  • Cycle route extension on Bath Road, Hounslow

    Created by Hounslow Cycling Campaign // 1 thread

    LBH says [edited]:

    The London Borough of Hounslow is proposing to make changes to a section of Bath Road, running between the Great West Road (A4) and Vicarage Farm Road, in order to make the road safer for cyclists and pedestrians. 

    We recently completed the Hounslow West Cycle and Highway Safety Improvements on Bath Road and now propose to extend the cycle route from Vicarage Farm Road junction westwards to the junction with the A4.  This proposal is to create a safer cycle lane mostly segregated from motor vehicles and pedestrians  ...  As well as the proposed cycle measures, this project aims to improve pedestrian safety by introducing raised entry treatments on all side road junctions along the route, enhancing existing pedestrian crossing facilities along this section of Bath Road and adding a Parallel Crossing (pedestrian & cycle) adjacent to Springwell Road.  In addition, some changes are proposed to the existing bus stop eastbound, introducing a floating island to avoid conflict with cycle and pedestrian movements.  To provide these cycle lanes there will be some localised road widening required on Bath Road and to improve current traffic flows where Bath Road meets the A4 junction.  ... Looking beyond this project it is this Council's aim to extend these cycle proposals to link with Hounslow Town Centre.

    The A3006 Bath Road is part of the Strategic Road Network within Hounslow and as such is an important and heavily used traffic corridor. The personal injury accident record on this section of road is higher than the borough average with 26 injury accidents over the last five years, five involving pedestrians (including two serious), five involving motor bikes and three involving cyclists.

    Please sign in to vote.
  • Refurbishment of 1 Regent Street

    Martin Lucas-Smith // 1 thread

    Cambridge University is planning to refurbish 1 Regent Street for its Cambridge Institute for Sustainability Leadership (CISL).

    Currently there are very anti-cycling 'No cycle parking' notices along the railings, which is hardly an example of sustainability leadership.

    We should use this as an opportunity to get cycle parking along here.

    Please sign in to vote.
  • Roadworks: Kentish Town Road / St Pancras Way

    Created by Paul Allen // 1 thread

    There are currently temporary traffic lights around this junction. Work is expected to be finished on the 15th June 2019.

    These roadworks are now for the junction improvements that will provide a cycling route to/from the cycle lanes of Royal College Street (North) to/from Prince of Wales Road via castle Street.

    Here are links to the proposed infrastructure improvements scheme:

    https://camdencyclists.cyclescape.org/issues/3151-kentish-town-road-royal-college-street-castle-road-junction

    CCC response and Officer's report: http://camdencyclists.org.uk/2018/03/kentish-town-road-rcs-castle-road/

    Status info from Camden Council: http://find.camden.gov.uk/streetworks.aspx?area=kentish%20town%20road

    The initial works were for Virgin Media presumably preparing for the main changes.

    Please sign in to vote.
  • S/1355/19/RM Northstowe H8 - 73 homes

    Created by Matthew // 1 thread

    Application for approval of all reserved matters (appearance, landscaping, access, layout and scale) for 73 dwellings following outline planning permission S/0388/12/OL .

    http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/1355/19/RM&theTabNo=3

    Land south east of the B1050 at Station Road, Parcel H8, Phase 1, Northstowe, Longstanton, Cambs

    Please sign in to vote.
  • 19/0512/FUL Grafton Centre bus turning circle redevelopment

    Created by Matthew // 1 thread

    Redevelopment of existing bus turning head and redundant service area to provide new hotel and ancillary restaurant (Use Class C1), new public realm (urban park) and landscape improvements together with associated highway works to East Road providing new bus stops, pedestrian and cycle routes.

    Grafton Centre Fitzroy Street Cambridge CB1 1PS

    Cambridge

    Application reference : 19/0512/FUL

    Please sign in to vote.
  • Proposed improvements between Wood Lane and Notting Hill Gate

    TfL says:

    We want your views on our proposals to transform roads in west London through four connected neighbourhood improvement schemes between Wood Lane and Notting Hill Gate.

    The proposals are an important part of the Mayor's Transport Strategy. The proposals are guided by the Mayor's Healthy Streets Approach, which aims to encourage walking, cycling and public transport and make London greener, healthier and more pleasant. The proposals are also an important part of the Mayor's Walking and Cycling Action Plans. These complementary plans set out how we and London boroughs will work to increase the number of people walking and cycling, helping to address poor air quality and congestion, while improving infrastructure to make walking and cycling even easier, safer and more accessible for everyone.

    These proposals would provide benefits for road users and communities in these areas, making it easier to cross busy roads, removing through traffic on some residential roads and offering a segregated space for people to cycle in west London. They would form part of London’s emerging cycling network and create a more appealing street environment for everyone to enjoy.

    The proposals include:

    • New and upgraded pedestrian crossings
    • Public space improvements along the route to create more welcoming streets for people and communities to enjoy
    • Two-way segregated cycle track throughout
    • Changes to bus stop locations, with removal of some, and layout changes throughout, including new bus stop bypasses for cyclists
    • Making some side roads entry or exit only to help the safe and timely movement of traffic
    • Removal of some trees in Notting Hill Gate and Holland Park Avenue to accommodate the facilities with appropriate new trees planted nearby
    • Changes to parking and loading bays and hours of operation  

    The proposed changes presented in this consultation are not final. We welcome your views on our proposals and your feedback will inform how we progress the schemes.

    Please sign in to vote.
  • Wapping Liveable Streets engagement

    Created by Alex Jenkins // 1 thread

    From the consultation website:
    https://www.pclconsult.co.uk/liveablestreetswapping/

    The Liveable Streets programme is part of the Love Your Neighbourhood initiative which aims to improve the area for all by making changes to the street infrastructure. By reallocating road space to walking, cycling and public transport, the scheme will encourage changes in travel behaviour which will help to improve people’s health and well being. The scheme also aims to restrict rat running to improve the safety of residential streets.

    Over a 4-year period, 17 areas across the borough have been identified for the scheme. The image below shows the different areas and phases of the scheme. Liveable Streets Wapping is one of the schemes in the first phase of the project.

    We would like to hear what is important to you and the changes you think should be made to encourage more walking, cycling and public transport use in Wapping.

    Please sign in to vote.
  • Bow Liveable Streets Engagement

    Created by Alex Jenkins // 1 thread

    From the consultation website:
    https://www.pclconsult.co.uk/liveablestreetsbow/

    The Liveable Streets programme is part of the Love Your Neighbourhood initiative which aims to improve the area for all by making changes to the street infrastructure. By reallocating road space to walking, cycling and public transport, the scheme will encourage changes in travel behaviour which will help to improve people’s health and well being. The scheme also aims to restrict rat running to improve the safety of residential streets.

    Over a 4-year period, 17 areas across the borough have been identified for the scheme. The image below shows the different areas and phases of the scheme. Liveable Streets Bow is one of the schemes in the first phase of the project.

    We would like to hear what is important to you and the changes you think should be made to encourage more walking, cycling and public transport use in Bow.

    Please sign in to vote.
  • Bethnal Green Liveable Streets engagement

    Created by Alex Jenkins // 1 thread

    From the consultation website:
    https://www.pclconsult.co.uk/liveablestreetsbethnalgreen/

    The Liveable Streets programme is part of the Love Your Neighbourhood initiative which aims to improve the area for all by making changes to the street infrastructure. By reallocating road space to walking, cycling and public transport, the scheme will encourage changes in travel behaviour which will help to improve people’s health and well being. The scheme also aims to restrict rat running to improve the safety of residential streets.

    Over a 4-year period, 17 areas across the borough have been identified for the scheme. The image below shows the different areas and phases of the scheme. Liveable Streets Bethnal Green is one of the schemes in the first phase of the project. Please click on the image to see an enlarged version.

    We would like to hear what is important to you and the changes you think should be made to encourage more walking, cycling and public transport use in Bethnal Green.

    Please sign in to vote.
  • Greenwich Liveable Neighbourhood

    Created by Neil Robertson // 1 thread

    Having won Liveable Neighbourhood Funding for Greenwich Town Centre, the Royal Borough of Greenwich are starting to create more detailed plans.

    Following the pre-Consultation which resulted in a high percentage of responses for the reduction in motor traffic, the council are planning to design the changes in liaison with local groups.

    The expectation is that the gyratory will be removed in favour of a simple 2 way road East to West.

    The concept sketches suggest the other half of the gyratory to be a footpath and cycle route to be ready for when the CS4 extension is planned. The road section would have 3 sets of traffic lights controlling the three main junctions.

    Access to and from Greenwich Park will be high priority, especially as it seems to be confirmed as part of Quietway 1 (daytime only).

    Please sign in to vote.
  • Segregation on the A1010 South

    Created by Paul F // 1 thread

    As the cycle lanes on the A1010 South (from Ponders End to the North Circular) near completion, segregation is starting to be added. What do we want this to be like, what particular issues are there? Thoughts welcome.

    Please sign in to vote.
  • HS2 closure of lane 1 Hampstead Road northbound

    Created by Mixhael // 1 thread

    I know HS2 aren't very cooperative with cycling needs but I was wondering if anyone would have any influence to bear on them with this.

    They have closed lane 1 of Hampstead Road before Granby Terrace for no reason I can see. They don't corral deliveries in it, they don't store plant in it, they don't even park in it. It seems to be closed for no reason other than that they can close it.

    Motor traffic at this part of Hampstead Road is always speeding as quickly as it can between the bottle-necks of Euston Road and Mornington Crescent. It is unpleasant and dangerous having to merge with fast moving lane 2 traffic. Is there any way we can ask HS2 to allow cycles to pass on lane 1?

    Please sign in to vote.
  • Stapleford to Sawston cycleway

    Created by Jon Warbrick // 1 thread

    Contractors are currently rebuilding the section of the Stapleford to Sawston cycleway (part of NCN11) between Sawston traffic lights and the junction with the Sawston Bypass. This isn't a problem in itself and is welcome but it is a bit surprising - while this section of the path was uneven in places and rather narrow it was still better that much provision elsewhere (including elsewhere on this cycleway).  It looks like it part of this.

    Please sign in to vote.
  • Pelier Park

    Created by Sean Howes // 1 thread

    Pelier park has a ball court that is in poor condition, a dog walking area, and a children’s playground that has seen better days which is not very appealing to the younger and older children. There is some seating in the centre area but again this is not in very good condition and it does not feel very inviting.

    Given its location, this park is not well attended; a complete redesign and new equipment to Pelier Park will provide a welcoming bright new space for children and the neighbourhood which will increase the use of this community space.

    The new designs will provide a safe and bright area for play and recreation, appealing to more local people and improving the number of visitors into and around the park.

    Please sign in to vote.
  • Parking Control Measures for carparks in parks

    Created by Sean Howes // 1 thread

    Parking Control Measures for carparks in parks

    The council is proposing to introduce and amend existing parking control measures in the six Southwark parks that have off-street carparks. Ongoing budget pressures mean that it has become necessary to find new ways of covering costs and maintaining the high standards in our parks.

    We aim to prioritise park users over commuters and improve road safety and access to the parks, in particular for vulnerable road users - Blue Badge holders will still have free and unlimited access. We also hope that other park users will adopt more sustainable modes of transport, and that this will help to improve air quality for everyone in Southwark.

    Please sign in to vote.
  • S/0874/19/FL Unit 330 Science Park - front extension and new cycle park

    Created by Matthew // 1 thread

    Unit 330 is a circa 30,000 sq. ft over 2, 330 , Cambridge Science Park, Milton, CB4 0WN

    First Floor front extension. Window and external door renewal. External repairs to existing area of hard and soft landscaping. Reduction of car parking spaces and provision of new bin store and cycle shelter.

    http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/0874/19/FL&theTabNo=3

    (location is approximate)

    Please sign in to vote.
  • S/3983/18/FL - 158 student rooms. Neal Drive, Orchard Park

    Erection of two new private residential blocks comprising 158 student rooms and associated facilities

    Planning Application Ref:

    S/3983/18/FL

    Registration Date:

    20-Sep-2018

    Decision Date:

    Application Type:

    Full Planning (Small Major)

    Determination Extension:

    20-Jan-2019

    Parish:

    Orchard Park CP

    Main Location:

    Western side of Land Parcel COM 4 Orchard Park, Neal Drive, Cambridge

    Full Description:

    Erection of two new private residential blocks comprising 158 student rooms and associated facilities

    Status:

    Out for Consultation

    Please sign in to vote.
  • Danson Lane

    Proposed changes to junction to aid W=E movement for Quietway, has questionable impact on  rides on N=S route and those joining / leaving Quietway.  Present layout shown in google satellite in 'photo' above.  Drawing of new layout in link below,  Consultation notice here: https://drive.google.com/open?id=1qZW5AML3rZIVjmv3BMFL6f7mHhmbq5Xz  .

    Note eastern arm of junction is not public highway, but two adjacent driveways, one (generally open)  leading to church; other with gate at present closed to vehicles, and separate narrow pedestrian gate, generally open for walkers and riders   - see streetview image (not provided).

    Please sign in to vote.
  • Greening of Phoenix Road

    Created by John Chamberlain // 1 thread

    Phoenix Road plus Brill Place connects Eversholt Street with Midland Road and is in principle an excellent pedestrian and cycle link between Euston and Kings Cross/St Pancras stations. But it is not attractive, especially for pedestrians. Camden have money from HS2 to improve it and have come up with a set of ideas which are set out in two large and very thorough reports which are available here and here.

    Motor traffic and cycle flows on the corridor are relatively low (see pages 26 and 27 of the Stage 1 report). They show a maximum of 144 motor vehicles per hour in the morning peak (sum of both directions, west of Chalton Street) and 175 in the evening peak, with cycle flows of 24 and 27 (very low). The measurements were done in 2017; motor traffic is likely to be higher now that motors have diverted up Ossulston Street, though Google sends motors via Polygon Road rather than Phoenix Road. For comparison, cycle flows on Ossulston Street were 232 and 230 (a.m. and p.m. peak hour).

    So there are not many cyclists using the corridor.  This may increase once the Midland Road tracks are open but Eversholt Street is not an attractive route unless you are going to Euston station and anyone making that journey is probably already using Ossulston Street so cycle numbers probably will not increase much.

    6 options are proposed, ranging from a minimal treatment which would not affect the road layout (option 1A) to a complete closure (option 4). Option 4 is not supported by Camden so we’ll discount it.

    Option 1A retains the current road layout with some greening and reduction of carriageway width to 4.8m. 1B converts it to one-way, alternating westbound and eastbound and should therefore reduce rat-running. Option 2 has closures to motor traffic (modal filters) between Ossulston and Chalton Streets and between Chalton and Werrington Streets. Option 3 adds another road closure between Eversholt and Werrington Streets and 3B is the same but with added measures on neighbouring streets to reduce or prevent traffic displacement. Option 4 is a full closure but is not supported by Camden. In all cases, cycling is permitted in both directions throughout and access is retained for emergency vehicles.

    In the Stage 2 report they suggest how the actual street layouts might look. The main issues are whether the carriageway should be linear or ‘meandering’.

    From a cycling point of view any reduction in motor traffic is a good thing. We normally would have concerns about the interaction with pedestrians in shared space. However, as cycle counts are low perhaps this is not a major issue here and the improved streetscape might outweigh any concerns. If one of the options 2 or 3 were chosen we should probably ask that the design makes it clear that cyclists are allowed and that also the meandering design might be better as it would signal to cyclists that low speeds are appropriate.

    More information plus the online response form is at https://consultations.wearecamden.org/groundwork/greening-phoenix-road/

    Meanwhile please feed your comments to us via the threads on this issue, or by email to john@camdencyclists.org.uk . Responses are due by 31st May so we’ll send in our formal response by the 28th.

    Please sign in to vote.
  • A1010 North

    Hamish F // 1 thread

    The plans for this scheme have been revised following earlier consultation.

    From Enfield Council:

    We are close to finalising the designs of the A1010 North scheme, and welcome your feedback on the draft plans. Copies of the A1010 North design drawings, draft traffic management orders and statement of reasons are available to download in the document library on the right of this page . Please view these and then provide your comments using the survey below.  (See web link)