Barriers on shared path
Barriers blocking shared path in Tollgate, Colchester for cyclists, wheelchairs, mobility scooters etc.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Stuart Johnson // 1 thread
Barriers blocking shared path in Tollgate, Colchester for cyclists, wheelchairs, mobility scooters etc.
Created by Steven Moseley // 1 thread
East Suffolk and North Essex NHS Foundation Trust (ESNEFT) are preparing two planning applications for a proposed Elective Orthopaedic Centre and Northern Approach Road access at Colchester Hospital, Turner Road, Colchester. The public is invited to comment on the development proposals in a consultation between 1 March and 12 March 2021.
The detailed elements of the works involved with the Elective Orthopaedic Centre comprise:
The detailed elements of the works involved with the Northern Approach Road access comprise:
The new Northern Approach Road access point is proposed to be located to the south‐western corner of the site, and will create a clearer, more legible and direct access for staff, patients and visitors from the strategic network in line with other local hospitals in Essex, and will provide improved highway safety and environmental benefits to residents residing along Turner Road, as well as encouraging improved sustainable travel behaviours.
More information on the plans can be downloaded here
Your views are very important to help us develop our proposals. Please use the SurveyMonkey comments form here, or alternatively email your response direct to Sam Hazell samhazell@lppartnership.co.uk
The consultation period will run from Monday 1 March 2021 until 5.00pm on Friday 12 March 2021.
Created by Steven Moseley // 1 thread
"When Colchester council approved the plan, in about 2007, it insisted that all private motor traffic enter and leave the estate via an access on to the A134 (Cordelia Drive), near to the A12 but at the farthest point from the town centre. ...
A year ago, the developers, Mersea Homes and Countryside, decided they didn't like this arrangement and applied to scrap the bus gate. They hedged their bets and also asked to move the bus gate into their estate, giving 160 homes access to Mile End Road.
Colchester council rejected the scrapping of the bus gate but granted a temporary access for five years to be covered by a legal agreement.
The developers decided to go to appeal." (blog)
Created by Stuart Johnson // 1 thread
The new shared path that runs parallel to Severalls Lane has obstructive chicane barriers and cyclist dismount signs where the path crosses the drive to Whitehouse Farm.
sound+fury // 1 thread
Created by Stuart Thomas // 1 thread
Barriers restrict access for people of all abilities, e.g. hand cycles, buggies for carers with disabled children, and for this that wish to cycle.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Plans for erection of cycle shelter
93 Regent Street Cambridge CB2 1AW
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00188/FUL:
Erection of a two storey dwelling, with associated amenity space, parking, bin and cycle store following demolition of garage.
Land R/o 207 Cherry Hinton Road, Cambridge, CB1 7DA
Created by Diane // 1 thread
There is a proposal to build 35 new homes on Sandy Lane (described by the developers as 26 'family houses' and 9 'affordable homes').
The project has a website: https://yoursay.online/sandy-lane#about-the-project
At 6pm today (23rd February 2021) there will be webinar about the development (hosted by the developers).
Created by Rosamund Humphrey (Admin Officer) // 0 threads
21/00264/FUL: Erection of two new buildings comprising Class E(g)i/E(g)ii floorspace including ancillary accommodation/ facilities with associated plant and cycle parking for Block F2 and an Aparthotel (Class C1) with multi-storey car park for Network Rail, including car and cycle parking, for Block B2 with associated plant, hard and soft landscaping and permanent access from Devonshire Road to the Cambridge Station Car Park, utilising the existing pedestrian and cycle access, restricted to emergency access to the railway only.
Blocks B2 & F2, Devonshire Quarter, Devonshire Road, Cambridge
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00038/FUL
Erection of new 2 bedroom 1.5 storey dwelling, associated works along with new parking/cycle parking following demolition of existing outbuildings
199-201 Cherry Hinton Road, Cambridge, CB1 7BX
Created by nix // 1 thread
The bike lanes across Marble Arch have long been chaotic and poorly marked. Confusion has been increased by the hurried COVID additions. I have found taking my 14 year old to practice learning to ride on North Carriage Drive scary.
I have heard our Chair despair on the subject before.
Specifically there are no clearly marked lanes on the Marble Arch island, through an area mobbed in Summer with visitors, and with a table tennis table on the intuitive route. But a chance has emerged - see below. Link via Westminster web-site to oxfordst@westminster.gov.uk.
Views are sought to "stakeholderteam@murphycareyjv.co.uk by Friday 19 February
sound+fury // 1 thread
New 2 bedroom house being built close to an existing property.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00027/FUL | Change of use from Class C3(a) to C4 turning a 7bed dwelling to a large no 8bed HMO and 1no 2bed self-contained flat.
1 Hurrell Road Cambridge CB4 3RQ
Created by Jean Dollimore // 1 thread
Camden proposes the following measures:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/05396/FUL
Erection of four commercial mid-tech buildings comprising Use Class E (commercial, business and service) to provide flexible office, research and development and light industrial uses, and Use Class B8 (storage and distribution) limited to a maximum of 20% GEFA; together with car parking, cycle parking, landscaping, substation and associated infrastructure (following demolition of the existing buildings).
Trinity Hall Farm Industrial Estate, Nuffield Road, Cambridge, CB4 1TG
Created by Jean Dollimore // 1 thread
The Camden Square area is bounded by Camden Road, Camden Park Road-York Way, Agar Grove and St Pancras Way. Most of this area already benefits from some road closures made in the 1970s at junctions with Agar Grove (St Augustines Road, St Paul’s Crescent and Stratford Villas) and at junctions with Camden Road (Rochester Square and Cantelowes Road). But Murray Street is still used as a rat-run between Camden Road and Agar Grove.
This consultation focuses on
The rat-run reduction scheme proposes two filters:
The proposals for improving the cycle route are:
Created by Marcus Howarth // 1 thread
The plans involve East/West road with multiple signage for entry/exit of 20/30mph zones plus the Byway cul-de-sac.
Plan (pdf) is embedded on consultation page.
To the North of route shown in blue is existing 20mph
This forms part of the NCN77 route.
Created by Marcus Howarth // 1 thread
The draft document is linked right at the bottom of the consulation page, again here
https://drive.google.com/file/d/15a9o8nCb5R9rs5iPINp8M2zrr3Qm-Axr/view
from 1.3
Everyone benefits from sustainable transport because it means that we are:
• Keeping the air cleaner through alternative travel choices, such as walking, cycling to work, using public transport or using electric vehicles, while improving public health;
• Improving safety for travellers, especially for people with disabilities, children, older residents and other vulnerable road users such as pedestrians and cyclists;
1.13 In July 2019, the London Borough of Sutton declared a climate emergency, and pledged to make the borough carbon neutral. Air quality improvements and carbon reduction are byproducts of, and some of many reasons for, sustainable transport.
from section 4
Cycle mode share is low, 1.1% of all journeys and among the lowest share in London.
5.7 Essentially, more people in Sutton are choosing to use their car for journeys of less than 2km than anywhere else in London.
See Section 6 re. cycling.
6.12 The existing number of cycling trips made each year in Sutton is 7,700, out of a total in outer London of 208,200 trips.
However, there is a potential for 234,900 daily cyclable trips, which would mean that 3% of all borough journeys would be by cycle. This
figure is higher than boroughs of similar size and population such as Harrow, Merton and Richmond upon Thames.
6.13 As with walkable trips, Sutton also has the highest number of potentially cyclable trips per resident that are currently made by a motorised mode of travel22.
Targets include
Appendix F : no mention of cycleways
also saw under Developer checklists:
Cycling
G6g) The Council, landowners, developers, infrastructure providers and funding agencies will work together to implement the place-based projects in the Sutton Public Realm Design Guide Supplementary Planning Document (adopted January 2020).
G6h) The Council, landowners, developers, infrastructure providers and funding agencies will work together to implement the Liveable Neighbourhoods schemes and to bid for and implement future schemes where possible.
Created by Steve Crapper // 1 thread
An obvious link between the very well publicised and used Brierley trail and Skegby Trail is required in this plot of land to enable circular routes to be created
Created by Jean Dollimore // 1 thread
All of the schemes operate timed road closures on Mondays to Fridays e.g. from 8.15am-9.15am and 3pm-4pm in term time.
In all but one of the schemes, it is stated that the restrictions will be enforced using Automatic Number Plate Recognition (ANPR) cameras.
Each scheme would be introduced as a trial for a maximum of 18 months with a further consultation After 12 months.
Exemptions: properties and businesses in the closed section of the affected road, emergency services, bin lorries, blue badge and pupils of the school that have a disability that prevents them from using active travel.
A few nice surprises here, marked with asterisks ***
Brookfield School
A Healthy School Street on Croftdown Road, between the junction with Chester Road and the east side of the junction with St. Albans Road.
And close with planters and bollards the west side of the junction Croftdown Road/ St Albans Road
Consultation on Camden’s website:
https://consultations.wearecamden.org/supporting-communities/healthy-school-streets-brookfield/
Kentish Town Church of England Primary School
A Healthy School Street on Islip Street, from Frideswide Place to the junction with Hammond Street.
*** Create a permanent restriction on Hammond Street by placing planters halfway between Islip Street and Caversham Road.
Temporary widening of footway outside school. Why temporary?
Removal of some guard rails
Consultation on Camden’s website:
https://consultations.wearecamden.org/supporting-communities/healthy-school-streets-kentish-town/
Christopher Hatton Primary School
1. A Healthy School Street On Mount Pleasant, between the junction with Grays Inn Road and the junction with Elm Street.
No mention of the use of ANPR cameras.
*** 2. Make permanent the trial scheme in Laystall Street north of Rosebery Avenue which implemented a mid-point closure and allowed two-way cycling.
Consultation on Camden’s website
Argyle Primary School
A Healthy School Street road on Bidborough Street, Hastings Street and Tonbridge Street.
*** The one-way systems on all three streets would remain in place, with the addition of a contraflow for cycles.
Consultation on Camden’s website
https://consultations.wearecamden.org/supporting-communities/healthy-school-streets-argyle/
St Mary and St Pancras School
A Healthy School Street on Polygon Road between Chalton Street and Werrington Street.
Consultation on Camden’s website:
Ecole Jeanine Manuel
A Healthy School Street on the south side of Bedford Square which is one-way westbound.
from the junction with Bloomsbury Street to Adeline Place
*** Add a contraflow cycle lane to the southern side of Bedford Square
Consultation on Camden’s website:
Created by Jean Dollimore // 1 thread
The proposal is to made a Tiger crossing over Mansfield Road between Estelle Roads and the cut-through to Elaine Grove. This will replace the existing zebra crossing. The following supporting measures are also proposed:
The improvement of this crossing is in preparation for the extension of C6 from Kentish Town via Castle Road, Castelehaven Road and Grafton Road to reach Hampstead Heath at Savernake bridge.
Implement on 18 month ETO,
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Change of use to large HMO (8 bed) including conversion of existing garage to make the 8th bedroom with ensuite.
189 Arbury Road, Cambridge, CB4 2JJ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00182/PRI03O | Prior approval for change of use of offices (Class B1(a) to 3 No. dwellinghouses (Class C3)
175-179 Newmarket Road, Cambridge, CB5 8HA
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by DavidT // 2 threads
The current layout of the pedestrian crossing at the junction of Winchester road and Vermont close forces cyclists out of the cycle lane and into the flow of traffic. This is a risky maneuver and relies on the patience of the car driver behind the cyclist. A possible solution would be to be extend the cycle lane through the chicane, with give way markings so that pedestrians have right of way.
Southampton Cycling Campaign has received many reports of local cyclists having accidents on the cycle path outside the Dominos Pizza outlet at the southern end of The Avenue.
A recent incident was reported in the Southampton Echo, http://www.dailyecho.co.uk/news/10475081.Cyclist_hurt_in_road_crash/
Created by PeterMac // 1 thread
Redesign of Grey Street to remove the danger of cars reversing (blind) out parking bays into middle of the road.
We have a tandem which fits in all the spaces on trains in Scotland (as far as I know), but we are prohibited from taking it on any except the East Coast line trains. I've been writing to various officials - elected and otherwise - and contributed to the recent review of the Scotrail franchise, but am not getting much joy. No one seems to think it is a big deal. But, for my family, with 2 kids aged 5 and 1, and no car, if we don't go by tandem and train, we can't go anywhere much. The tandem is not a luxury but a practical transport solution. Does anyone else want to join in and make this more than a one-woman issue?
(another related issue: even once the kids can ride their own bikes, we won't be able to use trains much since most only allow 2 reservations).
Created by Alex Oldman // 1 thread
Disused railway tracks on St Peters Dock provide short section of road surface that is dangerous to traverse from East to West by bike.
If you are avoiding crossing the tracks then you are forced into oncoming traffic.
If you cross the tracks, you are then potentially trapped between parked cars and the railway tracks, which can be dangerous.
The tracks are very slippery when wet or icy, and sections are often hidden underwater because there is poor drainage after heavy rain.
Ideally the tracks are totally removed, or the surface covered with concrete or tarmac.
Created by Shaun McDonald // 1 thread
There is a loading bay in the cycle contraflow cycle lane, which means that the cycle lane is blocked for cyclists as soon as a vehicle is parked there. This means that cyclists have to pull out into the path of oncoming buses, thus making the NCN route unsuitable to young children or inexperienced cyclists.
Created by Andrea Casalotti // 1 thread
Here is an ambitious plan for a Bicycle Boulevard from Shoreditch to Fitzrovia, along Old Street, Clerkenwell Road and Theobalds Road, open only to bicycles, buses and motor traffic for local access only.
a. It is now the most cycled route in London, showing that it is the desired EW route.
b. It is of variable width, therefore trying to accommodate bikes, buses, and through traffic in a consistent and safe way is impossible. In other words, a compromise will be a botch job.
c. There will not be mixing of buses and bicycles: bicycles will have a dedicated two way cycle lane on the South side of the street.
d. The Boulevard stops being a mega- EW-rat-run. Motor traffic will have to use Pentonville/City Road.
More details here: https://docs.google.com/presentation/d/1yw9mkHhGZaVBKYJs6FxyhC1Z4nNYVl-IFH-aR1ScK9U/pub?start=false#slide=id.p
Created by Gregory Williams // 1 thread
The A2 is a hostile environment for cycling. Cyclists should be directed away from using the A2 towards existing safe alternatives (e.g. RCR16) and the current A2 cycle signs should be removed.
Surface, drainage and width issues.
Planned for upgrade as part of CEC 'family network'
No details/dates.
Was an issue 5 years ago (and before)
Martin Lucas-Smith // 27 threads
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
Created by Rohan Wilson // 1 thread
I've visited Riverside to Waterbeach with William Rayner of county cycling team. He's revising signage here and providing it along the St Ives corridor, with the old NCN 51 being renamed Regional Route 24 (blue patch). We've decided finally to continue to sign NCN 11 from Riverside Bridge to Waterbeach Station, and he's looking at suitable (hopefully temporary) wording to advise to follow NCN 51 to Bottisham for destinations beyond Waterbeach, which will hopefully eliminate misrouting those from outside the area.
Our inspection of existing signs showed that only one new signboard was provided on completion 5 years ago of Riverside Bridge. Signboards still send people via Green Dragon. Sustrans considers signage is an important part of any route project.
The intention is to sign Milton Country Park as a destination, not as part of the route, removing route signs within the park, and probably retaining Coles Road as the signed route through the village, though it would be much preferable to have improvements past the shops and the village green, pubs etc.
Retaining the route to Waterbeach as NCN will help keep the gap in people's awareness.
I am planning to contact again the landowner of the missing link between Bottisham Lock and Fen Road, Lode with a suggestion for a low-level route, southeast side of the Bottisham Lode floodbank which is the route of the public footpath, where signs forbid cycling. It might be considered more visually acceptable. All parish councils are for the route, including the one of which he is a member.
Created by Andy Allan // 1 thread
Garratt Lane at Earlsfield station sucks massively for cyclists, and is a jarring interruption to the Wandle Trail (Sustrans route 20). It would be great to extend the riverside path underneath the railway to avoid this dangerous stretch of road.
Created by DavidTheScientist // 1 thread
While some painted "cycle lane" does exist northbound, there is woefully little provision for cyclists considering the huge number that use this section of road each day, a large number of whom are those who work at the General Hospital and other nearby health centres. Southbound cyclists have no real provision of space at all, save a graduated stopline, where cars turning right often try to pass right-turning cycles on the inside. Dale road itself is extremely narrow by winchester road, with almost no pavement space for pedestrians.
Cyclists heading northbound on Winchester road must beat traffic off the line at Dale road to get to the painted centre of Winchester road. North of the traffic light at The Range, the cycle lane is almost non-existent, placing cyclists between 2 lanes of heavy traffic, and cyclists have to stop and wait in this dangerous area in order to turn right onto Wilton road. Furthermore, the road surface, especially at this part of Winchester road, is currently deplorable.
Created by londoncycler // 1 thread
Six inch high ridge near left side of north bound lane on the south side of the bridge forces cyclists too close to the kerb or into the path of motor vehicles. Issue reported via CTC pothole reporting site. Resurfacing required.
Created by Kevin Ablitt // 1 thread
Motorised vehicles currently use the rat run through Milner Street to avoid the fraffic lights at Grove Lane/ St Helens St.
This is part of NCN 41 , any extra traffic passing through here detracts from the cycling experience and is negative for residents.
Cyclist comments are needed now !
Created by Chris Neston // 2 threads
The cycle path crosses the soutbound exit from the M53 at Cheshire Oaks. The exit is light controlled for traffic as they enter the roundabout. This provides a safe time for cyclists to ride across the sliproad. However the lights are not visible to cyclist on the path and there is no light provided to advise cyclists when they can cross.
This makes it very difficult and dangerous for cyclists to know when they can safely cross. This would require no physical change to the road layout simply a new light to show cyclists when to cross.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Martin Lucas-Smith // 1 thread
The permeability gate between Hooper Street and Kingston Street is obstructive as it only allows passage in one direction at a time.
Given the ever-increasing amount of cycling in areas like this, it's time to get this replaced with a simple bollard arrangement that would allow two-way passage whilst still enable the emergency services to unlock for access in an emergency.
Created by David Green // 1 thread
My employer is planning to relocate from central cambridge to the Cambridge Business Park (near Waterbeach). There is currently no decent cycle (or footpath!) access to this business park which avoids riding along the A10. I am a confident cyclist but I am not looking forward to riding to work along sections of the A10.
Are there any plans for cycle route construction which the campaign can, perhaps, help accelerate?
Created by Simon Nuttall // 16 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Created by Eric Booth // 2 threads
Prince St bridge is an anarchic pigs ear. I like pigs and fond of a bit of anarchy but it's getting beyond a joke. Of course it will all be sorted out properly in due course but we could live with this for years. Here's a quick fix:
SOUTH
1. Move south vehicle stop line back 10m behind tramlines
2. Remove all bollards unless one or two kept in line with centre of bridge with arrows right for cars
3. Widen cycle lane from bridge to Festival way turn so suitable for 2-way cycling.
4. Put in Give Way painted line at an angle running from enlarged cycle lane to centre line so southbound cyclists alerted to need to filter across traffic.
NORTH
1. Remove all bollards
2. Widen cycle lane for 2 way cycling all the way up to the traffic lights with The Grove.
3. Remove 5 bollards on each side of north bound traffic light along with the two set back
4. Paint cycle lane passing behind light and then back onto carriageway making it nice and clear that it's an option for cyclists when lights red or they can carry on (as most will, no worse than now but at least it will be clear that they can treat these as 'give way')
5. There will need to be 'give way' paint to make clear that pedestrians have right of way on the by-pass.
Yes it's muddled but less so than now and makes the desire lines easier. It's also a cheap paint based fix pending the proper job.
Created by WildNorthlands // 1 thread
Brook Hill roundabout is a major barrier for cyclists in West Sheffield. The traffic is fast and as it is a three-lane spiral roundabout with the exit roads (except Bolsover St) having two lanes there is a lot of lane-switching by motorists. This makes the risk of a collision very high, and for less experienced cyclists it is simply a no-go area.
Many of the buildings adjacent to the roundabout belong to the University, and have been built up to the curtilage, so there is no space to expand the pavements and make them shared use.
One alternative for cyclists coming from the Walkley/Crookes area via Bolsover St is to use Tower Court, but this area can be very congested when the University is in session, with several thousand students using the Arts Tower and Library.
The council has signed an alternative route via Weston St and the Netherthorpe Rd tram subway, but this involves a drop in height of about 100 metres and subsequent climb up again, plus the negotiation of access barriers in the subway, so is not really sensible.
Meanwhile on Upper Hanover Way, a cycle crossing was severed when the tramway was installed, although cyclists still use the crossing. A proposed alternative crossing is stalled as it is too expensive.
What can be done about this knotty problem?
Created by Rosie Downes // 5 threads
Transport for London's public consultation on Cycle Superhighway 1 is open from 16 February to 29 March. The LCC office has set up this thread to facilitate discussion of the proposals.
Created by HVS // 2 threads
The A41 ring road cuts across a useful quiet route north-west out of Chester, which is an alternative to the traffic-free Greenway (which is unlit, and slippery in icy conditions). Crossing the A41 during busy periods - e.g. when commuting at rush-hour - can be a slow and potentially very dangerous process, especially after dark. A better crossing for cyclists and pedestrians, or a lower speed limit on the A41 (or both), would be very helpful here.
[Original version of map was wrong; I've now updated it.]
Created by David Wilcox // 3 threads
Proposal
To investigate options to provide a safe, continuous route from St James Barton Roundabout to the top of Park Street.
Rationale
Marlborough Street/Upper Maudlin Street/Perry Road/Park Row (known as the Scope Route) is the most desirable route for cyclists from the east of the city to the University, the Triangle, Clifton etc but is heavily trafficked with little cycle provision.
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF proposals.