Cambridge Cycling City
This group is closed and will be removed.
This group doesn't have any public threads
-
24/00922/FUL Erection of seven dwellings, with access, car and cycle parking
Erection of seven residential dwellings along with access, car and cycle parking, landscaping and associated infrastructure works following demolition of existing buildings.
195 Perne Road Cambridge Cambridgeshire CB1 3NT
Cambridge
Application reference : 24/00922/FUL
-
Sidgwick Avenue: General condition and future
Poor surfacing of the road with potholes, cracks and very limited space for pedestrians
-
Milton Road Residents Parking
Cambridgeshire County Council is publishing this proposal on 18th March 2024.
-
Darwin Green trees
The cycle lanes on this road have trees growing over them with many branches at eye height (as demonstrated by my glamorous assistant).
-
23/04289/FUL Construction of new science park building
Demolition of existing buildings and structures, and erection of building (Class E(g)i/ii) with associated access, site infrastructure, landscaping and car and cycle parking provision.
Brookmount Court Kirkwood Road Cambridge Cambridgeshire CB4 2QH
Cambridge
Application reference : 23/04289/FUL
-
Fen Ditton village cycle path resurfaced with very uneven finnish .
Very uneven surface on cycle path between Fen Ditton village and Horningsea .
-
24/00384/FUL Change of layout to existing customer car park.
Change of layout to existing customer car park.
Land At Cambridge Retail Park Newmarket Road Cambridge Cambridgeshire CB5 8WR
Cambridge
Application reference : 24/00384/FUL
-
22/04976/CONDB (Cycle parking)
Submission of details required by condition 10 ( hard and soft landscape works) and 11 (Cycle parking) of planning permission 22/04976/FUL
26 Barton Road Cambridge Cambridgeshire CB3 9JZ
Cambridge
Application reference : 22/04976/CONDB
-
23/03273/FUL and 23/03273/COND7 east of NMR P&R
Don't know why we didn't see 23/03273/FUL (decided, with conditions) but there is now 23/03273/COND7 re staff cycle parking to consider.
Full:
Cond7:
-
Corduroy paving used instead of textured
The new shared-use path here is lovely except they've installed corduroy paving, with the very narrow bumps, on the newest stretch, to indicate the cycling and pedestrian halves, instead of the usual fat textured paving. Last week in the bad weather it caught my wheel and I skidded on it, only just avoided coming off completely. I couldn't get a photo because it was after dark, but you know the paving I mean. It's not suitable for cycle paths under any circumstances and I don't know why they've used it here. The section they installed previously, along Gregory Park up to the back entrance of the P&R, has the correct paving.