Cycleway/footway St Albans to Hemel Hempstead
Cycleway/footway alongside A4147 St Albans to Hemel Hempstead
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Angela Dyer // 0 threads
Cycleway/footway alongside A4147 St Albans to Hemel Hempstead
Created by Angela Dyer // 0 threads
Reduce vegetation to improve visibility on Alban Way between Camp Rd and London Rd. This is particularly an issue where footpath from Vanda Way crosses Alban Way
Provide a link from the Alban Way to hatfield road via the Hatfield road cemetry.
STACC member request May 2011
Created by mike1727 // 0 threads
Contraflow cycle lane on Marlborough Road from Victoria Street to London Road.
STACC member request May 2011.
Provides a connection to Sustrans route 6 and London Road cycle route at the Beehive juntion avoiding Lattimore Road and the Lattimore Road/London road junction.
Created by mike1727 // 0 threads
Provide a ramp alongside the steps to access the York Road railway bridge.
STACC member request from May 2011.
Enables a low traffic E/W link paralleling Hatfield road linking Fleetville to the north of the city centre.
Created by mike1727 // 0 threads
STACC member survey in May 2011 asked that this junction should be changed to allow cycles to use the "buses only" turning into St Michaels coming down Bluehouse Hill.
It provides a useful link from Bluehouse Hill into the Verulalium cycle routes.
Created by Sarah Wood // 0 threads
There are several pedestrian refuges along the road particularly at the western end of the road. The refuges cause a pinch point for cyclists. The road marking confuse priorities between those using the on road cycle path and other traffic.
Created by Simon Nuttall // 3 threads
The annual university societies' fair is an opportunity to suggest to the student body the existence of the campaign.
Historically we get few students joining, but it can be a useful networking opportunity.
Created by Paul L // 1 thread
Raising and re-surfacing path that we have been complaing about since forever. Pity it isn't wider, doesn't go all the way to Mortlake Brewery and the White Hart has obstructive seating but still worth celebrating.
Martin Lucas-Smith // 0 threads
The Virgin Gym trade entrance is being used by drivers as a shortcut.
Created by Jim Chisholm // 5 threads
Issues regarding sharing of space on commons in central Cambridge
Created by Jon Warbrick // 1 thread
The link from Barton Road to the Lammas Land car park (and the car park itself) have been closed to all use by the County Council for some development work. This is a buisy cycle route, and no effort has been put into providing a diversion. Currently most people are cycling across the grass behind the hedge beside the road (though how long this will remain possible if it rains is unclear); an alternative is to use other paths across Lammas Land, but they are narrow, not actually marked for cycling, and it's further.
According to a notice at the junction with Barton Road this work will continue to the start of December. There was and is no warning when approaching from east of the river.
Created by Jim Chisholm // 1 thread
Proposals are coming forward for the redevelopment of part of the Cambridge University Pres Site as a single location for Cambridge Assessment. Some public engagement will apparently start in November
Richard G // 1 thread
At a recent BUG-WAG* meeting, the Trust reported that the council will be modifying the Long Road/Adrian way junction.
Those of you that know the area will know that the exit from Addenbrooke's is 'no right turn' with a small shaped island to direct traffic westbound onto Long Rd
plans were shown to create a cutout in the small island for bikes to exit eastbound. Presuamably with signs to indicate this too
The trust said that suggestions to the junction would be welcome in the planning of further changes to Long Rd
Richard
*BUG-WAG - the Bicycle User Group, Walking Action Group of interested parties on the Addenbrooke's campus
Created by mike1727 // 0 threads
Reported in the Herts Advertiser w/s 30/09/13 http://www.hertsad.co.uk/news/secret_plan_for_new_school_on_harpenden_green_belt_1_2818938
"On Monday, the Herts county council’s (HCC) cabinet agreed to press ahead with the compulsory acquisition of up to 15 hectares of farm land on the corner of Common Lane, off Lower Luton Road."
"The acquisition would provide a development site for a new school with a capacity of six to eight forms of entry." <...>
"Cllr Chris Hayward, cabinet member for education, said if a decision is made to build on the site, it would go through a full planning application."
The site is on a busy road but close to route 57. Planning should include at least a good link to route 57 as well as more local routes to the north- and possibly off road route next to Lower Luton road.
Created by alpaca // 0 threads
TFL have a consultation open until 18th October 2013.
https://consultations.tfl.gov.uk/streets/tottenham-hale-20mph
Blog posts:
http://cyclelondoncity.blogspot.co.uk/2013/10/something-has-got-to-change-cycling-is.html
http://rachelaldred.org/writing/where-is-the-space-for-cycling-on-broad-lane/
Created by Jose Ferraro // 0 threads
Coombe Lane West heading towards Raynes Park: There is a long downhill slope which has new potholes appearing frequently which after a long while are filled with blobs of tarmac creating equally dangerous lumps. Grit fallen from HGVs and parked cars narrowing the lane make this a very risky road to cycle along at speed. A cyclist needs to slow down to be prepared to manoeuvre these hazards which puts them into conflict with motorised traffic behind them who wish to pass but lack the room. This is especially true when cycling uphill over the flyover (in either direction).
There is a short piece of cycle lane only at the base of the hill which does not continue over the flyover and leaves slower cyclists to mix in with the much faster flow of motorised traffic.
The result is frequent close passes unless you cycle in a primary position which invites further conflict (tailgating and intimidation) from impatient motorists.
Created by Heather Coleman // 1 thread
Dropped bike off for service at Grand Arcade and walked to get Uni4 bus from outside Pembroke at around 8.30am today. At least four separate lorries stopped on double yellow lines between Little St Mary's Lane and Fitzwilliam Museum, causing traffic chaos. This is really dangerous for cyclists since even if a cyclist has had the courage to get past the obstruction, or has right of way, drivers just don't seem to see them or think they really are only about six inches wide. This also causes massive traffic hold-ups. Congestion (where there is no mandatory or advisory cycle lane) is generally dangerous for cyclists as it tends to lead to "white lining" or squeezing through gaps. This is a busy cycle route. I'm sure Peterhouse have a back entrance for lorries for example.
Why is loading allowed on double yellow lanes on busy cycle and bus routes during the rush hours? OK, I know there's an alleged loading ban on Hills Road which is rarely, or if ever enforced, but at least there is a ban there. I've highlighted that bit of Trumpington St as road users were having to do a slalom there this morning, but this is a Cambridge-wide problem and I'm sure members can also provide evidence of other examples.
I can't quite believe that certain businesses being allowed to hold up the traffic willy-nilly is good for the Cambridge-wide economy in general.
Do we have a position on this? Should the new Police and Crime Commissioner have a position on this? Should Stagecoach (who probably find it causes them a problem, even though they're not our favourite people) have a position on this? Is there a Chamber of Commerce? What do they think about employees who are late for work or deliveries they are expecting being delayed by these sort of hold-ups?
I have lots of photos which will tell me how long I was standing at the bus stop observing these lorries, which I will unload when I have the means.
There is a short section of the Alban Way where it is significantly narrowed as a result of encroachment from the morissons supermarket dite, leaving a width of no more than 1.5m. To the side the land falls away down to the caravan park road. It could be eaily widened with gabbions on the caravan park road side subject to land ownership and approval.
Created by mike1727 // 1 thread
At the back of Morrisons there is a large tree which obstructs the Alban Way, narrowing an already narrow stretch down to approx 750mm at the tree and causing obstructions.
This tree needs removing asap.
Created by mike1727 // 0 threads
The Stonecross/Avenue road junction is to be redesigned. It is rounoured there may be a ban on bikes turning right from Stonecross onto Avenue road, which makes bike journeys W-E using Avenue road difficult. It would be better to redesign the junction to allow bikes through since many people will continue to ride/use the pavement as this is a desire line route.
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Harpenden Leyton Green / Amenbury Lane, changes proposed to benefit walkers and prevent incidents with cyclists and skateboarders. Doug has responded for STACC.
The Aincent Briton junction has been flagged for a redesign, let's get on top of the issue and make sure it is done right.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by MJR // 2 threads
There was a Heritage Lottery Fund stage 1 project hoping to progress to stage 2 and work for 5 years from June 2014 to regenerate the "old town" around the Saturday Market Place. The initial draft contains no cycle measures but does mention cycle access policy, so may be persuaded to reinstate lost public cycle parking in places like opposite the old Post Office and might even be a way to fill in the missing link in National Cycle Network Route 1. The consultation papers are online at http://www.west-norfolk.gov.uk/default.aspx?page=26919 and open until 16 December.
The key cycling problem in this area is the difficulty of accessing Saturday Market Place without passing through the poor junction at its east end and the lack of signs telling cyclists to use Priory Lane to reach SMP.
Martin Lucas-Smith // 11 threads
Major planning application here - c. 10,000 homes
Created by Simon Redding // 2 threads
The railway path from Sheffield down through Staveley & Poolsbrook stops at Arkwright Town. Since an opencast / landfill was south of this point, there is no trace of the former railway line to join to the trails at Sutton Spring Wood. This is an important local link.
Create an off-road route along the railway line out to the east, which could ultimately form a route out to Collin.
A community consultation 'The Barnes Ponder' in October 2013 has show strong support for making Barnes a 20 mph neighbourhood .
“20mph is plenty enough speed on the roads!”
Created by Shaun McDonald // 1 thread
St Peter's Dock on the National Cycle Route 51 just north of Stoke Bridge has a really poor surface which collects water, also the old rails that are no longer used and no longer connect to the rest of the rail network are a hazard for cyclists and ideally should be removed.
Created by Andrew Woodward // 0 threads
Railway footbridge should have a ramp/trough added to make it easier for cyclists to cross the railway. This would then create a quiet north/south route to Marshgate school as an alternative to Manor Road.
Created by Andrew Woodward // 2 threads
Ham Gate Avenue: As you cycle past parked vehicles which narrow the road by almost half you are trapped in a long tunnel. Impatient motorists who want to enter from the other end do so and simply drive at you forcing you practically into the gutter or off the road completely. Would it be ever possible to ban parking on this avenue and limit the speed to 20mph as it is in the park?
Note - there is a shared use segregated track alongside the road here (part of NCN 4) but it is frequently too narrow to cope with the volumes of cyclists and pedestrians; it is overhung with low tree branches and the surface is poor.
Created by Jack Thurston // 1 thread
There are currently around 6 or 8 cages for cycle parking. One bike per cage. While this is great for anyone lucky manages to find an unused cage, often they're all used. Some additional Sheffield type stands required.
Created by Fraser Stephens // 1 thread
RAISED AT PUBLIC MEETING 10-04-2014
The infamous missing link in the Llanfoist-Brynmawr cycle path (route 46) is a huge barrier to its safe use by children as well as those who find the steep section of the diversion route impossible to climb.
Created by Jamie // 1 thread
At the moment it is possible to cycle from Cambridge Road, near Madingley, to Girton, on a bridleway that crosses over the A428 and then passes under the M11 at the Girton Interchange. You can then cross three roads (A1307) and reach a pavement on the North-East side of the Interchange. Using the pavement you can then reach Washpit Lane and cycle up towards Girton. (The pavement is marked as a shared-use route on the OSM Cycle map, although I am not sure that it really is.)
Apart from having to be careful when crossing the A1307 junction it is a rather pleasant route to ride.
The Girton Interchange is being "improved" to reduce the bottleneck for cars. Does anyone know what plans there are to ensure that the current route through remains open and whether there are plans to improve the bridleway route through? Or will this be another example of roads being developed to the detriment of footpaths/bridleways.
Created by Andrea // 3 threads
In Museum Street and Upper Brook Street/Northgate Street it is very dangerous to cycle. Both roads are very narrow, have lots of buses pass through and there are contraflow cycle paths. On those you are very close to the buses (both directions) even if you wait on the pavements to let them through because you are worried about accidents. Can cyclepaths go through Elm Street, Tower Street or Tower Rampart instead?
Created by Fraser Stephens // 1 thread
RAISED AT PUBLIC MEETING 10-04-2014
If a foot/cycle bridge is not going to happen in the medium term, then how about some traffic calming measures to reduce driver's speed expectations over the bridge? Drivers who have just come of a dual carriage way at 70mph+ or have been zooming along the A40 at 60mph+ are suddenly sharing space with cyclists having had little warning that this is about to happen.
We suggest deploying traffic calming measures, such as marked cycle ways, belisha beacon crossings (much needed anyway!) and signage making it clear that care is required. If the speed limit was clearly lower, many drivers will not be so aggressively trying to overtake cyclists.
Created by Matthew Phillips // 1 thread
The route on the east side of the A167 past Crossgate Moor and Framwellgate Moor crosses a number of roundabouts. The cycle-path leads you across the roads very close to the roundabout, via the central refuge in the middle of the road. Some of these roads have two lane entry to the roundabout. Crossing both lanes at once is tricky as you have to have an eye on whether the traffic is about to move out onto the roundabout. If you have a longer vehicle, such as a bus, waiting, then the route to the refuge is blocked. There are no road markings to warn motorists that cyclists might be expected.
The route is probably going to be improved as part of the Great North Cycleway. If these roundabouts are to be made safe enough for children to use, major alterations will be required. (The route goes past Durham Johnston School so should be available to children.) The route should cross further from the mouth of the roundabout, preferably on a different-coloured surface, maybe raised.
Created by Grahame Cooper // 1 thread
Irlams O'th Height roundabout has been the location of a number of collisions involving cyclists (including myself and my daughter last September).
There was a consultation last year over proposals produced by Sustrans for the improvement of this, and I showed my comments (annotations on proposed plans) at a previous GMCC meeting. You can find this annotated document here: https://copy.com/tAIjQdMSxfcsq4fz (large PDF - need to download to see all pages).
A leaflet on the intended imrovements can be found here: http://www.urbanvision.org.uk/wp-content/uploads/2014/08/Cycling-Leaflet.pdf
I am disappointed with this for the following reasons:
- Extensive use of shared footways in the scheme (Salford Council seems to be in love with these, but they are bad).
- Southbound approach on A666 looks impractical & dangerous: a sharp left turn onto the shared footway right at the busy entrance to the roundabout!
- Whilst carriageway widths have been reduced, kerb radii at the mouth of entrances and exits do not seem to have been reduced, so "drivers looking right whilst accelerating left" will still pose a danger for cyclists who do not want to use the shared footways.
- Limited improvements to the subways (tile removal, lighting and resurfacing) will probably not result in an attractive facility for cyclists. Access to this from Bolton Road (northbound) looks awkward.
- There is no undertaking mentioned to ensure that facilities will be maintained and swept.
- I'm still not confident regarding the social safety of the off-road parts, especially in the dark winter months.
Those are my immediate reactions. Could be more to add.
Created by timlennon // 1 thread
Initial quietway consultation from Richmond. This is a thread to build RCC's response
Created by Sam Saunders // 1 thread
A northern stretch of Bristol's waymarked "Concorde Way" runs along a quiet residential street, Wordsworth Road. On the newest housing development as Bristol gives way to South Gloucestershire there is a barrier between the end of Wordsworth Road and the start of Eighth Avenue to prevent motor vehicles passing through. There is a raised curb, offset railings and large grey concrete bollards and only a narrow passage either side of one bollard for cyclists to ride through. Tricycles, cargo bikes, or trailers might be to be lifted over the raised curb. In dusk or darkness neither the bollards nor the curb are easy to see. There is a light on the traffic sign offering some help, but a less intimidating arrangements or reflective/high-visibility surfaces could be considered.
Hamish F // 0 threads
There are no contraflow signs when entering Devonshire Rd from Adermans Hill. Cyclists have reported hostility towards them as they ride "against the flow". The markings are correct as the cyclist enters Devonshire Rd from A105 but of course the drivers do not see that.
Where the quite good segregated cycle lane joins The Ride, DfT advice was certainly NOT followed. As per DfT advice, when cycle lanes are merged with the carriageway, it should be done via a length of dropped kerb that is flush with the carriageway and the cycle lane shouldn't be joined at a 90 degree angle to the road.
Here, the cycle lane runs parallel to the road for a short distance before it loops around a large boulder specifically placed to force cyclists around and then finally joins the road at a 90 degree angle.
The kerb, though dropped, is far from flush and creates a risk for cyclists joining the track from the road.
This junction between the road and the track should be scrapped and redone according to DfT guidelines.
Created by Paul James // 1 thread
The cycleways along the Thames Path and along Ducks Walk are not connected with the south/east side cycleway across Twickenham Bridge and only to the north/west side cycleway via a long detour through Old Deer Park or along The Avenue.
A ramped way down from the bridge would create a useful route for people into and out of Richmond town center that is currently only possible by using two flights of steps.
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by Andrew Woodward // 1 thread
The path linking Bank Lane to Palewell Fields is currently pedestrian only, with gates across it. Opening this up to cyclists would improve permeability and provide a quiet route to Richmond Park Academy school from Roehampton (east-west); and to Ibstock Place school from Sheen (west-east).
Created by SamGW // 1 thread
The Road between Great Wilbraham and Fulbourn is very well used by Cyclists, runners and walkers throughout the year. It is a single track road with a 60 MPH speed limit. A bicycle path here would encourage more people to cycle to Fulbourn and Cambridge. The path would significantly improve safety for cars, pedestrians and cyclists.
Despite the number of bridges that link Newcastle and Gateshead, there is not a single route across the Tyne that throws bike users in to conflict with either high volumes of motor vehicles at high speeds or that uses shared paths that create potential conflict with pedestrians.
Due to the amount of people who already cycle between Newcastle and Gateshead and the potential for this to grow, there should be at least one high level crossing that gives bike users there own space when crossing the Tyne.
Created by Shaun McDonald // 1 thread
It would be much safer to have cyclist priority on the slip roads here as is done in The Netherlands http://www.flickr.com/photos/smsm1/10046288016/ , or even the following example from Britain: http://www.cycling-embassy.org.uk/photos/good-cycling-facility-of-the-week/good-cycling-facility-of-the-week-14th-november-2013-0
The slip roads also need to be narrowed to slow motor vehicle speeds as does the turning radii of the roundabout.