  • S/1312/19/OL Milton Road Impington - 50 residential dwellings & community park

    Created by Matthew // 1 thread

    Outline application for planning permission with all matters other than access reserved, for the development of up to 50 residential dwellings and a Community Park to provide recreation and leisure facilities, including a community building, and associated works.

    http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/1312/19/OL

    Please sign in to vote.
  • S/1031/19/OL Bourn Airfield - 24,620sqm of light industry

    Created by Matthew // 1 thread

    Outline planning permission with some matters reserved except for appearance for the redevelopment of the former Gestamp factory site at Bourn Airfield for up to 24,620sqm/265,000sqft GEA of commercial floorspace (B1c light industry and B8 warehouse), associated car parking and service yards, external works and landscaping

    http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/1031/19/OL&theTabNo=3

    Please sign in to vote.
  • Milkwood Road Speed Humps

    Created by Simon Still // 1 thread

    Residents are being consulted on the installation of four speed humps, which will assist in lowering traffic speeds on the road. The consultation is open from 15 April 2019. Respond to our survey below.

    As you are aware, Milkwood Road has high traffic speeds. Due to this Milkwood Road has been included in the Council’s Speed Reduction Programme.

    The objective of the Speed Reduction Programme is to calm the speeds on streets, particularly where these have community buildings such as schools.

    Proposed Scheme: to tackle speed

    Speed cushions, like those on Milkwood Road, are less effective than road humps at keeping speeds low. Some vehicles can straddle them, meaning some drivers and motorcyclists travel significantly above the 20mph speed limit.

    To remedy this, we propose to directly replace three sets of speed cushions and instead install three full-width, cycle-friendly, sinusoidal road humps as shown here and an additional speed hump will be included in a new location. To reinforce drivers’ awareness of the speed limit new 20mph hour banners will be installed in April. Additional 20mph signs and road markings will be installed in May/June.

    Please sign in to vote.
  • Various traffic calming Traffic Management Orders Wallington

    Created by Marcus Howarth // 2 threads

    The London Borough of Sutton are proposing to make Traffic Management Orders to facilitate a traffic calming schemes and prevention of obstruction in:-

    Sandy Lane South junction with Foresters Drive and Wordsworth Road;

    Wordsworth Road junction with Lavender Vale;

    Ross Parade junction with Bridge Road; and 

    Ross Road access to Mulberry Mews.

     

    If you wish to view all the statutory documents and make any representations on the proposals please select the link    

    SuttMap 1067

     

    Your representations will need to be with us by Thursday 2 May 2019 and

    If you require further information please contact mohamad.kabash@sutton.gov.uk

    Kind Regards,

     

    Technical Operations Team

    Highways and Transport

    Kingston & Sutton Shared Environment Service

    London Borough of Sutton

    Denmark Road | Carshalton | Surrey | SM5 2JG

    Email: tmo@sutton.gov.uk

    Please sign in to vote.
  • Nasty pothole #1 on Hadley Road

    Created by Paul D.Smith // 1 thread

    Actually two nasty potholes on the westbound carriageway (towards Hadley Wood).  18in-24in across but deep with sharp sides.  Hit one of these last week and got instant puncture.

    Please sign in to vote.
  • Cambridge Biomedical Campus Transport Needs Review

    Created by Sam Webster // 1 thread

    Cambridge Biomedical Campus Transport Needs Review report came out a couple of weeks ago.  Whilst some of it is good, I think the cycling stuff is poor in general:

    1. They look at cyclist safety in the surrounding area but due to the dates and area selected, they claim no fatalities.  Ignoring Steve Moir's death is insensitive at best.
    2. I didn't see any mention of NCR 11 passing through the site which suggests to me they didn't even realise
    3. A tiny bit about air pollution but the word climate doesn't even appear
    4. 'The segregated route alongside the CGB' - Do they mean segregated from buses?!
    5. 'Site observations showed the route alongside the Busway to the west of the site to be particularly well used by pedestrians and cyclists and of high quality'.  It's unsafe due to lack of separation from buses and pedestrians, too narrow for numbers and given speed differences over bridge and crosswinds.
    6. Nothing about the bus stops in mandatory cycle lanes
    7. Section 5.3.3 - peak counts/hour would be very useful
    8. 'Site visit observations suggest that cycling infrastructure near to CBC is currently performing well with the current demand' - CGB path is way over capacity at peak times.  I don't know about the other routes.

    I propose complaining about the standard of the cycling part of the report.

    Please sign in to vote.
  • 19/0389/FUL 62 Silverwood Close - change to 7 bedroom HMO

    Created by Matthew // 1 thread

    Rather pitiful looking front 'garden' with some things sticking out of the wall supposedly providing eight cycle parking spaces. Note that the photograph included in the D&A statement seems to show 'no cycles' signs plastered on the same wall.

    ...

    Change of use to a large HMO (sui generis use class) with seven bedrooms serving seven people.

    62 Silverwood Close Cambridge CB1 3HA

    Cambridge

    Application reference : 19/0389/FUL

    Please sign in to vote.
  • 19/0379/FUL 42 Birdwood Road - 2 bedroom dwelling

    Created by Matthew // 1 thread

    What appears to be two Sheffield stands in the garden. The spacing is only 70cm. They are uncovered. The exterior door appears to be 90cm.

    ...

    Erection of a two bed dwelling to the rear following demolition of existing garage.

    42 Birdwood Road Cambridge CB1 3SU

    Cambridge

    Application reference : 19/0379/FUL

    Please sign in to vote.
  • S/4615/18/OL 28,000sqm office and R&D space

    Created by Roxanne (Cycling Campaign Officer) // 1 thread

    Outline Application for the erection of up to 28,000sqm of mixed B1 (a) offices, B1 (b) research and development, B1 (c) light industrial, B2 general industrial, B8 storage and distribution, and A1/A3 amenity café, with all matters reserved (Access from Beech Road, Appearance, Landscaping, Layout and Scale)

    Land To The West Of Cambridge Research Park, Beach Drive, Landbeach, CB25 9TL

    South Cambridgeshire

    Application reference : S/4615/18/OL

    Please sign in to vote.
  • 19/0347/FUL Parking reconfiguration & pedestrian crossing. Newmarket Road

    Created by Roxanne (Cycling Campaign Officer) // 1 thread

    External works including parking reconfiguration and new pedestrian crossing; new shopfront to western elevation; reconfiguration of rear ramped access; creation of three door openings; formation of loading bay; and raised plant deck.

    Unit 10 Cambridge Retail Park Newmarket Road Cambridge Cambridgeshire CB5 8WR

    Cambridge

    Application reference : 19/0347/FUL

    Please sign in to vote.
  • Two second cyclist/ped green

    Anon // 1 thread

    The glorious development that was the removal of the barriers to Clifton Backies has revealed another problem: the green light (or phase, as highways engineers call it) for pedestrians and cyclists crossing from the east side of Water Lane to the west side of Water Lane just south of the junction with Green Lane has been dialled down to the absolute minimum. I swear it used to be a leisurely five seconds or so, allowing for parents with buggies to amble and cyclists to roll across with little fuss - their reward for having waited their turn to cross. Now however it's more like a blink-and-wasn't-that-light-green-a-second-ago two seconds: you glimpse the long-awaited green, start moving off and before you've even travelled a metre, it has disappeared.

    I know why this has happened: this junction gets really congested, particularly at peak times, largely because the new housing being built nearby was seemingly given the go-ahead without any consideration for the impact that it would have on the road network. Doubtless the Council has received a series of irate communications from frustrated motorists, and Council officers have responded not by acknowledging maybe giving permission to dozens of houses without considering the transport implications wasn't such a good idea, but rather by depriving cyclists and pedestrians of valuable seconds on their 'phase' of the crossing. It's utterly pointless, of course. I very much doubt these seconds 'solve' the congestion experienced by motorists, or whether they even have any real impact. But losing them does have a real impact for pedestrians and cyclists, who are pretty much guaranteed to find themselves in the stressful situation of being stranded on the crossing without a green light reassuring them they're safe.

    It's horribly undemocratic too: the decision to deprive pedestrians and cyclists this reassurance of being able to cross safely was, like other traffic light timing decisions in York, made without consulting pedestrians and cyclists. Rather, it was decided by a lone highways officer that motorists were being unduly impeded, they should therefore have longer green phases, and this time should come out of the pedestrian/cyclist phase. So much for the Council's transport hierarchy, which puts pedestrians and cyclists respectively at the top. So yeah, this is something to discuss with the Council...

    Please sign in to vote.
  • 19/0358/FUL David Lloyd Leisure - car park expansion, modification to the Tins

    Created by Matthew // 1 thread

    They are proposing to expand the car park by adding 45 car parking spaces along the service road that crosses the Tins.

    Transport Statement section 5.2.5 describes a set of measures to create proper visibility splays at the crossing of the Tins and reinforce the give-way markings for drivers. This sounded great...

    However, Appendix D several diagrams and some of them show give-way markings being painted on the cycleway in addition to the service road.

    In contrast, the existing situation is that the Tins is continuous and the give-way markings are painted on the service road.

    This may only be a mistake in some of the diagrams, it does not appear to be mentioned in the text, but we must object that these diagrams show an interruption of the Tins and a degradation of the cycleway.

    ...

    19/0358/FUL | Car park extension to provide 45no. new parking spaces. | 21-25 Coldhams Business Park Norman Way Cambridge CB1 3LH

    https://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=POES6TDXKG900

    Please sign in to vote.
  • Waterloo and South Bank Public Realm Framework

    Created by Simon Still // 1 thread

    Waterloo and South Bank is experiencing significant development and economic growth. This brings both benefits and challenges, including increased pressure on infrastructure and the public realm.

    To understand the public realm Improvement needs of the area better and to prioritise and direct resources, Lambeth Council has worked with urban design and public realm consultants, Publica, to develop a Draft Public Realm Framework.

    The Framework provides an assessment of the existing public realm and identifies opportunities for improvement across Bishop’s Ward, Lambeth. Based on a rigorous baseline audit of streets and spaces, it establishes six guiding principles to shape better placemaking. These principles inform and infuse 18 location specific spatial briefs that describe the type of improvements that should be considered in each location.

    The Draft Public Realm Framework is intended to underpin the Lambeth Local Plan and other strategic documents, provide direction to the public and private sector, help secure support and funding from a variety of public and private sources, and act as a springboard for the improvement and investment necessary to support growth, resilience, independence and place.

    Please sign in to vote.
  • Western Road/Tate Road : Proposed improvements outside Homefield Preparatory Sch

    Created by Marcus Howarth // 1 thread

    The Sutton local area committee has agreed for officers to carry out improvements outside Homefield preparatory school in Western Road at its junction with Tate Road. Funding for the scheme has been secured from Transport for London (TfL) to address concerns raised by the school regarding unacceptable traffic speeds and difficulty in crossing the road outside the school.

    Highways officers have met with school representative to assess these issues and a preliminary improvement scheme has been drawn as shown on the attached plan which aims to address concerns regarding traffic speeds and pedestrian safety. The scheme is fully supported by the school. 

    The scheme proposes to change the priority at Western Road junction with Tate Road and introduce a raised table with a kerb build-out to assist pupils and parents to cross the road and to help reduce traffic speeds outside the school. The scheme also includes re-arranging and providing additional ‘school keep clear’ markings and installation of red/yellow pencil bollards.

    Whilst there were no pedestrian accidents recorded at the location in the last three years, the proposed measures will improve pedestrian safety and thus promote walking as a sustainable mode of travel.

    Please sign in to vote.
  • B1049/The Green Histon roadworks 8 April

    Created by Jonathan Gough // 1 thread

    I've read that there are to be roadworks on the B1049 in Histon at the Green, which means temporary traffic lights and the closure of the end of Impington Lane.  I can't find many details but the local HisImp News paper says it is starting 8th April for 8 weeks.

    I'm concerned about cycle & pedestrian access to Impington Lane from the B1049 during this period and whether access will have been fully considered.  Turning onto Impington Lane coming from the South normally quite dangerous as the road is narrow (hopefully to be improved by the works!)

    Please sign in to vote.
  • The Avenues cycle route

    Created by Richard Jennings // 1 thread

    The Avenues Shambles

    Few people who live in the area will be happy with the situation on The Avenues. A couple of years ago the city won a grant to improve cycle routes around the city, called a “Cycle City Ambition Grant”. The first route to be improved was the one that came along the Avenues, known as the “Pink” route. After two years of planning, public meetings and proposals we are left with the dangerous inadequate mess we see today.

    Why is The Avenues Special?

    Far more bikes use The Avenues than any other road in the city, "nearly 700,000 in 2016 according to the Air Quality Status Report for 2018. Most are students at UEA or workers at the Hospital and Research Parks. It’s also the route hundreds of children should be using to cycle to the City Academy School, so the potential number of cyclists could be even higher if the road were not so dangerous. Logically it should have been the highest priority for providing proper cycle tracks, but it didn’t turn out like that.

    Why is it bad?

    The road markings only allow enough space for one direction of flow on a two way street, so if it needs to pass traffic has to drive in the cycle lanes and when it gets busy the cycle lane simply disappear. There is basically far too much traffic for this type of design.

    Why did we end up with this mess?

    That’s a good question but there are clues, take a look on Tombland and the expensive paving around the cathedral gate. All this meant there just wasn’t enough money left to build the proposed cycle tracks and the present botch is the result. The council decided that the cost of doing The Avenues didn’t represent good value for money, yet doing Tombland did. This is a very suspect situation which has left us with an unacceptable, dangerous mess that simply can’t be left as it is.

    What can be done?

    Please sign in to vote.
  • 'Barnwell Gate' planning application 19/0340/FUL 154 student rooms, Newmarket Rd

    Martin Lucas-Smith // 1 thread

    Erection of student accommodation with 154 student rooms (following demolition of existing buildings). Together with ancillary accommodation comprising common/study rooms, laundry room, management office, plant room, bin and bicycle enclosures, landscaping and associated infrastructure including a Sub-Station.

    John Banks Honda 444 Newmarket Road Cambridge Cambridgeshire CB5 8JL

    https://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=POAWVADX0CE00

    Cambridge Application reference: 19/0340/FUL

    Please sign in to vote.
  • Difficult crossing on Airport Way (near the school)

    Created by Jacob Bramley // 1 thread

    This appears to be a busy crossing, and is used by parents and children heading to and from the school, both by cycle and on foot.

    The chicane barriers make it difficult to cross here with a standard bicycle, let alone a cargo bike or trailer. The cross-hatched area is much more practical to use than the island, but leaves users exposed on a fast road, especially considering that primary-school children are likely to be using this facility.

    On the western side, there is nowhere to wait to cross, so riders with large cycles an trailers have to block the path for other users whilst they wait to cross.

    This is outside the area of the Cherry Hinton North development, but both motor and cycle traffic through here is likely to increase when that is completed, so it is somewhat related.

    Please sign in to vote.
  • Difficult crossing at airport way roundabout

    Created by Jacob Bramley // 1 thread

    There are better-than-average cycle paths either side of this junction, but actually crossing at this point is very difficult because there is a near-constant stream of vehicular traffic leaving the roundabout to head into town.

    Alternative routes (avoiding this crossing) involve lengthy detours.

    Please sign in to vote.

This map shows all issues, whether points, routes, or areas: