Issues

This section lists issues - problems on the street network and related matters.

Issues always relate to some geographical location, whether very local or perhaps city-wide.

You can create a new issue using the button on the right.

Listed issues, most recent first:

  • Cycle path closed

    Created by Helen Cook // 1 thread

    Cycle path on southbound side of Eddington Avenue has been closed for no apparent reason since August 2018.  Obstructive signs tell cyclists to dismount or use the road.

    Please sign in to vote.
  • Here lies a new shared path off-limits to disabled cyclists

    Anon // 1 thread

    Last year a new path was built by Sustrans linking an existing bridleway to Rufforth. Great, right? Sure, *unless you dare to cycle on a non-conventional bike and/or have a physical disability*! Because what's this we have here? It's a barrier that makes it impossible for people with a physical disability and/or on a non-conventional bike to get past! Sustrans claim that the Council is responsible for this barrier, and the Council have said that those responsible "have been informed". Will action be taken? Will the 15-20% of York residents who have a physical disability be able to use this new path funded with their taxpayers' money? We shall see.

    Please sign in to vote.
  • Disabled cyclists - You Shall Not Pass!

    Anon // 1 thread

    Another signed cut-through for cyclists, another barrier that is ableist, discriminatory and a massive hassle even for able-bodied cyclists on conventional, diamond-frame, relatively light bikes. If you don't tick both those boxes then your options are:

    1. Lift your bike over the barrier. Here's hoping you're not on a cargo bike, trike or heavy city bike!

    2. Reverse back along the path if you're coming from the north/Malton Way and try to find a different route that isn't blighted by barriers.

    3. Take the road. Don't like cycling alongside motorised traffic? Tough!

    And here's what the Council needs to do - follow the example of more enlightened cities (pretty much any city in Scandinavia, the Netherlands, Germany etc etc etc) and remove the barriers!!

    Please sign in to vote.
  • Horribly obstructive barrier on "cycle route"

    Anon // 1 thread

    This cut-through is on a key, signed, cycle route from Clifton Moor Gate, supposedly allowing cyclists to avoid the busy routes. But cyclists seeking to make use of this cut-through have to contend with not one, but two barriers, both apparently installed to impede cycle traffic or at the very least force to cyclists to walk (because all cyclists can walk without problem, right?!). The older barrier is a fence-type one which greatly narrows the space available to pass through. Apparently that wasn't enough to stop those pesky cyclists, as a concrete bollard has been installed maybe 0.5 metres from the metal barrier, in front of the greatly narrowed space. In short, only able-bodied cyclists with conventional bikes have any hope of getting through, and even then, it's a struggle. These barriers need to be removed.

    Please sign in to vote.
  • Vehicle free tradespeople

    Created by Nick Flynn // 1 thread

    A list of carpenters, cleaners, electricians, plumbers and other tradespeople who can attend jobs in Cambridge without needing a car parking space (for example those arriving by cargo bike) would be a useful resource.

    It could be used by people who cannot offer car parking, or those who would prefer to choose someone who can arrive by sustainable transport.

    Please sign in to vote.
  • Draft Air Quality Action Plan Consultation

    Created by Charles Martin // 1 thread

    The London Borough of Sutton's revised Air Quality Action Plan, draft for consultation (6 December 2018 to 6 February 2019). https://sutton.citizenspace.com/environment/draft-air-quality-action-plan-consultation/

    Get Sutton Cycling produced a short film in 2017 "Air Pollution in Sutton: how it affects you and how cycling can help" https://getsuttoncycling.org.uk/2017/10/05/the-video-you-cant-afford-to-miss/ 

    Please sign in to vote.
  • Chesterton Road Tree Lining - Project Consultation

    Cambridge City Council through the Environmental Improvement Programme (EIP) have allocated funding to improve the streetscape by increasing the number of trees along on Chesterton Road. We have identified a number of potential locations for new trees as shown on the 2 maps below.  

    Currently we have funding available for a smaller number of trees then shown on the plans below.  We wish to prioritise a number of these trees for the first phase of works.  We would hope to be able to plant further trees when and if we get additional funding.  

    This consultation gives local residents and stakeholders an opportunity to comment on and rate the potential tree location options put forward.

    All the potential locations will need to take into account highways infrastructure and underground utilities services, which may affect the locations currently being considered. 

    This consultation will end at noon on Friday the 15th of February 2018. 

    https://www.surveymonkey.co.uk/r/ChestRdTrees

    Please sign in to vote.
  • Wrythe Lane / Tweeddale Road / Thornton Road - proposed changes to junction

    Created by Charles Martin // 1 thread

    • Removing the existing access into Tweeddale Road from Wrythe Lane. It is proposed to create new access from Thornton Road across the green space. This will help to reduce vehicle conflicts and provide better pedestrian routes.
    • Converting the closed section of Tweeddale Road to grassed area as shown on the plan in green hatch lines.
    • A raised table is proposed at the new entry into Tweeddale Road to provide a level crossing for pedestrians and to help with slowing down traffic speeds.

    Please sign in to vote.
  • Roadworks: Park Village East

    Created by John Chamberlain // 0 threads

    From January 17th until early 2020 Park Village East will be closed to motor traffic at the northern end for Thames Water to install a new 42 main. This is due to HS2 construction. It is currently possible to cycle through and the good news is that the road is temporarily two-way with effectively a modal filter at the north end! I wonder if we can persuade Camden to make the arrangement permanent.

    Please sign in to vote.
  • 18/2062/FUL just east of Clerk Maxwell - 35 new dwellings

    Created by Matthew // 1 thread

    Need to measure the cycle parking sheds

    May be a good one to test policy 80 and continuous footways as this will cut a new access driveway into the existing footway on the east side of Clerk Maxwell.

    ...

    Erection of 35 dwellings (12 x 1bed, 4 x 2bed, 10 x 3bed and 9 x 4+bed) and re-position of existing access onto Clerk Maxwell Road. Provision of new spine road, parking, cycle provision, landscaping and associated infrastructure. Clerk Maxwell Road Cambridge Cambridgeshire https://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=PKP81SDX0CE00 Cambridge Application reference : 18/2062/FUL

    Please sign in to vote.
  • 19/0004/FUL Romsey Labour Club

    Created by Matthew // 1 thread

    Transport Assessment

    4.16 Cycle parking for residents will be provided on the proposed basement level. Access will be
    provided via the main lobby, leading to a cycle wheel ramp. This will descend into a cycle
    store room with capacity for 38 cycles. The main staircase and lift will descend into the
    basement for direct access to the main residential block.

    4.17 As part of the development proposals, an on-site bike / ebike loan scheme will be implemented
    for the future residents of the services apartments to provide a readily available opportunity
    for travel by cycle.


    4.18 Visitor cycle parking will be provided at ground level, with capacity for 24 cycles. These will
    be provided adjacent to the western front of the site and can be accessed directly from
    Coleridge Road.

    Dimensions look OK. Main issue is basement. I think it's unavoidable, so the questions are:

    What is the gradient of the ramp?

    Is there enough turning space at the bottom?

    What provision is being made for people who cannot use the stairs/ramp to reach the basement? (none currently, but the courtyard looks reasonable) Alternatively can the lift be used for cycles? (it's 2m by 2m)

    Where are the mentioned e-bike hire bikes being parked?

    ...

    Serviced apartment (sui generis use class) scheme containing 38no self-contained 1xbed room units along with Cafe, gym and community space at ground floor with a vehicle drop-off zone, disabled car parking space, cycle parking and associated landscaping and retention of existing BLI frontage. Romsey Labour Club Mill Road Cambridge CB1 3NL https://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=PKPLWXDXIQ900 Cambridge Application reference : 19/0004/FUL

    Please sign in to vote.
  • East Dulwich parking zone and healthier streets

    Created by Sean Howes // 1 thread

    Southwark Council is conducting a parking and healthier streets study in the East Dulwich area, shown in pink (on cyclescape pic).

    We have received many requests for permit parking from residents in East Dulwich since 2015 and we expect parking pressure to increase with the adjacent Dog Kennel Hill parking zone recently implemented and should the 'Peckham West' zone to the North be implemented (also in consultation). We are therefore carrying out a study on the potential introduction of a parking zone in East Dulwich, to improve parking for residents and support businesses while creating more healthy streets for people from all walks of life.

    We expect for the zone to result in freeing up roughly 40% of the kerbside space and are therefore proposing ‘healthy streets’ proposals to encourage walking and cycling for people from all walks of life: ‘parklets’ (planting and communal seating in the place of a parking space), seating along walking routes for places to stop and rest, and cycle parking with reserved spaces for cargo bikes and disability adapted cycles. The Southwark Spine cycle route soon to be implemented along Crystal Palace Road is expected to further encourage cycling in the area.

    To improve bus journey times we are proposing to amend the bus lane operation to include an afternoon/evening peak operating time in the existing bus lane north of Blackwater Road, and to remove parking at the junction with Ashbourne Grove which is a pinchpoint for buses.

    We aim to support the high street by encouraging walking and cycling: research has shown that improving the environment for walking and cycling has positive effects on the high street economy: https://tfl.gov.uk/corporate/publications-and-reports/economic-benefits-of-walking-and-cycling  with people walking, cycling and using public transport spending spending 40% more each month than car drivers . In addition, to enable more flexibility and higher turnover, we are proposing to extend the operating time of half hour bays so that after the initial free half hour visitors could extend their stay for a fee. Visitors will also be able to use shared used bays in surrounding side streets.

    Why We Are Consulting

    A parking and healthier streets study is an opportunity for the council to assess the parking issues in a certain area by asking the local residents and businesses how they view parking on their street and whether they would like a parking zone and street improvements to be introduced.

    The council will analyse all responses on a road by road basis and make a recommendation to the decision maker.

    Any parking controls or street improvements that we introduce will take into account the results of the consultation as well as existing highway safety issues in the proposed zone, feedback from emergency services, and our wider transport policies reflecting our responsibilities to air quality and active travel.

    We would like to hear your views on the proposals. Please read the background documents below and consider the proposed layout and preliminary healthy street imrpovements before completing the questionnaire online or by post via the freepost address, by 31 January 2019.

    For the background information see the documents below and for more information about parking and the decision making process in Southwark visit www.southwark.gov.uk/parkingprojects

    Please sign in to vote.
  • 'Peckham West' parking zone and healthier streets

    Created by Sean Howes // 1 thread

    Southwark Council is conducting a parking and healthier streets study in the 'Peckham West' area, shown in orange in cyclescape picture.

    We have received many requests for permit parking from residents in this area since 2015 and parking pressure has increased since the adjacent Dog Kennel Hill parking zone was implemented in December 2018, as evidenced by photos of double parking below sent by a resident and reports of parking on kerbs and in front of drop kerbs. In addition, should the East Dulwich zone to the South be implemented (also in consultation) parking stress will increase further.

    We are therefore carrying out a study on the potential introduction of a parking zone in 'Peckham West', to improve parking for residents and support businesses while creating more healthy streets for people from all walks of life.

    We expect for the zone to result in freeing up roughly 40% of the kerbside space and are therefore proposing ‘healthy streets’ proposals to encourage walking and cycling for people from all walks of life: ‘parklets’ (planting and communal seating in the place of a parking space), seating along walking routes for places to stop and rest, and cycle parking with reserved spaces for cargo bikes and disability adapted cycles. The Southwark Spine cycle route soon to be implemented along Maxted and Adys Road is expected to further encourage cycling in the area.

    Why We Are Consulting

    A parking and healthier streets study is an opportunity for the council to assess the parking issues in a certain area by asking the local residents and businesses how they view parking on their street and whether they would like a parking zone and street improvements to be introduced.

    The council will analyse all responses on a road by road basis and make a recommendation to the decision maker.

    Any parking controls or street improvements that we introduce will take into account the results of the consultation as well as existing highway safety issues in the proposed zone, feedback from emergency services, and our wider transport policies reflecting our responsibilities to air quality and active travel.

    We would like to hear your views on the proposals. Please read the background documents below and consider the proposed layout and preliminary healthy street imrpovements before completing the questionnaire online or by post via the freepost address, by 31 January 2019.

    For the background information see the documents below and for more information about parking and the decision making process in Southwark visit www.southwark.gov.uk/parkingprojects

    Please sign in to vote.
  • Uneven tarmac at bus stop

    Created by Paul D.Smith // 1 thread

    2019/01/20 - This has been resurfaced and is all nice and flat now.

    Going east at this point there is a bus stop where buses stopping have caused the tarmac to ripple badly.  Could cause you a nasty surprise if you don't spot it.

    Please sign in to vote.

This map shows all issues, whether points, routes, or areas:

Spinner Please wait…
Back to top