SMALL SCHEMES, BIG CHANGES - BARNSTAPLE
Upgrade footpath Holland Street to shared path (with new sign)
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Upgrade footpath Holland Street to shared path (with new sign)
Created by North Devon Cycling Forum // 0 threads
Lower kerb (some tarmac in gutter against kerb?) at end of Holland Street (jct strand)
Created by North Devon Cycling Forum // 0 threads
The Strand jct cross street; new sign explaining cyclists are allowed to go both ways
Created by North Devon Cycling Forum // 0 threads
Removal of confusing and hazardous bicycle pictorials on on-road "two way" (!) cycle lane Sticklepath Terrace
20 mph speed limit on Long Bridge section between The Square and Severn Brethren desired
Created by North Devon Cycling Forum // 0 threads
Sequence of lights Seven Brethren: current waiting time to cross town centre lane over 2 mins! Needs reducing!
This is one of the seven routes called Strategic Cycle Routes or SCR where Newcastle City Council wants to drastrically improve cycling experience, to increase cycling level six-fold across the city.
This is one of the seven routes called Strategic Cycle Routes or SCR where Newcastle City Council wants to drastrically improve cycling experience, to increase cycling level six-fold across the city.
This is one of the seven routes called Strategic Cycle Routes or SCR where Newcastle City Council wants to drastrically improve cycling experience, to increase cycling level six-fold across the city.
This is one of the seven routes called Strategic Cycle Routes or SCR where Newcastle City Council wants to drastrically improve cycling experience, to increase cycling level six-fold across the city.
This is one of the seven routes called Strategic Cycle Routes or SCR where Newcastle City Council wants to drastrically improve cycling experience, to increase cycling level six-fold across the city.
This is one of the seven routes called Strategic Cycle Routes or SCR where Newcastle City Council wants to drastrically improve cycling experience, to increase cycling level six-fold across the city.
Created by Katja Leyendecker // 1 thread
This is one of the seven routes called Strategic Cycle Routes or SCR where Newcastle City Council wants to drastrically improve cycling experience, to increase cycling level six-fold across the city.
Created by David Earl // 1 thread
Consultation February 2014 (see thread)
Created by David Earl // 0 threads
Car Parks P, F1 And F2
Addenbrookes
Hills Road
To provide education centre, private hospital, hotel, conference centre,
ancillary space, associated car parking and public realm works to replace
existing surface parking to accommodate 42,600sqm of development.
Created by David Earl // 1 thread
Churchill College
Storeys Way
Cambridge
CB3 0DS
Erection of new building comprising 68 study bedrooms, shared kitchens, and meeting room, associated external works and tree and shrub planting together with alterations to South Court building (grade II listed) to widen pedestrian / wheelchair access.
Created by David Earl // 0 threads
St Clements Gardens
Thompsons Lane
CB5 8AH
Erection of new student accommodation comprising 72 study bedrooms
together with ancillary kitchens, common rooms, porter's office, plant and store rooms, cycle parking (including 13 dedicated external spaces for Bishop Bateman Court) and associated external works following demolition of 1-8 St Clements Gardens.
Created by Paul L // 0 threads
There is a long-established cycle route via Broom Rd, lower Teddington Rd but that runs into congestion in Hampton Wick High Street. A cycle lane could join to the cycle track across Kingston Bridge. There is generally no room for 2 traffic lanes but a cycle lane + general traffic lane would fit.
Created by Paul L // 0 threads
Tedington railway bridge is the steepest hill in Teddington and the roundabouts make cycling at busy times stop-start. There are sections of off-road track but they pushy you back onto the road at narrow sections. What is needed is a comprehensive scheme with protected crossings of Park Rd and Waldegrave rd parallel to the existing zebras.
Created by Katja Leyendecker // 0 threads
It's a busy ped / cycle route to school and the city centre. Yet the (toucan) crossing prioritises motor traffic hurtling past at 40mph (speed limit). Drivers frequently ignore red lights. The alignment, crossing space and phasing could be much fairer to pedestrians and cyclists using this crossing.
Newcastle City Council said this crossing is looked at, but their wheels turn too slowly.
Created by Katja Leyendecker // 0 threads
It's a route to school and a natural route for Gosforth residents to walk and cycle into the city centre. Yet it's incredibly over-run by inconsiderate drivers, speeding and blighted by pavement parking. It's 20mph but due to its rat-run nature feels like a motorway thorough-fare. There are blind spots at the metro bridge crossings either end which are dangerous to navigate too. Drivers turning into Ilford / Rectory are also cutting corner, so you'd find a situation of an oncoming cars in your traffic lane.
Newcastle City Council have said there's nothing they can do. I don't believe that to be true. I think they are putting drivers needs before the needs of people walking and cycling.
Created by Paul L // 1 thread
There is an existing cycleroute linking Stanley Rd and Fifth Cross Rd via a toucan. Putting a bidirectional cycle track adjacent to the footway on the E side of Hampton Rd would tie in Wellesey Rd with Strawberry Hill station and quiet routes to Twickenham.
Created by Paul L // 0 threads
The cycle route from Ranelaugh Drive towards Isleworth involves crossing the footway. A dropped kerb has been provided (but no other markings) but this is frequently blocked by parked cars. A solution would be to place a bollard either side of the dropped section.
Created by Shaun McDonald // 1 thread
http://www.travelipswich.co.uk/what-is-happening-and-where/orchard-street-area/
What’s Proposed:
January 2014
* New cycle facilities to allow cyclists to travel northbound on Orchard Street.
* A 'No Entry except for cyles' sign to be placed on the St Helen's Street/Orchard Street junction.
Created by Shaun McDonald // 3 threads
http://www.travelipswich.co.uk/what-is-happening-and-where/barrack-corner/
Barrack Corner
Description: New toucan crossing. No entry at Barrack Lane
Planned Start:Mid April 2014 Planned Finish Works due to last 6 weeks
Location:
Expected Disruption:
Scheme Information:
One of the projects main objectives is to provide safe and convenient crossing facilities where the town’s main pedestrian and cycle routes cross busy main roads. This new scheme will link cycle facilities to the new Handford Road/ Portman Road junction.
The main objective for Barrack Corner is to extend the Portman Road pedestrian and cycle route northwards across Norwich Road by installing a new toucan crossing at the Norwich Road / Barrack Lane junction. This will link the housing areas north of Norwich Road with Ipswich Village and the east side of the town centre. To provide the crossing at the bottom of Barrack Lane it will be necessary to prohibit all vehicles except emergency vehicles from turning in or out of Barrack Lane at its junction with Norwich Road. This means drivers will use alternative routes, therefore access to the Barrack Lane Medical Centre will be signed from the Civic Drive /Berners Street roundabout and from the Norwich Road / Orford Street junction. Cycle access to / from Portman Road would be from a footway build out, which would be protected from parked cars by double yellow lines.
For further information, or to express comments, please contact us on travelipswich@suffolk.gov.uk
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Created by Sarah Wood // 0 threads
There are several pedestrian refuges along the road particularly at the western end of the road. The refuges cause a pinch point for cyclists. The road marking confuse priorities between those using the on road cycle path and other traffic.
Created by Sarah Wood // 0 threads
This contraflow infrastructure is hazardous for several reasons: the path is very narrow - realistically around 0.5m wide, the cyclists is riding in the gutter, at risk of being doored and catching wing mirrors. What caught me out was a vehicle travelling North and turned right to access an entrance. Our sight lines were blocked by parked vehicles in parking bays to the right of the cycle path. Until this situation is addressed cyclists will continue to be vulnerable along this section of the road.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by ambrosen // 1 thread
Sustrans route 4 coming from the canal path on its main route into Bath city centre has a high level of traffic conflict and the need to filter between two tight lanes of traffic with a large proportion of LGVs coming down the A36 Beckford Road.
The right turn from Sydney Place southbound into Great Pulteney Street is signposted as no right turn as well as being route 4, and has no refuge to turn from.
It should be possible to route the path through Sydney Gardens as the Darlington Place/Sydney Place westbound/Great Pulteney Street junction has been improved to increase pedestrian flows.
Some non-cycling residents are also concerned about cyclists using the pavement in this area too.
Created by David Wilcox // 3 threads
Proposal
To investigate options to provide a safe, continuous route from St James Barton Roundabout to the top of Park Street.
Rationale
Marlborough Street/Upper Maudlin Street/Perry Road/Park Row (known as the Scope Route) is the most desirable route for cyclists from the east of the city to the University, the Triangle, Clifton etc but is heavily trafficked with little cycle provision.
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF proposals.
Created by Matt Turner // 1 thread
Castle Street cycle lane is a contraflow cycle lane on a one way street in Sheffield. It has been here since March 1997 and allows cyclists enter the city centre from the network of cycle paths on the East, avoiding some big arterial routes with no cycling provision.
For the past 15 years this cycle lane has been plagued by Hackney Carriage drivers parking illegally on this cycle lane, blocking cyclists access and forcing them into oncoming traffic. This has been the case for over a decade.
There is a taxi rank on the pavement side of the cycle lane, taxis often fill up this rank and overflow, parking in the cycle lane, blocking the way for cyclists.
Created by Chris Neston // 2 threads
The cycle path crosses the soutbound exit from the M53 at Cheshire Oaks. The exit is light controlled for traffic as they enter the roundabout. This provides a safe time for cyclists to ride across the sliproad. However the lights are not visible to cyclist on the path and there is no light provided to advise cyclists when they can cross.
This makes it very difficult and dangerous for cyclists to know when they can safely cross. This would require no physical change to the road layout simply a new light to show cyclists when to cross.
Created by David Green // 1 thread
My employer is planning to relocate from central cambridge to the Cambridge Business Park (near Waterbeach). There is currently no decent cycle (or footpath!) access to this business park which avoids riding along the A10. I am a confident cyclist but I am not looking forward to riding to work along sections of the A10.
Are there any plans for cycle route construction which the campaign can, perhaps, help accelerate?
Created by HVS // 2 threads
The A41 ring road cuts across a useful quiet route north-west out of Chester, which is an alternative to the traffic-free Greenway (which is unlit, and slippery in icy conditions). Crossing the A41 during busy periods - e.g. when commuting at rush-hour - can be a slow and potentially very dangerous process, especially after dark. A better crossing for cyclists and pedestrians, or a lower speed limit on the A41 (or both), would be very helpful here.
[Original version of map was wrong; I've now updated it.]
Created by Andrew Woodward // 0 threads
Cyclist coming from the river come up Friars Lane exit and have to currently route right round Richmond Green because it is one way. Many do not and simply cycle across the green. The path across the green should be formally opened up to cyclists - as a share path with pedestrian priority - or a seperate track provided along the south side of Richmond Green.
Martin Lucas-Smith // 1 thread
The permeability gate between Hooper Street and Kingston Street is obstructive as it only allows passage in one direction at a time.
Given the ever-increasing amount of cycling in areas like this, it's time to get this replaced with a simple bollard arrangement that would allow two-way passage whilst still enable the emergency services to unlock for access in an emergency.
Created by Charlie // 1 thread
Confusion created by inconsistent design in the two parts of the new segregated cycle path - one bit is clearly segrated with a distinct red surface; the other bit appears on first glance to be shared-use but on closer inspection is intended to be segregated. Why was this allowed to happen? There are also considerable problems with traffic flow which could have been eliminated with a little more thought. I dispair of Bristol City Council's ability to get anything right!
Created by Shaun McDonald // 1 thread
Is this really the best that Edinburgh can do for the flagship national cycle network route 1 to get it to cross Clerk Street? You have to go through a pile of bins, on to the pavement to get round a barrier and then try and judge it right to cross the road, or use the nearby pedestrian crossing.
Created by Fraser Stephens // 1 thread
RAISED AT PUBLIC MEETING 10-04-2014
The infamous missing link in the Llanfoist-Brynmawr cycle path (route 46) is a huge barrier to its safe use by children as well as those who find the steep section of the diversion route impossible to climb.
Created by timlennon // 1 thread
Initial quietway consultation from Richmond. This is a thread to build RCC's response
Created by Sam Saunders // 1 thread
A northern stretch of Bristol's waymarked "Concorde Way" runs along a quiet residential street, Wordsworth Road. On the newest housing development as Bristol gives way to South Gloucestershire there is a barrier between the end of Wordsworth Road and the start of Eighth Avenue to prevent motor vehicles passing through. There is a raised curb, offset railings and large grey concrete bollards and only a narrow passage either side of one bollard for cyclists to ride through. Tricycles, cargo bikes, or trailers might be to be lifted over the raised curb. In dusk or darkness neither the bollards nor the curb are easy to see. There is a light on the traffic sign offering some help, but a less intimidating arrangements or reflective/high-visibility surfaces could be considered.
Created by Grahame Cooper // 1 thread
Irlams O'th Height roundabout has been the location of a number of collisions involving cyclists (including myself and my daughter last September).
There was a consultation last year over proposals produced by Sustrans for the improvement of this, and I showed my comments (annotations on proposed plans) at a previous GMCC meeting. You can find this annotated document here: https://copy.com/tAIjQdMSxfcsq4fz (large PDF - need to download to see all pages).
A leaflet on the intended imrovements can be found here: http://www.urbanvision.org.uk/wp-content/uploads/2014/08/Cycling-Leaflet.pdf
I am disappointed with this for the following reasons:
- Extensive use of shared footways in the scheme (Salford Council seems to be in love with these, but they are bad).
- Southbound approach on A666 looks impractical & dangerous: a sharp left turn onto the shared footway right at the busy entrance to the roundabout!
- Whilst carriageway widths have been reduced, kerb radii at the mouth of entrances and exits do not seem to have been reduced, so "drivers looking right whilst accelerating left" will still pose a danger for cyclists who do not want to use the shared footways.
- Limited improvements to the subways (tile removal, lighting and resurfacing) will probably not result in an attractive facility for cyclists. Access to this from Bolton Road (northbound) looks awkward.
- There is no undertaking mentioned to ensure that facilities will be maintained and swept.
- I'm still not confident regarding the social safety of the off-road parts, especially in the dark winter months.
Those are my immediate reactions. Could be more to add.
Created by Paul James // 1 thread
The cycleways along the Thames Path and along Ducks Walk are not connected with the south/east side cycleway across Twickenham Bridge and only to the north/west side cycleway via a long detour through Old Deer Park or along The Avenue.
A ramped way down from the bridge would create a useful route for people into and out of Richmond town center that is currently only possible by using two flights of steps.
Martin Lucas-Smith // 11 threads
Major planning application here - c. 10,000 homes
Created by SamGW // 1 thread
The Road between Great Wilbraham and Fulbourn is very well used by Cyclists, runners and walkers throughout the year. It is a single track road with a 60 MPH speed limit. A bicycle path here would encourage more people to cycle to Fulbourn and Cambridge. The path would significantly improve safety for cars, pedestrians and cyclists.
Created by Simon Redding // 2 threads
The railway path from Sheffield down through Staveley & Poolsbrook stops at Arkwright Town. Since an opencast / landfill was south of this point, there is no trace of the former railway line to join to the trails at Sutton Spring Wood. This is an important local link.
Created by Andrew Woodward // 0 threads
Railway footbridge should have a ramp/trough added to make it easier for cyclists to cross the railway. This would then create a quiet north/south route to Marshgate school as an alternative to Manor Road.
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Where the quite good segregated cycle lane joins The Ride, DfT advice was certainly NOT followed. As per DfT advice, when cycle lanes are merged with the carriageway, it should be done via a length of dropped kerb that is flush with the carriageway and the cycle lane shouldn't be joined at a 90 degree angle to the road.
Here, the cycle lane runs parallel to the road for a short distance before it loops around a large boulder specifically placed to force cyclists around and then finally joins the road at a 90 degree angle.
The kerb, though dropped, is far from flush and creates a risk for cyclists joining the track from the road.
This junction between the road and the track should be scrapped and redone according to DfT guidelines.