins! Needs reducing!
This is one of the seven routes called Strategic Cycle Routes or SCR where Newcastle City Council wants to drastrically improve cycling experience, to increase cycling level six-fold across the city.
This is one of the seven routes called Strategic Cycle Routes or SCR where Newcastle City Council wants to drastrically improve cycling experience, to increase cycling level six-fold across the city.
This is one of the seven routes called Strategic Cycle Routes or SCR where Newcastle City Council wants to drastrically improve cycling experience, to increase cycling level six-fold across the city.
This is one of the seven routes called Strategic Cycle Routes or SCR where Newcastle City Council wants to drastrically improve cycling experience, to increase cycling level six-fold across the city.
This is one of the seven routes called Strategic Cycle Routes or SCR where Newcastle City Council wants to drastrically improve cycling experience, to increase cycling level six-fold across the city.
This is one of the seven routes called Strategic Cycle Routes or SCR where Newcastle City Council wants to drastrically improve cycling experience, to increase cycling level six-fold across the city.
Created by Katja Leyendecker // 1 thread
This is one of the seven routes called Strategic Cycle Routes or SCR where Newcastle City Council wants to drastrically improve cycling experience, to increase cycling level six-fold across the city.
Created by David Earl // 1 thread
Consultation February 2014 (see thread)
Created by David Earl // 0 threads
Car Parks P, F1 And F2
Addenbrookes
Hills Road
To provide education centre, private hospital, hotel, conference centre,
ancillary space, associated car parking and public realm works to replace
existing surface parking to accommodate 42,600sqm of development.
Created by David Earl // 1 thread
Churchill College
Storeys Way
Cambridge
CB3 0DS
Erection of new building comprising 68 study bedrooms, shared kitchens, and meeting room, associated external works and tree and shrub planting together with alterations to South Court building (grade II listed) to widen pedestrian / wheelchair access.
Created by David Earl // 0 threads
St Clements Gardens
Thompsons Lane
CB5 8AH
Erection of new student accommodation comprising 72 study bedrooms
together with ancillary kitchens, common rooms, porter's office, plant and store rooms, cycle parking (including 13 dedicated external spaces for Bishop Bateman Court) and associated external works following demolition of 1-8 St Clements Gardens.
Created by Paul L // 0 threads
There is a long-established cycle route via Broom Rd, lower Teddington Rd but that runs into congestion in Hampton Wick High Street. A cycle lane could join to the cycle track across Kingston Bridge. There is generally no room for 2 traffic lanes but a cycle lane + general traffic lane would fit.
Created by Paul L // 0 threads
Tedington railway bridge is the steepest hill in Teddington and the roundabouts make cycling at busy times stop-start. There are sections of off-road track but they pushy you back onto the road at narrow sections. What is needed is a comprehensive scheme with protected crossings of Park Rd and Waldegrave rd parallel to the existing zebras.
Created by Katja Leyendecker // 0 threads
It's a busy ped / cycle route to school and the city centre. Yet the (toucan) crossing prioritises motor traffic hurtling past at 40mph (speed limit). Drivers frequently ignore red lights. The alignment, crossing space and phasing could be much fairer to pedestrians and cyclists using this crossing.
Newcastle City Council said this crossing is looked at, but their wheels turn too slowly.
Created by Katja Leyendecker // 0 threads
It's a route to school and a natural route for Gosforth residents to walk and cycle into the city centre. Yet it's incredibly over-run by inconsiderate drivers, speeding and blighted by pavement parking. It's 20mph but due to its rat-run nature feels like a motorway thorough-fare. There are blind spots at the metro bridge crossings either end which are dangerous to navigate too. Drivers turning into Ilford / Rectory are also cutting corner, so you'd find a situation of an oncoming cars in your traffic lane.
Newcastle City Council have said there's nothing they can do. I don't believe that to be true. I think they are putting drivers needs before the needs of people walking and cycling.
Created by Paul L // 1 thread
There is an existing cycleroute linking Stanley Rd and Fifth Cross Rd via a toucan. Putting a bidirectional cycle track adjacent to the footway on the E side of Hampton Rd would tie in Wellesey Rd with Strawberry Hill station and quiet routes to Twickenham.
Created by Paul L // 0 threads
The cycle route from Ranelaugh Drive towards Isleworth involves crossing the footway. A dropped kerb has been provided (but no other markings) but this is frequently blocked by parked cars. A solution would be to place a bollard either side of the dropped section.
Created by Shaun McDonald // 1 thread
http://www.travelipswich.co.uk/what-is-happening-and-where/orchard-street-area/
What’s Proposed:
January 2014
* New cycle facilities to allow cyclists to travel northbound on Orchard Street.
* A 'No Entry except for cyles' sign to be placed on the St Helen's Street/Orchard Street junction.
Created by Shaun McDonald // 3 threads
http://www.travelipswich.co.uk/what-is-happening-and-where/barrack-corner/
Barrack Corner
Description: New toucan crossing. No entry at Barrack Lane
Planned Start:Mid April 2014 Planned Finish Works due to last 6 weeks
Location:
Expected Disruption:
Scheme Information:
One of the projects main objectives is to provide safe and convenient crossing facilities where the town’s main pedestrian and cycle routes cross busy main roads. This new scheme will link cycle facilities to the new Handford Road/ Portman Road junction.
The main objective for Barrack Corner is to extend the Portman Road pedestrian and cycle route northwards across Norwich Road by installing a new toucan crossing at the Norwich Road / Barrack Lane junction. This will link the housing areas north of Norwich Road with Ipswich Village and the east side of the town centre. To provide the crossing at the bottom of Barrack Lane it will be necessary to prohibit all vehicles except emergency vehicles from turning in or out of Barrack Lane at its junction with Norwich Road. This means drivers will use alternative routes, therefore access to the Barrack Lane Medical Centre will be signed from the Civic Drive /Berners Street roundabout and from the Norwich Road / Orford Street junction. Cycle access to / from Portman Road would be from a footway build out, which would be protected from parked cars by double yellow lines.
For further information, or to express comments, please contact us on travelipswich@suffolk.gov.uk
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Kate Ravilious // 1 thread
no cyclist ever uses this junction as the engineers intended. It doesn't function well and is dangerous. Needs reviewing.
Created by WillC // 1 thread
Cycle lane marking is badly worn which means other road users cannot tell if it's really there or not - which is bad news for cyclists, and dangerous. needs urgent re-painting. Lodged with highways@leeds.gov.uk twice in last 2 years but no action taken.
Created by Charlie Halliday // 1 thread
Proposal by HCC to add advisory cycle lanes on both sides of Kingsmead between the SUP near the junction with Victoria Road to the entrance of Pinehurst car park.
The cycle lanes would have a contrasting red surface at the entrances to Sainsburys and the Kingsmead and Sainsburys car parks.
Created by Dan // 1 thread
Traffic lights will not change for cyclists when on the sensor (at night).
Created by Stephan Matthiesen // 0 threads
Road was converted to one-way recently, forcing cyclists from Kings Buildings out onto busy West Mains Rd where previously they could cycle within the campus to the toucan at the NE corner.
Created by David Lally // 1 thread
Consultation on development in the area of the proposed HS2 East Midlands Hub at Toton. Transport provision with be the County responsibility but it's important that the possibility of cycle route links between the Toton Lane tram terminus (which now has a good quality cycle route to the outskirts of Beeston) and Long Eaton / Route 67 is not compromised.
There is a very poor road surface on the left hand northbound lane of Stockport Road (A6) after the Plymouth Grove junction.
This is dangerous as if you bear left it encourages traffic behind you to sneak past you, if you go through it can damage your bicycle or even cause you to come off, if you bear right brings you into direct conflict with traffic which often wants to merge into the right hand lane.
The solution is very simple, resurface this small section of road.
Created by Shaun McDonald // 2 threads
The cycle parking outside the Sainsburys is damaged, some stands are bent, others are missing.
Created by Shaun McDonald // 1 thread
The "cyclist priority route" on NCN1, Felixstowe Road obviously isn't that subjectively safe as I've seen someone cycling on the pavement southbound rather than on the road.
http://www.youtube.com/watch?v=DItGP0Lt200 is a video of the road from another occasion.
Created by Rogerdodge // 1 thread
Kingston Council have opened the Consultation on this route, it also includes Ewell Rd - see separate Map. Open until 17th November
Martin Lucas-Smith // 2 threads
Improvements and changes to Perne Road - making this as cycle-friendly as possible.
Created by Rhian // 1 thread
This is a well used route already but very muddy as there is no surfaced footpath across the playing field. A dropped kerb at the end of Noble Grove and a surfaced path around the football pitches to a dropped kerb on Parkhead Loaning would be a significant improvement. A type 1 and dust path as detailed in the attached link would perhaps be more suitable than a fully tarmacked path. Lighting at the points of entry to the grassed area would be an added benefit as this is currently a very dark route.
Created by Shaun McDonald // 0 threads
Comment at Cycle Ipswich meeting on 2014-10-09:
"not at all nice - cycle "lane" too narrow, not visible in dark, potholed, conflict with turning traffic etc. better to have only 1 lane motors and thus proper [cycle] lane??? (still left turn problem)"
Created by User 2125 (deleted) // 1 thread
The shared access path on Colne road, on its north side, creates conflict between cycles and vehicles. The provision seems worse than using the road. The presence of commercial premises on both sides of this road make the use of a shared access path highly problematic.
More photos can be found on the campaign blog.
Created by Mr Andrew Woodhouse // 1 thread
When trying to turn right up Regent Street to join the orbital route from Lawrence Street cyclists have to use the main traffic straight on lane indicating right and stopping at the junction, with no safe marked or protected bay to direct traffic from either direction around them. Making the cyclist exposed and also confusing and frustrating drivers.
Coming up Lawrence street I often feel intimidated by drivers as I indicate right and pull into the straight on lane, I guess as they don't understand that cyclists can turn right and cars can't, there is no indication to the traffic that this is possible, with either road markings approaching or at the junction. Also when turning right the cyclist is faced with oncoming traffic itself trying to turn right, not understanding why the cyclist is positioned where they are in the road, and maybe also taking up the possibly safe space that the cyclist needs to use to get out of the traffic.
Created by Dawes Jaguar // 0 threads
Bunbury Road is busy, but road users emerging from Woodlands Park Road and Northfield Road have to play a game of chicken as they try to judge the best moment to make a rapid exit without crashing into each other. Adding to the processing overload, the following must also be taken into account by road users:
* A service road opposite Woodlands Park Road connects with Bunbury Road at this point.
* A cycle path runs from the junction down to Bunbury Gardens.
* A zebra crossing, one that many motorists (including police drivers) fail to stop for, presumably because of the processing overload.
Lacking acceleration, cyclists face a long wait either at the junction or the zebra crossing. Either way they risk being mown down by a motorist lacking the superhuman skills required to negotiate this junction safely. Since even police drivers make dangerous mistakes here, then it is clearly hopelessly wrong.
There is quite a bit of space here. I would suggest as a minimum a single lane roundabout be created, but since Bunbury Road is busy and there is already a cycle path here it should be made a proper Dutch-style roundabout. To ease the design, close Northfield Road at this point to motor traffic (Northfield Road runs parallel to Bunbury Road).
Created by Simon Still // 1 thread
The Local Implementation Plan (LIP) sits underneath the Local Plan and sets out our commitments to make the changes outlined in the Local Plan a reality.
This LIP also identifies how the London Borough of Redbridge will work with Transport for London (TfL) towards achieving the Mayor's Transport Strategy goals of:
Created by Tammy Hervey // 0 threads
There is a bike rack outside Leopold Square. But it was full when I arrived there at 3pm on Thursday 6 Sept 2012. So I locked my bike to the railings outside the Aagrah Restaurant on Leopold Square. When I came back to it (after a lovely afternoon tea in the Leopold Hotel) someone had locked another bike to it. After frantic asking around everyone I could see in the square (embarrassing!), I found that the manager of Aagrah had done it. He was most unpleasant about it, saying (I believe correctly) that it is private property and that I could not park a bike there. There was no notice anywhere requesting bike users not to do so.
I gather that the issue has been taken up with the management - so if whomever did this on my behalf would like to comment, I'd be grateful.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by wookey // 2 threads
Out of the A1307 Linton Greenway consultation has come a plan for the section between Addenbrooke's roundabout and the Babraham P&R, which the county/GCP are keen to move forward. There was an initial invite-only consultation event on Thur 31st Jan for local residents/residents associations to comment.
Created by Andrew Woodward // 1 thread
South Worple Way is signposted as part of LCN 37; but the western end of it is blocked off with this obstruction; which leaves only a very narrow gap for bikes to get through. Could you get a cargo bike or a trailer through there?
Martin Lucas-Smith // 1 thread
The Eastern Gate proposals are a strategic attempt by the City Council to rework the Newmarket Road roundabout area towards a standard crossing, and create a welcoming entrance into this very run-down looking part of the city.
It is supposed to be being paid for by Section 106 moneys from developments, yet proposal after proposal is coming forward but nothing is happening.
Created by Simon Munk // 2 threads
This 7.5km route would stretch from Hackney to the Isle of Dogs via Westferry, Mile End and Victoria Park. It would connect with the cycle routes between Stratford and Aldgate and Barking to Tower Hill, as well as the proposed Rotherhithe to Canary Wharf crossing. There are currently two options in Hackney we want your views on.
Created by londoncycler // 1 thread
On the south (Southwark) side of the bridge just before the central section there is a very prominent ridge approximately one metre away from the kerb and running parallel to the bridge for some 30 metres. It is located exactly in the path of cyclists crossing the bridge who can be knocked off as they cross the ridge in either direction. In the dark and in the wet the ridge is very hard to see and cyclists may not see the ridge. The fault has been reported repeatedly in the course of more than 2 years to the local highway authority but no action has been taken. Can the highway authority explain why the ridge has not been removed?
Created by Colin Wing // 2 threads
This is the proposed route of Quietway 16 in Westminster
Nominal deadline set to clear this from the Consultation Map.